THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 9801 - 9850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
(Amended Heritage Report) 132kV transmission line from Maanhaarberg WEF to Hydra Substation | Addendum to the Original Approved Heritage Impact Assessment Report: Proposed construction of a 132kV transmission line from the Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility near De Aar, Northern Cape – Dated 10 April 2014 | Heritage Impact Assessment Specialist Reports | 01/09/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 21/10/2015 - 10:29 | |
Integrated HIA: Proposed Ephraim Sun Solar PV Development | INTEGRATED HERITAGE IMPACT ASSESSMENT IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999): PROPOSED DEVELOPMENT OF EPHRAIM SUN SOLAR PV DEVELOPMENT ON THE REMAINDER OF PORTION 62 (A PORTION OF PORTION 9)(VRYHEID) OF THE FARM VAALKOPPIES 40, INCLUDING GRID CONNECTIONS ALTERNATIVES ACROSS PORTIONS OF THE FARM VAAL KOPPIES 40/3, 9, 52 & 66; FARM 555/7; AND ERVEN 73 & 19951, //KHARA HAIS MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 2 | 20/10/2015 | Stefan de Kock, Peter Nilssen, John Almond, Stephen Stead | 20/10/2015 - 13:32 | ||
Heritage Survey Report | Proposed Sewage Pipeline in Ward 20, Edendale, Pietermaritzburg, Msunduzi Municipal Area, Kwazulu-Natal. | HIA Letter of Exemption | 04/09/2015 | Len van Schalkwyk | Ethemb | Ethemb | 20/10/2015 - 11:37 |
HIA-KonkoonsiesII | Heritage Impact Assessment for the proposed 132 kV power line and substation at the Konkoonsies II SEF. | Heritage Impact Assessment Specialist Reports | 16/08/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 20/10/2015 - 07:51 |
Interim Report for the mitigation of JZCP_Site 1 | Interim Report: Archaeological Mitigation undertaken at a midden (JZCP_Site 1) exposed during Construction Work at the Car Park of the Johannesburg Zoo, City of Johannesburg Metropolitan Municipality, Gauteng Province | Archaeological Permit Report | 16/10/2015 | Polke Birkholtz, Joanna Behrens | PGS Heritage and Grave Relocation Consultants | Mayat Hart | 20/10/2015 - 07:22 |
Kriel Extension 23 HIA | Raubex Building Kriel Extesnion 23 Township Development Heritage Impact Assessment | Heritage Study | 08/05/2015 | Geovicon Environmental (Pty) Limited | 19/10/2015 - 17:00 | ||
Kriel Extension 23 HIA | Raubex Building Kriel Extesnion 23 Township Development Heritage Impact Assessment | Heritage Study | 08/05/2015 | Geovicon Environmental (Pty) Limited | 19/10/2015 - 16:55 | ||
HIA, P57, KZN | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THE UPGRADE OF THE P57 ROAD FROM EZINQOLENI TO THE MTAMVUNA RIVER BRIDGE, WITHIN THE EZINQOLENI LOCAL AND UGU DISTRICT MUNICIPALITIES, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 19/10/2015 - 11:59 | |
PIA[P1]-Debe Water Supply Scheme Upgrade: Phase 2, Eastern Cape | Phase 1 Palaeontological Assessment for the Proposed Upgrading of Debe Water Supply Scheme, Amatola Water (AW 2013/14/04) Infrastructure, Nkonkobe Local Municipality, Amathole District Municipality, Eastern Cape Province | PIA Phase 1 | 19/10/2015 | Gideon Groenewald | EOH Coastal & Environmental Services (CES) - East London | 19/10/2015 - 09:42 | |
AIA[P1]-Debe Water Supply Scheme Upgrade: Phase 2, Eastern Cape | Phase 1 Archaeological Impact Assessment - Debe Water Supply Scheme Upgrade: Phase 2, Nkonkobe Local Municipality, Amathole District Municipality, Eastern Cape | AIA Phase 1 | 19/10/2015 | Karen Van Ryneveld | EOH Coastal & Environmental Services (CES) - East London | 19/10/2015 - 09:36 | |
BREEKKIERIE KENHARDT VAN WYKSVLEI | ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MTN CELL PHONE MAST AT BREEKKIERIE NEAR KENHARDT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 14/04/2011 | Cobus Dreyer | MTN (Pty) Ltd | MTN (Pty) Ltd | 18/10/2015 - 12:24 |
