THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 4801 - 4850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Blythedale Coastal Estate - Heritage Scoping Report | Heritage Scoping Report Blythedale Coastal Estate Dolphin Coast KwaDukuza Local Municipality, Ilembe District Municipality KwaZulu-Natal | 10/03/2020 | Len van Schalkwyk | eThembeni Cultural Heritage | Elan Property Group | 13/03/2020 - 09:47 | |
Heritage Scoping Report - Blythedale Coastal Estate | Heritage Scoping Report Blythedale Coastal Estate Dolphin Coast KwaDukuza Local Municipality, Ilembe District Municipality KwaZulu-Natal | Heritage Scoping | 10/03/2020 | Len van Schalkwyk | eThembeni Cultural Heritage | Elan Property Group | 13/03/2020 - 08:57 |
Rietvlei X6 Filling Station - HIA | Rietvlei X6 Filling Station - HIA | HIA Phase 1 | 01/02/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 12/03/2020 - 16:09 | |
Excavation and sampling of Mwulu's Cave | Excavation and sampling of Mwulu's Cave | Archaeological Permit Report | 12/03/2020 | Paloma de la Peña | 12/03/2020 - 15:05 | ||
Paleomagnetic sampling from Rose Cottage cave | Paleomagnetic sampling from Rose Cottage cave | Export Permit Report | 12/03/2020 | 12/03/2020 - 15:02 | |||
Permit for exportation of luminiscence sample from Mwulu's Cave | Permit for exportation of luminescence sample from Mwulu's Cave | Export Permit Report | 12/03/2020 | 12/03/2020 - 14:59 | |||
442HIA - PIA Report: Uster Rangers Hill Farm, Piggery | Palaeontological Field Assessment For The Proposed Piggery On Portion 46 Of The Farm Brakkefontien 416, Within The Nelson Mandela Bay Municipality, Eastern Cape | Palaeontological Specialist Reports | 14/02/2020 | Elize Butler | PGS Heritage (Pty) Ltd | Habitat Link Consulting (Pty) Ltd | 12/03/2020 - 14:58 |
Temporary permit of quartz tools from Sibudu | Temporary permit of quartz tools from Sibudu | Archaeological Permit Report | 12/03/2020 | Paloma de la Peña | 12/03/2020 - 14:54 | ||
442HIA -HIA Report: Uster Rangers Hill Farm, Piggery | The Proposed Piggery On Portion 46 Of The Farm Brakkefontien 416, Within The Nelson Mandela Bay Municipality, Eastern Cape | Heritage Impact Assessment Specialist Reports | 14/02/2020 | Cherene de Bruyn, Wouter Fourie | PGS Heritage (Pty) Ltd | Habitat Link Consulting (Pty) Ltd | 12/03/2020 - 14:51 |
Exemption Letter: Heritage Impact Assessment for 13 ha area demarcated for new cemetery on Farm Boemfontein 654, Bloemfontein, Free State Province | Exemption Letter: Heritage Impact Assessment for 13 ha area demarcated for new cemetery on Farm Boemfontein 654, Bloemfontein, Free State Province | HIA Letter of Exemption | 31/10/2019 | Lloyd Rossouw | National Museum Bloemfontein - Archaeology and Anthropology | Imbazo Trading Pty Ltd | 11/03/2020 - 11:57 |
Phase 1 Heritage Impact Assessment for industrial development on Plot 14, Ribblesdale, Bloemfontein, Free State Province. | Phase 1 Heritage Impact Assessment for industrial development on Plot 14, Ribblesdale, Bloemfontein, Free State Province. | Heritage Impact Assessment Specialist Reports | 03/05/2018 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 11/03/2020 - 11:24 |
Fiona Mining Enterprise | Revised Basic assessment report for Fiona Mining enterprise mining permit application | 10/03/2020 - 17:58 | |||||
Phase 1 Archaelogical Heritage Impact for Portion 7 & 8 of the Farm Boerboomkraal | Phase 1 Archaelogical Heritage Impact Assessment for Proposed Debushing of natural Land for agricultural use Portion 7 & 8 of the Farm Boerboomkraal 353-KT Burgerford, Limpopo | HIA Phase 1 | 01/11/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 10/03/2020 - 15:10 |
