THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 5051 - 5100 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Proposed Newlyn Petro Chemical Storage Facility | Heritage Impact Assessment Report Proposed Newlyn Petro Chemical Storage Facility Ambrose Park, Bayhead Durban Harbour eThekweni | HIA Phase 1 | 05/09/2019 | Len van Schalkwyk | eThembeni Cultural Heritage | GIBB Engineering & Science - Durban | 15/11/2019 - 15:58 |
Bloemsmond 4 Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) Bloemsmond 4 PV Project, Upington, Northern Cape Province | AIA Phase 1 | 01/09/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Cape Environmental Assessment Practitioners | 15/11/2019 - 14:47 |
Phase 1 Heritage Impact Assessment of the farm Rietfontein 313 near Leandra, Mpumalanga Province | Phase 1 Heritage Impact Assessment of the farm Rietfontein 313 near Leandra, Mpumalanga Province | HIA Phase 1 | 14/12/2018 | Lloyd Rossouw | Green-Box Consulting | 15/11/2019 - 14:36 | |
Bloemsmond 3 Heritage Impact Assessment | Bloemsmond 3 Heritage Impact Assessment Report | AIA Phase 1 | 01/09/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Cape Environmental Assessment Practitioners | 15/11/2019 - 12:46 |
Phase 1 Cultural Heritage Impact Assessment - THE PROPOSED UPGRADE OF THE MONTANA SPRUIT CHANNEL WITHIN THE DOORNPOORT AND MONTANA PARK RESIDENTIAL AREA, NORTH OF PRETORIA, GAUTENG PROVINCE | Phase 1 Cultural Heritage Impact Assessment - THE PROPOSED UPGRADE OF THE MONTANA SPRUIT CHANNEL WITHIN THE DOORNPOORT AND MONTANA PARK RESIDENTIAL AREA, NORTH OF PRETORIA, GAUTENG PROVINCE | HIA Phase 1 | 30/04/2019 | Johnny van Schalkwyk | JA van Schalkwyk Heritage Consultant | TGM Environmental Services CC | 15/11/2019 - 12:06 |
oribi community hall | HERITAGE SURVEY OF THE PROPOSED ORIBI COMMUNITY HALL, PIETERMARITZBURG, KWAZULU-NATAL | Heritage Scoping | 24/06/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | JG AFRIKA | 15/11/2019 - 10:49 |
fourfeet | LETTER OF EXEMPTION AND DESKTOP HERITAGE SURVEY OF THE PROPOSED FOURFEET FARMING EXPANSION | Heritage Scoping | 13/11/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Naturestamp | 15/11/2019 - 10:32 |
sibaya node 6 | HERITAGE SURVEY OF THE PROPOSED SIBAYA NODE 6 DEVELOPMENT, UMDLOTI, KWAZULUNATAL. | HIA Phase 1 | 05/06/2018 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 14/11/2019 - 18:12 | |
BAR for Bothaville NE Ext A | BASIC ASSESSMENT REPORT FOR THE AMENDMENT OF AN EXISTING PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORISATION FOR BOTHAVILLE NE EXT A, SITUATED IN THE FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 28/02/2019 | Kuni Mosweu | Shango Solutions | 07/11/2019 - 14:26 | |
HIA FOR MAINTENANCE OF TRANSFORMER STRUCTURE AT MAPUNGUBWE | HIA FOR MAINTENANCE OF THE BUNDLE CONDUCTOR AND TRANSFORMER STRUCTURES ALONG THE LIMPOPO RIVER, MAPUNGUBWE NATIONAL PARK AND WORLD HERITAGE SITE LIMPOPO PROVINCE, SOUTH AFRICA | Heritage Impact Assessment Specialist Reports | 18/10/2019 | Ndivhuho Eric Mathoho, Shadreck Chirikure | De Beers Considated Mines | 07/11/2019 - 12:07 | |
Exemption of a Heritage Impact Assessment (HIA) | Letter of Recommendation for Exemption of a Heritage Impact Assessment (HIA) for the proposed refurbishment to be undertaken at the existing Bushkoppie Wastewater Treatment Works | HIA Letter of Exemption | 12/08/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 07/11/2019 - 10:03 | |
Limpopo Central Hospital Phase 1 Heritage Impact Assessment | Phase 1 Heritage Impact Assessment for the proposed development of the Limpopo Central Hospital on the remaining extent of Erf 6861 - Extension 30 in Polokwane in the Limpopo Province | HIA Phase 1 | 23/10/2019 | Marko Hutten | PGS Heritage (Pty) Ltd | 06/11/2019 - 17:39 | |