PIA-Roggeveld | Palaeontrological Impact Assessment Proposed Roggeveld Wind Energy Facility | PIA Phase 1 | 01/03/2011 | Duncan Miller | ACO Associates CC | ERM South Africa | 16/10/2015 - 16:43 |
Phase 1 Heritage Impact Assessment | Phase One Heritage Impact Assessment of the Proposed Isandlwana Heritage Development, Umzinyathi District Municipality, KwaZulu-Natal | HIA Phase 1 | 17/07/2015 | Frans Prins | Active Heritage CC | Green Door Environmental | 16/10/2015 - 10:49 |
Integrated HIA: Proposed Legoko Solar Facility, Kathu | HIA Phase 2 | 21/09/2015 | Stefan de Kock | Perception Heritage Planning | Perception Heritage Planning | 15/10/2015 - 10:31 | |
PIA Orange Grove Residential Development | PALAEONTOLOGICAL IMPACT ASSESSMENT OF THE PROPOSED ORANGE GROVE 3500 RESIDENTIAL DEVELOPMENT, BUFFALO CITY METROPOLITAN MUNICIPALITY EAST LONDON, EASTERN CAPE PROVINCE | PIA Phase 1 | 27/05/2015 | Elize Butler | National Museum Bloemfontein | NSVT Consultants | 14/10/2015 - 19:54 |
AIA Phase 1 Orange Grove | Phase 1 AIA – Orange Grove Residential Development, Farm RE/862, East London, BCMM, Eastern Cape | AIA Phase 1 | 31/05/2015 | Karen Van Ryneveld | NSVT Consultants | ArchaeoMaps Archaeological Consultancy | 14/10/2015 - 19:49 |
Heritage Impact Assessment Matjesspruit | Heritage impact assessment for the ADDITIONAL AREA OF THE PROPOSED PHOTOVOLTAIC POWER PLANT ON A PORTION OF THE FARM MATJESSPRUIT 145HP, LEEUDORINGSTAD REGION, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 29/09/2015 | Johnny Van Schalkwyk | 14/10/2015 - 12:15 | ||
Buffalo Camp Heritage Impact Assessment | Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape. | HIA Phase 1 | 29/05/2015 | David Morris | McGregor Museum | SRK Consulting (Pty) Ltd - Western Cape | 13/10/2015 - 14:16 |
Buffalo Camp Heritage Impact Assessment | Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape | HIA Phase 1 | 15/05/2015 | David Morris | McGregor Museum | SRK Consulting (Pty) Ltd - Western Cape | 13/10/2015 - 14:13 |
APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY TELECOMMUNICATIONS MAST, LETAMO ESTATE | PROPOSED CONSTRUCTION OF A TELECOMMUNICATIONS MAST, LETAMO ESTATE, GAUTENG PROVINCE. APPLICATION FOR EXEMPTION FROM A PHASE 1 STUDY | HIA Letter of Exemption | 13/10/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Lokisa Environmental Consulting CC | 13/10/2015 - 13:55 |
AIA FOR THE SEKURUWE SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE | Archaeological Impact Assessment FOR THE SEKURUWE SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE | AIA Phase 1 | 06/09/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 13/10/2015 - 13:42 |
AIA REPORT FOR THE SEEMA SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT FOR THE SEEMA SECONDARY BULK WATER SUPPLY, MOKOPANE, LIMPOPO PROVINCE | AIA Phase 1 | 30/09/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tekplan Environmental | 13/10/2015 - 13:37 |
P187 HIA | THE PROPOSED UPGRADE OF PROVINCIAL ROAD P187 WITHIN EMNAMBITHI LOCAL MUNICIPALITY, UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 14/09/2015 | Stephan Gaigher | G&A Heritage Management Consultants | 13/10/2015 - 12:47 | |
Heritage Impact Assessment Ikageng Extension 13 | Cultural heritage assessment for the PROPOSED IKAGENG EXTENSION 13 ON PORTION 2 OF THE REMAINDER OF TOWN AND TOWNLANDS OF POTCHEFSTROOM 435IQ, NORTH WEST PROVINCE | Heritage Impact Assessment Specialist Reports | 01/05/2015 | Johnny Van Schalkwyk | 13/10/2015 - 11:59 | ||
Heritage Impact Assessment Greater Summerfield | HIA Phase 1 | 05/08/2015 | G&A Heritage Management Consultants | G & A Heritage | 13/10/2015 - 09:07 | ||
