FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
Kwasobabili Irrigation Project Palaeontological Report Palaeontological Impact Assessment for the proposed Kwasobabili Cooperative (irrigation project), near Estcourt, KwaZulu Natal Province PIA Desktop 21/01/2018 Marion Bamford GCS Water and Environmental Consultants - Durban 13/02/2018 - 13:09
Kwasobabili DRDLR Irrigation Project KWASOBABILI AGRICULTURAL COOPERATIVE IRRIGATION PROJECT, IMBABAZANE LOCAL MUNICIPALITY, KWAZULU-NATAL Phase 1 Heritage Impact Assessment January 2018 HIA Phase 1 16/01/2018 Jean Beater JLB Consulting GCS Water and Environmental Consultants - Durban 13/02/2018 - 13:02
HIA New Modder x 6 Heritage Impact Assessment for the Proposed New Modder x 6 Light Industrial Development on Part of the Remainder of Portion 1 of the Farm Modderfontein 76, IR. 13/02/2018 - 10:31
HIA Ventersdorp, North West Province HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VENTERSDORP TOWNSHIP ESTABLISHMENT, NORTH WEST PROVINCE PROJECT HIA Phase 1 14/11/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting METHALE ENVIRONMENTAL CONSULTING 13/02/2018 - 08:03
Exemption from Phase 1 Palaeontological Impact Assessment: New township development on the farm Elandskuil, Ventersdorp, North West Province Exemption from Phase 1 Palaeontological Impact Assessment: New township development on the farm Elandskuil, Ventersdorp, North West Province PIA Desktop 03/12/2017 Lloyd Rossouw Paleo Field Services METHALE ENVIRONMENTAL CONSULTING 13/02/2018 - 07:59
Archaeological Impact Assessment: Plot 31, Spitskop Smallholdings, Bloemfontein, Free State Province. Exemption from further Archaeological Impact Assessment: Plot 31, Spitskop Smallholdings, Bloemfontein, Free State Province. HIA Letter of Exemption 11/01/2018 Lloyd Rossouw Paleo Field Services Paleo Field Services 12/02/2018 - 21:35
Amanzi Pivots Farm Waterford HIA A Phase 1 Heritage Impact Assessment of proposed installation of new irrigation pivots and associated infrastructure on portion 0 and 2 of the farm Waterford 229 outside Hopetown, NC Province. AIA Phase 1 04/10/2017 Lloyd Rossouw Paleo Field Services Paleo Field Services 12/02/2018 - 20:36
Marataba Roads & Staff Accommodation Heritage Report Cultural Heritage Impact Assessment: Phase 1 Investigation for Proposed Development of New Access Roads within the Marataba Section of the Marakele National Park, Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province HIA Phase 1 16/05/2018 Francois P Coetzee 12/02/2018 - 15:40
PIA Barcklay Vale 288 JT and Montrose 290 JT Palaeontological Impact Assessment for the proposed Clearing and cultivation of currently untransformed areas on the Farms Montrose 290 JT and Barclay Vale 288 JT, Mpumalanga Province PIA Desktop 11/07/2017 Marion Bamford University of the Witwatersrand - Wits School of Arts Henwood Environmental Services 12/02/2018 - 15:25
HIA Barcklay Vale 288 JT and Montrose 290 JT Phase 1 Archaeological and Heritage Impact Assessment on the farms Barclay Vale 288 JT and Montrose 290 JT in respect of proposed agricultural development, Mpumalanga Province. HIA Phase 1 16/10/2017 Jean-Pierre Celliers Kudzala Antiquity Henwood Environmental Services 12/02/2018 - 15:16
HIA: Proposed Expansion of the Eshowe Cemetery, KZN. Heritage Impact Assessment for the Proposed Expansion of the Eshowe Cemetery in the uMlalazi Local and uThungulu District Municipalities, KwaZulu Natal. HIA Phase 1 02/02/2018 Stephan Gaigher G&A Heritage Management Consultants Ecosphere 12/02/2018 - 14:36
Ngwadini Weir and Abstraction Works HIA PROPOSED NGWADINI WEIR AND ABSTRACTION WORKS, PIPELINE AND ACCESS ROAD, LOWER UMKHOMAZI BULK WATER SUPPLY SCHEME, KWAZULU-NATAL HIA Phase 1 01/10/2017 Jean Beater 12/02/2018 - 14:09
