THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 5251 - 5300 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Irene concentration camp memorial | A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE ERECTION OF A MEMORIAL AT THE IRENE CONCENTRATION CAMP CEMETERY, CITY OF TSHWANE, GAUTENG PROVINCE | HIA Phase 1 | 26/08/2019 | Anton van Vollenhoven | Archaetnos CC | Federasie van Afrikaanse Kultuurvereniginge | 27/08/2019 - 15:00 |
Phase 1 Heritage Impact Assessment Specialist Report | BASIC ASSESSMENT PROPOSED N3 ROAD UPGRADES BETWEEN DURBAN AND CEDARA KWAZULU-NATAL HAMMARSDALE INTERCHANGE TO CATO RIDGE INTERCHANGE Phase 1 Heritage Impact Assessment Specialist Report | Heritage Impact Assessment Specialist Reports | 10/04/2019 | Len van Schalkwyk | eThembeni Cultural Heritage | 27/08/2019 - 12:00 | |
Heritage Impact Assessment for Annesley Salt Version 2 | PHASE 1 HIA REPORT BLOUPAN, REMAINDER OF THE FARM ANNESLEY NO. 338, NORTHERN CAPE | HIA Phase 1 | 24/08/2019 | Jan Engelbrecht, Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | 27/08/2019 - 09:05 | |
Heritage Impact Assessment for Annesley Salt | PHASE 1 HIA REPORT BLOUPAN, REMAINDER OF THE FARM ANNESLEY NO. 338, NORTHERN CAPE | HIA Phase 1 | 24/08/2019 | UBIQUE HERITAGE CONSULTANTS | 27/08/2019 - 08:54 | ||
Palaeontological Field Assessment Nigel Gas Pipeline | Palaeontological Field Assessment for the Proposed Nigel Gas Transmission Pipeline Project in the Nigel Area of the Ekurhuleni Metropolitan Municipality, Gauteng Province | PIA Phase 1 | 24/08/2019 | Elize Butler | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 26/08/2019 - 14:41 |
Bloemsmond 3 Visual Impact Assessment | Visual Impact Assessment for Bloemsmond 3 Solar | Visual Impact Assessment | 01/06/2019 | Stephen Stead | Visual Resource Management Africa cc | Cape Environmental Assessment Practitioners | 26/08/2019 - 13:15 |
Bloemsmond 3 Palaeontology Desktop Assessment | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED BLOEMSMOND 3, BLOEMSMOND 4 AND BLOEMSMOND 5 SOLAR PV FACILITIES ON PORTIONS 5 AND 14 OF THE FARM BLOEMSMOND 455 NEAR UPINGTON AND THEIR CONNECTION TO THE NATIONAL GRID VIA THE UPINGTON MAIN TRANSMISSION SUBSTATION, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 01/07/2019 | John Almond | Natura Viva CC | Cape Environmental Assessment Practitioners | 26/08/2019 - 12:45 |
LETTER OF RECOMMENDATION FOR EXEMPTION: THE DEVELOPMENT OF A COMMERCIAL TOWNSHIP AT EXTENSIONS 15, 16 AND 17 GRAND CENTRAL, MIDRAND, GAUTENG PROVINCE. | LETTER OF RECOMMENDATION FOR EXEMPTION: THE DEVELOPMENT OF A COMMERCIAL TOWNSHIP AT EXTENSIONS 15, 16 AND 17 GRAND CENTRAL, MIDRAND, GAUTENG PROVINCE. | Heritage Statement | 23/08/2019 | JA van Schalkwyk Heritage Consultant | JA van Schalkwyk Heritage Consultant | JA van Schalkwyk Heritage Consultant | 26/08/2019 - 12:40 |
Bloemsmond 3 Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT (REQUIRED UNDER SECTION 38(8) OF THE NHRA (No. 25 OF 1999) For the Bloemsmond 3 PV Project, Upington, Northern Cape Province | HIA Phase 1 | 01/06/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Cape Environmental Assessment Practitioners | 26/08/2019 - 12:38 |
HIA-Kangala Colliery | STATUS QUO AND PRE-MITIGATION HERITAGE IMPACT ASSESSMENT REPORT INCORPORATING SOCIAL FACILITATION FOR BURIALS IDENTIFIED DURING PHASE 1 IMPACT ASSESSMENT STUDY FOR UNIVERSAL COAL DEVELOPMENT I PTY LTD KANGALA COLLIERY IN DELMAS. VICTOR KANYE LOCAL MUNICIPALITY, IN MPUMALANGA PROVINCE. | HIA Phase 1 | 21/08/2018 | Mabuda Mmbudziseni Moses | Mulaifa Development Projects cc | Universal Coal (Pty) Ltd | 26/08/2019 - 09:14 |
