FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
Pase 1 HIA study for proposed Mafube Road Realignment A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED MAFUBE LIFE X ROAD REALIGNMENT PROJECT NEAR BELFAST IN THE MPUMALANGA PROVINCE Heritage Study 13/11/2017 Dr Julius CC Pistorious Archaeologist and heritage Consultant Golder Associates Africa (Pty) Ltd 19/03/2018 - 10:08
EIA FOR CSP IN BOKPOORT, NORTHERN CAPE AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 06/03/2018 Johan van Schalkwyk, Cobus Dreyer 16/03/2018 - 16:30
Palaeontological Impact Assessment: Desktop Study for the upgrade of the R37 from Modikwa mine to Burgersfort Palaeontological Impact Assessment: Desktop Study for the upgrade of the R37 from Modikwa mine to Burgersfort, Limpopo Province PIA Desktop 16/03/2018 Dr. Heidi Fourie Chameleon Environmental 16/03/2018 - 12:49
PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED CONSTRUCTION OF ROAD K6 PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED CONSTRUCTION OF ROAD K6 BETWEEN THE FUTURE PLANNED ROAD K207 (KNOWN AS HONINGNESTKRANS ROAD/D1931) AND THE EXISTING ROAD K139 (KNOWN AS THE MOLOTO ROAD/R573), CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE. HIA Phase 1 10/03/2018 Leonie Marais-Botes 16/03/2018 - 09:30
Fochville Powerline Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTUCTION OF THE FOCHVILLE 132KV POWER LINE, GAUTENG PROVINCE. 30/05/2017 Johnny Van Schalkwyk 16/03/2018 - 09:07
NID CCT desalination Plant V & A Waterfront Cape Town NID CCT desalination Plant V & A Waterfront Cape Town Built Environment and Cultural Landscapes 15/03/2018 Bridget O'Donoghue City of Cape Town - Environmental and Heritage Management City of Cape Town - Environmental and Heritage Management 15/03/2018 - 17:43
NID CCT desalination Plant V & A Waterfront Cape Town NID CCT desalination Plant V & A Waterfront Cape Town Built Environment and Cultural Landscapes 15/03/2018 Bridget O'Donoghue City of Cape Town - Environmental and Heritage Management City of Cape Town - Environmental and Heritage Management 15/03/2018 - 17:36
Umkhunya HIA Heritage Impact Assessment for the Proposed Mkhunya Bulk Water Supply Scheme HIA Phase 1 10/07/2017 Stephan Gaigher G&A Heritage Management Consultants Gedezar Consulting 15/03/2018 - 17:11
AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE Amendment: EIA Application for the CSP in Bokpoort, Northern Cape Heritage Statement 06/03/2018 Johan van Schalkwyk 15/03/2018 - 16:54
AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE AMENDMENT: EIA APPLICATION FOR CSP IN BOKPOORT, NORTHERN CAPE Heritage Statement 06/03/2018 Johan van Schalkwyk 15/03/2018 - 16:39
Phase 1 Heritage Impact Assessment of proposed installation of a new 19 ha irrigation pivot on the farm Reliance no. 347 near Griekwastad, Northern Cape Province. Phase 1 Heritage Impact Assessment of proposed installation of a new 19 ha irrigation pivot on the farm Reliance no. 347 near Griekwastad, Northern Cape Province. AIA Phase 1 20/02/2018 Lloyd Rossouw Paleo Field Services Paleo Field Services 15/03/2018 - 09:32
Phase 1 Heritage Impact Assessment of proposed installation of a new irrigation pivots on the farm Reliance No. 347 near Griekwastad, Northern Cape Province. Phase 1 Heritage Impact Assessment of proposed installation of a new irrigation pivots on the farm Reliance No. 347 near Griekwastad, Northern Cape Province. AIA Phase 1 20/02/2018 Lloyd Rossouw Paleo Field Services Paleo Field Services 14/03/2018 - 19:16
