FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
Arcaheological Assessment for the proposed Hankey Sanitation Upgrade A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED UPGRADING OF THE HANKEY SANITATION SYSTEM WITHIN THE KOUGA LOCAL MUNICIPALITY OF THE EASTERN CAPE PROVINCE HIA Letter of Exemption 05/11/2020 Johan Binneman Eastern Cape Heritage Consultants Eastern Cape Heritage Consultants 06/11/2020 - 18:15
Eshowe WWTW and Sewage Reticulation Heritage Scoping Report Upgrade of the Waste-Water Treatment Works and Sewage Reticulation in Eshowe Mlalazi Local Municipality, King Cetshwayo DM, KwaZulu-Natal. Heritage Scoping 11/10/2020 Len van Schalkwyk eThembeni Cultural Heritage Exigent Environmental 06/11/2020 - 17:21
Phase 1 HIA for the Turfvlakte Open Pit Project (updated) A Phase 1 Heritage Impact Assessment Study for the Proposed Exxaro Turfvlakte Open Pit Project near Lephalale in the Limpopo Province. HIA Phase 1 01/06/2020 Dr Julius CC Pistorius Dr Julius CC Pistorious Archaeologist and heritage Consultant Golder Associates Africa (Pty) Ltd 06/11/2020 - 06:50
Draft Basic Assessment Report for Trust Mining and Energy (Pty) Ltd DRAFT BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON THE REMAINING EXTENT OF THE FARM RIETPAN 17, IN THE MAGISTERIAL DISTRICT OF WELKOM, FREE STATE Conservation Management Plan 05/11/2020 05/11/2020 - 14:31
Greater Kilimon PIA PIA Phase 2 06/04/2020 Gideon Groenewald 04/11/2020 - 07:59
HERITAGE ASSESSMENT FOR THE PROPOSED DEVELOPMENT ON PORTION 98 OF THE FARM NIETGEDACHT 535JQ SOUTH OF DIEPSLOOT REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR THE PROPOSED DEVELOPMENT ON PORTION 98 OF THE FARM NIETGEDACHT 535JQ SOUTH OF DIEPSLOOT, GAUTENG HIA Phase 1 03/09/2018 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 04/11/2020 - 07:45
a 06/09/2020 04/11/2020 - 07:37
Phase 2 HIA on the Meyer and Du Toit Farmsteads Phase 2 Heritage Impact Assessment on the Meyer and Du Toit Farmsteads HIA Phase 2 27/05/2020 Polke Birkholtz, Cherene de Bruyn PGS Heritage (Pty) Ltd Glencore Operations South Africa (Pty) Ltd 04/11/2020 - 03:42
PHASE 1 HIA REPORT AGRICULTURAL IRRIGATION DEVELOPMENT, OLYVENHOUTS DRIFT SETTLEMENT, NORTHERN CAPE PROPOSED DEVELOPMENT OF A PIPELINE, IRRIGATION DAM AND AGRICULTURAL EXPANSION ON ERVEN 453, 281, 1074 AND 754, OLYVENHOUTS DRIFT SETTLEMENT, UPINGTON, DAWID KRUIPER MUNICIPALITY, Z.F. MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. HIA Phase 1 28/02/2020 Heidi Fivaz, Jan Engelbrecht, Elize Butler UBIQUE HERITAGE CONSULTANTS Enviroafrica CC 03/11/2020 - 17:23
Acaciaville Housing development HIA PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED ACACIAVALE HOUSING PROJECT ON PORTION OF THE REMAINDER OF ERF 1, LADYSMITH NO. 5695 WITHIN ALFRED DUMA LOCAL MUNICIPALITY OF UTHUKELA DISTRICT, KWAZULU-NATAL AIA Phase 1 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants NDG-AFRICA 03/11/2020 - 08:31
Acaciaville Housing development HIA PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED ACACIAVALE HOUSING PROJECT ON PORTION OF THE REMAINDER OF ERF 1, LADYSMITH NO. 5695 WITHIN ALFRED DUMA LOCAL MUNICIPALITY OF UTHUKELA DISTRICT, KWAZULU-NATAL AIA Phase 1 17/09/2020 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants NDG-AFRICA 02/11/2020 - 14:32
