THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 7701 - 7750 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Heritage report Queenswood Extension 14 | Cultural heritage impact assessment for THE PROPOSED TOWNSHIP ESTABLISHEMENT ON PART OF PORTION 69 OF THE FARM KOEDOESPOORT 325JR, CITY OF TSHWANE, GAUTENG PROVINCE | HIA Phase 1 | 10/10/2016 | J Paul van Wyk | 15/05/2017 - 09:56 | ||
Proposed upgrade of N2 highway from Lovu River to Umlaas Canal | Proposed upgrade of the N2 highway from the Lovu River to the Umlaas Canal, eThwekwini Municipality | HIA Phase 1 | 29/05/2017 | Jean Beater | JLB Consulting | Kerry Seppings Environmental Management | 12/05/2017 - 16:44 |
CTS17_049 Terreco Sand Mining East London | Heritage Screener: Proposed Sand Mine on Portion 2 Farm 1096, Eastern Cape | 09/05/2017 | Katie Smuts | CTS Heritage | Terreco Environmental | 12/05/2017 - 11:55 | |
Erf 22011 BFN PalaeoDesktop | Palaeontological Desktop Assessment of portion of Erf 1/22011 and remainder of Erf 22011, Farm 654, Bloemfontein, FS Province | Heritage Scoping | 28/04/2017 | Lloyd Rossouw | DESTEA-Free State | Spatial Solutions Environmental Consultants | 12/05/2017 - 02:07 |
SR_Hospital and Heritage Lifestyle Centre_Bfn | Heritage Scoping report for the proposed Hospital and Heritage Lifestyle Centre, Bloemfontein | Heritage Scoping | 10/05/2017 | Loudine Philip | DESTEA-Free State | Spatial Solutions Environmental Consultants | 12/05/2017 - 02:01 |
Updated_Palaeontology_Amandelbult_Report | Updated_Palaeontology_Amandelbult_Report | Palaeontological Specialist Reports | 09/05/2017 | JF Durand | Gaigher & Associates | Aurecon South Africa (Pty) Ltd | 11/05/2017 - 15:23 |
Updated_Palaeontology_Amandelbult_Report | Updated_Palaeontology_Amandelbult_Report | Palaeontological Specialist Reports | 09/05/2017 | JF Durand | Gaigher & Associates | Aurecon South Africa (Pty) Ltd | 11/05/2017 - 15:22 |
Leeuwfontein X24 PIA | Leeuwfontein X24 Palaeontological Assessment | AIA Desktop | 13/04/2017 | Dr Heidi Fourie | Dr Heidi Fourie | MR Aust Sandwerke | 11/05/2017 - 14:05 |
PHASE I HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON A PORTION OF FARM 393, BARKLY WEST DISTRICT, NORTHERN CAPE PROVINCE | PHASE I HERITAGE IMPACT ASSESSMENT REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING ON A PORTION OF FARM 393, BARKLY WEST DISTRICT, NORTHERN CAPE PROVINCE. This report provides a heritage impact evaluation in terms of Section 38 of the National Heritage Resources Act (25 of 1999) in respect of an application by Sedibeng Mines (JV) for prospecting and mining rights on a Portion of the Farm 393, Barkly West District, Northern Cape. The report is based on a scoping ground survey and understanding of the significance and heritage attributes of the cultural heritage resources found on the property and recommends an overall approach to the conservation of the resources. | HIA Phase 1 | 10/05/2017 | Edward Matenga | Archaeological and Heritage Services Africa (Pty) Ltd | Archaeological and Heritage Services Africa (Pty) Ltd | 11/05/2017 - 11:10 |
Holkrans 2015 | Report on the Archaeological Excavations at Holkrans Rock Shelter, Vredefort Dome, North West Province Wits University Archaeology Field School August 2015 | Archaeological Permit Report | 10/05/2017 | Karim Sadr | Department of Archaeology, University of the Witwatersrand | 10/05/2017 - 16:35 | |
Holkrans 2014 | Report on the Archaeological Excavations at Holkrans Rock Shelter, Vredefort Dome, North West Province Wits University Archaeology Field School September 2014 | Archaeological Permit Report | 10/05/2017 | Karim Sadr | Department of Archaeology, University of the Witwatersrand | 10/05/2017 - 16:30 | |
Holkrans 2013 | Report on the Archaeological Excavations at Holkrans Rock Shelter, Vredefort Dome, North West Province Wits University Archaeology Field School September 2013 | Archaeological Permit Report | 10/05/2017 | Karim Sadr | Department of Archaeology, University of the Witwatersrand | 10/05/2017 - 16:23 | |
