THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 10001 - 10050 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
AM[P2]-Samy's Wholesalers, Erf 44500, KBY, SPM, NC | Phase 2b Archaeological Monitoring - Samy's Wholesalers Extension Development, Erf 44500, c/o Quinn & Lawrence Streets, Kimberley, Sol Plaatjie Municipality, Northern Cape, South Africa [SAHRIS Case ID #6899; SAHRA BGG Unit Permit ID #2016] | AIA Phase 2 | 01/09/2015 | Karen Van Ryneveld | Samy's Wholesalers | 01/09/2015 - 07:08 | |
Phase 1 HIA for proposed power station development near Colenso | PHASE 1 HIA REPORT FOR THE PROPOSED COLENSO POWER PROJECT NEAR COLENSO, KWAZULU-NATAL | HIA Phase 1 | 31/07/2015 | Anton Pelser | A Pelser Archaeological Consulting | EcoPartners | 31/08/2015 - 13:55 |
Vlakfontein HIA | Heritage Impact Assessment for the Proposed Vlakfontein Township Development | 31/08/2015 - 12:54 | |||||
Spaarwater HIA | Heritage Impact Assessment for the Proposed Spaarwater Township Development | 31/08/2015 - 12:44 | |||||
Dalpark Witpoortjie HIA | Heritage Impact Assessment for the Proposed Helderwyk Township Development | 31/08/2015 - 12:35 | |||||
Brakpan Old Location HIA | Heritage Impact Assessment for the proposed Brakpan Old Location Township Development | Heritage Impact Assessment Specialist Reports | 17/03/2015 | 31/08/2015 - 11:56 | |||
Nsikazi North Bulk Water Scheme Upgrade | Phase 1 Heritage Impact Assessment For The Proposed Nsikazi North Bulk Water Scheme Upgrade In Nyongane, Mpumalanga Province. | HIA Phase 1 | 31/08/2015 | Makhosazana Mngomezulu | 31/08/2015 - 02:13 | ||
Nongoma Wards Roads HIA | HERITAGE SURVEY OF THE ROAD UPGRADES FOR NONGOMA WARDS 10, 16 & 17 | HIA Phase 1 | 22/05/2010 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 30/08/2015 - 11:27 | |
Cedarville HIA Exemption letter | Letter Of Exemption For The Cedarville Middle Income Housing Development | HIA Letter of Exemption | 20/06/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | NS Environmental (Pty) Ltd | 27/08/2015 - 22:52 |
Fibre Optic Cable JOhannesburg-Yzerfontein | SPECIALIST STUDY: HERITAGE IMPACT ASSESSMENT FOR THE INSTALLATION OF THE SIRIUS FIBRE OPTIC CABLE BETWEEN JOHANNESBURG AND YZERFONTEIN, GAUTENG, FREE STATE, EASTERN AND WESTERN CAPE PROVINCES | Heritage Impact Assessment Specialist Reports | 08/03/2015 | Dr J de Jongh | JG AFRIKA | 27/08/2015 - 13:19 | |
A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PUBLIC ACCESS TO SARDINIA BAY | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PUBLIC ACCESS TO SARDINIA BAY | AIA Phase 1 | 15/07/2015 | Johan Binneman | Eastern Cape Heritage Consultants | CEN Integrated Environmental Management Unit | 27/08/2015 - 12:56 |
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PUBLIC ACCESS TO SARDINIA BAY BEACH, PORT ELIZABETH, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE | PIA Desktop | 05/08/2015 | John Almond | Natura Viva CC | CEN Integrated Environmental Management Unit | 27/08/2015 - 09:55 |
A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR PUBLIC ACCESS TO SARDINIA BAY | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A PARKING BAY AND ASSOCIATED INFRASTRUCTURES AT SARDINIA BAY, PORT ELIZABETH, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 22/07/2015 | Johan Binneman | Eastern Cape Heritage Consultants | CEN Integrated Environmental Management Unit | 27/08/2015 - 09:49 |
Vaal-Gamagara pipeline | Phase 1 Heritage Impact Assessment of the 2.3 km long 40478 Vaal-Gamagara water pipeline alternative route around Kathu Pan, Northern Cape Province | HIA Phase 1 | 07/07/2015 | Lloyd Rossouw | 26/08/2015 - 13:46 | ||