HIA for Thembinkosi Primary School upgrade | heritage Impact Assessment for the proposed upgrading of Thembinkosi Primary School situated at Erf 803 And 804 in Osizweni D (Ward 9) in the Newcastle Local Municipality, Amajuba District, Kwazulu-Natal. | HIA Phase 1 | 31/10/2019 | Wouter Fourie | PGS Heritage (Pty) Ltd | NCC Environmental Services (Pty) Ltd | 06/11/2019 - 16:05 |
HIA for Upgrade of Thembinkosi Primary School in KwaZulu-Natal | PROPOSED UPGRADING OF THEMBINKOSI PRIMARY SCHOOL SITUATED AT ERF 803 AND 804 IN OSIZWENI D (WARD 9) IN THE NEWCASTLE LOCAL MUNICIPALITY, AMAJUBA DISTRICT, KWAZULU-NATAL | HIA Phase 1 | 31/10/2019 | Wouter Fourie | PGS Heritage (Pty) Ltd | NCC Environmental Services (Pty) Ltd | 06/11/2019 - 16:02 |
Garsfontein X8 Filling Station - PIA | 06/11/2019 - 10:37 | ||||||
Cultural heritage assessment | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DE GROOTE BOOM MINING RIGHT APPLICATION ON THE FARM DE GROOTEBOOM 373 KT, CLOSE TO STEELPOORT, LIMPOPO PROVINCE | Heritage Impact Assessment Specialist Reports | 01/05/2017 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | 05/11/2019 - 11:25 | |
Phase 1 Heritage Impact Assessment for two agricultural pivot localities on the farm Gladiam (Kloof 143), Niekerkshoop, NC Province. | Phase 1 Heritage Impact Assessment for two agricultural pivot localities on the farm Gladiam (Kloof 143), Niekerkshoop, NC Province. | AIA Phase 1 | 12/09/2019 | Lloyd Rossouw | Paleo Field Services | Paleo Field Services | 05/11/2019 - 10:22 |
Equiano Cable System | Maritime Archaeological Impact Assessment of Proposed Equiano Cable System, Landing at Melkbosstrand, Western Cape Province. | Heritage Impact Assessment Specialist Reports | 31/10/2019 | John Gribble | ACO Associates CC | ACER (Africa) Environmental Management Consultants | 05/11/2019 - 08:29 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment: Desktop Study | PIA Desktop | Dr. Heidi Fourie | Exigo3 Sustainability | Magogudi Construction Projects CC | 04/11/2019 - 18:50 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM SLYPKLIP 36 | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM SLYPKLIP 36 FOR THE PROPOSED MAGOGUDI TYRE STORAGE FACILITIES SLYPKLIP PROJECT, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | Nelius Kruger | Exigo3 Sustainability | Magogudi Construction Projects CC | 04/11/2019 - 18:48 | |
Palaeontological Impact Assessment | Palaeontological Impact Assessment: Desktop Study | PIA Desktop | Dr. Heidi Fourie | Exigo3 Sustainability | Magogudi Construction Projects CC | 04/11/2019 - 18:33 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON OLYVENHOUTSDRIFT PLOT 1298 | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON OLYVENHOUTSDRIFT PLOT 1298 FOR THE PROPOSED MAGOGUDI TYRE STORAGE FACILITIES OLYVENHOUTSDRIFT PROJECT, DAWID KRUIPER LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 25/05/2019 | Nelius Kruger | Exigo3 Sustainability | Magogudi Construction Projects CC | 04/11/2019 - 18:24 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment: Desktop Study | PIA Desktop | Heidi Fourie | Exigo3 Sustainability | Magogudi Construction Projects CC | 04/11/2019 - 18:07 | |
Archaeological Impact Assessment | MAGOGUDI CONSTRUCTION PROJECTS: PROPOSED MAGOGUDI TYRE STORAGE FACILITIES ANNFIELD PROJECT ON PORTION 3 OF THE FARM ANNFIELD 178, GA-SEGONYANA LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 25/05/2019 | Nelius Kruger | Exigo3 Sustainability | Magogudi Construction Projects CC | 04/11/2019 - 18:00 |
PALAEONTOLOGICAL DESKTOP STUDY | PALAEONTOLOGICAL DESKTOP STUDY PROPOSED MINING RIGHT FOR MAXWILL 146 CC ALLUVIAL DIAMOND MINING, NORTHERN CAPE PROVINCE, SIYANCUMA LOCAL MUNICIPALITY UNDER PIXLEY KA SEME DISTRICT MUNICIPALITY | PIA Desktop | 31/07/2019 | JF Durand | Francois Durand | MAXWILL 146 CC | 04/11/2019 - 14:21 |