Proposed CIA Amendment Process, Richards Bay | HERITAGE SURVEY OF THE PROPOSED RICHARDS BAY CENTRAL INDUSTRIAL AREA | Heritage Impact Assessment Specialist Reports | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - Grahamstown | 10/05/2017 - 13:01 | |
Proposed CIA Amendment Process, Richards Bay | HERITAGE SURVEY OF THE PROPOSED RICHARDS BAY CENTRAL INDUSTRIAL AREA | Heritage Impact Assessment Specialist Reports | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Coastal & Environmental Services - Grahamstown | 10/05/2017 - 13:01 | |
Palaeontological Impact Assessment - FEIR | Palaeontological impact assessment for SolaReserve Kotulo Tsatsi PV2 | Palaeontological Specialist Reports | 31/10/2014 | John Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 10/05/2017 - 10:50 |
Heritage Impact Assessment - Final EIA (May 17) | Heritage Imapct Assessment for the proposed SolarReserve Kotulo Tsatsi PV 2 | Heritage Impact Assessment Specialist Reports | 31/03/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 10/05/2017 - 10:42 |
port st Johns WWTW 2 | HERITAGE SURVEY OF THE PROPOSED PORT ST JOHNS WASTE WATER TREATMENT WORKS | HIA Phase 1 | 05/04/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 10/05/2017 - 08:34 |
port st Johns WWTW 2 | HERITAGE SURVEY OF THE PROPOSED PORT ST JOHNS WASTE WATER TREATMENT WORKS | HIA Phase 1 | 05/04/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EOH Coastal & Environmental Services (CES) - East London | 10/05/2017 - 08:33 |
Rustenburg Pedestrian Bridge | The proposed development of a pedestrian bridge | Heritage Impact Assessment Specialist Reports | 15/11/2016 | 09/05/2017 - 18:04 | |||
Rustenburg Pedestrian Bridge | The proposed development of a pedestrian bridge, Rustenburg Local Municipality, North West | Heritage Impact Assessment Specialist Reports | 15/11/2016 | 09/05/2017 - 17:28 | |||
HIA Kriel | PROPOSED EXPANSION OF THE EXISTING KRIEL ASH DAM FACILITY, KRIEL POWER STATION, KRIEL (GA-NALA), EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | Heritage Impact Assessment Specialist Reports | 07/12/2016 | Polke Birkholtz | Professional Grave Solutions (Pty) Limited | Aurecon - Cape Town | 09/05/2017 - 13:39 |
Leeuspruit, Rouxville | ARCHAEOLOGICAL INVESTIGATION OF AN EARLY TREK-FARMER SETTLEMENT AND TRADING POST: THE FARM LEEUSPRUIT 469, ROUXVILLE DISTRICT, FREE STATE PROVINCE | Archaeological Permit Report | 09/05/2017 | National Museum Bloemfontein - Archaeology and Anthropology | 09/05/2017 - 10:35 | ||
Landau Colliery Lifex HIA - 2013 (applicable to Blaauwkrans Co-disposal's existing location) | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED LANDAU COLLIERY LIFE EXTENSION PROJECT NEAR EMAHLALENI (WITBANK) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | AIA Phase 1 | 01/05/2014 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | Clean Stream Environmental Services | 09/05/2017 - 09:47 |
Kleinkopje Colliery 2012 Heritage Assessment | REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR A PROPOSED PIPELINE AND TWO DAMS TO BE CONSTRUCTED AT KLEINKOPJE COLLIERY CLOSE TO EMALAHLENI DATED January 2012 | AIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | WSP | 09/05/2017 - 08:41 |
Heritage Report 2010 | Phase 1 Archaeological Impact Assessment for the proposed Khanyisa Power Station on portions of the farms Klippan 332 JS, Groenfontein 331 JS and Klipfontein 322 JS near Witbank | AIA Phase 1 | 01/01/2014 | Kudzala Antiquity | Kudzala Antiquity | Kudzala Antiquity | 08/05/2017 - 14:56 |
Hotazel Solar Farm & Transmission lines (Paleontology exemption rec.) | PROPOSED HOTAZEL SOLAR PARK ON THE FARM HOTAZEL ANNEX LANGDON (F278/0), JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 27/10/2016 | John E Almond | Natura Viva CC | Aurecon South Africa (Pty) Ltd | 08/05/2017 - 13:33 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Kleinkopje Colliery Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:43 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |