THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 7201 - 7250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
NID: CCT desalination plant Harmony Park Cape Town | NID & Annexures CCT Desalination Plant Harmony Park Cape Town | 22/10/2017 | Bridget O'Donoghue | City of Cape Town Metropolitan Municipality | 22/10/2017 - 18:25 | ||
NID: CCT desalination plant Monwabisi Cape Town | NID and Annexures CCT desalination plant Monwabisi Cape Town | Built Environment and Cultural Landscapes | 18/10/2017 | Bridget O'Donoghue | City of Cape Town Metropolitan Municipality | 20/10/2017 - 17:08 | |
NID: CCT desalination plant Strandfontein Cape Town | NID and Annexures: CCT desalination plant Strandfontein Cape Town | Built Environment and Cultural Landscapes | 18/10/2017 | Bridget O'Donoghue | City of Cape Town Metropolitan Municipality | 20/10/2017 - 16:14 | |
PIA Bruintjieslaagte 465JT | Palaeontological Impact Assessment for the proposed construction of a dam wall on farm Bruintjieslaagte 465JT, in the Schoemanskloof Valley, Mpumalanga Province. | PIA Desktop | 14/08/2017 | Marion Bamford | University of the Witwatersrand - Wits School of Arts | Kudzala Antiquity | 19/10/2017 - 15:59 |
EMPR | Environmental Management Program - Sienna Estate | Conservation Management Plan | 15/10/2017 | Jonathon Smythe | G&M Environmental management solutions | G&M Environmental management solutions | 19/10/2017 - 11:46 |
PIA Sabis School | Palaeontological Impact Assessment: Desktop study Proposed Sabis School - School development with related infrastructure City of Tshwane Metropolitan Municipality, Gauteng Province Farm: Portion 20 of the Farm Zwartkoppies 364 JR | PIA Desktop | 13/01/2017 | Dr. Heidi Fourie | Dr Heidi Fourie | LEAP - Lanscape Architect Environmental Planner | 19/10/2017 - 08:48 |
AIA Sabi School | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED SABIS SCHOOL, GAUTENG PROVINCE | AIA Phase 1 | 30/01/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | LEAP - Lanscape Architect Environmental Planner | 18/10/2017 - 20:32 |
PIA Karino Interchange, Mbombela, Mpumalanga | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DEVELOPMENT OF THE KARINO INTERCHANGE, LOCATED EAST OF MBOMBELA, MBOMBELA LOCAL MUNICIPALITY, EHLANZENI DISTRICT MUNCIPALITY, MPUMALANGA PROVINCE | PIA Desktop | 14/10/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 18/10/2017 - 13:27 |
Phase 1 Cultural Heritage Impact Assessment: Revised | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED DIAMONDS ALLUVIAL AND DIAMONDS GENERAL PROSPECTING RIGHT NEAR SCHWEIZER-RENEKE ON PORTION 2 AND A CERTAIN EXTENT OF THE REMAINING EXTENT OF THE FARM KAMEELKUIL 88HO, MAMUSA LOCAL MUNICIPALITY, NORTH WEST PROVINCE. | HIA Phase 1 | 16/10/2017 | J.A. van Schalkwyk | 17/10/2017 - 08:50 | ||
FOU2191 Oakleaf HIA | Heritage Impact Assessment: Environmental Impact Assessment for the Proposed Open Pit Coal Mine and Associated Infrastructure, near Bronkhorstspruit, Gauteng | Heritage Impact Assessment Specialist Reports | 31/08/2015 | Justin du Piesanie | Digby Wells Environmental | Oakleaf Investment Holdings Holdings 95 (Pty) Ltd | 17/10/2017 - 08:08 |
R 56 | THE PROPOSED, R56 HOUSING DEVELOPMENT 20MVA 132/22/11KV SUBSTATION AND 132KV TURN-OFF LINES AT KOKSTAD, KZN | HIA Phase 1 | 11/10/2017 | Frans Prins | Ludloko Developments | Active Heritage CC | 17/10/2017 - 06:24 |
APOSTLE BATTERY HERITAGE REPORT & DEVELOPMENT GUIDELINES | TABLE MOUNTAIN NATIONAL PARK APOSTLE BATTERY HERITAGE REPORT & DEVELOPMENT GUIDELINES COMPILED IN TERMS OF SECTION 27 OF THE NHRA (1999) FOR Erven 1432-RE and CA 902-1, The Apostle Battery, Victoria Avenue, Llandudno. DRAFT V.4 July 2017 | Conservation Assessment | 21/07/2017 | Jenna Lavin, Larissa Heyns, Michael Scurr | Rennie Scurr Adendorff | South African National Parks | 16/10/2017 - 17:44 |
AIA FOR THR PROPOSED HERSCHEL REGIONAL LANDFILL SITE DEVELOPMENT PROJECT, HERSCHEL, JOE GQABI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THR PROPOSED HERSCHEL REGIONAL LANDFILL SITE DEVELOPMENT PROJECT, HERSCHEL, JOE GQABI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 04/08/2017 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - East London | 16/10/2017 - 16:04 |
Phase 1 Cultural Heritage Impact Assessment | Phase 1 Cultural Heritage Impact Assessment: PROSPECTING RIGHT APPLICATION OF DIAMONDS ALLUVIAL AND DIAMONDS GENERAL NEAR CHRISTIANA ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM KAFFRARIA 314HO, LEKWA-TEEMANE LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 29/09/2017 | J.A. van Schalkwyk | 13/10/2017 - 15:43 | ||
Phase 1 Heritage Impact Assessment, Revised | Phase 1 Heritage Impact Assessment of the Remaining Extent of Portion 2 (Cypherfontein) and Portion 15 (On Avon – a Portion of Portion 2) of the farm Maraetchesfontein 54, near Schweizer Reneke, Northwest Province. | HIA Phase 1 | 12/10/2017 | L Rossouw | 13/10/2017 - 11:23 | ||
AIA: 22kv powerlines in the Eastern Cape | AIA: In terms of Section 38(8) of the NHRA for NEW 22KV POWER LINES IN VARIOUS LOCATIONS IN THE EASTERN CAPE | AIA Phase 1 | 13/10/2017 | Katie Smuts, Jenna Lavin, Guy Thomas | CTS Heritage | JG AFRIKA | 13/10/2017 - 11:14 |
PIA - H2 Energy (02.10.17) | Palaeontological Impact Assessment for the H2 Energy Power Station, Mpumalanga Province | Palaeontological Specialist Reports | 02/10/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/10/2017 - 14:58 |
HIA - H2Energy (Oct'17) | Heritage Impact Assessment for the H2 Energy Power Station, Mpumalanga Province | Heritage Impact Assessment Specialist Reports | 09/10/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 12/10/2017 - 14:56 |
11074 PIA | Recommended Exemption from further Palaeontological Studies: Proposed access roads for the Zeerust PV Plant on remainder of portion 5 of portion 5 of Hazia 240JP and portion 15 of Kameeldoorn 271JP near Zeerust, North West Province | PIA Desktop | 01/06/2017 | John Almond | 12/10/2017 - 14:38 | ||
Cons Modder PIA | Palaeontological Impact Assessment for the proposed Gedex project near Brakpan, Gauteng Province | PIA Desktop | 09/04/2017 | Marion Bamford | Prime Resources (Pty) Ltd | 12/10/2017 - 09:38 | |
Cons Modder HIA | BASELINE STUDY & HERITAGE ASSESSMENT REPORT FOR THE NEWSHELF 1186 (PTY) LTD’S GEDEX PROJECT, IN BRAKPAN, GAUTENG | HIA Phase 1 | 30/04/2017 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Prime Resources (Pty) Ltd | 12/10/2017 - 09:35 |
EXX4731_Matla_HSMP_ProgressReport | Exxaro Matla HSMP Watching Brief Progress Report | Non Impact Assessment Related Reports | 31/08/2017 | Justin du Piesanie | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 12/10/2017 - 09:22 |
T17997 Umfula Motors | the construction of a telecommunication mast for MTN (Ericsson) | 12/10/2017 | 12/10/2017 - 08:58 | ||||
PIA Bothma and Son | S. BOTHMA AND SON TRANSPORT SAND MINE Palaeontological Impact Assessment for the Application of an Integrated Water Use License by Environmental Impact Management Services on the S. Bothma and Son Transport Sand Mine on Remainder Portion of the Farm Boschbank 12, Sasolburg, Free State Province. | PIA Phase 1 | 02/10/2017 | W Fourie | Environmental Impact Management Services (Pty) Ltd | 12/10/2017 - 07:59 | |