SAS3432_Sigma_Mooikraal_Watching_Brief | Heritage Watching Brief Report for the Sasol Sigma Mooikraal 7Mℓ Pipeline | Heritage Impact Assessment Specialist Reports | 27/07/2015 | Natasha Higgitt, Justin du Piesanie | Digby Wells Environmental | Sasol Mining (Pty) Ltd | 26/08/2015 - 12:57 |
ERG3537_7L5_7L6_NID | Notification of Intent to Develop for the Prospecting Right and Environmental Authorisation Application for the 7L5 and 7L6 Slimes Dam on Vlakfontein 281 IR | Heritage Impact Assessment Specialist Reports | 13/08/2015 | Natasha Higgitt, Johan Nel | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 26/08/2015 - 09:51 |
PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR KATHU CEMETERY EXTENSION | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE EXPANSION OF THE KATHU CEMETERY, GAMAGARA LOCAL MUNICIPALITY, JOHN TAOLE GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | PIA Desktop | 19/12/2014 | Gideon Groenewald | 26/08/2015 - 09:32 | ||
Vanwyksvlei pipeline | Phase 1 Heritage Impact Assessment of a proposed new subsurface water pipeline between the Vanwyksvlei reservoir and Saaipoort, near Carnarvon, Northern Cape Province. | HIA Phase 1 | 17/08/2015 | Lloyd Rossouw | 26/08/2015 - 09:28 | ||
ERG3537_7L4_NID | Notification of Intent to Develop for the Prospecting Right and Environmental Authorisation Application for the 7L4 Slimes Dam on Vogelstruisbult 127 IR and Daggafontein 125 IR | Heritage Impact Assessment Specialist Reports | 13/08/2015 | Natasha Higgitt, Johan Nel | Digby Wells Environmental | Ergo Mining (Pty) Ltd | 26/08/2015 - 09:21 |
HIA for the Kathu cemetery Expansion | Heritage Impact Assessment for the Proposed Kathu cemetery extension on parts of the remainder of the farm Uitkoms 463 on the north eastern side of the town of Kathu in the Gamagara Local Municipality, Northern Cape | HIA Phase 1 | 11/12/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 26/08/2015 - 09:14 | |
Bloemfontein N8 Graves Final Report | REPORT ON THE RELOCATION OF GRAVES N8-14 GRAVE RELOCATION PROJECT FARM MIDWAY 2631, WORLEY PARSONS (PTY) LTD, BLOEMFONTEIN, FREE STATE | BGG Phase 1 | 31/07/2015 | Henk Steyn | PGS Heritage and Grave Relocation Consultants | Worley Parsons RSA (Pty) Ltd | 25/08/2015 - 15:51 |
Van Eeden Family Trust HIA Exemption | Application for Exemption from a Phase 1 Heritage Impact Assessment Van Eeden Projects Trust appliction for a mining permit to mine 4.9 ha of a portion of Portion 1 of Lot 29 Umfolozi No 15607, Mtubatuba, Mbonambi Local Municipality, KwaZulu-Natal | HIA Letter of Exemption | 19/08/2015 | Len van Schalkwyk | eThembeni Cultural Heritage | Greenmined Environmental | 25/08/2015 - 12:36 |
UNITRA-THORNHILL transmission line | HERITAGE SURVEY OF THE UNITRA/THORNHILL POWERLINE, EASTERN CAPE. | HIA Phase 1 | 25/08/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Indwe Environmental Consulting | 25/08/2015 - 11:27 |
NCAMBEDLANA BULK SEWER PIPELINE | HERITAGE SURVEY OF THE PROPOSED NCAMBEDLANA BULK SEWER PIPELINE, MTHATHA, EASTERN CAPE. | Heritage Impact Assessment Specialist Reports | 25/08/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Indwe Environmental Consulting | 25/08/2015 - 10:34 |
Ndumo-Gezisa HIA | HERITAGE SURVEY FOR THE NDUMO-GEZISA TRANSMISSION LINE, KWAZULU-NATAL | HIA Phase 1 | 25/08/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Sibelo Resources Development (Pty) Ltd | 25/08/2015 - 09:43 |
Ndumo-Gezisa HIA | HERITAGE SURVEY FOR THE NDUMO-GEZISA TRANSMISSION LINE, KWAZULU-NATAL | HIA Phase 1 | 25/08/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Sibelo Resources Development (Pty) Ltd | 25/08/2015 - 09:43 |
