THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 3851 - 3900 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
UCD6170 - NID | Notification of Intent to Develop - Proposed Dalyshope Coal Mining Project, situated in the Magisterial District of Lephalale, Limpopo Province | Heritage Impact Assessment Specialist Reports | 02/03/2021 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Anglo Operations Proprietary Limited | 02/03/2021 - 20:06 |
COP6679 - NID | Notification of Intent to Develop - Environmental Authorisation Process for the Expansion of the Copper Sunset Mining Right Area | Heritage Impact Assessment Specialist Reports | 02/03/2021 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Copper Sunset Sand (Pty) Ltd | 02/03/2021 - 19:49 |
Cape Fortifications | Cape Fortifications - Western Cape | Heritage Study | 29/10/1991 | Joanna Marx | 02/03/2021 - 12:38 | ||
Paarl survey | Survey of Main Street, Paarl | Heritage Study | 01/01/1985 | National Monuments Council | 02/03/2021 - 12:33 | ||
Tiara AIA | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For the Proposed Tiara Mining Project on the demarcated portions of the Remaining Extents of the Farms B.V.B Ranch 776 LT, Josephine 749 LT and the Farm Granville 767 LT, Phalaborwa, Limpopo | AIA Phase 1 | 30/11/2020 | Tobias Coetzee | 02/03/2021 - 11:11 | ||
Survey of Buildings in Colesberg | An Annotated Survey of Conservation-Worthy Buildings in Colesberg | Heritage Study | 01/01/1991 | National Monuments Council (Northern Cape) | 02/03/2021 - 10:22 | ||
Prince Albert Conservation Survey - (Part 2) | Prince Albert Conservation Survey - Block Diagram (Part 2) | Heritage Study | 02/03/2021 - 09:30 | ||||
Prince Albert Conservation Survey Part 1 | Prince Albert Conservation Survey - Block Diagram (Part 1) | Heritage Study | 02/03/2021 - 09:28 | ||||
THT370579122 - TSHILISANANI INNOCENT MUZILA | THT370579122 - TSHILISANANI INNOCENT MUZILA -PIA Desktop Study | PIA Desktop | 02/02/2021 | 01/03/2021 - 23:37 | |||
Skeerhok | Heritage Impact Assessment Specialist Reports | 01/03/2021 - 14:53 | |||||
Skeerhok | 01/03/2021 - 12:44 | ||||||
SAHRIS CaseID 15421 - Letter | SAHRIS CaseID 15421 - Letter | 01/03/2021 | Karen Van Ryneveld | 01/03/2021 - 12:07 | |||
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT | PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR SECTION 102 PORTION 61 AND 62 OF THE FARM CYFERFONTEIN 457 KR, MODIMOLLE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 10/10/2019 | Udo Kusel | African Heritage Consultants CC | 01/03/2021 - 10:38 | |
Palaeontological Impact Assessment: Phase 1: Field Study | Environmental Impact Assessment Report and Environmental Management Programme Report for Listed Activities Associated with a Mining Right Amendment on Portion 61 & 62 of the Farm Cyferfontein 457-KR | PIA Phase 1 | 06/09/2020 | Heidi Fourie | Ditsong Museums of South Africa | Ditsong Museums of South Africa | 01/03/2021 - 08:47 |
desktop martime underwater survey | Maritime Heritage underwater survey | AIA Desktop | 08/12/2020 | Vanessa Maitland | ACRM | 26/02/2021 - 14:35 | |
PHASE 1 HERITAGE IMPACT ASSESSMENT | A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE DEVELOPMENT OF THE GOEDEHOOP 300MW SOLAR PV FACILITY LOCATED ON SEVERAL PORTIONS OF FARMS IN THE HANOVER DISTRICT, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE. | HIA Phase 1 | 25/02/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 25/02/2021 - 16:16 | |
PALAEONTOLOGICAL HERITAGE REPORT: COMBINED DESKTOP & FIELD-BASED ASSESSMENT (REV 1) | PROPOSED SOVENTIX SOLAR PV PROJECT ON VARIOUS FARMS NEAR HANOVER, ENTHANJENI MUNICIPALITY, PIXLEY KA SEME DISTRICT, NORTHERN CAPE. | PIA Desktop | 25/02/2021 | John E Almond | Natura Viva CC | 25/02/2021 - 15:55 | |