Phase 1 Cultural Heritage Impact Assessment | The proposed Umnotho Mews Residential Complex and filling station development in Bronkhorstspruit, City of Tshwane Metropolitan Municipality, Gauteng Province. | HIA Phase 1 | 27/11/2019 | J.A. van Schalkwyk | Provincial Heritage Resources Authority Gauteng | JA van Schalkwyk Heritage Consultant | 10/03/2020 - 11:13 |
PIA_Tumelo | Palaeontological Impact Assessment for the Section 102 Amendment Application for the existing Tumelo Colliery, located on Farm Boschmanskop 154 IS, between Pullenshope and Hendrina, Mpumalanga Province | Marion Bamford | 10/03/2020 - 10:34 | ||||
Phase 1 Archaelogical Heritage Impact Assessment | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR PROPOSED DEBUSHING OF NATURAL LAND FOR AGRICULTURAL USE: PORTIONS 7 AND 8 OF THE FARM BOERBOONKRAAL 353KT BURGERSFORT LIMPOPO PROVINCE | HIA Phase 1 | 13/11/2014 | Ralf Kalwa | Adansonia Heritage Consultants | 09/03/2020 - 15:07 | |
Theft of Cultural Heritage objects | Theft of Cultural Heritage objects | 09/03/2020 - 09:55 | |||||
SAHRIS CaseID 14758-Postponement of Date of Submission of Requested Information to 23 March 2020 | SAHRIS CaseID 14758-Postponement of Date of Submission of Requested Information to 23 March 2020 | 09/03/2020 | Karen Van Ryneveld | 09/03/2020 - 09:34 | |||
Integrated Heritage Impact Assessment | An Integrated Assessment from all other specialist reports focus on the potential heritage impacts. | Heritage Impact Assessment Specialist Reports | 28/02/2020 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 09/03/2020 - 08:31 |
40673 Maselsppoort 2018 | Phase 1 Heritage Impact Assessment of three proposed pipeline alternatives along Roodewal Midway Road between the Renosterspruit and Blesbok Avenue, Bloemfontein, Free State Province. | HIA Phase 1 | 03/10/2019 | 06/03/2020 - 14:11 | |||
PIA: DESKTOP STUDY BOKPOORT II SOLAR PV FACILITY | PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY Proposed Bokpoort II Solar Power Facility on the Remaining Extent of Farm Bokpoort 390 near Groblershoop, Northern Cape Province | AIA Desktop | 10/02/2020 | John E. Almond | Natura Viva CC | Royal Haskoning DHV | 06/03/2020 - 08:45 |
Phase 1 Cultural HIA: THE PROPOSED BOKPOORT II PV SOLAR POWER FACILITIES | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED BOKPOORT II PV SOLAR POWER FACILITIES ON THE FARM BOKPOORT 390 NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 31/01/2020 | Johnny Van Schalkwyk | Royal Haskoning DHV | 06/03/2020 - 08:31 | |
DFT Coali prospecting Right Application. DMR Ref: KZN 10899 PRO | PHASE 1 HERITAGE IMPACT ASSESSMENT COAL PROSPECTING RIGHT APPLICATION ON FARM MOOIKLIP 239 HU IN THE VRYHEID DISTRICT, KWAZULU NATAL PROVINCE | HIA Phase 1 | KwaZulu-Natal Amafa and Research Institute | Lushika Services | 06/03/2020 - 08:18 | ||
NID: Proposed Rehabilitation of the Old Jagersfontein Mine Pit | Notification of Intent to Develop: Proposed Rehabilitation of the Old Jagersfontein Mine Pit | 17/02/2020 | Polke Birkholtz | PGS Heritage (Pty) Ltd | Jagersfontein Developments (Pty) Ltd | 05/03/2020 - 15:26 | |
Ritluka Resources | Revised Basic assessment report for the Prospecting right application | 05/03/2020 - 15:06 | |||||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE), COMBINED WITH A WASTE LICENSE APPLICATION, REGISTRATION DIVISION: GORDONIA AND KENHARDT, NORTHERN CAPE PROVINCE | PIA Desktop | 05/03/2020 | Elize Butler | 05/03/2020 - 11:48 | ||