HIA S Bothma and Sons | S. BOTHMA AND SON TRANSPORT (PTY) LTD SAND WORKS PROPOSED TRANSPORT SAND MINING/ INTEGRATED WATER USE LICENCE APPLICATION ON THE REMAINDER PORTION OF THE FARM BOSCHBANK 12, NEAR SASOLBURG, METSIMAHOLO LOCAL MUNICIPALITY, FEZILE DABI DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 02/10/2017 | W Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 12/10/2017 - 07:55 |
RBM Zulti North 2015 | The Archaeological Surveys and Excavations of the Zulti North Mining Lease | HIA Phase 3 | 01/02/2016 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | Richards Bay Minerals | 11/10/2017 - 17:04 |
Palaeontological Specialist Report | Environmental and Social Impact Assessment (ESIA) for the Gamsberg Zinc Mine and Associated Infrastructure, Northern Cape Province; Palaeontological Impact Assessment Desktop Study | PIA Desktop | John Pether | South African Heritage Resources Agency | Black Mountain Mining (PTY) LTD | 11/10/2017 - 12:45 | |
Heritage and Archaeological Specialist Report | Archaeological and Cultural Heritage Investigation for the Environmental and Social Impact Assessment (ESIA) for the Gamsberg Zinc Mine and Associated Infrastructure in the Northern Cape, South Africa | Heritage Impact Assessment Specialist Reports | David Morris | South African Heritage Resources Agency | Black Mountain Mining (PTY) LTD | 11/10/2017 - 12:38 | |
Walmer 11305 Palaeontological LoE | Recommended Exemption from further Palaeontological Studies: Proposed Low-cost Housing Developemtn on ERf 11305, Walmer, Nelson Mandela Bay Municipality, Eastern Cape | HIA Letter of Exemption | 01/09/2014 | John Almond | Natura Viva CC | SRK Consulting (South Africa) (Pty) Ltd - PLZ | 10/10/2017 - 08:59 |
PROPOSED SPRINGS NATURAL GAS LIQUEFACTION (LNG) PLANT DEVELOPMENT PROJECT, EKURHULENI, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THR PROPOSED SPRINGS LNG PLANT DEVELOPMENT PROJECT ON THE REMAINDER OF PTN 93 OF THE FARM RIETFONTEIN 128IR, SPRINGS, EKURHULENI, GAUTENG PROVINCE | AIA Phase 1 | 04/10/2017 | Neels Kruger | Exigo Sustainability | Exigo Sustainability | 09/10/2017 - 15:58 |
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED ACCESS ROADS FOR THE ZEERUST PV PLANT ON REMAINDER OF PORTION 5 OF HAZIA 240JP & PORTION 15 OF KAMEELDOORN 271JP NEAR ZEERUST, NORTHWEST PROVINCE | Palaeontological Specialist Reports | 09/10/2017 | John Almond | RE CAPITAL 2 (Pty) Ltd | 09/10/2017 - 15:45 | |
Phase 1 HIA Bronberg | 100ML Bronberg Reservoir and Associated Infrastructure | HIA Phase 1 | 01/03/2017 | Leonie Marais-Botes | Rand Water | 09/10/2017 - 09:22 | |
HIA: Driefontein 179 Ptn 90 | Cultural Heritage Impact Assessment: Phase 1 Investigation for an Environmental Impact Assessment for the Proposed Construction of an Entertainment Area, Chalets, Camps, Cultural Huts, Septic Tank and Restaurant on the farm Driefontein 179, Portion 90, Muldersdrift, Mogale City Local Municipality, West Rand District Municipality, Gauteng Province | HIA Phase 1 | 01/09/2017 | Francois Coetzee | GKM Environmental Consultants | 06/10/2017 - 12:31 | |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 05/10/2017 - 07:27 |
Heritage Scoping Report LONZA Water Products and Wood Preservation Facility | Heritage Scoping Report LONZA Water Products and Wood Preservation Facility Cato Ridge, eThekweni Municipality, KwaZulu-Natal | Heritage Scoping | 27/06/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Kantey & Templer Consulting Engineers | 05/10/2017 - 04:22 |
