ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
PIA For the Demilander Feedlot Development Palaeontological Impact Assessment for the proposed Feedlot on Farm Demilander 273 between Marquard and Winburg, Free State Province PIA Desktop 18/09/2022 Marion Bamford Prof Marion Bamford SPOOR Environmental Services (PTY) Ltd. 20/09/2022 - 07:55
Springhaas Line 7 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 9 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 15:58
Springhaas Line 7 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 9 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 15:27
Springhaas Line 6 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 8 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 15:20
Springhaas Line 6 Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 8 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 15:12
Springhaas Line 5 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 6 to Springhaas Collector Substation B, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 14:48
Springhaas Line 5 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 6 To Collector Substation B Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 14:44
Springhaas Line 4 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 5 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 14:05
Springhaas Line 4 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 5 To Collector Substation A within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 14:00
Desktop HIA Proposed Seaton Equestrian Estate DESKTOP HERITAGE IMPACT ASSESSMENT OF THE PROPOSED SEATON EQUISTRIAN ESTATE, ILEMBE MUNICIPALITY, KZN HIA Phase 1 23/08/2019 Active Heritage CC EnviroPro 19/09/2022 - 13:28
Springhaas Line 3 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 4 to Springhaas Collector Substation A, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:26
Springhaas Line 3 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 4 to Collector Substation A within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:23
Springhaas Line 2 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 3 to Springhaas Collector Substation B, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:10
Springhaas Line 2 Heritage Impact Assessment: Proposed Powerline Line 2 from Springhaas Solar Facility 3 to Collector Substation B within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 13:07
Springhaas Line 1 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Overhead Lines up to 275kV in Capacity from Springhaas Solar Facility 1 to Springhaas Collector Substation B, Near Dealesville, Bloemfontein, Free State PIA Desktop 07/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:50
Springhaas Line 1 Heritage Impact Assessment Heritage Impact Assessment: Proposed Powerlines from Springhaas Solar Facility 1 to Collector Substation B within the proposed Springhaas Grid Corridor near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:40
Springhaas LiLo 2 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed LiLo Connection from Springhaas Collector Substation B to the Beta/ Delphi 400kV Overhead Line, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:29
Springhaas LiLo 2 Heritage Impact Assessment Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation B to the Beta/Delphi 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:24
Springhaas LiLo 1 Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed LiLo Connection from Springhaas Collector Substation A to the Beta/ Hydra 400kV Overhead Line, Near Dealesville, Bloemfontein, Free State PIA Desktop 25/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:16
Springhaas LiLo 1 Heritage Impact Assessment Heritage Impact Assessment: Proposed LiLo Connection from Springhaas Collector Substation A to the Beta/Hydra 400kV OHL within the proposed Springhaas grid connection near Dealesville in the Free State Province Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 12:11
Springhaas Collector Substation B Palaeontological Impact Assessment Springhaas Collector Substation B Palaeontological Impact Assessment PIA Desktop 07/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 10:27