Lulamisa powerline & Substations HIA Phase 1 Cultural Heritage Impact Assessment:THE PROPOSED CONSTRUCTION OF THE LULAMISA TO DIEPSLOOT EAST TO BLUE HILLS TO CROWTHORNE 88KV POWER LINE AND TWO SUBSTATIONS, GAUTENG PROVINCE HIA Phase 1 15/02/2017 JA van Schalkwyk Heritage Consultant 14/03/2018 - 16:48
DESKTOP PALAEONTOLOGY ASSESSMENT FOR LEC Palaeontological desk top study for the Construction of a power line from Foskor MTS near Phalaborwa to Spencer MTS near Tzaneen and the establishment of a transformation yard at Spencer MTS PIA Desktop 10/02/2018 JF Durand Francois Durand Vhubvo Archaeo-Heritage Consultants 14/03/2018 - 09:27
ARCHAEOLOGICAL AND CULTURAL ASSESSMENT FOR LEC PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF 400KV POWERLINE FROM FOSKOR SUBSTATION TO SPENCER SUBSTATION WITHIN THE JURISDICTION OF THE LOCAL MUNICIPALITIES OF GREATER LETABA, MARULENG, GREATER TZANEEN AND BA-PHALABORWA OF MOPANI DISTRICT MUNICIPALITY IN LIMPOPO PROVINCE. AIA Phase 1 12/02/2018 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants DIGES Group 14/03/2018 - 09:20
PALAEONTOLOGICAL DESK TOP STUDY FOR LEC Palaeontological desk top study for the Construction of a power line from Foskor MTS near Phalaborwa to Spencer MTS near Tzaneen and the establishment of a transformation yard at Spencer MTS PIA Desktop 10/02/2018 JF Durand Francois Durand DIGES Group 13/03/2018 - 19:51
PHASE 1 ARCHAEOLOGICAL AND CULTURAL REPORT FOR LIMPOPO EAST CORRIDOR STRENGTHENING PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF 400KV POWERLINE FROM FOSKOR SUBSTATION TO SPENCER SUBSTATION WITHIN THE JURISDICTION OF THE LOCAL MUNICIPALITIES OF GREATER LETABA, MARULENG, GREATER TZANEEN AND BA-PHALABORWA OF MOPANI DISTRICT MUNICIPALITY IN LIMPOPO PROVINCE. AIA Phase 1 13/02/2018 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants DIGES Group 13/03/2018 - 19:40
Ferrum Sekgame 132kV line & switching station desktop Palaeontological study Palaeontological Desktop Assessment for the Proposed Electricity Expansion Project and Sekgame Switching Station at the Sishen Mine, Northern Cape Province PIA Desktop 07/03/2018 Elize Butler Banzai Environmental (Pty) Ltd Eskom Distribution Division 13/03/2018 - 18:07
Phase 1 Archaeological Impact Assessment for the proposed Bauba Platinum Farms Mining Project PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the proposed opencast mining and initial site areas of the Northern and Southern Clusters of the Bauba Platinum Farms Mining Project, Sekhukhune, Limpopo AIA Phase 1 24/11/2017 Eco Elementum (Pty) Ltd Red Kite Environmental Solutions (Pty) Ltd 13/03/2018 - 14:21
Phase 1 Archaeological Impact Assessment for the proposed expansion of the Moeijelijk Chrome Mine Phase 1 Archaeological Impact Assessment for Eco Elementum (Pty) Ltd for the proposed expansion of the Moeijelyk Chrome Mine on the remaining extent of the farm Moeijelijk 412 KS, Sekhukhune, Limpopo AIA Phase 1 14/11/2017 Eco Elementum (Pty) Ltd Red Kite Environmental Solutions (Pty) Ltd 13/03/2018 - 13:45
Leeufontein HIA Phase 1 Cultural Heritage Impact Assessment: THE CONSTRUCTION OF A 132KV CHIKADEE POWER LINE ON THE FARM LEEUWFONTEIN 428JQ, SOUTHWEST OF BELFAST, EMAKHAZENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 10/12/2017 13/03/2018 - 11:03
Phase 1 Heritage Impact Assessment Report Heritage Impact Assessment Scoping Report for the Prospecting Right Application , Boreholes and Trenches: Hedley Plains A 64 Portions 2, 3, 4 and 5 near Copperton in the Northern Cape Province Heritage Scoping 05/03/2018 Stephan Gaigher G&A Heritage Management Consultants 13/03/2018 - 11:01
