Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 7351 - 7400 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
Phase 1 Heritage Impact Assessment for the proposed construction of an 88kv distribution powerline | Phase 1 Heritage Impact Assessment for the proposed construction of an 88kv distribution powerline from the existing Straatsdrift substation to the proposed Silwerkraans substation within the Ramotshere Moiloa, Moses Kotane and Kgetlengrivier Local Municipalities, North West Province. | HIA Phase 1 | 28/08/2017 | Makhosazana Mngomezulu | Vungandze Projects | BAAGI ENVIRONMENTAL CONSULTANCY | 22/08/2017 - 13:02 | |
Heritage Screener: Kwandwe Staff Village, Eastern Cape | CTS17_096 Heritage Screener: Kwandwe Staff Village, Remainder of Farm Hermanuskraal No. 95, Eastern Cape | 18/08/2017 | Jenna Lavin, Kyla Bluff | CTS Heritage | CEN Integrated Environmental Management Unit | 22/08/2017 - 11:34 | ||
LoE for D1814 | Exemption from Phase 1 Palaeontological Impact Assessment: Upgrading of 4.9 km - long section of Road D1814 from gravel, single carriageway to a surfaced, dual carriageway, Gauteng Province | Palaeontological Specialist Reports | 18/08/2017 | Lloyd Rossouw | Paleo Field Services | TGM Environmental Services CC | 22/08/2017 - 09:06 | |
HIA: Erf 2747, Langa | Heritage Impact Assessment in terms of section 38(1) for the PROPOSED NEW TELECOMMUNICATION MAST ON ERF 2747, LANGA | Heritage Impact Assessment Specialist Reports | 18/08/2017 | Katie Smuts, Jenna Lavin, Kyla Bluff | Cedar Tower Services | Atlas Tower | 21/08/2017 - 13:46 | |
HIA PROPOSED UPGRADE OF ROAD D1814 | HIA PROPOSED UPGRADE OF ROAD D1814, GAUTENG PROVINCE. | HIA Phase 1 | 18/08/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | TGM Environmental Services CC | 21/08/2017 - 12:35 | |
PHASE I CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT | HIA Phase 1 | 20/02/2015 | Udo Kusel | African Heritage Consultants CC | African Heritage Consultants CC | 21/08/2017 - 12:18 | ||
AIA-Boschendal Village Development | Archaeological Assessment of Portions 7/1674 And 10/1674 Of The Boschendal Estate. | AIA Phase 1 | 01/03/2015 | Natalie Kendrick, Timothy Hart | ACO Associates CC | Boschendal (Pty) Ltd | 21/08/2017 - 11:20 | |
VIA-Boschendal Village Development | Proposed Boschendal Village Development, Stellenbosch Municipal Area, Western Cape Visual Impact Assessment | Visual Impact Assessment | 01/06/2016 | Quinton Lawson, Bernard Oberholzer, | Boschendal (Pty) Ltd | 21/08/2017 - 11:18 | ||
PIA for a new dam in Amsterdam, Mpumalanga | Palaeontological Impact Assessment: Construction of a new Dam and Associated Infrastructure as part of the Upgrading of the Bulk Water Supply Scheme to Amsterdam, Mpumalanga. Farm: Remainder of Portion 11 of the farm Amsterdam 408 IT. | PIA Desktop | 30/06/2017 | Dr. Heidi Fourie | Dr Heidi Fourie | AdiEnvironmental cc | 21/08/2017 - 10:25 | |
HIA for a new dam in Amsterdam, Mpumalanga | A Report on a Cultural Heritage Impact Assessment for a Proposed New Dam and Pipelines at Amsterdam, Mpumalanga Province. | HIA Phase 1 | 19/05/2017 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | AdiEnvironmental cc | 21/08/2017 - 10:18 | |
HIA for Maphephetheni Water Pipeline | FIRST PHASE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF MAPHEPHETENI WATER PIPELINE, ETHEKWENI DISTRICT MUNICIPALITY | HIA Phase 1 | 01/11/2015 | 21/08/2017 - 07:20 | ||||
Richards Bay CCPP_ASR (May'17) | Archaeological Scoping Report for the Proposed Development of the Richards Bay Combined Cycle Power Plant (CCPP) and Associated Infrastructure on a Site Near Richards Bay, Kwazulu-Natal Province | Archaeological Specialist Reports | 17/05/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/08/2017 - 15:44 | |
Richards Bay CCPP_PIA Report (28.04.17) | Palaeontological Impact Assessment of the Proposed Development of theRichards Bay Combined Cycle Power Plant (CCPP) and Associated Infrastructure on a Site Near Richards Bay, Kwazulu-Natal Province | Palaeontological Specialist Reports | 28/04/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | Savannah Environmental (Pty) Ltd | 18/08/2017 - 15:41 | |
Mbhekamuzi bridge | FIRST PHASE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MBHEKAMUZI PEDESTRIAN BRIDGE NEAR ULUNDI, NORTHERN KWAZULU-NATAL | HIA Phase 1 | 10/07/2017 | Frans Prins | Active Heritage CC | Green Door Environmental | 18/08/2017 - 14:28 | |
HIA Report for Goudrand Ext. 12 and Goudrand Ext. 13, Roodepoort, Gauteng | Heritage Impact Assessment for the proposed establishment of Goudrand Ext. 12 and Goudrand Ext. 13, situated within the Roodepoort Magisterial District, City of Johannesburg Metropolitan Municipality, Gauteng Province. | HIA Phase 1 | 26/05/2017 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Hunter Theron Inc. Town and Regional Planners | 18/08/2017 - 11:58 | |
Heritage Impact Assessment: S.Singh's Proposed Sand Mining Project | HERITAGE IMPACT ASSESSMENT FOR A PROPOSED SAND MINE ALONG THE UMZIMKHULU RIVER, PORT SHEPSTONE, PORT SHEPSTONE MAGISTERIAL DISTRICT, KWAZULU-NATAL | HIA Letter of Exemption | 24/06/2017 | Jayson Orton, Jaco van der Walt | KwaZulu-Natal Amafa and Research Institute | ASHA Consulting(Pty) Ltd | 17/08/2017 - 15:36 | |
AIA: Staff village, Kwandwe Private Game Reserve | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED DEVELOPMENT OF A STAFF VILLAGE AND ASSOCIATED INFRASTRUCTURE ON PORTION 1 OF THE FARM FORT BROWN NO. 98, KWANDWE PRIVATE GAME RESERVE IN THE ALBANY DISTRICT, EASTERN CAPE PROVINCE | AIA Phase 1 | 01/03/2015 | Johan Binneman | Eastern Cape Heritage Consultants | CEN Integrated Environmental Management Unit | CTS_406892 | 17/08/2017 - 13:37 |
AIA: Airstrip and Two Proposed Sites for Construction of Family Lodge, Kwandwe Private Game Reserve | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT OF TWO PROPOSED SITES FOR THE CONSTRUCTION OF AN AIRSTRIP & TWO PROPOSED SITES FOR A FAMILY LODGE ON PORTION 3 (KOODOOS RUN) (A PORTION OF PORTION 2) OF THE FARM NOOITGEDAGT NO. 92 AND PORTION 2 (THE FORT) OF THE FARM KOESTERS DRIFT NO. 129, KWANDWE PRIVATE GAME RESERVE, EASTERN CAPE | AIA Phase 1 | 01/08/2013 | Johan Binneman | Eastern Cape Heritage Consultants | CEN Integrated Environmental Management Unit | CTS_ | 17/08/2017 - 13:12 |
