THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 7501 - 7550 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
GRAVEL ACCESS ROADS AND BRIDGE CULVERTS MOUNT AYLIFF | Heritage Scoping Report GRAVEL ACCESS ROADS AND BRIDGE CULVERTS, MOUNT AYLIFF UMZIMVUBU LOCAL MUNICIPALITY, EASTERN CAPE | Heritage Scoping | 27/06/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 20/07/2017 - 06:42 |
GRAVEL ACCESS ROADS AND BRIDGE CULVERTS MOUNT FRERE | Heritage Scoping Report GRAVEL ACCESS ROADS AND BRIDGE CULVERTS MOUNT FRERE, UMZIMVUBU LOCAL MUNICIPALITY, EASTERN CAPE | Heritage Scoping | 27/06/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | ACER (Africa) Environmental Management Consultants | 20/07/2017 - 06:23 |
Manaye Hall - Request for Comment - Amafa Submission | Request for Comments and Endorsement for the F.J. Sithole Urban Renewal Development including the Associated Refurbishment of the Manaye Hall Precinct to a Memorial Museum as part of the Greater Edendale Development Initiative (GEDI) Msunduzi Municipality, KwaZulu-Natal | Built Environment and Cultural Landscapes | 16/06/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Msunduzi Local Municipality | 19/07/2017 - 04:00 |
Heritage Walk Down - Thabametsi | Heritage Walk Down Report for the Proposed Thabametsi Power Station Water Supply Line, Limpopo Province | 21/06/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 18/07/2017 - 16:07 | |
New Mixed Landuse Developement on the Farm Vogelstruisfontein 667-LS | PHASE 1 HERITAGE RESOURCES SCOPING REPORT Proposed New Mixed Landuse Developement on the Farm Vogelstruisfontein 667-LS, Polokwane, Limpopo | Heritage Impact Assessment Specialist Reports | 01/07/2017 | Frans Roodt | Shasa Heritage Consultants CC | 18/07/2017 - 13:32 | |
Kokerboom 2 Heritage | Heritage impact assessment for the proposed Kokerboom 2 Wind Energy Facility on Farm 215/REM and 1164, north of Loeriesfontein, Calvinia Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 31/01/2017 | Jayson Orton | ASHA Consulting(Pty) Ltd | Aurecon South Africa (Pty) Ltd | 18/07/2017 - 11:33 |
Taung Palaentology Report | Proposed electrification project within Taung Skull buffer zone in Buxton (Norlim), North West Province | Palaeontological Specialist Reports | 24/06/2017 | Trust Mlilo | Integrated Specialist Services | Eskom - NOU | 18/07/2017 - 10:36 |
Kokerboom 1 Heritage | Heritage Impact Assessment for the proposed Kokerboom 1 Wind Energy Facility on Farm 227/REM and Farm 1163, north of Loeriesfontein, Calvinia Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 31/01/2017 | Jayson Orton | ASHA Consulting(Pty) Ltd | Aurecon South Africa (Pty) Ltd | 18/07/2017 - 10:34 |
HIA for MDALA MKHOMBO DEVELOPMENT AND UPGRADING OF INFRASTRUCTURE | MDALA MKHOMBO DEVELOPMENT AND UPGRADING OF INFRASTRUCTURE HERITAGE IMPACT ASSESSMENT, MPUMALANGA PROVINCE | HIA Phase 1 | 13/06/2017 | Edward Matenga | 17/07/2017 - 19:22 | ||
Frankenwald, Bergvalei | Frankenwald, BERGVALEI 37/5 BERGVALEI RE/1/27-IR | Heritage Statement | Ayanda Msibi | Emendo Town and Regional Planning | Emendo Town and Regional Planning | 17/07/2017 - 15:50 | |
BERGAVALEI FRANKENWALD | Heritage Statement | Ayanda Msibi | Emendo Town and Regional Planning | Emendo Town and Regional Planning | 17/07/2017 - 15:38 | ||
Tshepiso Primary School Development | School development | Archaeological Specialist Reports | 10/07/2017 | Siegwalt Udo Kusel | African Heritage Consultants CC | African Heritage Consultants CC | 17/07/2017 - 11:14 |
Residential Developemnt at the Old Dairy Site, Hilton College | Cultural Heritage Impact Assessment of the Proposed Establishment of a Residential Development atht he Old Dairy Site, Hilton College, Umngeni Local Municipality, KZN | Heritage Impact Assessment Specialist Reports | 12/10/2016 | Frans Prins | Active Heritage CC | Terratest (Pty) Ltd | 17/07/2017 - 11:02 |
Ndumo Project 3 | FIRST PHASE CULTURAL HERITAGE IMPACT ASSESSMENT OF NDUMO ROAD (PROJECT 3) IN NORTHERN KWAZULU-NATAL. | Heritage Impact Assessment Specialist Reports | 15/12/2016 | Frans Prins | Active Heritage CC | Terratest (Pty) Ltd | 17/07/2017 - 10:22 |
Walk Down Report Aries | ARCHAEOLOGICAL WALK-DOWN SURVEY FOR THE PROPOSED ARIES 50KV POWER LINE NEAR KENHART, KAI! GARIB LOCAL MUNICIPALITY OF ZF MGCAWU DISTRICT, NORTHERN CAPE | AIA Phase 1B | 11/07/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | AECOM SA - Head Office | 17/07/2017 - 08:21 |
Walk Down Report Helios | ARCHAEOLOGICAL WALK-DOWN SURVEY FOR THE PROPOSED HELIOS 50KV POWER LINE NEAR LOERIESFONTEIN, HANTAM LOCAL MUNICIPALITY OF THE NAMAKWA DISTRICT, NORTHERN CAPE | AIA Phase 1B | 11/07/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | AECOM SA - Head Office | 17/07/2017 - 08:10 |
HIA Karino Interchange, Mbombela, Mpumalanga | Heritage Impact Assessment for the Proposed Development of the Karino Interchange, located east of Mbombela, Mbombela Local Municipality, Ehlanzeni District Muncipality, Mpumalanga Province | HIA Phase 1 | 24/06/2017 | Polke Birkholtz, M Naude | PGS Heritage and Grave Relocation Consultants | Trans African Concessions (TRAC) | 14/07/2017 - 16:27 |
HIA Carter-Brown Proposed Dam | CULTURAL HERITAGE IMPACT ASSESSMENT OF A DAM (250 000 CUBIC METRES) NEAR CREIGHTON, INGWE LOCAL MUNICIPALITY. | 14/07/2017 - 14:58 | |||||
HIA Hesketh | HERITAGE SURVEY OF THE PROPOSED HESKETH COUNTRY ESTATE, PIETERMARITZBURG, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 22/07/2016 | Frans Prins | Active Heritage CC | Green Door Environmental | 14/07/2017 - 14:48 |
Erven 862, 863, 865 and 866 Mapleton X 10 Heritage Impact Assessment report | Erven 862, 863, 865 and 866 Mapleton Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 05/04/2017 | 14/07/2017 - 12:47 | |||
HIA Burnlea Trust Wetland Rehab | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF AN 800 COW DAIRY, THREE NEW DAMS, EXPANSION OF AN EXISTING DAM AND THE CULTIVATION OF 131 HA OF VELD ON PORTION 3 AND PORTION 4 OF NEW BIGGIN NO 13390, PORTION 1 OF LOT FP 364 NO 11628, REM OF LOT FP 277B NO. 9266, REM OF LOT FP 320 NO 8965, REM OF SUNRISE NO 5567 AND REM OF BURNLEA NO 15994 LOCATED NEAR TO UNDERBERG | Heritage Impact Assessment Specialist Reports | 10/07/2011 | Frans Prins | Active Heritage CC | Green Door Environmental | 14/07/2017 - 11:22 |
South Germiston Extension 25 Heritage Impact Assessment Report | South Germiston Extension 25 Heritage Impact Assessment Report | Heritage Impact Assessment Specialist Reports | 05/04/2017 | 14/07/2017 - 11:20 | |||
HIA Burnlea Trust Wetland Rehab | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF AN 800 COW DAIRY, THREE NEW DAMS, EXPANSION OF AN EXISTING DAM AND THE CULTIVATION OF 131 HA OF VELD ON PORTION 3 AND PORTION 4 OF NEW BIGGIN NO 13390, PORTION 1 OF LOT FP 364 NO 11628, REM OF LOT FP 277B NO. 9266, REM OF LOT FP 320 NO 8965, REM OF SUNRISE NO 5567 AND REM OF BURNLEA NO 15994 LOCATED NEAR TO UNDERBERG | Heritage Impact Assessment Specialist Reports | 10/07/2011 | Frans Prins | Active Heritage CC | Green Door Environmental | 14/07/2017 - 11:12 |
HIA Hesketh Race Track | HERITAGE SURVEY OF THE PROPOSED HESKETH COUNTRY ESTATE, PIETERMARITZBURG, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 22/07/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Independent Environmental Advisor | 14/07/2017 - 10:00 |