Declaration | Declaration of the Sibhudu Cave; Kwadukuza Municipality, KwaZulu-Natal as a National Heritage Site | Significance Report | 18/12/2020 | National Government of South Africa | 25/02/2021 - 14:57 | ||
Duho Mining (Pty) Ltd- NC 12457 | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING SITUATED ON THE FARMS ANNEX GAMODISA NO. 707 AND VOSTERS HOOP NO. 706, IN THE MAGISTERIAL DISTRICT OF KURUMAN, NORTHERN CAPE | 25/02/2021 - 11:58 | |||||
HIA of Dalpark x 18 | Heritage Impact Assessment Report for the Proposed Dalpark x 18 on Portion 461 of Witpoortje 117 IR | Stephan Gaigher | 25/02/2021 - 11:48 | ||||
Paleontological Report | Desktop Study Paleontology Report | PIA Desktop | 24/02/2021 | Eric Ndivhuho Mathoho | Millenium Heritage Group (Pty) Ltd | Tholoana Sustainable Development and Environmental Consultants | 25/02/2021 - 11:16 |
Imvubu Berries desktop PIA | Palaeontological Impact Assessment for the proposed three dam project on Portions 6 and 8, Elandsbosch 122 KR, Naboomspruit for Imvubu Berries, Limpopo Province | PIA Desktop | 20/02/2021 | Prof Marion Bamford | Prof Marion Bamford | Setala Environmental | 24/02/2021 - 10:59 |
Archaeological Impact Assessment | PHASE1: ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED HENNOPS WEDDING AND CONFERENCE CENTRE ON PORTION 200 OF THE FARM HENNOPS RIVIER NO 489 JQ, HENNOPS RIVER, CITY OF TSHWANE, GAUTENG PROVINCE, SOUTH AFRICA | Archaeological Specialist Reports | 02/08/2019 | Mathoho Ndivhuho Eric | Millennium Heritage Group (PTY) LTD | 24/02/2021 - 03:41 | |
HIA | PHASE 1 HIA FOR PROSPECTING RIGHT APPLICATION FOR PROPOSED DEVELOPMENT OF SAMARA OPENCAST ALLUVIAL DIAMOND MINE AND ASSOCIATED INFRASTRUCTURE, NORTHERN CAPE PROVINCE. | HIA Phase 1 | 07/08/2020 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD | 23/02/2021 - 20:29 |
PROPOSED UPGRADING OF AMAOTI No. 3 SECONDARY SCHOOL, BROOKDALE, PHOENIX, KWAZULU-NATAL | Heritage Impact Assessment | HIA Phase 1 | 28/01/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | NCC Environmental Services (Pty) Ltd | 23/02/2021 - 14:03 |
HIA KOLOMELA AIRFIELD | PHASE 1 HIA IN SUPPORT OF THE EIA FOR THE KOLOMELA AIRFIELD | HIA Phase 1 | 21/08/2020 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | EXM Advisory Services (Pty) Ltd | 23/02/2021 - 13:44 |
PIA KOLOMELA AIRFIELD | PHASE 1 PIA COMPLETED IN SUPPORT OF EIA FOR THE DEVELOPMENT OF THE KOLOMELA AIRFIELD | PIA Phase 1 | 20/08/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | EXM Advisory Services (Pty) Ltd | 23/02/2021 - 13:40 |
Trust Feeds WR | TRUSTFEED WATER RETICULATION PHASE 1, UMSHWATHI MUNICIPALITY, KZN | HIA Phase 1 | 20/02/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Sukuma Consulting Engineers | 23/02/2021 - 12:32 |
Heritage Assessment | HERITAGE IMPACT ASSESSMENT: PROPOSED GAS TO POWER FACILITY ON FARM 1238 (ERF 16001), FARM 1237 (ERF 16000), RE PORTION 2 OF YZERVARKENSRUG 129 AND PORTION 65 (A PORTION OF PORTION 13) OF YZERVARKENSRUG 127, SALDANHA, WESTERN CAPE | 23/02/2021 - 10:25 | |||||
Paleontological Report | Paleontological Impact Assessment Report | PIA Phase 1 | 30/06/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | Tholoana Sustainable Development and Environmental Consultants | 23/02/2021 - 09:09 |
Heritage Impact Statement Mulilo De Aar EA Amendment | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 22:12 |
Heritage Impact Statement Badenhorst PV3 EA Amendment | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 21:55 |
Motivational Report for EA Amendment Badenhorst Dam Solar PV3 Generator | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 21:52 |
EA Amendment Application Mulilo De Aar PF : 9.9MW Generator | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 21:35 |
Badenhorst Dam Solar PV3: 9.99MW Auxiliary Generator | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 18:58 |
Heritage Impact Statement (C6- Heritage) | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 18:49 |