AIA Yangeni Mining Permit Application | A HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED MINING PERMIT APPLICATION FOR A QUARRY TO MINE GRAVEL, AGGREGATE, AND OTHER STONES AT YANGENI TRIBAL AREA RESERVE 16 15836 SITUATED WITHIN THE AMBIT OF JOZINI LOCAL MUNICIPALITY, THE MAGISTERIAL DISTRICT OF UMKHANYAKUDE, KWAZULU NATAL PROVINCE SOUTH AFRICA | AIA Phase 1 | 14/06/2017 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Ankone Environmental Consultants | 25/08/2019 - 17:21 |
Cygnus 549 MS - PIA | Palaeontological Impact Assessment: Phase 1 Field Study Application for a Mining Right and Associated Environmental Authorisation and Waste Management Licence for Coal Mining at Cygnus 549-MS, Limpopo Province | PIA Phase 1 | 15/07/2019 | Dr. Heidi Fourie | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 23/08/2019 - 09:47 | |
Cygnus 549 MS - HIA | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Application for a Mining Right and Associated Environmental Authorisation and Waste Management License for Coal Mining on the Farm Cygnus 549 MS, Makhado Local Municipality, Vhembe District Municipality Limpopo Province | HIA Phase 1 | 01/06/2019 | Francois Coetzee | SRK Consulting (Pty) Ltd - Johannesburg | 23/08/2019 - 09:44 | |
Musket 2718 HIA | Phase 1 Heritage Impact Assessment for a proposed new service station, business and residential area on Portions 13 and 15 of Farm Musket 2718, Bloemfontein Free State Province. | HIA Phase 1 | 20/08/2019 | Lloyd Rossouw | Paleo Field Services | 22/08/2019 - 14:39 | |
HIA Exemption Report | 376HIA_Savannah_Kriel Power Station Exemption Letter_20190222_v0.1 | Heritage Impact Assessment Specialist Reports | 22/02/2019 | IIan Smeyatsky | Savannah Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 22/08/2019 - 14:08 |
HIA Exemption Report | 376HIA_Savannah_Kriel Power Station Exemption Letter_20190222_v0.1 | Heritage Impact Assessment Specialist Reports | 22/02/2019 | IIan Smeyatsky | Savannah Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 22/08/2019 - 14:01 |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for The Isiko Malt Grain Milling Plant on Pt 7 of the Farm Reydal 165 IQ, Krugersdorp, Gauteng | HIA Phase 1 | 09/07/2019 | Tobias Coetzee | Tobias Coetzee | Eco Elementum (Pty) Ltd | 22/08/2019 - 13:02 |
Heritage Report | 376HIA_Savannah_Kriel Power Station Exemption Letter_20190222_v0.1 | HIA Letter of Exemption | 22/02/2019 | IIan Smeyatsky | Savannah Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 22/08/2019 - 12:30 |
PIA and Protocol for Finds for a proposed rock quarry on Mimosa Glen 885/9 Bloemfontein | Palaeontological Impact Assessment and Protocol for Finds of a proposed new quarry on Portion 9 (of 6) of the farm Mimosa Glen 885, Bloemfontein, Free State Province | PIA Desktop | 16/08/2019 | Elize Butler | 22/08/2019 - 09:07 | ||
Heritage Impact Assessment for the N11 | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED NEWCASTLE BYPASS, MANDENI MUNICIPALITY | HIA Phase 1 | 22/08/2019 - 07:37 | ||||
Cultural Heritage Impact Assessment: | Phase 1 Investigation for the Application for a Mining Right and Associated Environmental Authorisation and Waste Management License for Coal Mining on the Farm Cygnus 549 MS, Makhado Local Municipality, Vhembe District Municipality Limpopo Province | AIA Phase 1 | Francois P Coetzee | Heritage Consultants | Department of Anthropology and Archaeology, UNISA | 21/08/2019 - 12:37 | |
VGRWSS-II: Upgrade of Existing Scheme - Palaeontological Impact Assessment | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED UPGRADE OF THE VAAL GAMAGARA REGIONAL WATER SUPPLY SCHEME: PHASE 2 AND GROUNDWATER ABSTRACTION | Banzai Environmental (Pty) Ltd | 21/08/2019 - 10:19 | ||||
VGRWSS-II: Upgrade of Existing Scheme - Heritage Impact Assessment | Heritage Impact Assessment for the proposed Upgrade of the Vaal Gamagara Regional Water Supply Scheme Phase 2 | Heritage Impact Assessment Specialist Reports | David Morris, Abenicia Henderson | McGregor Museum | 21/08/2019 - 10:07 | ||
