FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
(Amended Heritage Report) 132kV transmission line from Maanhaarberg WEF to Hydra Substation Addendum to the Original Approved Heritage Impact Assessment Report: Proposed construction of a 132kV transmission line from the Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility near De Aar, Northern Cape – Dated 10 April 2014 Heritage Impact Assessment Specialist Reports 01/09/2015 Wouter Fourie PGS Heritage and Grave Relocation Consultants 21/10/2015 - 10:29
Integrated HIA: Proposed Ephraim Sun Solar PV Development INTEGRATED HERITAGE IMPACT ASSESSMENT IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999): PROPOSED DEVELOPMENT OF EPHRAIM SUN SOLAR PV DEVELOPMENT ON THE REMAINDER OF PORTION 62 (A PORTION OF PORTION 9)(VRYHEID) OF THE FARM VAALKOPPIES 40, INCLUDING GRID CONNECTIONS ALTERNATIVES ACROSS PORTIONS OF THE FARM VAAL KOPPIES 40/3, 9, 52 & 66; FARM 555/7; AND ERVEN 73 & 19951, //KHARA HAIS MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 2 20/10/2015 Stefan de Kock, Peter Nilssen, John Almond, Stephen Stead 20/10/2015 - 13:32
Heritage Survey Report Proposed Sewage Pipeline in Ward 20, Edendale, Pietermaritzburg, Msunduzi Municipal Area, Kwazulu-Natal. HIA Letter of Exemption 04/09/2015 Len van Schalkwyk Ethemb Ethemb 20/10/2015 - 11:37
HIA-KonkoonsiesII Heritage Impact Assessment for the proposed 132 kV power line and substation at the Konkoonsies II SEF. Heritage Impact Assessment Specialist Reports 16/08/2015 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 20/10/2015 - 07:51
Interim Report for the mitigation of JZCP_Site 1 Interim Report: Archaeological Mitigation undertaken at a midden (JZCP_Site 1) exposed during Construction Work at the Car Park of the Johannesburg Zoo, City of Johannesburg Metropolitan Municipality, Gauteng Province Archaeological Permit Report 16/10/2015 Polke Birkholtz, Joanna Behrens PGS Heritage and Grave Relocation Consultants Mayat Hart 20/10/2015 - 07:22
Kriel Extension 23 HIA Raubex Building Kriel Extesnion 23 Township Development Heritage Impact Assessment Heritage Study 08/05/2015 Geovicon Environmental (Pty) Limited 19/10/2015 - 17:00
Kriel Extension 23 HIA Raubex Building Kriel Extesnion 23 Township Development Heritage Impact Assessment Heritage Study 08/05/2015 Geovicon Environmental (Pty) Limited 19/10/2015 - 16:55
HIA, P57, KZN PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THE UPGRADE OF THE P57 ROAD FROM EZINQOLENI TO THE MTAMVUNA RIVER BRIDGE, WITHIN THE EZINQOLENI LOCAL AND UGU DISTRICT MUNICIPALITIES, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports Frans Prins Active Heritage CC Green Door Environmental 19/10/2015 - 11:59
PIA[P1]-Debe Water Supply Scheme Upgrade: Phase 2, Eastern Cape Phase 1 Palaeontological Assessment for the Proposed Upgrading of Debe Water Supply Scheme, Amatola Water (AW 2013/14/04) Infrastructure, Nkonkobe Local Municipality, Amathole District Municipality, Eastern Cape Province PIA Phase 1 19/10/2015 Gideon Groenewald EOH Coastal & Environmental Services (CES) - East London 19/10/2015 - 09:42
AIA[P1]-Debe Water Supply Scheme Upgrade: Phase 2, Eastern Cape Phase 1 Archaeological Impact Assessment - Debe Water Supply Scheme Upgrade: Phase 2, Nkonkobe Local Municipality, Amathole District Municipality, Eastern Cape AIA Phase 1 19/10/2015 Karen Van Ryneveld EOH Coastal & Environmental Services (CES) - East London 19/10/2015 - 09:36