Heritage Scoping Report - Proposed Upgrade of Banana City Informal Settlement | Heritage Scoping Report Proposed Upgrade of Banana City Informal Settlement eThekwini Metropolitan Municipality | Heritage Scoping | 22/09/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | SRK Consulting (Pty) Ltd - Johannesburg | 03/10/2017 - 03:40 |
Heritage Scoping Report Proposed Upgrade of Banana City Informal Settlement | Heritage Scoping Report Proposed Upgrade of Banana City Informal Settlement eThekwini Metropolitan Municipality, KZN. | Heritage Scoping | 22/01/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | SRK Consulting (Pty) Ltd - Johannesburg | 03/10/2017 - 03:18 |
Gaza Gray excavation report | A HISTORICAL ARCHAEOLOGICAL INVESTIGATION OF THE GAZA GRAY OUTPOST OF STEINAECKER’S HORSE, LOWER SABIE DISTRICT, KRUGER NATIONAL PARK (REPORT NO. IV) A HISTORICAL ARCHAEOLOGICAL INVESTIGATION OF THE GAZA GRAY OUTPOST OF STEINAECKER’S HORSE, LOWER SABIE DISTRICT, KRUGER NATIONAL PARK (REPORT NO. IV) A HISTORICAL ARCHAEOLOGICAL INVESTIGATION OF THE SITE OF SARDELLI’S SHOP AT SABIEPOORT, ALSO KNOWN AS THE SITE WHERE BILL SANDERSON WAS INTERNED, LOWER SABIE DISTRICT, KRUGER NATIONAL PARK | Archaeological Permit Report | 15/12/2015 | Anton van Vollenhoven | Archaetnos CC | 02/10/2017 - 18:47 | |
Heritage Statement -Interior Alterations Trafalgar School District Six | Draft for Comment-Heritage Statement: Interior Alterations at the Trafalgar School District Six ( Erf 116980, corner Stirling and De Villiers Streets) | Heritage Statement | 02/10/2017 | 02/10/2017 - 17:26 | |||
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 02/10/2017 - 13:38 |
ROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION | PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 22/09/2017 | Nkosinathi Godfrey Tomose | BAAGI ENVIRONMENTAL CONSULTANCY | 02/10/2017 - 11:49 | |
PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION | PROPOSED CONSTRUCTION OF PETRUSDAM 88KV SWITCHING STATION, WITHIN THE RAMOTSHERE MOILOA LOCAL MUNICIPALITY, NORTH WEST PROVINCE. | HIA Phase 1 | 22/09/2017 | Nkosinathi Godfrey Tomose | BAAGI ENVIRONMENTAL CONSULTANCY | 02/10/2017 - 10:59 | |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 01/10/2017 - 13:21 |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 01/10/2017 - 09:30 |
Scaw metals watching brief | REPORT ON A WATCHING BRIEF RELATED TO POSSIBLE GRAVES AT A GRAVEYARD ON THE PROPERTY OF SCAW METALS, GERMISTON, CITY OF EKURHULENI, GAUTENG PROVINCE | Archaeological Monitoring | 06/09/2017 | Anton van Vollenhoven | Archaetnos CC | Scaw South Africa (Pty) Ltd | 01/10/2017 - 09:25 |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 01/10/2017 - 09:14 |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Monitoring | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | SANRAL | 01/10/2017 - 09:03 |
Pampoennek watching brief | REPORT ON A WATCHING BRIEF DURING THE DEMOLUTION OF AN ANGLO-BOER WAR (1899-1902) BLOCHOUSE AT PAMPOENNEK, NORTHWEST PROVINCE | Archaeological Permit Report | 26/09/2017 | Anton van Vollenhoven | Archaetnos CC | Aveng Lubicon Joint venture | 01/10/2017 - 08:56 |
Construction of a Dam for LM Schoonspruit Farming Pty Ltd | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR PROPOSED DEBUSHING OF NATURAL LAND FOR THE CONSTRUCTION OF A DAM FOR SCHOONSPRUIT FARMING PTY LTD., PORTION 3 OF THE FARM VYEBOOM 414JU, KOMATIPOORT MPUMALANGA PROVINCE | AIA Phase 1 | 29/09/2017 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 29/09/2017 - 19:01 |
Palaeo - OvervaalTrustPV | Palaeontological Desktop Assessment of the Proposed Overvaal Trust PV Facility, Buffelspoort, North-West Province | PIA Desktop | 25/09/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | Savannah Environmental (Pty) Ltd | 29/09/2017 - 13:50 |