Heritage Impact Assessment for the proposed Erven 1356 & 1357 Magagula Heights Township | Heritage Impact Assessment for the proposed Erven 1356 & 1357 Magagula Heights Township | Heritage Impact Assessment Specialist Reports | 25/05/2017 | Jaco van der Walt | 14/07/2017 - 09:51 | ||
Heritage Study for Pongola River Bridge | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF PHONGOLA (MBOZA) RIVER BRIDGE, UMHLABUYALINGANA LOCAL MUNICIPALITY, KWAZULU-NATAL. | Heritage Impact Assessment Specialist Reports | 30/11/2015 | Frans Prins | Active Heritage CC | 13/07/2017 - 13:34 | |
Polokwane Heritage Assessment | A Report on Cultural Heritage Impact Assessment for the Proposed Polokwane Smelter SO2 Abatement Project, Limpopo Province | HIA Phase 1 | 24/04/2017 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | WSP Environmental Pty Ltd - Johannesburg | 13/07/2017 - 12:45 |
Check | 13/07/2017 - 12:38 | ||||||
HIA and PIA_L20 EXT_Geluksburg_Near Bergville | L20 EXT_Geluksburg_Near Bergville_HIA&PIA | Heritage Impact Assessment Specialist Reports | 09/07/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 13/07/2017 - 09:44 |
HIA and PIA | L20 EXT_Geluksburg_Near Bergville_HIA&PIA | Heritage Impact Assessment Specialist Reports | 09/07/2017 | Frans Prins | Active Heritage CC | Active Heritage CC | 13/07/2017 - 09:41 |
HIA OF ABAKHETHINKOSI CO-OPERATIVE LIMITED | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE ABAKHETHINKOSI PRIMARY AGRICULTURAL CO-OPERATIVE LIMITED MINING PROJECT SITUATED ON PORTION 2201 OF THE FARM UMLAZI LOCATION NO. 4676 NEAR UMBUMBULU, KZN | HIA Phase 1 | 29/05/2017 | Frans Prins | Active Heritage CC | IMPENDULO CONSULTING | 12/07/2017 - 20:01 |
Newtown C | A LETTER OF RECOMMENDATION FOR THE EXEMPTION OF THE INANDA NEWTOWN C SEWER RETICULATION | HIA Letter of Exemption | 26/05/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Kinvig and Associates (PTY) Ltd | 12/07/2017 - 17:11 |
Newtown C | A LETTER OF RECOMMENDATION FOR THE EXEMPTION OF THE INANDA NEWTOWN C SEWER RETICULATION | HIA Letter of Exemption | 26/05/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Kinvig and Associates (PTY) Ltd | 12/07/2017 - 13:38 |
El Ranchito | HERITAGE SURVEY OF THE PROPOSED ESTABLISHMENT OF IRRIGATED LANDS AND INFRASTRUCTURE, EL RANCHITO FARM, REM OF FARM LOT FP198 NO. 8759, UNDERBERG, KWA-ZULU NATAL | HIA Phase 1 | 24/06/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Independent Environmental Advisor | 12/07/2017 - 12:32 |
Hilltop reticulation | HERITAGE SURVEY OF THE PROPOSED EMPANGENI HILLTOP PIPELINE | HIA Phase 1 | 18/06/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Kinvig and Associates (PTY) Ltd, City of Umhlathuze Local Municipality | 12/07/2017 - 11:18 |
Mkhunya Bulk Water Supply Scheme | Heritage Impact Assessment for the Proposed Mkhunya Bulk Water Supply Scheme in the Harry Gwala District Municipality, KwaZulu Natal. | HIA Phase 1 | 10/07/2017 | Stephan Gaigher | G&A Heritage Management Consultants | Harry Gwala District Municipality | 12/07/2017 - 10:55 |
Trustfeed WWTW | HERITAGE SURVEY OF THE TRUSTFEED BULK WATER SUPPLY | HIA Phase 1 | 07/07/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Afzelia Environmental Consultants Pty Ltd | 12/07/2017 - 10:32 |
Palaeontological Desktop Assessment for Pit 62E (BAR) & Pit 36W at Anglo American Platinum | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DEVELOPMENT OF OPEN PIT MINING AT PIT 36W (New Pit) AND 62E (Dishaba) AMANDELBULT MINE COMPLEX, THABAZIMBI, LIMPOPO PROVINCE. | PIA Desktop | 25/04/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | PGS Heritage and Grave Relocation Consultants | 12/07/2017 - 10:03 |