PIA Infill Jan Kempdrop | Palaentological Desktop Assessment of the proposed residential development on Portion 42 of Farm Geldunskat No. 36 in Jan Kempdorp, Phokwane Local Municipality, Northern Cape Province | PIA Desktop | 02/05/2019 | Elize Butler | Banzai Environmental (Pty) Ltd | NSVT Consultants | 20/08/2019 - 14:37 |
AIA Jan Kempdorp Infill | Heritage Impact Assessment (Archaeology) for the proposed Guldenskat Residential Development, Jan Kempdorp, Northern Cape | AIA Phase 1 | 31/07/2019 | David Morris | Archaeology department, McGreggor Museum | NSVT Consultants | 20/08/2019 - 14:30 |
Exemption letter | RECOMMENDATION FOR EXEMPTION FROM HERITAGE AND PALAEONTOLOGICAL IMPACT STUDIES: ENVIRONMENTAL AUTHORISATION (EA) AND CLOSURE AND REHABILITATION OPTIMISATION PROJECT AT THE TSHIPI BORWA MINE, NEAR HOTAZEL, NORTHERN CAPE PROVINCE - CASEID: 13996 | HIA Letter of Exemption | 15/08/2019 | 20/08/2019 - 11:49 | |||
Paleontology Letter | Request for Exemption for Palaeontological Impact Assessment for the proposed development of a Commercial Township at extensions 15, 16 and 17 Grand Central, Midrand, Gauteng (GAUT002/12-13/E0226) SAHRIS Case ID:13950 | Palaeontological Specialist Reports | 17/08/2019 | Marion Bamford | Prof Marion Bamford | 20/08/2019 - 11:19 | |
Palaeontological Impact Assessment - Persberg Dam | Field Work Palaeontology Report: Paleontological Impact Assessment - Persberg Dam on Persberg Farm (Portion Linde No 4733) Helpmekaar, KwaZulu- Natal | Palaeontological Specialist Reports | 20/08/2019 | Alan Smith | KwaZulu-Natal Amafa and Research Institute | Alan Smith Consulting | 20/08/2019 - 10:32 |
Coleskop Paleontological Impact Assessment | Palaeontological Specialist Reports | Natura Viva CC | 20/08/2019 - 09:10 | ||||
Coleskop Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | Umlando: Archaeological Surveys & Heritage Management | 20/08/2019 - 09:08 | ||||
Kathu Extensions 6-10 Cultural Heritage Management Plan for Grave Site | A CULTURAL HERITAGE MANAGEMENT PLAN FOR A GRAVE SITE LOCATED AT THE KATHU EXTENSIONS 6-10 TOWNSHIP ESTABLISHMENT ON PORTIONS 1 & 2 OF THE FARM KALAHARI GHOLF & JAG LANDGOED 775 GAMAGARA LOCAL MUNICIPALITY (KATHU), NORTHERN CAPE PROVINCE | BGG Phase 1 | 31/07/2019 | Anton Pelser | A Pelser Archaeological Consulting | Maxim Planning Solutions | 20/08/2019 - 08:29 |
BASIC ASSESSMENT REPORT FS 30/5/1/1/2/10549 PR | BASIC ASSESSMENT REPORT FOR THE PROPOSED COAL PROSPECTING RIGHT APPLICATION IN BOTHAVILLE, FREE STATE PROVINCE | 19/08/2019 | Gregory N | Lushika Services | Lushika Services | 19/08/2019 - 13:41 | |
Existing Persberg Dam Wall - Phase 1 Heritage Impact Assessment | EXISTING PERSBERG DAM WALL, PERSBERG FARM (PORTION LINDE NO 4733) SITUATED NEAR HELPMEKAAR, MSINGA LOCAL MUNICIPALITY, UMZINYATHI DISTRICT MUNICIPALITY, KWAZULU-NATAL - Phase 1 Heritage Impact Assessment | HIA Phase 1 | 15/08/2019 | Jean Beater | KwaZulu-Natal Amafa and Research Institute | Afzelia Environmental Consultants Pty Ltd | 19/08/2019 - 10:23 |
Umsobomvu Paleontological Impact Assessment | Palaeontological specialist assessment: combined desktop and field-based study Umsobomvu 1 Wind Energy Facility near Middelburg, Pixley ka Seme & Chris Hani District Municipalities, Northern and Eastern Cape | Palaeontological Specialist Reports | 13/09/2018 | John E. Almond | Natura Viva CC | InnoWind (Pty) Ltd | 19/08/2019 - 10:01 |
Umsobomvu Heritage Impact Assessment | HERITAGE SURVEY OF THE UMSOBOMVU 1 WIND ENERGY FACILITY, EASTERN AND NORTHERN CAPE FOR EOH COASTAL AND ENVIRONMENTAL SERVICES. | Heritage Impact Assessment Specialist Reports | 13/09/2018 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | InnoWind (Pty) Ltd | 19/08/2019 - 09:57 |