BREEKKIERIE KENHARDT VAN WYKSVLEI ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MTN CELL PHONE MAST AT BREEKKIERIE NEAR KENHARDT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 14/04/2011 Cobus Dreyer MTN (Pty) Ltd MTN (Pty) Ltd 18/10/2015 - 12:24
PIA-Roggeveld Palaeontrological Impact Assessment Proposed Roggeveld Wind Energy Facility PIA Phase 1 01/03/2011 Duncan Miller ACO Associates CC ERM South Africa 16/10/2015 - 16:43
Phase 1 Heritage Impact Assessment Phase One Heritage Impact Assessment of the Proposed Isandlwana Heritage Development, Umzinyathi District Municipality, KwaZulu-Natal HIA Phase 1 17/07/2015 Frans Prins Active Heritage CC Green Door Environmental 16/10/2015 - 10:49
Integrated HIA: Proposed Legoko Solar Facility, Kathu HIA Phase 2 21/09/2015 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 15/10/2015 - 10:31
PIA Orange Grove Residential Development PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED ORANGE GROVE 3500 RESIDENTIAL DEVELOPMENT, BUFFALO CITY METROPOLITAN MUNICIPALITY EAST LONDON, EASTERN CAPE PROVINCE PIA Phase 1 27/05/2015 Elize Butler National Museum Bloemfontein NSVT Consultants 14/10/2015 - 19:54
AIA Phase 1 Orange Grove Phase 1 AIA – Orange Grove Residential Development, Farm RE/862, East London, BCMM, Eastern Cape AIA Phase 1 31/05/2015 Karen Van Ryneveld NSVT Consultants ArchaeoMaps Archaeological Consultancy 14/10/2015 - 19:49
Heritage Impact Assessment Matjesspruit Heritage impact assessment for the ADDITIONAL AREA OF THE PROPOSED PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM MATJESSPRUIT 145HP, LEEUDORINGSTAD REGION, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 29/09/2015 Johnny Van Schalkwyk 14/10/2015 - 12:15
Buffalo Camp Heritage Impact Assessment Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape. HIA Phase 1 29/05/2015 David Morris McGregor Museum SRK Consulting (Pty) Ltd - Western Cape 13/10/2015 - 14:16
Buffalo Camp Heritage Impact Assessment Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape HIA Phase 1 15/05/2015 David Morris McGregor Museum SRK Consulting (Pty) Ltd - Western Cape 13/10/2015 - 14:13
APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY TELECOMMUNICATIONS MAST, LETAMO ESTATE PROPOSED CONSTRUCTION OF A TELECOMMUNICATIONS MAST, LETAMO ESTATE, GAUTENG PROVINCE. APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY HIA Letter of Exemption 13/10/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Lokisa Environmental Consulting CC 13/10/2015 - 13:55
AIA FOR THE SEKURUWE SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE Archaeological Impact Assessment FOR THE SEKURUWE SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE AIA Phase 1 06/09/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Tekplan Environmental 13/10/2015 - 13:42
AIA REPORT FOR THE SEEMA SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT FOR THE SEEMA SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE AIA Phase 1 30/09/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Tekplan Environmental 13/10/2015 - 13:37
P187 HIA THE PROPOSED UPGRADE OF PROVINCIAL ROAD P187 WITHIN EMNAMBITHI LOCAL MUNICIPALITY, UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 14/09/2015 Stephan Gaigher G&A Heritage Management Consultants 13/10/2015 - 12:47
Heritage Impact Assessment Ikageng Extension 13 Cultural heritage assessment for the PROPOSED IKAGENG EXTENSION 13 ON PORTION 2 OF THE REMAINDER OF TOWN AND TOWNLANDS OF POTCHEFSTROOM 435IQ, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 01/05/2015 Johnny Van Schalkwyk 13/10/2015 - 11:59