Draft Heritage Report for the proposed P236 Road Upgrade from km 14.00 to km 32.00 FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED P236 ROAD UPGRADES FROM KM14 TO KM32, UBOMBU, KWAZULU-NATAL HIA Phase 1 10/11/2017 Active Heritage CC 13/03/2018 - 09:47
CTS18_034_Terreco_Riverbend Heritage Screener for the PROPOSED RIVERBEND RETIREMENT VILLAGE DEVELOPMENT, EAST LONDON AIA Desktop 12/03/2018 Jenna Lavin CTS Heritage Terreco Environmental 12/03/2018 - 15:20
Umsimbithi eMakhazeni project: HIA Heritage Impact Assessment for the proposed Umsimbithi eMakhazeni Mining Project near Belfast, Mpumalanga Province. Heritage Impact Assessment Specialist Reports 04/12/2017 Jessica Angel PGS Heritage (Pty) Ltd Kongiwe Environmental (Pty) Ltd 11/03/2018 - 21:06
Black Rock Updated EMPR Abdul Ebrahim EScience 09/03/2018 - 16:22
HIA Underwater Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 17/08/2017 09/03/2018 - 12:31
Bhekuzulu HIA & Desktop Palaeo Survey of the Proposed Bhekuzulu, Epangweni and Ennersdale Water Supply Scheme, Estcourt, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 08/04/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Terratest (Pty) Ltd 09/03/2018 - 11:54
Palaeontological desktop study PALAEONTOLOGICAL HERITAGE ASSESSMENT: DESKTOP STUDY. Proposed single-circuit BPBH and KDLO Interconnector 22kV powerline near Boshof, Boshof District, Free State PIA Desktop 09/03/2018 09/03/2018 - 11:48
Vaalbank Heritage Report PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Diep Vaalbank Coal Project Between Hendrina and Bethal, Mpumalanga AIA Phase 1 12/02/2018 Tobias Coetzee Tobias Coetzee Ecoelementum Environmental and Engineering (Pty) Ltd 09/03/2018 - 11:13
Phase 1 Heritage impact assessment Glenover 371 LQ REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE GLENOVER PHOSPHATE MINE PROJECT ON PORTION 1 OF GLENOVER 371LQ, NEAR STEENBOKPAN, LIMPOPO PROVINCE HIA Phase 1 27/02/2018 Anton Pelser 08/03/2018 - 19:00
Phase 1 Arecheological Assessment Corobrik Driefontein 355 IQ REPORT ON A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF 2 NEW KILNS AS PART OF COROBRIK DRIEFONTEIN’S EXPANSION ON PORTIONS 23 & 27 (PORTIONS OF PORTION 22) OF THE FARM DRIEFONTEIN 355IQ, NEAR CARLETONVILLE, GAUTENG AIA Phase 1 24/01/2018 Anton Pelser A Pelser Archaeological Consulting 08/03/2018 - 18:30
TNPA RBAY TNPA Construction of marine infrastructure in the Port of Richards Bay Heritage Study 08/03/2018 - 15:38
PHASE I HERITAGE IMPACT ASSESSMENT PROPOSED VLAKVARKFONTEIN COLLIERY EXPANSION PROJECT HIA Phase 1 01/02/2018 Nkosinathi Godfrey Tomose PGS Heritage and Grave Relocation Consultants Environmental Impact Management Services (Pty) Ltd 08/03/2018 - 13:49
Vlakvarkfontein Coal Mine Palaeontological Impact Assessment for the Expansion of Open Cast Mining, a New Integrated Water Use License and the Establishment of a Coal Processing Facility by Ntshovelo Mining Resources (Pty) Ltd on Farm Vlakvarkfontein 213R, Victor Khanye Local Municipality, Mpumalanga Province PIA Desktop 01/02/2018 W Fourie PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 08/03/2018 - 13:35
Phezukomoya HIA v2 with images Heritage Impact Assessment for the Proposed Phezukomoya Wind Energy Facility to be situated on the Norther Cape Heritage Impact Assessment Specialist Reports 26/02/2018 Tim Hart ACO Associates CC Arcus Consulting 08/03/2018 - 13:07
Site Inspection report B 4 FARM in Limpopo Site Inspection report B 4 FARM, OHRIGSTAD Site Inspection Report 08/05/2017 Nkosazana Queenie Machete 08/03/2018 - 08:29
Site Inspection Report_Wearne Quarry Site Inspection Report_BY WEARNE QUARRY MULDERSDRIFT Site Inspection Report 16/05/2017 Nkosazana Queenie Machete 08/03/2018 - 08:19
Site Inspection Report_ Annesley Mine Site Inspection Report: Grave Relocated from Annesley Andalusite Mine Site Inspection Report 08/03/2017 08/03/2018 - 07:55
Umhlali residential development HERITAGE SURVEY OF THE PROPOSED UMHLALI RESIDENTIAL DEVELOPMENT HIA Phase 1 15/12/2017 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 07/03/2018 - 20:29
ANK3784 - Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed extraction of the No. 2 coal seam via open-pit strip mining within the 314 MR, Elandsfontein Colliery, Mpumalanga Province PIA Phase 1 25/02/2018 Marion Bamford Digby Wells Environmental Anker Coal and Mineral Holdings SA (Pty) Ltd 07/03/2018 - 16:01
HIA - Kruisvallei Hydro (Feb'18) Heritage Impact Assessment for the Proposed New Kruisvallei Hydroelectric Power Generation Scheme Heritage Impact Assessment Specialist Reports 21/02/2018 Nicholas Wiltshire CTS Heritage Savannah Environmental (Pty) Ltd 07/03/2018 - 11:52
Desktop HIA: Eskom Riries Maruping 22V Line Split REPORT ON A DESKTOP STUDY WITH REGARDS TO THE CULTURAL HERITAGE RELATING TO THE ESKOM RIRIES-MARUPING 22KV LINE SPLIT, NORTHERN CAPE PROVINCE Heritage Statement 28/02/2018 A.C. van Vollenhoven 05/03/2018 - 14:29
NRF4874 - NID Notification of Intent to Develop: The South African Astronomy Observatory Square Kilometer Array Heritage Impact Assessment and Conservation Management Plan Project. 05/03/2018 Justin du Piesanie Digby Wells Environmental South African Radio Astronomy Observatory 05/03/2018 - 14:19
Colwyn Drive Sewer Pipeline and supporting Infrastructure Heritage Scoping Report Proposed Colwyn Drive Sewer Pipeline with Supporting Infrastructure Sheffield Beach, KwaDukuza LM, KwaZulu-Natal. Heritage Scoping 24/01/2018 Len van Schalkwyk eThembeni Cultural Heritage, Sustainable Development Projects CC 02/03/2018 - 04:21
Amended - St Anne's Convent, Umzinto Revision of Erven and proposed land use Proposed Subdivision of the Remainder of Erf 328 Umzinto Umdoni Local Municipality, Ugu DM, KwaZulu-Natal Built Environment and Cultural Landscapes 28/02/2018 Len van Schalkwyk eThembeni Cultural Heritage 02/03/2018 - 03:23
Paleontological Desktop Assessment SO2 Mortimer RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: Proposed Wet Gas Sulfuric Acid Plant at the Mortimer Smelting Complex on Farms Zwartklip 405 KQ, Spitskop 410 KQ, Haardoorn 6 JQ and Turfbult 404 KQ, Bojanala Platinum District Municipality, near Rustenburg, Northwest Province PIA Desktop 15/02/2018 John E Almond Natura Viva CC WSP Environmental Pty Ltd - Johannesburg 01/03/2018 - 12:40
Paleontological Assessment for SO2 Abatement Plant at Polokwane Smelter RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: Proposed Wet Gas Sulfuric Acid Plant at the Polokwane Metallurgical Complex, Portions 6 and 49 of the Farm Palmietfontein 24KS near Polokwane, Limpopo Province PIA Desktop 15/02/2018 John E Almond WSP Environmental Pty Ltd - Johannesburg 01/03/2018 - 12:27
Use of existing P73 borrow pit HIA Use of existing P73 borrow pit, Hlokozi, Ubuhlebezwe Local Municipality, KwaZulu-Natal HIA Phase 1 11/09/2017 Jean Beater JLB Consulting Kerry Seppings Environmental Management 01/03/2018 - 09:17
PIA Scoping - Boulders WEF (Feb'18) Palaeontological Scoping Report for the Proposed Boulders Wind Farm in Saldanha Bay Local Municipality, Vredenburg District, Western Cape 06/11/2017 J Pether Savannah Environmental (Pty) Ltd 28/02/2018 - 13:54