Heritage Impact Assessment for Pit 62E and 36W at Anglo American Platinum | HERITRAGE IMPACT ASSESSMENT THE PROPOSED DEVELOPMENT OF TWO OPEN MINING PITS 62E/60E (DISHABA) AND 36W (TUMELA) AT THE AMANDELBULT MINING COMPLEX LOCATED NORTH OF NORTHAM, THABAZIMBI LOCAL MUNICIPALITY, WATERBERG DISTRICT MUNCIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 01/05/2017 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Aurecon South Africa (Pty) Ltd | 12/07/2017 - 09:59 |
Wembezi reticulation | HERITAGE SURVEY OF THE PROPOSED WEMBEZI WATER RETICULATION PROJECT, ESTCOURT, KWAZULU-NATAL | HIA Phase 1 | 29/06/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | JG AFRIKA | 12/07/2017 - 09:16 |
Pylon Park | HERITAGE SURVEY OF THE PROPOSED PYLON PARK DAM | HIA Phase 1 | 10/07/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | SLR Consulting (South Africa) (Pty) Ltd | 12/07/2017 - 07:49 |
Proposed upgrade of District Road 2264 from gravel road to a blacktop | Cultural Heritage impact Assessment: Proposed Upgrade of D2264 Rd | HIA Phase 1 | 11/07/2017 | Frans Prins | Active Heritage CC | 11/07/2017 - 12:38 | |
Letter of Exemption for the BRT Line 3 | LETTER OF RECOMMENDATION FOR THE PROPOSED TSHWANE BRT LINE UPGRADE, TSHAWANE, PRETORIA | HIA Letter of Exemption | 23/02/2017 | Gavin Brown | Umlando: Archaeological Surveys & Heritage Management | 11/07/2017 - 11:17 | |
Booysendal South Expansion Phase 1 Archaeological and Heritage IA | A PHASE I ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR BOOYSENSDAL SOUTH EXPANSION ENVIRONMENTAL AUTHORISATIONS | AIA Phase 1 | 22/06/2017 | Julius CC Pistorius | Dr Julius CC Pistorious Archaeologist and heritage Consultant | 11/07/2017 - 10:56 | |
Palaeontological Assessment for Nkandla Extension 2 | PALAEONTOLOGICAL ASSESSMENT (DESKTOP) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE ESTABLISHMENT FOR NKANDLA EXTENSION 2 IN HARTSWATER, PHOKWANE LOCAL MUNICIPALITY IN THE FRANCES BAARD DISTRICT OF THE NORTHERN CAPE PROVINCE | PIA Desktop | 20/06/2017 | Joseph Chikumbirike | Frances Baard District Municipality | 10/07/2017 - 22:35 | |
HIA | Cultural Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 17/12/2016 | Anton van Vollenhoven | 10/07/2017 - 15:16 | ||
Amended Exemption Letter - Palaeontologist - Samancor Varkensvlei | Exemption Letter - The proposed Samancor Application for Mining Right, Environmental Authorisation, Waste Management Licence and Water Use Licence on Varkensvlei 403 KQ in the Bojanala District Municipality, Moses Katane Local Municipality in the Limpopo Province. CaseID: 10658 - Amended. | PIA Desktop | 09/07/2017 | Dr. Heidi Fourie | Dr Heidi Fourie | Golder Associates Africa (Pty) Ltd | 10/07/2017 - 12:50 |
Development of a filling station and shopping complex at Bakenberg | Proposed filling station and shopping complex at Bakenberg. Mogalakwena Local Municipality. Waterberg District. Limpopo Province | HIA Phase 1 | 09/07/2017 | Frans Roodt | Phakanani Strategies | 09/07/2017 - 10:53 | |
Tlisitseng 2 132kV Substation and Power Line Heritage Report | TLISITSENG PROJECT - TLISITSENG 2 SUBSTATION AND POWER LINE Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 29/06/2017 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 07/07/2017 - 13:28 |
Cultural heritage impact assessment for upgrade of N2 section 19 between Nqadu and Mzeke river | Cultural heritage impact assessment for THE UPGRADE OF THE NATIONAL ROUTE N2, SECTION 19 BETWEEN NQADU (KM 22,0) AND MZEKE RIVER (KM 55,4), O R TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE | HIA Phase 1 | 12/04/2016 | Johnny Van Schalkwyk | SAHRA Council | Chameleon Environmental | 07/07/2017 - 12:09 |