Tshepo HIA input 02/11/2020 - 13:16
Kagiso HIA input 02/11/2020 - 13:14
PIA Copperton Palaeontological Impact Assessment for the proposed upgrade and irrigation for Prieska Copper Mine, at Copperton, Northern Cape Province PIA Desktop 19/07/2020 Marion Bamford Prof Marion Bamford ABS Africa 02/11/2020 - 13:13
Heritage Impact Assessment Prieska Copper-Zinc Project – Irrigation Project Northern Cape Province Heritage Impact Assessment Prieska Copper-Zinc Project – Irrigation Project Northern Cape Province HIA Phase 1 21/10/2019 Jaco van der Walt Heritage Contracts and Archaeological Consulting ABS Africa 02/11/2020 - 13:10
Lutzburg HIA input 02/11/2020 - 13:02
Life HIA input 02/11/2020 - 12:54
Boitshoko HIA input 02/11/2020 - 12:47
SIDING COMMERCIAL DEVELOPMENT ERF 1500, HILTON, UMNGENI LOCAL MUNICIPALITY ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON PROPOSED SIDING DEVELOPMENT ERF 1500, HILTON, UMNGENI LOCAL MUNICIPALITY, UMGUNGUNDLOVU DISTRICT MUNICIPALITY, KWAZULU-NATAL Jeremy Hollmann Norton dos Santos Architects T/A Design Workshop Norton dos Santos Architects T/A Design Workshop 02/11/2020 - 11:32
Phase 1 Cultural Heritage Impact Assessment: Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION ON VARIOUS PORTIONS OF THE FARM READS DRIFT 74, DOUGLAS REGION, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 01/11/2019 Johnny van Schalkwyk 02/11/2020 - 08:46
PALAEONTOLOGICAL FIELD ASSESSMENT PALAEONTOLOGICAL FIELD ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL & GENERAL) BETWEEN DOUGLAS AND PRIESKA ON PORTION 12, REMAINING EXTENT OF PORTION 29 (PORTION OF PORTION 13) AND PORTION 31 (PORTION OF PORTION 29) ON THE FARM READS DRIFT 74, REGISTRATION DIVISION; HERBERT, NORTHERN CAPE PROVINCE PIA Phase 1 20/09/2020 Banzai Environmental (Pty) Ltd 02/11/2020 - 08:41
HERITAGE IMPACT ASSESSMENT HERITAGE IMPACT ASSESSMENT, FOR THE PROPOSED VODACOM PTY LTD 22 KV POWERLINE, DINGLETON, GAMAGARA LOCAL MUNICIPALITY, NORTHERN CAPE HIA Phase 1 02/11/2020 02/11/2020 - 08:33
Heritage Screening Assessment: Oya OHL Desktop Heritage Screening Assessment: Proposed development of an overhead powerline for the approved Oya PV Facility, Western and Northern Cape Heritage Scoping 30/10/2020 Jenna Lavin CTS Heritage G7 Energies (Pty) Ltd 02/11/2020 - 08:09
AIA FOR THE PROPOSED DASSIESRIDGE CTMF DEVELOPMENT PROJECT, CACADU DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM BLAUW BAADJIES VLEY 189 FOR THE PROPOSED DASSIESRIDGE CTMF DEVELOPMENT PROJECT, CACADU DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 19/10/2020 Neels Kruger Exigo Sustainability Coastal & Environmental Services - East London 02/11/2020 - 07:42
AIA FOR THE PROPOSED DASSIESRIDGE BESS DEVELOPMENT PROJECT, CACADU DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM GRASSRIDGE 187 FOR THE PROPOSED DASSIESRIDGE BESS DEVELOPMENT PROJECT, CACADU DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE AIA Phase 1 19/10/2020 Neels Kruger Exigo Sustainability Coastal & Environmental Services - East London 02/11/2020 - 07:38