Heritage Impact Assessment Report - Japies Rus Minerale | Phase 1 Heritage Impact Assessment for the Mining Right application by Japies Rus Minerale (Pty) Ltd on Portion 1 of the Farm Magoloring 668 and Portion 6 (a portion of Portion 2) of the Farm Magoloring 668, near Postmasburg in the Northern Cape Province. | HIA Phase 1 | 09/02/2017 | Stephan Gaigher | G&A Heritage Management Consultants | 17/08/2017 - 10:55 | ||
HIA - BOSCHENDAL VILLAGE NODE | HERITAGE IMPACT ASSESSMENT Prepared in terms of Section 38 (8) of the National Heritage Resources Act (Act 25 of 1999) BOSCHENDAL VILLAGE NODE Portion 7 of Farm 1674 and Portion 10 of Farm 1674, Boschendal, Stellenbosch Municipality | HIA Phase 1 | 01/08/2017 | Nicolas Baumann, Sarah Winter, Dave Dewar , Piet Louw | Boschendal (Pty) Ltd | 17/08/2017 - 10:40 | ||
LED4349 PIA Letter | Palaeontological Review for the Ledjadja Borrow Pit BAR and AEL | Palaeontological Specialist Reports | 16/08/2017 | Marion Bamford | Palaeosciences Centre, University of the Witwatersrand | Digby Wells Environmental | 17/08/2017 - 09:34 | |
Heritage Screener for Arch for an Arch Project | Heritage Screener - Arch for an Arch- Temporary - Public Artwork Installation in The Company's Garden | Heritage Scoping | 16/08/2017 | Katie Smuts, Kyla Bluff | CTS Heritage | Design Indaba | 16/08/2017 - 16:33 | |
RBM Zulti North 2016 | The Archaeological Surveys and Excavations of the Zulti North Mining Lease 2016 | Archaeological Permit Report | 01/02/2017 | Gavin Anderson, Louise Anderson | Umlando: Archaeological Surveys & Heritage Management | Richards Bay Minerals | 16/08/2017 - 15:51 | |
URBAN DESIGN DEVELOPMENT PLAN | URBAN DEVELOPMENT OF CONSTITUTION HILL | Heritage Impact Assessment Specialist Reports | 01/03/2012 | Herbet Prins | Constitution Hill | URBANWORKS ARCHITECTURE & URBANISM, XHAMAL DESIGNS AND HMJ PRINS ARCHITECT | 16/08/2017 - 13:54 | |
PIA Bruintjieslaagte 465JT | Palaeontological Impact Assessment for the proposed construction of a dam wall on farm Bruintjieslaagte 465JT, in the Schoemanskloof Valley, Mpumalanga Province. | PIA Phase 1 | 14/08/2017 | Marion Bamford | 16/08/2017 - 10:58 | |||
Upgrade of D1095 road, Ray Nkonyeni Municipality | Proposed upgrade of D1095 road, Ray Nkonyeni Municipality | HIA Phase 1 | 06/07/2017 | Jean Beater | JLB Consulting | ECA CONSULTING | 15/08/2017 - 19:47 | |
P449 HIA and PIA | Phase 1 HIA and Desktop PIA for P449 | HIA Phase 1 | 15/08/2017 | Frans Prins, Gideon Groenewald | Royal Haskoning DHV | 15/08/2017 - 12:30 | ||
P230 Culvert Replacement | Phase 1 HIA and Desktop PIA for P230 Road Rehab - Addendum to cBAR | HIA Phase 1 | 15/08/2017 | Frans Prins, Gideon Groenewald | Royal Haskoning DHV | 15/08/2017 - 12:11 | ||
HIA FOR SAEON OFFICE AT SAAO | SOUTH AFRICAN ASTRONOMICAL OBSERVATORY ERF 26423-0-2, OBSERVATORY, CAPE TOWN NEW OFFICE FOR SOUTH AFRICAN ENVIRONMENTAL OBSERVATION NETWORK HERITAGE IMPACT ASSESSMENT REPORT Prepared in terms of Section 38 (1, 3 & 4) of the National Heritage Resources Act (Act 25 of 1999) HWC CASE NUMBER 160802003WD0803E | HIA Phase 1 | 15/08/2017 | Sarah Winter | Sarah Winter Heritage Practitioner | SOUTH AFRICAN ASTRONOMICAL OBSERVATORY NATIONAL RESEARCH FOUNDATION | 15/08/2017 - 10:43 | |
ANK3784 - Elandsfontein NID | Notification of Intent to Develop: Environmental Regulatory Processes relating to the amendment of the Environmental Management Programme for its Elandsfontein Operations | Heritage Impact Assessment Specialist Reports | 28/02/2017 | Justin du Piesanie | Digby Wells Environmental | Anker Coal and Mineral Holdings SA (Pty) Ltd | 15/08/2017 - 06:22 | |