Phase 1 Archaeological Impact Assessment report for mining right | Phase 1 Archaeological Impact Assessment report for mining right of Maxwill Opencast Alluvial Diamond Mine and associated infrastructure, Northern Cape Province under the jurisdiction of Pixely Ka Seme District Municipality in the Northern Cape Province | AIA Phase 1 | 30/06/2019 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | MAXWILL 146 CC | 04/11/2019 - 14:11 |
Equiano Cable System Maritime HIA | Maritime Archaeological Impact Assessment of Proposed Equiano Cable System, landing at Melkbosstrand, Western Cape Province | AIA Desktop | 28/10/2019 | John Gribble | ACO Associates CC | 01/11/2019 - 14:30 | |
Equiano Cable System Maritime HIA | Maritime Archaeological Impact Assessment of Proposed Equiano Cable System, landing at Melkbosstrand, Western Cape Province | AIA Desktop | 28/10/2019 | John Gribble | ACO Associates CC | 01/11/2019 - 14:20 | |
Phase 1 HIA_KZN ASP_Powerline | A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED 132KV TRANSMISSION POWERLINE FROM THE EXISTING KINGSBURGH SUBSTATION TO THE PROPOSED SUBSTATION AT THE KZN AUTOMOTIVE SUPPLIER PARK AT ILLOVO, DURBAN SOUTH, WITHIN ETHEKWINI MUNICIPALITY | HIA Phase 1 | 20/07/2019 | Trust Mlilo | Sativa Travel and Environmental Consultants | GIBB (Pty) Ltd | 01/11/2019 - 08:57 |
Phase 1_HIA_KZN ASP_Sewerline | A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED SEWERLINE ROUTE FROM THE KZN ASP SITE TO THE EXISTING KINGSBURGH WASTEWATER TREATMENT WORKS (WWTW) AT ILLOVO, DURBAN SOUTH. WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL | HIA Phase 1 | 20/07/2019 | Trust Mlilo | Sativa Travel and Environmental Consultants | GIBB (Pty) Ltd | 01/11/2019 - 08:55 |
HIA_Proposed KZN ASP | A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED ILLOVO AUTOMOTIVE SUPPLIER PARK (ASP), ACCESS ROAD AND INDUSTRIAL DEVELOPMENT ON THE REMAINDER OF THE FARM NOGI NO. 17469, ILLOVO, WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL | HIA Phase 1 | 06/08/2019 | Trust Mlilo | Sativa Travel and Environmental Consultants | GIBB (Pty) Ltd | 01/11/2019 - 08:36 |
HIA Ivydale Hospital, Polokwane, Limpopo Province | HIA Ivydale Hospital, Polokwane, Limpopo Province | HIA Phase 1 | 03/10/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Kamekho Consulting CC | 01/11/2019 - 07:55 |
Heritage Screener: Loerie Estate | HERITAGE SCREENING ASSESSMENT: PROPOSED LOERIE COUNTRY ESTATE MIXED USE DEVELOPMENT, EAST LONDON | Heritage Scoping | 31/10/2019 | Jenna Lavin | CTS Heritage | Terreco Environmental | 31/10/2019 - 12:09 |
PIA for Development of Housing and Access Gates at Seaton | Palaeontological Impact Assessment for the proposed development of housing and access gates on Seaton Equestrian Estate, near Ballito, KwaZulu Natal Province | Palaeontological Specialist Reports | 04/10/2019 | Marion Bamford | Prof Marion Bamford | EnviroPro | 30/10/2019 - 16:34 |
HIA Proposed Seaton Equestrian Estate | DESKTOP HERITAGE IMPACT ASSESSMENT OF THE PROPOSED SEATON EQUISTRIAN ESTATE, ILEMBE MUNICIPALITY, KZN. | HIA Phase 1 | 23/08/2019 | Frans Prins | Active Heritage CC | EnviroPro | 30/10/2019 - 16:31 |
Malekane Bridge and upgrades | 30/10/2019 - 15:45 | ||||||
EXX3775_Belfast_GRP_Report_Addendum | Addendum to the Belfast Implementation Project Burial Grounds and Graves Relocation Report | Burial Grounds and Graves Specialist Reports | 07/10/2019 | Justin du Piesanie | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 30/10/2019 - 12:59 |