Springhaas Collector Substation B Heritage Impact Assessment Springhaas Collector Substation B Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 10:22
NETCARE ST AUGUSTINES HOSPITAL DURBAN Netcare St Augustines Hospital Durban ADDITIONS & ALTERATIONS TO THEATRE COMPLEX & ROOF TOP PLANT ROOM 19/09/2022 Wayne Allen 19/09/2022 - 09:32
Springhaas Collector Substation B Palaeontological Impact Assessment Springhaas Collector Substation B Palaeontological Impact Assessment PIA Desktop 07/07/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 09:27
Springhaas Collector Substation B Heritage Impact Assessment Springhaas Collector Substation B Heritage Impact Assessment PIA Desktop 07/06/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 09:24
Springhaas Collector Substation B Heritage Impact Assessment Springhaas Collector Substation B Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 20/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 09:21
Springhaas Collector Substation A Palaeontological Impact Assessment PIA Desktop 07/06/2022 Marion Bamford Prof Marion Bamford ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 09:03
Springhaas Collector Substation A Heritage Impact Assessment Heritage Impact Assessment for the proposed construction and operation of Springhaas Collector Substation A Heritage Impact Assessment Specialist Reports 11/06/2022 Jayson Orton ASHA Consulting(Pty) Ltd ABO Wind Renewable Energies (Pty) Ltd 19/09/2022 - 08:59
Klipkraal WEF 3 Heritage Report PROPOSED CONTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 3, NEAR FRASERBURG, NORTHERN CPE PROVINCE, SOUTH AFRICA. Heritage Impact Assessment Specialist Reports 19/08/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 16/09/2022 - 16:57
Klipkraal WEF 2 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 2, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 19/08/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 16/09/2022 - 16:42
Klipkraal WEF 1 Heritge Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL WIND ENERGY FACILITY 1, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Impact Assessment Specialist Reports 16/09/2022 Wouter Fourie PGS Heritage (Pty) Ltd SiVEST SA (Pty) Ltd 16/09/2022 - 16:32
HIA Lion Pride Extension, Gauteng Province Heritage Impact Assessment for the proposed Lion Pride Extension, on Portion 162, Remainder of Portion 23 and Remainder Of Portion 196 Of The Farm Nooitgedacht 534-Jq, Mogale City Local Municipality, Gauteng Province HIA Phase 1 Jaco van der Walt Beyond Heritage Isquare Environmental Planning and GIS 16/09/2022 - 09:24
Palaeontological Impact Assessment - 132kV Emoyeni Grid Connection Infrastructure PALAEONTOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED POWERLINE AND GRID CONNECTION ASSOCIATED WITH THE AUTHORISED UMSINDE EMOYENI AND KHANGELA EMOYENI WIND ENERGY FACILITIES IN THE NORTHERN AND WESTERN CAPE PROVINCES Heritage Impact Assessment Specialist Reports 13/05/2022 Elize Butler PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 16/09/2022 - 08:09
Heritage Impact Assessment - Proposed132kV Emoyeni Grid Infrastructure HERITAGE IMPACT ASSESSMENT - THE PROPOSED 132kV POWERLINE ASSOCIATED WITH THE EMOYENI WIND ENERGY FACILITIES AND ASSOCIATED INFRASTRUCTURE, NEAR MURRAYSBURG, WESTERN AND NORTHERN CAPE PROVINCES. Heritage Impact Assessment Specialist Reports 01/09/2022 Nikki Mann PGS Heritage (Pty) Ltd Nala Environmental (Pty) Ltd 16/09/2022 - 08:05
Heritage Impact Assessment for the proposed installation of a of Dual Flue Gas Conditioning Plant at Tutuka Power Station Heritage Impact Assessment (including a Palaeontological Assessment) in Terms of Section 38(8) of the National Heritage Resources Act (No 25 of 1999) for the Proposed Installation of Dual Flue Gas Conditioning Plant at Tutuka Power Station near Standerton, Mpumalanga Province HIA Phase 1 14/08/2022 Edward Matenga (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd 15/09/2022 - 17:54
Development of additional areas for agriculture on the farm Krokodilspruit 248JT Phase 1 AIA//HIA for an additional 76ha for agricultural development (orchards) on the farm Krokodilspruit 248JT, White River area, Mpumalanga Province AIA Phase 1 15/09/2022 Christine Van Wyk Rowe Adansonia Heritage Consultants Rhengu Environmental Services 15/09/2022 - 05:36