ANK3784 - Elandsfontein HIA | Heritage Impact Assessment: Environmental Regulatory Processes relating to the amendment of the Environmental Management Programme for its Elandsfontein Operations | Heritage Impact Assessment Specialist Reports | 28/02/2017 | Justin du Piesanie | Digby Wells Environmental | Anker Coal and Mineral Holdings SA (Pty) Ltd | 15/08/2017 - 06:19 | |
Reply to SAHRA interim comment 31-7-17 | Reply by dr H Fourie to SAHRA interim commen of 31-7-2017 | 12/08/2017 | Dr Heidi Fourie | Dr Heidi Fourie | Setala Environmental | 14/08/2017 - 16:05 | ||
Coega IDZ Heritage Assessments (PIA, AIA, HIA. 2010 (Binneman, Bennie, Almond) | PIA Phase 1 | 14/08/2017 | 14/08/2017 - 14:11 | |||||
HERITAGE MEMO AND SITE MANAGEMENT PROCEDURES FOR AN EXPOSED BURIAL SITE THE FARM LOHATLHA 673, SIYANDA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | HERITAGE MEMO AND SITE MANAGEMENT PROCEDURES FOR AN EXPOSED BURIAL SITE THE FARM LOHATLHA 673, SIYANDA DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | BGG Phase 1 | 13/08/2017 | Neels Kruger | Exigo Sustainability | Kitso Mining (PTY) LTD | 14/08/2017 - 10:40 | |
PIA-Belvoir Aggregate Quarry II, Portion 7 of Farm Maidenhead 169, Division of Queenstown, Enoch Mgijima Local Municipality, Eastern Cape | PIA Phase 1 | 14/08/2017 | Elize Butler | isi-Xwiba Consulting cc | 14/08/2017 - 09:52 | |||
AIA-Belvoir Aggregate Quarry II, Portion 7 of Farm Maidenhead 169, Division of Queenstown, Enoch Mgijima Local Municipality, Eastern Cape | AIA Phase 1 | 14/08/2017 | Karen Van Ryneveld | isi-Xwiba Consulting cc | 14/08/2017 - 09:50 | |||
Autumn leaf PIA reply | Autumn leaf PIA reply dr H Fourie | 03/08/2017 | Dr Heidi Fourie | Dr Heidi Fourie | Setala Environmental | 11/08/2017 - 17:14 | ||
PROPOSED PACKING SHED ON REMAINDER OF PERSEEL 1731 KAKAMAS SOUTH SETTLEMENT, KAI! GARIB LOCAL MUNICIPALITY, NORTHERN CAPE | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES & MITIGATION: PROPOSED PACKING SHED ON REMAINDER OF PERSEEL 1731 KAKAMAS SOUTH SETTLEMENT, KAI! GARIB LOCAL MUNICIPALITY, NORTHERN CAPE | Palaeontological Specialist Reports | 01/08/2017 | John Almond | Natura Viva CC | Enviroafrica CC | 11/08/2017 - 16:03 | |
Emboni Dam Heritage Assessment | Emboni Dam Heritage Assessment | HIA Phase 1 | 15/07/2017 | Frans Prins | Active Heritage CC | Enviroedge | 11/08/2017 - 10:50 | |
STRUWIG DAM HIA | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED STRUWIG DAM | HIA Phase 1 | 15/07/2017 | Frans Prins | Active Heritage CC | Enviroedge | 11/08/2017 - 10:44 | |
Screener for Tshabo Housing Development | Heritage Screener Proposed Housing Development in Tshabo Village, King Williams Town | 18/07/2017 | Katie Smuts, Kyla Bluff | CTS Heritage | Terreco Environmental | 11/08/2017 - 09:39 | ||
Africary UCG and Power Generation Project - Phase 1 Palaeontological Field Study | African Carbon Energy Ltd. Underground Coal Gasification and Power Generation Project near Theunissen, Free State Province - Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | 09/08/2017 | Dr. Heidi Fourie | Dr Heidi Fourie | Golder Associates Africa (Pty) Ltd | 11/08/2017 - 08:40 | |