Lindley to Leratswana Pipeline PIA | PALAEONTOLOGICAL FIELD ASSESSMENT OF THE PROPOSED RAW WATER PIPELINE BETWEEN LINDLEY AND ARLINGTON, NKETOANA LOCAL MUNICIPALITY, FREE STATE PROVINCE | PIA Phase 1 | 20/10/2019 | Elize Butler | Banzai Environmental (Pty) Ltd | NSVT Consultants | 30/10/2019 - 09:49 |
STRAWBERRY FARM TOWNSHIP DEVELOPMENT | A REPORT ON A HIA RELATED TO A GRAVE SITE RELOCATION PROJECT FOR THE STRAWBERRY FARM TOWNSHIP DEVELOPMENT LOCATED ON A PORTION (PTN 14) OF THE FARM OLIFANTSFONTEIN 402JR OLIFANTSFONTEIN/IRENE/CLAYVILLE AREA, GAUTENG - APAC018/43 | Heritage Impact Assessment Specialist Reports | 01/06/2018 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | M&T Development (Pty) Ltd | 29/10/2019 - 15:23 |
Nkomati Anthracite Mine | A conservation Management Plan for the graves site at the Nkomati Anthracite Mine in the magisterial district of Barberton, Mpumalanga Province | Burial Grounds and Graves Specialist Reports | 27/12/2018 | Anton Carl | Archaetnos Culture & Cultural Resource Consultants | 29/10/2019 - 07:53 | |
PIA Magatle Filling Station, Limpopo Province | PIA Magatle Filling Station, Limpopo Province | PIA Desktop | 23/09/2019 | Marion Bamford | Prof Marion Bamford | Lokisa Environmental Consulting CC | 28/10/2019 - 22:10 |
HIA Magatle Filling Station | HIA Magatle Filling Station, Limpopo Province | HIA Phase 1 | 21/10/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Lokisa Environmental Consulting CC | 28/10/2019 - 22:03 |
Botesdal Ptn 15 | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR PORTION 15 OF THE FARM BOTESDAL 529 JQ LANSERIA WITHIN THE MOGALE CITY LOCAL MUNICIPALITY, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 22/11/2018 | Udo Kusel | Gauteng Provincial Government | African Heritage Consultants CC | 28/10/2019 - 15:03 |
Shengeza line | HERITAGE SURVEY OF THE PROPOSED SHENGEZA VODACOM TOWER, MANGUZI, KZN | HIA Phase 1 | 10/10/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Independent Environmental Advisor | 28/10/2019 - 14:42 |
Heritage Impact Assessment Northam Zondereinde 3 Shaft | Heritage Impact Assessment for the proposed Northam Zondereinde Platinum Mine 3 Shaft, Thabazimbi Local Municipality | HIA Phase 1 | 16/10/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Prism Environmental Management Services cc | 28/10/2019 - 14:19 |
HIA Dunbar Opencast Coal Mine | Heritage Impact Assessment For The Proposed Dunbar Opencast Coal Mine Mpumalanga Province | HIA Phase 1 | 30/08/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Enviro-Insight CC | 28/10/2019 - 12:12 |
PIA Dunbar Opencast Coal Mine | Palaeontological Impact Assessment for the proposed Mining Rights application on Dunbar 189, west of Hendrina, Mpumalanga Province | PIA Phase 1 | 16/08/2019 | Marion Bamford | Prof Marion Bamford | Enviro-Insight CC | 28/10/2019 - 12:02 |
SAS5202 - Chance Finds Protocol | Implementation of the Leeuspruit Risk Mitigation Measures Monitoring Plan: Chance Finds Protocol | Non Impact Assessment Related Reports | 28/10/2019 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sasol Mining (Pty) Ltd | 28/10/2019 - 11:48 |
Battery Energy Storage System, Pongola substation | Application for exemption from undertaking a Phase 1 HIA for the Battery Energy Storage System, Pongola substation, uPhongola Local Municpality, KwaZulu-Natal | HIA Letter of Exemption | 12/09/2019 | Jean Beater | JLB Consulting | 1World Consultants (Pty) Ltd | 27/10/2019 - 14:59 |
Battery Energy Storage System, Elandskop substation | Application for exemption from undertaking a Phase 1 HIA for the Battery Energy Storage System, Elandskop substation, Msundusi Local Municipality, KwaZulu-Natal | HIA Letter of Exemption | 12/09/2019 | Jean Beater | JLB Consulting | 1World Consultants (Pty) Ltd | 27/10/2019 - 14:48 |