Kwasa Mine Colliery Development, Mkondo Local Municipality, Mpumalanga. | eThembeni Cultural Heritage was appointed by Jindal to undertake a Phase 1 Heritage Impact Assessment for the Proposed Kwasa Mine Project. Kwasa Colliery is an abandoned colliery at which it is planned to re-establish a small, underground coal mine and an on-site wash plant. The phase 1 heritage impact assessment will focus upon the proposed Co-Disposal dump site; as well as the planned new roads and the proposed fresh water dam site. | HIA Phase 1 | 01/04/2015 | Len van Schalkwyk | 10/10/2015 - 11:47 | ||
ERG3537_NID_Addendum_Memo | Addendum Memo regarding the 7L5 and 7L6 Slimes Dams Prospecting Application, Ekurhuleni Metropolitan Municipality | Heritage Impact Assessment Specialist Reports | 29/09/2015 | Natasha Higgitt | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 09/10/2015 - 13:52 |
AIA-KonkoonsiesII(final) | Final Archaeological Survey for the Proposed Konkoonsies II Solar Energy Facility, Kenhardt Magisterial District, NC Province | Archaeological Specialist Reports | 23/07/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 09/10/2015 - 08:44 |
AIA-AggeneysSolar(final) | Final Archaeological Survey for the Proposed Aggeneys Solar Energy Facility, Namakwaland Magisterial District, NC Province | Archaeological Specialist Reports | 23/07/2015 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 09/10/2015 - 08:41 |
Mahoebe Archaeological Impact Assessment | MAHOEBE EIENDOMME: PROPOSED 2MW PHOTOVOLTAIC POWER PLANT DEVELOPMENT ON A PORTION OF THE FARM DE HOEK 32, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 28/09/2015 | Nelius Kruger | Exigo Sustainability | EOH | 08/10/2015 - 16:06 |
Mahoebe Archaeological Impact Assessment | MAHOEBE EIENDOMME: PROPOSED 2MW PHOTOVOLTAIC POWER PLANT DEVELOPMENT ON A PORTION OF THE FARM DE HOEK 32, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 28/09/2015 | Nelius Kruger | Exigo Sustainability | EOH | 08/10/2015 - 16:02 |
Schoonbee Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | Archaeological Specialist Reports | 05/08/2015 | Nelius Kruger | 08/10/2015 - 12:06 | ||
Schoonbee Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | Archaeological Specialist Reports | 05/08/2015 | Nelius Kruger | 08/10/2015 - 12:06 | ||
Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | Archaeological Specialist Reports | 05/08/2015 | Nelius Kruger | 08/10/2015 - 11:48 | ||
Archaeological Impact Assessment | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE PROPOSED SCHOONBEE SOLAR FARM AND 22KV POWER LINE PROJECT ON PORTION 4 OF THE FARM BLAAUWILDEBEESTFONTEIN 16JS, GROBLERSDAL, GREATER SEKHUKHUNE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | Archaeological Specialist Reports | 05/08/2015 | Nelius Kruger | 08/10/2015 - 11:48 | ||
Palaeontological Assessment for Palm Springs Recreational Facility Development | Palaeontological Desktop Assessment for the proposed development of a Multi-Purpose Recreational Facility in Palm Springs, for Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province | PIA Desktop | 28/07/2015 | Gideon Groenewald | 07/10/2015 - 11:56 | ||
PIA:Hennenman | Palaeontological specialist assessment: desktop study for the proposed Hennenman 5MW solar energy facility. | 22/07/2015 | John Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 07/10/2015 - 09:56 | |
Retirement village on portions 11 & 12 of the farm Nooitgedacht 62, White River | A Phase 1 AIA / HIA for the development of a lifestyle retirement village on portions 11 and 12 of the farm Nooitgedacht 62, White River, Mpumalanga Province | AIA Phase 1 | 06/10/2015 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Nkululeko Environment and Development Agency | 06/10/2015 - 19:41 |