PIA Eskom Riries-Maruping PIA Eskom Riries-Maruping PIA Desktop 29/01/2018 Marion Bamford 12/02/2018 - 12:12
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE HIA Phase 1 28/02/2019 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Nsovo Environmental Consulting 09/02/2018 - 12:25
PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF APPROXIMATELY 170KM 1 X 400KV POWERLINE FROM MAPHUTHA SUBSTATION TO WITKOP SUBSTATION WITHIN THE SEKHUKHUNE AND CAPRICON DISTRICT MUNICIPALITIES OF LIMPOPO PROVINCE HIA Phase 1 30/11/2017 Munyadziwa Magoma Nsovo Environmental Consulting Nsovo Environmental Consulting 09/02/2018 - 12:18
PIA Eskom Riries-Maruping PIA Eskom Riries-Maruping PIA Desktop 29/01/2018 08/02/2018 - 14:33
Phezukomoya Heritage Impact Assessment Heritage Impact Assessment for the Proposed Phezukomoya Wind Energy Facility to be situated in the Northern Cape Heritage Impact Assessment Specialist Reports 30/11/2017 Tim Hart ACO Associates CC Arcus Consulting 08/02/2018 - 14:04
PIA New Forest 243 Palaeontological Impact Assessment for the proposed Bushbuckridge Feedlot and Red meat Abattoir, Mpumalanga Province. PIA Desktop 01/10/2017 Marion Bamford University of the Witwatersrand - Wits School of Arts Enpact Environmental Consultants CC 08/02/2018 - 13:04
HIA New Forest 234 KU Phase 1 Archaeological and Heritage Impact Assessment on a portion of the farm New Forest 234 KU in respect of the proposed Bushbuckridge Feedlot and Abbatoir, Bushbuckridge, Mpumalanga Province HIA Phase 1 19/10/2017 Jean-Pierre Celliers Kudzala Antiquity Enpact Environmental Consultants CC 08/02/2018 - 12:55
San Kraal WEF Heritage Impact Assessment Heritage Impact Assessment for the Proposed San Kraal Wind Energy Facility to be situated in the Northern Cape Heritage Impact Assessment Specialist Reports 30/11/2017 Tim Hart ACO Associates CC Arcus Consulting 08/02/2018 - 12:10
Panbult PIA Palaeontological Impact Assessment for the Proposed Upgrade of the National Route N2 Section 34 (Between Piet Retief and Ermelo): Link and Grade-Separation for Existing Intersection at Provincial Road p97/2 and D803 for Kangra Mine Coal Haulage at Panbult, Mpumalanga Province, South Africa PIA Phase 1 03/09/2017 Marion Bamford LYMA Consulting Engineers 08/02/2018 - 09:33
Oasis Taaipit Heritage Imapct Assessment PHASE 1 ARCHAEOLOGICAL/ HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED OASIS-TAAIPIT 132KV POWERLINE UPGRADE INCLUDING 2 DEVIATIONS IN THE KAI!GARIB LOCAL MUNICIPALITY IN NORTHERN CAPE PROVINCE. AIA Phase 1 31/10/2017 Trust Mlilo Sativa Travel and Environmental Consultants GIBB (Pty) Ltd 07/02/2018 - 13:23
Archaeological Mitigation Report For the Iron Age/Historical Site (PLA1677/S.35-027) and Iron Age Smelting Site (PLA1677/S. 35-006) near Mokopane, Limpopo Province Archaeological Mitigation Report For the Iron Age/Historical Site (PLA1677/S.35-027) and Iron Age Smelting Site (PLA1677/S. 35-006) near Mokopane, Limpopo Province HIA Phase 2 15/12/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Ivanplats (Pty) Ltd 07/02/2018 - 12:27
Ntuzuma C WWR LETTER OF EXEMPTION FOR THE PROPOSED NTUZUMA C WATER RETICULATION PROJECT HIA Letter of Exemption 01/02/2018 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management JG AFRIKA 07/02/2018 - 10:25
L1292 HIA & PIA FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF A SINGLE LANE LOW-LEVEL VEHICLE RIVER BRIDGE AT THE CROSSING POINT BETWEEN THE CWEMBE RIVER AND THE LOCAL ROAD L1292, ALFRED DUMA LOCAL MUNICIPALITY, KWAZULU-NATAL. HIA Phase 1 28/01/2018 07/02/2018 - 08:56