Steve Tshwete waste transfer and sorting facility | A Phase 1 AIA / HIA for the proposed establishment of a waste transfer and sorting facility at Sikhululiwe village, on portion 9 of the farm Springboklaagte 416JS, east of Middelburg (Steve Tshwete Local Municipality), Mpumalanga Province. | AIA Phase 1 | 23/08/2015 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Delta Built Environment Consultants (Pty) Ltd | 23/08/2015 - 12:01 |
Residential Township development, Tekwane extension 2, Kanyamazane | Phase 1 Archaeological / Heritage Impact assessment for proposed residential Township, Tekwane extension 2, portion 7 of Tekwane 537JU, Kanyamazane | AIA Phase 1 | 23/08/2015 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 23/08/2015 - 11:15 |
Footbridge across Elands River, Elandshoek Railway siding | Phase 1 Archaeological / Heritage Impact assessment for the development of a footbridge across the Elands River, Elandshoek, Mpumalanga | AIA Phase 1 | 23/08/2015 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 23/08/2015 - 10:37 |
Proposed bulk services for Tekwane 537JU, Kanyamazane | Phase 1 Archaeological / Heritage Impact assessment for proposed reservoir, bulk sewer and bulk water pipelines, portion 7 of Tekwane 537JU, Kanyamazane, Mpumalanga Province | AIA Phase 1 | 22/08/2015 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 23/08/2015 - 09:34 |
Heritage Survey of Support Zone/Precinct 2 | Heritage Survey of the Dube TradePort Support Zone 2 | BE & CL Phase 1 | 20/11/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | La Mercy JV | 21/08/2015 - 07:18 |
Heritage Survey of Support Zone/Precinct 2 | Heritage Survey of the Dube TradePort Support Zone 2 | BE & CL Phase 1 | 20/11/2013 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | La Mercy JV | 21/08/2015 - 07:10 |
Site Inspection - Site BSK-01: Eskom Grassridge-Kudu-Melkhout Power Line, near Jeffrey's Bay, Kouga Local Municipality, Eastern Cape | Archaeological Site Inspection - Cemetery Site BSK-01, Farm 318/21, Eskom Grassridge-Kudu-Melkhout 132kV Power Line Rebuilding Project, near Jeffrey's Bay, Kouga Local Municipality, Eastern Cape | Site Inspection Report | 20/08/2015 | Karen Van Ryneveld | Royal Haskoning DHV | 20/08/2015 - 19:58 | |
Buffels River Bridge HIA | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED BUFFELS RIVER BRIDGE AT MLABA NEAR DUNDEE, KWAZULU-NATAL | HIA Phase 1 | 12/08/2015 | Frans Prins | Active Heritage CC | Nankhoo & Associates | 20/08/2015 - 17:59 |
Phase 1 Heritage Scoping Report: Kruger Berries | PHASE 1 HERITAGE RESOURCES SCOPING REPORT: PROPOSED CROPLANDS FOR BERRY CULTIVATION NEAR TZANEEN, LIMPOPO | Heritage Scoping | 04/05/2015 | Frans Roodt | Shasa Heritage Consultants CC | Polygon Environmental Planning CC | 20/08/2015 - 11:23 |
HIA for Thabong | Cultural Heritage Impact Assessment Report for the Proposed SANRAL Thabong Interchange Development, Welkom Region, Free State Province | Heritage Impact Assessment Specialist Reports | 31/03/2014 | 19/08/2015 - 17:36 | |||
Cultural HIA for Emergency Nondabula Water Reticulation Project | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EMERGENCY NONDABULA WATER RETICULATION PROJECT, WARD 9 OF THE NODWENGU TRADITIONAL COUNCIL, ILEMBE REGIONAL MUNICIPALITY. | Heritage Impact Assessment Specialist Reports | 15/06/2015 | Frans Prins | 19/08/2015 - 14:53 | ||