Ekuvukeni | SURVEY OF THE EKUVUKENI SHOPPING CENTRE, KWAZULU-NATAL | HIA Phase 1 | 28/09/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Triplo4 Sustainable Solutions (Pty) Ltd | 06/10/2015 - 14:23 |
PIA_Kentani Solar Development | Palaeontological Desktop Assessment for 12 new Solar Photovoltaic facilities near Dealesville, Free State Province | PIA Desktop | 03/02/2015 | Lloyd Rossouw | Paleo Field Services | ASHA Consulting(Pty) Ltd | 06/10/2015 - 11:09 |
Palaeo Asssessment of Morehill X11 | Desktop Palaeontological Heritage Impact Assessment Report on the Site of a proposed township Morehill Extension 11 situated on a portion of portion 50 of the farm vlakfontein 69 IR, Gauteng Province | PIA Desktop | 25/09/2015 | Barry Millsteed | BM Geological Services | Eco Assessments | 06/10/2015 - 10:46 |
Application for Exemption from Phase 1 heritage Impact Assessment: Mhlanga Water Scheme | Application for Exemption for a Phase 1 Heritage Impact Assessment for the Proposed Mhlanga Water Reticulation Project, Chris Hani District Municipality, Eastern Cape, South Africa | HIA Letter of Exemption | Len van Schalkwyk | eThembeni Cultural Heritage | GIBB Engineering & Science - Durban | 06/10/2015 - 00:22 | |
MIXED-USE DEVELOPMENT BRANDKOP 702 | FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED MIXED-USE DEVELOPMENT ON PORTION 5 OF BRANDKOP 702, BLOEMFONTEIN, FREE STATE | Heritage Impact Assessment Specialist Reports | 11/06/2015 | Cobus Dreyer | Nemai Consulting | Nemai Consulting | 05/10/2015 - 21:10 |
TRUCK STOP PALMIET 585 VREDE | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE PROPOSED TRUCK STOP DEVELOPMENTS AT PORTION 4, PALMIET 585, VREDE, FREE STATE | Heritage Impact Assessment Specialist Reports | 11/10/2015 | Cobus Dreyer | DESTUDIO DESIGN BLOEMFONTEIN | DESTUDIO DESIGN BLOEMFONTEIN | 05/10/2015 - 21:03 |
HERITAGE ASSESSMENT AND MANAGEMENT PLAN FOR THE PROSPECTING RIGHT APPLICATION ON PORTION 1 OF THE FARM MATSAP 81, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 20/07/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | SLR Consulting (Africa) | 05/10/2015 - 15:20 | |
Heritage Report for PV Plant Duvha Power Station | 2014JvS062 Duvha PV Sites Final | Heritage Impact Assessment Specialist Reports | eThembeni Cultural Heritage | 05/10/2015 - 12:07 | |||
AIA FOR A 2 MW PHOTOVOLTAIC POWER PLANT (MAHOEBE EIENDOMME SOLAR PARK) , PRIESKA, NORTHERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR A PROPOSED 2 MW PHOTOVOLTAIC POWER PLANT (MAHOEBE EIENDOMME SOLAR PARK) ON A PORTION OF THE FARM DE HOEK 32, PRIESKA, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | AIA Phase 1 | 28/09/2015 | Neels Kruger | Exigo3 Sustainability | EP3 Environmental | 05/10/2015 - 10:23 |
Heritage Scoping Report - Proposed Desalination Plant at Tongaat | Heritage Scoping Report Proposed Umgeni Water Desalination Plant and associated infrastructure at Tongaat eThekweni Municipality, KwaZulu-Natal | Heritage Scoping | 28/09/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | Council for Scientific and Industrial Research | 05/10/2015 - 10:09 |
Lovu Desalination Plant | Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed Umgeni Water Desalination Plant and associated infrastructure at Lovu eThekweni Municipality, KwaZulu-Natal | HIA Letter of Exemption | 10/08/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | Council for Scientific and Industrial Research | 05/10/2015 - 02:42 |
Protocol for Finds | Protocol for Finds | Palaeontological Monitoring | 28/09/2015 | Heidi Fourie | Ditsong Museums of South Africa | Clean Stream Environmental Services | 01/10/2015 - 11:09 |