Heritage EIA | HIA Phase 1 | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 05/03/2020 - 10:55 | |||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED PROSPECTING RIGHT APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE), COMBINED WITH A WASTE LICENSE APPLICATION, REGISTRATION DIVISION: GORDONIA AND KENHARDT, NORTHERN CAPE PROVINCE | PIA Desktop | 05/03/2020 | Elize Butler | 05/03/2020 - 08:19 | ||
Malekane Mall - HIA | Phase 1 HIA | 03/03/2020 - 16:34 | |||||
HIA Construction of Sludge Dams WTW and Supernatant Infrastrucre | MDA HIA Construction of Sludge Dams WTW and Supernatant Infrastructure | Heritage Impact Assessment Specialist Reports | 29/02/2020 | Lloyd Rossouw | 03/03/2020 - 15:42 | ||
Jan Kempdorp Cemetery Exp PIA | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE EXPANSION OF THE JAN KEMPDORP CEMETRY ON PORTION 43 OF FARM GULDENSKAT 36-HN, NORTHERN CAPE PROVINCE | PIA Desktop | 02/05/2019 | Elize Butler | Banzai Environmental (Pty) Ltd | NSVT Consultants | 03/03/2020 - 12:13 |
Jan Kempdorp Cemetery Exp AIA | Heritage Impact Assessment (Archaeology) for the proposed Jan Kempdorp Cemetery Extension, Phokwane Municipality, Northern Cape | AIA Phase 1 | 31/10/2019 | David Morris | McGregor Museum | NSVT Consultants | 03/03/2020 - 12:05 |
HIA for mixed use development on farm 15961 Madadeni | PHASE I DESKTOP STUDY CULTURAL HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED DEVELOPMENT OF RESIDENTIAL, INSTITUTIONAL AND COMMERCIAL UNITS AT MADADENI AREA WITHIN NEWCASTLE LOCAL MUNICIPALITY OF AMAJUBA DISTRICT IN KWAZULU-NATAL PROVINCE. | HIA Phase 1 | 02/03/2020 | Vhubvo Archaeo-Heritage Consultants | 02/03/2020 - 13:29 | ||
Risiville/Mckay Feeder Line | Risiville/Mckay Feeder Line - Heritage Screening & PIA Input | HIA Letter of Exemption | 02/03/2020 - 11:46 | ||||
Integrated Heritage Impact Assessment - Waterberg JV | Heritage Impact Assessment Specialist Reports | 28/02/2020 | Prof. Anton van Vollenhoven, Gert Pretorius, Marietjie Eksteen, Lizinda Dickson | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 28/02/2020 - 15:37 | |
MEMORANDUM ON SITE STATUS AND HERITAGE IMPACT SUBJECT TO A SECTION 24G APPLICATION AS PART OF THE DOOR OF HOPE DEVELOPMENT PROJECT, GAUTENG PROVINCE | MEMORANDUM ON SITE STATUS AND HERITAGE IMPACT SUBJECT TO A SECTION 24G APPLICATION AS PART OF THE DOOR OF HOPE DEVELOPMENT PROJECT ON A PORTION OF THE FARM HARTSENBERGFONTEIN 332I, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | Heritage Statement | 31/10/2019 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - Grahamstown | 28/02/2020 - 15:34 |
Integrated Heritage Impact Assessment | An integrated Heritage Impact Assessment compiled out of the AIA, PIA, EIA and other specialist studies to address SAHRAs comments | Heritage Impact Assessment Specialist Reports | 28/02/2020 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 28/02/2020 - 15:32 |
DESKTOP STUDY PALAEONTOLOGY: Door of Hope in the Sedibeng District Municipality, Gauteng | Development at the Door of Hope on a portion of the Farm Hartsenbergfontein 3321Q in the Sedibeng District Municipality, Gauteng DESKTOP STUDY PALAEONTOLOGY | PIA Desktop | 11/11/2018 | Francois Durand | Skarab CC | Coastal & Environmental Services - East London | 28/02/2020 - 15:28 |