EA Amendment Application Badenhorst Solar PV3 : 9.9MW Generator | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 18:28 |
Motivational Report for EA Amendment Badenhorst Dam Solar PV3 Generator | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 18:06 |
Motivational Report for EA Amendment | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 16:20 |
HIA Brakpan Old Location | Heritage Impact Assessment for the Proposed Brakpan Old Location Township Development. | HIA Phase 1 | 17/03/2015 | Stephan Gaigher | G&A Heritage Management Consultants | Galago Environmental | 22/02/2021 - 16:20 |
Motivational Report for EA Amendment | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 16:14 |
Heritage Impact Statement | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 05/08/2020 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 16:11 |
EA Amendment Application Mulilo De Aar PF : 9.9MW Generator | BADENHORST DAM SOLAR PV2 & PV3 FACILITIES ENVIRONMENTAL AUTHORISATION AMENDMENT: SPECIALIST IMPACT STATEMENT | Heritage Statement | 27/09/2021 | John Gribble | ACO Associates CC | Landscape Dynamics Environmental Consultants | 22/02/2021 - 16:03 |
Proposed Demolishing of Structures on Portion 1 and Remainder of Erf 705 on Farm Klipfontein 203, Ferndale, Randburg. | Phase 1 Heritage Impact Assessment Report for the proposed demolishing of structures located on Portion 1 and Remainder of Erf 705 on the Farm Klipfontein 203 in Ferndale, Randburg, Ekurhuleni Metropolitan Municipality, Gauteng Province. | HIA Phase 1 | 17/02/2021 | Stephan Gaigher | Netwater Properties (Pty) Ltd. | 22/02/2021 - 10:52 | |
PHASE 1 HERITAGE IMPACT ASSESSMENT | A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE DEVELOPMENT OF THE GOEDEHOOP 300MW SOLAR PV FACILITY LOCATED ON SEVERAL PORTIONS OF FARMS IN THE HANOVER DISTRICT, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE. | HIA Phase 1 | 19/02/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | APELSER ARCHAEOLOGICAL CONSULTING | 22/02/2021 - 09:45 |
PALAEONTOLOGICAL HERITAGE REPORT: COMBINED DESKTOP & FIELD-BASED ASSESSMENT | PALAEONTOLOGICAL HERITAGE REPORT: COMBINED DESKTOP & FIELD-BASED ASSESSMENT FOR THE PROPOSED SOVENTIX SOLAR PV PROJECT ON VARIOUS FARMS NEAR HANOVER, ENTHANJENI MUNICIPALITY, PIXLEY KA SEME DISTRICT, NORTHERN CAPE | PIA Desktop | 19/02/2021 | John E Almond | Natura Viva CC | Natura Viva CC | 22/02/2021 - 09:34 |
AIA FOR THE BISMARCK FENCE LINE UPGRADE PROJECT IN THE WEIPE AREA, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE BISMARCK FENCE LINE UPGRADE PROJECT ON THE FARMS BISMARCK 116 MS, SKUTWATER 115 MS, RIEDEL 48MS & WEIPE 47 MS IN THE WEIPE AREA, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 08/02/2021 | Neels Kruger | Exigo Sustainability | Bismarck Irrigation and Development (Pty Ltd) | 19/02/2021 - 12:17 |
HIA FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PHOTOVOLTIC POWER PLANT AND EMP AMENDMENT FOR THE NORTHAM PLATINUM ZONDEREINDE MINE CLOSE TO NORTHAM, NORTHWEST PROVINCE | HIA Phase 1 | 01/03/2013 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 19/02/2021 - 12:02 | |
Request for Exemption of any Palaeontological Impact Assessment for the proposed closure of CDR slimes dam, south of Middelburg, Mpumalanga | Request for Exemption of any Palaeontological Impact Assessment for the proposed closure of CDR slimes dam, south of Middelburg, Mpumalanga | PIA Desktop | 11/02/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Knight Piesold Consultants | 19/02/2021 - 09:10 |
Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga | Application for Exemption from a Heritage Impact Assessment for the proposed Decommissioning of the Chrome Direct Reduction (CDR) facility, Middelburg, Mpumalanga | HIA Letter of Exemption | 12/02/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Knight Piesold Consultants | 19/02/2021 - 09:08 |