Heritage Impact Assessment Greater Summerfield HIA Phase 1 05/08/2015 G&A Heritage Management Consultants G & A Heritage 13/10/2015 - 09:07
Kwasa Mine Colliery Development, Mkondo Local Municipality, Mpumalanga. eThembeni Cultural Heritage was appointed by Jindal to undertake a Phase 1 Heritage Impact Assessment for the Proposed Kwasa Mine Project. Kwasa Colliery is an abandoned colliery at which it is planned to re-establish a small, underground coal mine and an on-site wash plant. The phase 1 heritage impact assessment will focus upon the proposed Co-Disposal dump site; as well as the planned new roads and the proposed fresh water dam site. HIA Phase 1 01/04/2015 Len van Schalkwyk 10/10/2015 - 11:47
ERG3537_NID_Addendum_Memo Addendum Memo regarding the 7L5 and 7L6 Slimes Dams Prospecting Application, Ekurhuleni Metropolitan Municipality Heritage Impact Assessment Specialist Reports 29/09/2015 Natasha Higgitt Digby Wells Environmental Ergo Mining (Pty) Ltd 09/10/2015 - 13:52
AIA-KonkoonsiesII(final) Final Archaeological Survey for the Proposed Konkoonsies II Solar Energy Facility, Kenhardt Magisterial District, NC Province Archaeological Specialist Reports 23/07/2015 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 09/10/2015 - 08:44
AIA-AggeneysSolar(final) Final Archaeological Survey for the Proposed Aggeneys Solar Energy Facility, Namakwaland Magisterial District, NC Province Archaeological Specialist Reports 23/07/2015 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 09/10/2015 - 08:41
Mahoebe Archaeological Impact Assessment MAHOEBE EIENDOMME: PROPOSED 2MW PHOTOVOLTAIC POWER PLANT DEVELOPMENT ON A PORTION OF THE FARM DE HOEK 32, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 28/09/2015 Nelius Kruger Exigo Sustainability EOH 08/10/2015 - 16:06
Mahoebe Archaeological Impact Assessment MAHOEBE EIENDOMME: PROPOSED 2MW PHOTOVOLTAIC POWER PLANT DEVELOPMENT ON A PORTION OF THE FARM DE HOEK 32, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 28/09/2015 Nelius Kruger Exigo Sustainability EOH 08/10/2015 - 16:02
Schoonbee Archaeological Impact Assessment ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE Archaeological Specialist Reports 05/08/2015 Nelius Kruger 08/10/2015 - 12:06
Schoonbee Archaeological Impact Assessment ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE Archaeological Specialist Reports 05/08/2015 Nelius Kruger 08/10/2015 - 12:06
Archaeological Impact Assessment ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE Archaeological Specialist Reports 05/08/2015 Nelius Kruger 08/10/2015 - 11:48
Archaeological Impact Assessment ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE Archaeological Specialist Reports 05/08/2015 Nelius Kruger 08/10/2015 - 11:48
Palaeontological Assessment for Palm Springs Recreational Facility Development Palaeontological Desktop Assessment for the proposed development of a Multi-Purpose Recreational Facility in Palm Springs, for Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province PIA Desktop 28/07/2015 Gideon Groenewald 07/10/2015 - 11:56
PIA:Hennenman Palaeontological specialist assessment: desktop study for the proposed Hennenman 5MW solar energy facility. 22/07/2015 John Almond Natura Viva CC Savannah Environmental (Pty) Ltd 07/10/2015 - 09:56
Retirement village on portions 11 & 12 of the farm Nooitgedacht 62, White River A Phase 1 AIA / HIA for the development of a lifestyle retirement village on portions 11 and 12 of the farm Nooitgedacht 62, White River, Mpumalanga Province AIA Phase 1 06/10/2015 Christine Van Wyk Rowe Adansonia Heritage Consultants Nkululeko Environment and Development Agency 06/10/2015 - 19:41