Heritage Screener: Great Karoo OHL HERITAGE SCREENING ASSESSMENT FOR BASIC ASSESSMENT PROCESS FOR THE GRID CONNECTION INFRASTRUCTURE, INCLUDING 132KV OVERHEAD POWERLINE, SWITCHING STATION AND ANCILLARIES, FOR THE GREAT KAROO WIND FARM, NORTHERN CAPE Heritage Scoping 23/10/2020 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 30/10/2020 - 15:05
Erf 1852: 2 Lion Street Section 34 application: Erf 1852: 2 Lion Street Heritage Statement 23/10/2020 Vidamemoria Heritage Consultants 30/10/2020 - 13:13
PHASE 1 HIA REPORT !KHEIS TOWNSHIP EXPANSION GARIEP NORTHERN CAPE PROPOSED TOWNSHIP EXPANSION ON PLOT 113, GARIEP SETTLEMENT, FARM BOEGOEBERGNEDERSETTING RE/48, !KHEIS LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE. HIA Phase 1 29/06/2020 Heidi Fivaz, Jan Engelbrecht, Elize Butler UBIQUE HERITAGE CONSULTANTS Enviroafrica CC 30/10/2020 - 09:22
CULTURAL HERITAGE ASSESSMENT OF THE FARM THANDISIZWE, UMGUNGUNDLOVU DISTRICT, KWAZULU-NATAL CULTURAL HERITAGE ASSESSMENT OF THE FARM THANDISIZWE, UMGUNGUNDLOVU DISTRICT, KWAZULU-NATAL HIA Phase 1 30/11/2008 Natal Museum 29/10/2020 - 17:18
Amended HIA report: RE of Ptn 10 of the farm Newgate 802 MS Heritage Impact Assessment Report. Accidentally discovered human remains on RE of PTN 10 of the farm Newgate 802 MS. Avoca Vale Country Lodge. Makhado Local Municipality. Heritage Impact Assessment Specialist Reports 20/10/2020 Frans Roodt 29/10/2020 - 15:40
PIA for Nkomati Anthracite Madadeni Extension, Mpumalannga Phase 1 Palaeontological Impact Assessment for the Proposed N’komati Anthracite Opencast Mine Northern Extension, in the Barberton Magisterial District, Mpumalanga Province PIA Phase 1 30/08/2020 Elize Butler Banzai Environmental (Pty) Ltd PGS Heritage (Pty) Ltd 29/10/2020 - 15:06
PIA for the proposed bulk water and sewer pipelines, Hammanskraal West Ext 10 Palaeontological Impact Assessment for the proposed bulk water and sewer pipelines, Hammanskraal West Ext 10 PIA Desktop 29/10/2020 29/10/2020 - 14:23
Sappi Saiccor flood protection berm Sappi Saiccor flood protection berm, uMkhomazi, KwaZulu-Natal HIA Phase 1 30/09/2020 Jean Beater JLB Consulting WSP Environmental Pty Ltd - Durban 29/10/2020 - 11:42
Heritage Impact Assessment Skeerhok Transmission Line Heritage Impact Assessment Specialist Reports Jayson Orton CSIR 29/10/2020 - 11:31
R Bay powerline HIA FOR THE RICHARDS BAY POWERSHIP, RICHARDS BAY , KZN HIA Phase 1 03/09/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 28/10/2020 - 16:54
PIA for Gas to Power Project - Port of Saldanha Proposed Powerline Routing for Electricity Generation by a Karpowership Port of Saldanha to Eskom Blouwater Substation Saldanha Bay Municipality, Vredenburg Magisterial District, Western Cape Palaeontological Specialist Reports 02/10/2020 John Pether Agency for Cultural Resources Management Triplo4 Sustainable Solutions (Pty) Ltd 28/10/2020 - 16:04
Proposed Powership at Port of Saldanha, Saldanha Bay Proposed Powership at Port of Saldanha, Saldanha Bay Heritage Impact Assessment Specialist Reports 01/10/2020 Jonathan Kaplan Agency for Cultural Resources Management Triplo4 Sustainable Solutions (Pty) Ltd 28/10/2020 - 15:55
Heritage Impact Assessment Helderwyk Township Heritage Impact Assessment Helderwyk Township, Gauteng Province HIA Phase 1 24/11/2018 Jaco van der Walt Heritage Contracts and Archaeological Consulting LEAP - Lanscape Architect Environmental Planner 28/10/2020 - 15:40
Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 28/10/2020 - 15:39
Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed rehabilitation of the R104 road, North West Province PIA Desktop 27/10/2020 - 15:30
Ga-Mampa road upgrade Phase 1 Heritage Impact Assessment Scoping Report for Proposed Ga-Mampa Access Bridge, Limpopo Province. HIA Phase 1 02/12/2019 Liesl Stegmann Shasa Heritage Consultants CC 27/10/2020 - 12:39
Draft Basic Assessment Report for Sunny Mining (Pty) Ltd BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITHOUT BULK SAMPLING SITUATED ON THE FARMS MATJESFONTEIN NO. 97, BLAAUWBLOEMETJES KEEP NO. 95, AND DE VREEDE NO. 133 IN THE ADMINISTRATIVE DISTRICT OF SUTHERLAND, NORTHERN CAPE Conservation Management Plan 27/10/2020 27/10/2020 - 11:18
HIA Remhoogte Heritage Report Assessment for Remhoogte Vodacom Mast Heritage Impact Assessment Specialist Reports Tekplan Environmental Vodacom 27/10/2020 - 04:14
SIB6297 - DBAR Appendix H (Heritage Impact Assessment) Heritage Impact Assessment: Basic Assessment Process for the Closure of the Cooke Underground Operations HIA Phase 1 26/10/2020 Shannon Hardwick, Justin du Piesanie Digby Wells Environmental Sibanye Gold Limited 26/10/2020 - 15:59
Vyfhoek PHASE 1 HIA REPORT FOR A PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 51 OF THE FARM VYFHOEK 428IQ IN POTCHEFSTROOM, NORTHWEST PROVINCE AIA Phase 1 15/07/2020 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 26/10/2020 - 14:14
Tigane REPORT ON A PHASE 1 HIA FOR THE PROPOSED TOWNSHIP DEVELOPMENT OF TIGANE EXTENSIONS 7 & 8 ON A PORTION OF THE REMAINING EXTENT OF THE FARM URAAN 295IP & A PORTION OF REMAINING EXTENT OF THE FARM VOGELSTRUISFONTEIN 273IP CITY OF MATLOSANA LOCAL MUNICIPALITY, NORTH WEST PROVINCE AIA Phase 1 15/09/2020 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 26/10/2020 - 13:57
Ptn 100 Nooitgedacht REPORT ON A PHASE 1 HIA FOR THE PROPOSED TOWNSHIP DEVELOPMENTS OF JOUBERTON EXTENSION 34 & KANANA EXTENSION 16 ON A PORTION OF PORTION 100 OF THE FARM NOOITGEDACHT 434IP CITY OF MATLOSANA LOCAL MUNICIPALITY, NORTHWEST PROVINCE AIA Phase 1 15/09/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Maxim Planning Solutions 26/10/2020 - 13:36
HERITAGE IMPACT ASSESSMENT:f McTaggarts PV1, a solar PV facility and associated infrastructure on Portion 3 of the Farm McTaggarts Camp 453 and Portion 12 of the Farm Klip Punt 452, near Upington in the Northern Cape Province. Proposed development of McTaggarts PV1, a solar PV facility and associated infrastructure on Portion 3 of the Farm McTaggarts Camp 453 and Portion 12 of the Farm Klip Punt 452, near Upington in the Northern Cape Province. HIA Phase 1 01/09/2019 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 26/10/2020 - 12:48
Phase 1 Desktop PIA Palaeontological Impact Assessment for the proposed remediation project for Ngodwana Dam, Mpumalanga Province PIA Phase 1 01/06/2020 Marion Bamford Kudzala Antiquity Kudzala Antiquity 26/10/2020 - 10:57
Skutwater HIA Heritage Impact Assessment for the proposed Skutwater Development, Limpopo Province. HIA Phase 1 01/09/2020 Jaco van der Walt Heritage Contracts and Archaeological Consulting Tua Conserva Environmental 26/10/2020 - 10:48

Pages

CSV
 
 