Cultural heritage impact assessment for THE PLANNED BORROW PITS AND QUARRIES FOR THE IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 34 (BLOEMENDAL) TO KM 63.3 (PIET RETIEF), GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | Cultural heritage impact assessment for THE PLANNED BORROW PITS AND QUARRIES FOR THE IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 34 (BLOEMENDAL) TO KM 63.3 (PIET RETIEF), GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 16/12/2016 | Johnny Van Schalkwyk | SAHRA Council | Chameleon Environmental | 10/08/2017 - 15:39 | |
Cultural heritage impact assessment for THE PLANNED BORROW PITS AND QUARRIES FOR THE IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 30 (VERZAMELING) TO KM 60.0 (LEIDEN) | Cultural heritage impact assessment for THE PLANNED BORROW PITS AND QUARRIES FOR THE IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 30 (VERZAMELING) TO KM 60.0 (LEIDEN) | HIA Phase 1 | 09/12/2016 | Johnny Van Schalkwyk | SAHRA Council | Chameleon Environmental | 10/08/2017 - 15:28 | |
Cultural heritage impact assessment for THE PLANNED BORROW PITS AND QUARRIES FOR THE IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 60 (LEIDEN) TO KM 87.4 (CAMDEN), GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | Cultural heritage impact assessment for THE PLANNED BORROW PITS AND QUARRIES FOR THE IMPROVEMENT OF THE NATIONAL ROUTE N2, KM 60 (LEIDEN) TO KM 87.4 (CAMDEN), GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 02/12/2016 | Johnny Van Schalkwyk | SAHRA Council | Chameleon Environmental | 10/08/2017 - 15:15 | |
HIA&PIA_GOMOLA ROAD | HIA&PIA_GOMOLA ROAD | Heritage Impact Assessment Specialist Reports | 06/08/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 10/08/2017 - 10:01 | |
REHABILITATION OF TWO BRIDGE STRUCTURES IN THE TSHWANE REGION OF GAUTENG PROVINCE | REHABILITATION OF TWO BRIDGE STRUCTURES IN THE TSHWANE REGION OF GAUTENG PROVINCE | Heritage Study | 11/04/2017 | Johnny Van Schalkwyk | SAHRA Council | Chameleon Environmental | 10/08/2017 - 09:21 | |
KwaXolo Water Supply Scheme | Phase 1 Heritage Impact Assessment report for the proposed construction of reservoirs and water reticulation pipelines in KwaXolo area in Ugu District Municipality of KwaZulu Natal Province. | AIA Phase 1 | 27/03/2017 | Trust Mlilo | Integrated Specialist Services | Ugu District Municipality | 09/08/2017 - 22:17 | |
Westonaria Pump Station: Palaeontological Impact Assessment: Phase 1 Field Study | Palaeontological Impact Assessment: Phase 1 Field Study: Westonaria Local Municipality intends to construct a new sewage transfer pump station, new sewer, and pipeline to the Hannes van Niekerk WWTW, and associated infrastructure near Westonaria | PIA Phase 1 | 22/06/2017 | Dr. Heidi Fourie | Asande Projects | 09/08/2017 - 21:50 | ||
PIA Zwavelpoort Lodge | Proposed development of a Lodge to be known as Sleepy Creek City of Tshwane Metropolitan Municipality, Gauteng Province Farm: Portion 126 (A Portion of Portion 2) of the Farm Zwavelpoort 373 JR, Paleontological Desktop Study. | PIA Desktop | 22/03/2017 | Dr. Heidi Fourie | LEAP - Lanscape Architect Environmental Planner | 09/08/2017 - 21:14 |