AIA FOR THE PROPOSED DOOR OF HOPE VILLAGE PROJECT, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM HARTSENBERGFONTEIN 332I FOR THE PROPOSED DOOR OF HOPE VILLAGE PROJECT, SEDIBENG DISTRICT MUNICIPALITY, GAUTENG PROVINCE | AIA Phase 1 | 21/10/2019 | Neels Kruger | Exigo3 Sustainability | Coastal & Environmental Services - East London | 28/02/2020 - 15:26 |
Palmietfontein_Ventersdorp_AIA_Revised+desktop | Palmietfontein_Ventersdorp_AIA_Revised+desktop | Archaeological Specialist Reports | 22/02/2020 | Tobias Coetzee | 28/02/2020 - 11:05 | ||
Integrated Heritage Impact Assessment Report | Integrated report compiled from previously submitted EIA and specialist reports to address SAHRA comments | Heritage Impact Assessment Specialist Reports | 28/02/2020 | Prof. Anton van Vollenhoven, Gert Pretorius, Marietjie Eksteen, Lizinda Dickson | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 28/02/2020 - 09:34 |
Cedara Village | PHASE ONE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED KHANYA HOUSING DEVELOPMENT AT CEDARA COLLEGE, PIETERMARITZBURG. | 01/08/2017 | Frans Prins | Active Heritage CC | 27/02/2020 - 10:15 | ||
HIA for Bryantson Ext.3-B | Phase 1 Cultural Heritage Impact Assessment for Btaynston Ext. 3-B | HIA Phase 1 | 31/01/2020 | J.A. van Schalkwyk | GA Environment (Pty) Ltd | GA Environment (Pty) Ltd | 26/02/2020 - 17:54 |
Zwartkop 187 - Heritage Assessment | PROPOSED RETAIL DEVELOPMENT AND SCHOOL ON PORTION 195 & 237, REMAINDER OF PORTION 10 AND PART OF REMAINDER OF PORTION 187 OF THE FARM ZWARTKOP 356 JR WITHIN THE CITY OF TSHWANE, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 20/03/2019 | Jaco van der Walt | LEAP -Landscape Architectural and Environmental Planning | LEAP -Landscape Architectural and Environmental Planning | 26/02/2020 - 10:56 |
Permit report 11860 Klasies River excavation | Klasies River main site excavation permit: excavation, sampling, dating | Archaeological Permit Report | 26/02/2020 | Sarah Wurz | 26/02/2020 - 06:39 | ||
Phase 1 HIA Report for Vryheid Substation and Associated 2 X 88kV Power Lines | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED AUTHORISATION OF ERMELO-RICHARDS BAY COAL LINK UPGRADE PROJECT: DEVELOPMENT OF THE VRYHEID TRACTION STATION AND THE ASSOCIATED TURN-IN POWER LINES WITHIN THE ABAQULUSI LOCAL MUNICIPALITY OF ZULULAND DISTRICT IN KWAZULU PROVINCE | HIA Phase 1 | 01/07/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Ecosolve (Pty) Ltd | 25/02/2020 - 21:18 |
Phase 1 HIA Report for Vryheid Substation and Associated 2 X 88kV Power Lines | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED AUTHORISATION OF ERMELO-RICHARDS BAY COAL LINK UPGRADE PROJECT: DEVELOPMENT OF THE VRYHEID TRACTION STATION AND THE ASSOCIATED TURN-IN POWER LINES WITHIN THE ABAQULUSI LOCAL MUNICIPALITY OF ZULULAND DISTRICT IN KWAZULU PROVINCE | HIA Phase 1 | 01/07/2019 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultants | Ecosolve (Pty) Ltd | 25/02/2020 - 21:07 |
Jongiliziwe Sand Mining Basic assessment report | Basic assessment report for Jongiliziwe mining permit application | 25/02/2020 - 11:35 | |||||
Koenabib HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MINING OF SILLIMANITE, AGGREGATE AND STONE GRAVEL ON THE FARM KOENABIB 43, A PORTION OF PORTION 2, KHAI MA LOCAL MUNICIPALITY, NAMAKWA DISTRICT MUNICIPALITY, NAMAQUALAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | HIA Phase 1 | 17/01/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Greenmined Environmental | 25/02/2020 - 09:52 |
Maluti Plant and Hire Basic assessment report | Basic assessment report for the Mining permit application | 25/02/2020 - 09:29 |