Ekuvukeni SURVEY OF THE EKUVUKENI SHOPPING CENTRE, KWAZULU-NATAL HIA Phase 1 28/09/2015 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 06/10/2015 - 14:23
PIA_Kentani Solar Development Palaeontological Desktop Assessment for 12 new Solar Photovoltaic facilities near Dealesville, Free State Province PIA Desktop 03/02/2015 Lloyd Rossouw Paleo Field Services ASHA Consulting(Pty) Ltd 06/10/2015 - 11:09
Palaeo Asssessment of Morehill X11 Desktop Palaeontological Heritage Impact Assessment Report on the Site of a proposed township Morehill Extension 11 situated on a portion of portion 50 of the farm vlakfontein 69 IR, Gauteng Province PIA Desktop 25/09/2015 Barry Millsteed BM Geological Services Eco Assessments 06/10/2015 - 10:46
Application for Exemption from Phase 1 heritage Impact Assessment: Mhlanga Water Scheme Application for Exemption for a Phase 1 Heritage Impact Assessment for the Proposed Mhlanga Water Reticulation Project, Chris Hani District Municipality, Eastern Cape, South Africa HIA Letter of Exemption Len van Schalkwyk eThembeni Cultural Heritage GIBB Engineering & Science - Durban 06/10/2015 - 00:22
MIXED-USE DEVELOPMENT BRANDKOP 702 FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED MIXED-USE DEVELOPMENT ON PORTION 5 OF BRANDKOP 702, BLOEMFONTEIN, FREE STATE Heritage Impact Assessment Specialist Reports 11/06/2015 Cobus Dreyer Nemai Consulting Nemai Consulting 05/10/2015 - 21:10
TRUCK STOP PALMIET 585 VREDE FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED TRUCK STOP DEVELOPMENTS AT PORTION 4, PALMIET 585, VREDE, FREE STATE Heritage Impact Assessment Specialist Reports 11/10/2015 Cobus Dreyer DESTUDIO DESIGN BLOEMFONTEIN DESTUDIO DESIGN BLOEMFONTEIN 05/10/2015 - 21:03
HERITAGE ASSESSMENT AND MANAGEMENT PLAN FOR THE PROSPECTING RIGHT APPLICATION ON PORTION 1 OF THE FARM MATSAP 81, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 20/07/2015 Wouter Fourie PGS Heritage and Grave Relocation Consultants SLR Consulting (Africa) 05/10/2015 - 15:20
Heritage Report for PV Plant Duvha Power Station 2014JvS062 Duvha PV Sites Final Heritage Impact Assessment Specialist Reports eThembeni Cultural Heritage 05/10/2015 - 12:07
AIA FOR A 2 MW PHOTOVOLTAIC POWER PLANT (MAHOEBE EIENDOMME SOLAR PARK) , PRIESKA, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR A PROPOSED 2 MW PHOTOVOLTAIC POWER PLANT (MAHOEBE EIENDOMME SOLAR PARK) ON A PORTION OF THE FARM DE HOEK 32, PRIESKA, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 28/09/2015 Neels Kruger Exigo3 Sustainability EP3 Environmental 05/10/2015 - 10:23
Heritage Scoping Report - Proposed Desalination Plant at Tongaat Heritage Scoping Report Proposed Umgeni Water Desalination Plant and associated infrastructure at Tongaat eThekweni Municipality, KwaZulu-Natal Heritage Scoping 28/09/2015 Len van Schalkwyk eThembeni Cultural Heritage Council for Scientific and Industrial Research 05/10/2015 - 10:09
Lovu Desalination Plant Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed Umgeni Water Desalination Plant and associated infrastructure at Lovu eThekweni Municipality, KwaZulu-Natal HIA Letter of Exemption 10/08/2015 Len van Schalkwyk eThembeni Cultural Heritage Council for Scientific and Industrial Research 05/10/2015 - 02:42
Protocol for Finds Protocol for Finds Palaeontological Monitoring 28/09/2015 Heidi Fourie Ditsong Museums of South Africa Clean Stream Environmental Services 01/10/2015 - 11:09

Pages

CSV
 
 

Search form