Nkosi City Human Settlement Development 06/02/2018 - 16:37
Archarological Desktop Study ARCHAEOLOGICAL DESKTOP STUDY for the application of a on portions 36, 37, 38, 3 9p,r o40s paencdt i4n1g orifg thhte Farm Boekenhoutkloof 315 JR, Pretoria North, Gauteng AIA Desktop 01/10/2017 Tobias Coetzee Klei Minerale (Pty) Ltd 06/02/2018 - 15:07
SAS3869 - HIA Heritage Impact Assessment: Environmental Regulatory Process in terms of the Thubelisha, Trichardtsfontein and Vaalkop Mining Right areas Heritage Impact Assessment Specialist Reports 31/08/2017 Justin du Piesanie Digby Wells Environmental Sasol Mining (Pty) Ltd 06/02/2018 - 12:41
Heritage Scoping Report - Helmsley Agricultural Estate Heritage Scoping Report - Helmsley Agricultural Estate Located on Erf 1 Driefontein KwaDukuza LM, Ilembe DM, KwaZulu-Natal. Heritage Scoping 10/01/2018 Len van Schalkwyk eThembeni Cultural Heritage IDM Environmental 06/02/2018 - 11:34
Almond Palaeontogical comment Imvusa Kaolin Palaeontontological heritage comment: Rondawel Kaolien CC kaolin mine, Portion 1 Farm Rondawel 638, Namaqualand District, Northern Cape (Reference NC30/5/1/2/2/10638MP) 30/01/2018 Natura Viva CC 06/02/2018 - 09:44
Madonsi Gold MIne HIA Madonsi Gold MIne Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 01/12/2017 Nelius Kruger Exigo3 Sustainability 27/01/2018 - 09:06
Comment on graves discovered in a road at Port Nolloth Morris, D., Louw, J & Henderson, A. 2017. Comment on graves discovered in a road at Port Nolloth. Unpublished preliminary inspection report to Port Nolloth Local Municipality and SAHRA. BGG Phase 1 14/12/2017 McGregor Museum 26/01/2018 - 11:43
AIA for the Botswana-South Africa Transmission Line Project (Botswana component) Archaeological Impact Assessment for the BOSA Transmission Line Project from the Isang Substation to the Tlokweng Border Post in the South Eastern and Kgatleng Distrcits of Botswana Archaeological Specialist Reports 01/09/2017 Wim Biemond Lentswe Archaeological Consultants G&A Heritage Management Consultants, Aurecon South Africa (Pty) Ltd 26/01/2018 - 09:58
Phase I HIA - BOSA (South African component) Phase I Heritage Impact Assessment Report for the Proposed Botswana South Africa (BOSA) Transmission Project HIA Phase 1 24/08/2017 Stephan Gaigher G&A Heritage Management Consultants Aurecon South Africa (Pty) Ltd 26/01/2018 - 09:53
Umbumbulo Pump Station PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UMBUMBULO PUMP STATION, ETHEKWENI MUNICIPALITY, KZN. HIA Phase 1 25/01/2018 Frans Prins Active Heritage CC KSEMS Environmental Consulting 25/01/2018 - 15:17
Qamata Feed Mill HIA Phase 1 Heritage Impact Assessment of a proposed re-utilization of an existing mill in Qamata, EC Province. HIA Phase 1 15/01/2018 Lloyd Rossouw Paleo Field Services Enviroworks 25/01/2018 - 14:55
Heritage Assessment for Lilyvale 30/2313 Phase 1 Heritage Assessment with regard to planned Township development on the Farm Lilyvale 30/2313, Bloemfontein, Free State. Phase 1 Palaeontological Impact Assessment with regard to proposed Township development on the Farm Lilyvale 30/2313, Bloemfontein, Free State. HIA Phase 1 15/01/2018 24/01/2018 - 17:19
Cultural Heritage Assessment: Lewende Woord Cultural heritage impact assessment for THE PROPOSED LEWENDE WOORD DEVELOPMENT ON PORTION 123 OF PORTION 28 OF THE FARM VLAKFONTEIN 523JR, KUNGWINI LOCAL MUNICIPALITY, GAUTENG PROVINCE Heritage Statement 01/05/2016 Johnny Van Schalkwyk JA van Schalkwyk Heritage Consultant LEAP - Lanscape Architect Environmental Planner 24/01/2018 - 16:28