D6 Phase 4 Social History Socio-Hestorical Study Parcel P / Stage 4 District Six Intangible Heritage Report 20/06/2022 Tracey Randle Delta Built Environment Consultants (Pty) Ltd 14/09/2022 - 14:31
D6 Phase 4 VIA District Six Phased Redevelopment Redevelopment of Erf 177646 (Phase 4) as Part of Restitution Process, District Six, Cape Town: Visual Statement Visual Impact Assessment 01/08/2022 Amy Feng Square One Delta Built Environment Consultants (Pty) Ltd 14/09/2022 - 14:28
Final D6 Phase 4 AIA District Six Phased Redevelopment Archaeological Impact Assessment Submitted in Terms of Section 38(4) of the NHRA (1999): Redevelopment of Erf 177646 As Part of Restitution Process, District Six, Cape Town AIA Phase 1 08/08/2022 Katie Smuts Rennie Scurr Adendorff Delta Built Environment Consultants (Pty) Ltd 14/09/2022 - 14:24
Final D6 Phase 4 HIA District Six Phased Redevelopment Heritage Impact Assessment submitted in terms of Section 38(4) of the NHRA (1999): Redevelopment of Erf 177646 as part of Restitution Process, District Six, Cape Town HIA Phase 1 14/09/2022 Katie Smuts, Mike Scurr, Tracey Randle, Amy Feng Rennie Scurr Adendorff Delta Built Environment Consultants (Pty) Ltd 14/09/2022 - 14:19
Updated Heritage Scoping Report September 2022 for P3 Coniston 699MS Heritage Scoping 01/09/2022 Liesl Stegmann AGES (PTY) Ltd - Limpopo 14/09/2022 - 14:16
Updated Heritage Scoping Report September 2022 for P3 Coniston 699MS September 2022 updated report Heritage Scoping Report for P3 Coniston 699MS Heritage Scoping 01/09/2022 14/09/2022 - 13:28
Creighton BWSS Creighton Bulk Water Supply Scheme, Harry Gwala District Municipality, KwaZulu-Natal HIA Phase 1 20/06/2022 Jean Beater JLB Consulting Gedezar Consulting 14/09/2022 - 11:23
Queens warehouse Application for Extension of time to 19-348L 13/09/2022 Nadarajan Aubrey Nagan KwaZulu-Natal Amafa and Research Institute Transnet National Ports Authority - Durban 13/09/2022 - 14:53
HERITAGE IMPACT ASESSMENT FOR THE PROPOSED A RADIO MAST, 132KV POWERLINE AND 400KV LOOP IN LOOP OUT (LILO) POWERLINE LOCATED NEAR DEALESVILLE IN THE TOKOLOGO LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT IN THE FREE STATE PROVINCE – ADDENDUM TO HERITAGE IMP PROPOSED CONSTRUCTION AND OPERATION OF A RADIO MAST, 132KV POWERLINE AND 400KV LOOP IN LOOP OUT (LILO) POWERLINE LOCATED NEAR DEALESVILLE IN THE TOKOLOGO LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT IN THE FREE STATE PROVINCE – ADDENDUM TO HERITAGE IMPACT ASSESSMENT. Heritage Impact Assessment Specialist Reports 17/07/2022 Jayson Orton, Elize Butler ASHA Consulting(Pty) Ltd, Banzai Environmental (Pty) Ltd SLR Consulting (South Africa) (Pty) Ltd 12/09/2022 - 17:20
Phase 1 HIA Report A REPORT ON A PHASE 1 ARCHAEOLOGICAL & HERITAGE IMPACT ASSESSMENT RELATED TO THE DEVELOPMENT OF A 400 MW SOLAR PHOTOVOLTAIC (PV) FACILITY AND ASSOCIATED (PHASE 3) ON THE REMAINDER OF FARM GOEDE HOOP 26C, PORTION 3 OF FARM GOEDE HOOP 26C AND OTHER PROPERTIES, BETWEEN DE AAR & HANOVER, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE, SOUTH AFRICA HIA Phase 1 01/08/2022 Anton Pelser 12/09/2022 - 16:06
SITE SENSITIVITY VERIFICATION REPORT SITE SENSITIVITY VERIFICATION REPORT (IN TERMS OF PART A OF THE ASSESSMENT PROTOCOLS PUBLISHED IN GN 320 ON 20 MARCH 2020). PROPOSED DEVELOPMENT OF A 400 MW SOLAR PHOTOVOLTAIC FACILITY ON THE REMAINDER OF FARM GOEDE HOOP 26C AND PORTION 3 OF FARM GOEDEHOOP 26C, BETWEEN DE AAR & HANOVER, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE, SOUTH AFRICA Palaeontological Specialist Reports 31/05/2022 John E Almond 12/09/2022 - 16:01
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Mafatiki and Kapalpha Solutions Mining Permits on Portions of Portion 12 & 13 of the Farm Aangewys 81 IS, Kriel, Mpumalanga AIA Phase 1 07/09/2022 12/09/2022 - 13:46
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Mafatiki and Kapalpha Solutions Mining Permits on Portions of Portion 12 & 13 of the Farm Aangewys 81 IS, Kriel, Mpumalanga AIA Phase 1 07/09/2022 Tobias Coetzee 12/09/2022 - 13:44
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Mafatiki and Kapalpha Solutions Mining Permits on Portions of Portion 12 & 13 of the Farm Aangewys 81 IS, Kriel, Mpumalanga AIA Phase 1 07/09/2022 Tobias Coetzee 12/09/2022 - 13:33