Heritage Screener - DWA bridges on Skoenmakers River | Skoenmakers River Project - CTS15_008 | 18/08/2015 | Mariagrazia Galimberti, Kyla Bluff, Peter Kloos, Nicholas Wiltshire | CTS Heritage | SRK Consulting (Pty) Ltd - Johannesburg | 19/08/2015 - 13:32 | |
PIA Hendrina | Full Palaeontological Impact Assessment on the Farm Boschmanspoort 159, Hendrina, Mpumalanga Province. | PIA Phase 1 | 10/08/2015 | Barry Millsteed | BM Geological Services | Raubex Construction (Pty) Ltd. | 18/08/2015 - 13:14 |
AIA Hendrina | Archaeological Impact Assessment for the proposed quarry on the Farm Boschmanspoort 159, Hendrina, Mpumalanga Province. | AIA Phase 1 | 17/08/2015 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Raubex Construction (Pty) Ltd. | 18/08/2015 - 13:06 |
Proposed Infrastructure Development at the Goedehoop North Mini-Pit | AIA Phase 1 | 14/07/2015 | Jaco van der Walt | Prism Environmental Management Services cc | Jones & Wagener Engineering and Environmental Consultants | 18/08/2015 - 12:02 | |
Proposed infrastructure development at the Goedehoop North Mini-Pit. | Archaeological Impact Assessment for the proposed infrastructure development at the Goedehoop North Mini-Pit, Middelburg Wolvekrans Complex, Mpumalanga Province. | AIA Phase 1 | 14/07/2015 | Jaco van der Walt | Prism Environmental Management Services cc | Jones & Wagener Engineering and Environmental Consultants | 18/08/2015 - 11:49 |
Palaeontological Desktop Report – Thandeka Shaft, Greenside Colliery | PALAEONTOLOGICAL DESKTOP STUDY THANDEKA SHAFT OF GREENSIDE COLLIERY, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | PIA Desktop | 11/02/2015 | 18/08/2015 - 09:28 | |||
Palaeontological Desktop Report – Thandeka Shaft, Greenside Colliery | PALAEONTOLOGICAL DESKTOP STUDY THANDEKA SHAFT OF GREENSIDE COLLIERY, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | PIA Desktop | 11/02/2015 | 18/08/2015 - 09:28 | |||
HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR GREENSIDE COLLIERY’S THANDEKA SHAFT AND OVERHEAD POWER LINE PROJECT | A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR GREENSIDE COLLIERY’S THANDEKA SHAFT AND OVERHEAD POWER LINE PROJECT NEAR EMAHLALENI (WITBANK) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 01/01/2015 | 18/08/2015 - 09:18 | |||
HMP for Taung Skull WHS | Heritage Management Plan for the Taung Skull WHS | Conservation Management Plan | 28/07/2015 | Francois Odendaal, Jonathan Kingwill | EcoAfrica Environmental Consultants | EcoAfrica Environmental Consultants | 17/08/2015 - 15:55 |
PIA for Taung Skull WHS | Paleontological Impact Assessment for improvements to visitor facilities, site infrastructure and heritage site conservation measures for Taung Skull WHS | PIA Desktop | 24/07/2015 | James Brink | National Museum Bloemfontein | National Museum Bloemfontein | 17/08/2015 - 15:51 |
AIA for Taung Skull WHS | Archaeological Impact Assessment for improvements to visitor facilities, site infrastructure and heritage site conservation measures for Taung Skull WHS. | AIA Desktop | 24/07/2015 | David Morris | McGregor Museum | McGregor Museum | 17/08/2015 - 15:48 |
PIA for Taung Skull WHS | Paleontological Impact Assessment for improvements to visitor facilities, site infrastructure and heritage site conservation measures for Taung Skull WHS | PIA Desktop | 24/07/2015 | James Brink | National Museum Bloemfontein | National Museum Bloemfontein | 17/08/2015 - 15:45 |
AIA for Taung Skull WHS | Archaeological Impact Assessment for improvements to visitor facilities, site infrastructure and heritage site conservation measures for Taung Skull WHS | AIA Desktop | 10/07/2015 | David Morris | McGregor Museum | McGregor Museum | 17/08/2015 - 15:38 |