Chansbury Layer Poultry Houses | Proposed construction of Layer Poultry Houses, Chansbury Farm, REM of Farm Vaalkranz, No. 140038, Winterton, KwaZulu-Natal | HIA Phase 1 | 13/05/2019 | Jean Beater | JLB Consulting | Sivest - PMB | 19/08/2019 - 09:14 |
HIA Exemption Request | LETTER FOR HIA EXEMPTION REQUEST: Q4 Fuel Rustenburg: Proposed expansion of facilities | HIA Letter of Exemption | 05/07/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Setala Environmental | 18/08/2019 - 11:41 |
Palaeontological Impact Assessment: Desktop study | PIA Desktop | 31/07/2019 | Dr. Heidi Fourie | Bateleur Environmental & Monitoring Services (Pty) Ltd | 16/08/2019 - 10:40 | ||
Heritage Reports | Please note that there are two reports 1) Report done for the Goedetrouw Infrastructure Option (preferred option with the least impact on heritage resources and graves), and 2) The Ketting Infrastructure Option, which was evaluated as an alternative option. | Heritage Impact Assessment Specialist Reports | 23/07/2019 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 16/08/2019 - 10:35 |
FS 30/5/1/1/2/10548 PR | BASIC ASSESSMENT REPORT FOR THE PROPOSED COAL PROSPECTING RIGHT APPLICATION ON FARM THOR 142 RD, PRTN 0, 5, 6, 7 KRUIDFONTEIN 67 RD, DORKING 206 RD, KRONEBLOEM 68 RD, ODIN 93 RD, AND DIE PAN 225 RD. | 13/08/2019 | Gregory N | Lushika Services | Lushika Services | 15/08/2019 - 21:29 | |
Barberton Mines (Pty) Ltd HIA Updated | Updated HIA for the prospecting right by Barberton Mines | HIA Phase 1 | 08/08/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | EcoPartners | 14/08/2019 - 11:23 |
LITTLEFILLIAN HIA | Phase 1 Cultural Heritage Impact Assessment: THE REPLACEMENT AND UPGRADE OF WATER RETICULATION PIPELINES ALONG A NUMBER OF STREETS IN LITTLEFILLIAN, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE | HIA Phase 1 | 30/07/2019 | J.A. van Schalkwyk | 14/08/2019 - 08:57 | ||
Lindley to Leratswana Pipeline HIA | Phase 1 HIA Report for the proposed raw water pipeline between Lindley and Arlington, Nketoana Local Municipality, Free State Province | HIA Phase 1 | 29/03/2019 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | NSVT Consultants | 13/08/2019 - 15:23 |
Goedgedacht Piggery Expansion | HERITAGE IMPACT ASSESSMENT (INCLUDING PHASE ONE PALEONTOLOGY DESKTOP ASSESSMENT) OF THE PROPOSED GOEDGEDACT PIGGERY EXPANSION, FOCHVILLE GAUTENG | Heritage Impact Assessment Specialist Reports | 22/04/2019 | Frans Prins | Active Heritage CC | Green Door Environmental | 13/08/2019 - 10:44 |
The Gladys Lodge | The Proposed Development of the Gladys Lodge in the Klaserie Private Nature Reserve, Ehlanzeni District Municipality, Mpumalanga Province. | Heritage Impact Assessment Specialist Reports | 29/07/2019 | Johnny van Schalkwyk | 13/08/2019 - 10:29 | ||
Groot Kolk HIA | Heritage Impact Assessment: KOLK PROSPECTING RIGHT APPLICATION FOR BLACK MOUNTAIN MINING | 08/07/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | 12/08/2019 - 15:20 | ||
Tierklip HIA | Heritage Impact Assessment: TIERKLIP PROSPECTING RIGHT APPLICATION FOR BLACK MOUNTAIN MINING | Heritage Impact Assessment Specialist Reports | 08/07/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | 12/08/2019 - 15:05 | |
Wit Puts HIA | Heritage Impact Assessment: WIT PUTS PROSPECTING RIGHT APPLICATION FOR BLACK MOUNTAIN MINING | Heritage Impact Assessment Specialist Reports | 08/07/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | 12/08/2019 - 14:39 | |
Jaagers Plaat HIA | Heritage Impact Assessment: JAAGERS PLAAT PROSPECTING RIGHT APPLICATION FOR BLACK MOUNTAIN MINING | 08/07/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | 12/08/2019 - 14:23 | ||
Gifkop HIA | Heritage Impact Assessment: GIFKOP PROSPECTING RIGHT APPLICATION FOR BLACK MOUNTAIN MINING | Heritage Impact Assessment Specialist Reports | 08/07/2019 | Jennifer Kitto | PGS Heritage (Pty) Ltd | 12/08/2019 - 14:12 |