HIA Glaudina Extension 2 & Erf 395, Glaudina Extension 1 Report on a Phase 1 Heritage Assessment for the proposed Glaudina Extension 2 Township Establishment on a portion of the Remaining Extent of Portion 10 of the farm Vleeschkraal 145HO near Schweizer Reneke, North West Province HIA Phase 1 01/02/2017 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 24/01/2018 - 14:56
Wembezi Paleo Report Phase 1 Palaeontological AND “CHANCE FIND PROTOCOL” FOR THE PROPOSED WEMBEZI BULK WATER AND SEWERAGE RETICULTATION PROJECTS, INKOSI LANGALIBALELE LOCAL MUNICIPALITY, UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL PROVINCE PIA Phase 1 20/07/2017 Gideon Groenewald Dr. Gideon Groenewald Terratest (Pty) Ltd 24/01/2018 - 14:45
Sishen Mine - Proposed Overflow dam at Aldag PCD and Lylyveld South PCD HIA HIA_EXM_Proposed Pollution Control Dams_Final Reviewed Report Archaeological Specialist Reports 08/12/2017 Polke Birkholtz PGS Heritage (Pty) Ltd 24/01/2018 - 13:10
Heritage Scoping Report - Birdhaven Boutique Residential Estate Development Heritage Scoping Report Proposed Birdhaven Boutique Residential Estate Development 50B Colwyn Drive, Sheffield Beach KwaDukuza LM, Ilembe DM, KwaZulu-Natal. Len van Schalkwyk eThembeni Cultural Heritage Graham Projects, Birdhaven Boutique Residential Estate 23/01/2018 - 16:32
AIA for the Botswana-South Africa Transmission Line Project Archaeological Impact Assessment for the BOSA Transmission Line Project from the Isang Substation to the Tlokweng Border Post in the South Eastern and Kgatleng Districts of Botswana Archaeological Specialist Reports 01/09/2017 Wim Biemond Lentswe Archaeological Consultants Aurecon South Africa (Pty) Ltd, Digby Wells Environmental, G&A Heritage Management Consultants 23/01/2018 - 12:41
AIA FOR THE PROPOSED KA XIKWAMBANA FILLING STATION, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED KA XIKWAMBANA FILLING STATION, LIMPOPO PROVINCE AIA Phase 1 07/02/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Tekplan Environmental 23/01/2018 - 12:35
HIA for the Botswana-South Africa Transmission Project Phase 1 Heritage Impact Assessment Report for the Botswana-South Africa (BOSA) Transmission Project HIA Phase 1 24/08/2017 Stephan Gaigher G&A Heritage Management Consultants Aurecon South Africa (Pty) Ltd 23/01/2018 - 12:29
Cultural Heritage Assessment R37 between Modikwa Mine and Burgersfort Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE OF A SECTION OF THE R37 ROAD BETWEEN MODIKWE MINE AND BURGERSFORT, LIMPOPO PROVINCE HIA Phase 1 15/08/2017 Johnny Van Schalkwyk SAHRA Council Chameleon Environmental 22/01/2018 - 10:29
Phase 1 Cultural Heritage Impact Assessment: THE CONSTRUCTION OF A 132KV CHIKADEE POWER LINE ON THE FARM TWEEFONTEIN 458JS, SOUTHEAST OF MIDDELBURG, STEVE TSHWETE LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 01/12/2017 Johnny Van Schalkwyk Eskom Distribution Division Envirolution Consulting (Pty) Ltd 19/01/2018 - 12:56
CULTURAL HERITAGE IMPACT ASSESSMENT A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROSPECTING OF THE GLOSAM MINE CLOSE TO POSTMASBURG, NORTHERN CAPE PROVINCE. HIA Phase 1 19/01/2018 Anton van Vollenhoven A.C. van Vollenhoven A.C. van Vollenhoven 19/01/2018 - 11:19
Cultural Heritage Assessment - Prime Spot Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR, Sedibeng District Municipality, Midvaal Local Municipality, Gauteng Heritage Impact Assessment Specialist Reports 01/09/2013 Francois P Coetzee Umhlaba Environmental Consulting CC 18/01/2018 - 16:50
Almond Bank Heritage Impact Assessment Heritage Impact Assessment of Almond Bank Extension, Pietermaritzburg, KwaZulu-Natal HIA Phase 1 29/01/2009 eThembeni Cultural Heritage Afzelia Environmental Consultants Pty Ltd 18/01/2018 - 14:14

Pages

CSV
 
 

Search form