THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 101 - 150 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Heritage Assessment for Newcasle to Ncandu River Project | 12/10/2023 - 09:30 | ||||||
Phase 1 Heritage Assessment for P22071 Worcester to Glen Heatlie Project | Phase 1 Heritage Assessment of P22071 SANRAL Worcester to Glen Heatlie Project. | HIA Phase 1 | 12/10/2023 - 08:27 | ||||
New Worcester to Glen Heatlie HIA Report | 11/10/2023 - 14:44 | ||||||
Heritage Screener_PG Bison Pipeline | Desktop Letter of Exemption - Proposed pipeline and boreholes for the provision of water to the PG Bison facility near eMkhondo, Mpumalanga. | HIA Letter of Exemption | 22/09/2023 | Jenna Lavin, Mabeth Crafford | CTS Heritage | Zutari (Pty) Ltd | 11/10/2023 - 14:05 |
Chapel Street HIA Draft | Chapel Street Upgrade Heritage Impact Assessment Xubmitted in Terms of Section 38(4) of the NHRA (1999) for theUpgrade of Chapel Street, District Six, Cape Town, Erven 8000-RE, 8203-RE, 8204-re and 9869-RE: Draft for Comment | HIA Phase 1 | 09/10/2023 | Katie Smuts, Mike Scurr, Tracey Randle | Infinity Environmental | Infinity Environmental | 11/10/2023 - 12:57 |
Exemption from Heritage Impact Assessment for Carlswald Pipeline, Midrand, Gauteng | Application for exemption from a Heritage Impact Assessment for the replacement of an existing water pipeline in Carlswald, Gauteng Province | HIA Letter of Exemption | 07/02/2023 | Jaco van der Walt | Beyond Heritage | Zitholele Consulting | 11/10/2023 - 12:14 |
Annual progress report | Strathalan Cave Excavation Project annual report for 2022 | Archaeological Permit Report | 11/10/2023 | Jerome Reynard | Department of Archaeology, University of the Witwatersrand | 11/10/2023 - 09:17 | |
Mitigation report for the archaeological surface collections at MR001-MR008, Mier Rietfontein Solar PV | Mitigation report for the archaeological surface collections at MR001-MR008, Mier Rietfontein Solar PV and Battery Storage Project, Farm Mier 585, Dawid Kruiper local municipality, Northern Cape Province (CASEID-20703) | AIA Phase 2 | 04/08/2023 | Wouter Fourie, Henk Steyn, Daniel Tasker | PGS Heritage (Pty) Ltd | WSP Group Africa (Pty) Ltd | 11/10/2023 - 08:16 |
Keno C Diamonds (Pty) Ltd- NC 13672 PR | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT SITUATED ON THE PORTIONS 1, 2, 3, 4, 5, 6 AND THE REMAINDER OF THE FARM BOLHAM NO. 686, IN THE ADMINISTRATIVE DISTRICT OF KURUMAN | 10/10/2023 - 15:22 | |||||
PALAEONTOLOGICAL DESKTOP ASSESSMENT: PROPOSED MIRACH SOLAR PV PROJECT NEAR THABAZIMBI, LIMPOPO PROVINCE | 10/10/2023 - 14:42 | ||||||
Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF THE PROPOSED MIRACH SOLAR PV PROJECT NORTH OF THABAZIMBI, LIMPOPO PROVINCE | 10/10/2023 - 14:40 | ||||||
Palaeontological Desktop Assessment | Palaeontological Desktop Assessment: Section 102/Part 2 Amendment Application Combined with Waste License Application to amend the Existing Prospecting Right to include the Prospecting of Aluminium-, Zinc-, Silicon- and Copper Ore, Registration Division: Kuruman, Northern Cape Province. DMRE ref: NC30/5/1/1/2/11873PR | PIA Desktop | 22/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | 10/10/2023 - 13:03 | |
HIA for the Phula PV Facility, Limpopo Province | Heritage Assessment for the proposed Phula Solar PV Project, near Steelpoort, Greater Tubatse Local Municipality and Greater Sekhukhune District Municipality, Limpopo Province | HIA Phase 1 | 05/04/2023 | Wouter Fourie, Nikki Mann | PGS Heritage (Pty) Ltd | Jones & Wagener Engineering and Environmental Consultants | 10/10/2023 - 12:57 |
Phase 1 cultural heritage resources impact assessment | Phase 1 cultural heritage resources impact assessment for the proposed prospecting area on portion 1 (Kadgame number 3), portion 2 (Noordpool) and portion 4 (Bakenskop) of the farm Kadgame 558 located within the Kuruman Magisterial District, Northern Cape Province. | HIA Phase 1 | Danie Labuschagne | Milnex 189 CC | 10/10/2023 - 12:53 | ||
Request for Exemption of any Palaeontological Impact Assessment for the proposed Maretlwana Tributary Project, near Marikana, North West Province | Request for Exemption of any Palaeontological Impact Assessment for the proposed Maretlwana Tributary Project, near Marikana, North West Province | PIA Desktop | 16/06/2023 | Marion Bamford | Prof Marion Bamford | Alta van Dyk Environmental Consultants cc | 10/10/2023 - 08:41 |
Maretlwana Tributary Rehabilitation Project at Marikana Operations, North West Province | HIA for the Maretlwana Tributary Rehabilitation Project at Marikana Operations, North West Province | HIA Phase 1 | 28/07/2023 | Jaco van der Walt | Beyond Heritage | Alta van Dyk Environmental Consultants cc | 10/10/2023 - 08:39 |
Heritage Compliance Statement - Chargo Fuels | Heritage Compliance Statement for proposed new Filling Station Development on Erf 1058, Graaff-Reinet , EC Province. | Heritage Statement | 15/08/2023 | CW | Environmental Management Group (Pty) Ltd | Environmental Management Group (Pty) Ltd | 09/10/2023 - 13:53 |
4 Ryde Place - forms | 09/10/2023 - 13:50 | ||||||
Heritage Impact Assessment Limberg Substations, Switching station and 132kV line | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE LIMBERG SUBSTATION/SWITCHING ON THE FARM MIDDELLAAGTE 382-KQ, WITH AN ALTERNATIVE SITE ON FARM ZWARTKOP 369-KQ PORTION 18, THABAZIMBI LOCAL MUNICIPALITY IN WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE. | HIA Phase 1 | 18/09/2023 | Jaco van der Walt | Beyond Heritage | Setala Environmental | 08/10/2023 - 12:03 |
Rutendo HR Consultants_FS 10678 PR | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT SITUATED ON THE REMAINING EXTENT OF THE FARM VAALBANK 135, A PORTION OF PORTION 1 OF THE FARM VAALBANK 135 AND PORTION 2 OF THE FARM VAALBANK 135, IN THE MAGISTERIAL DISTRICT OF LEJWELEPUTSWA, IN THE TOWN OF WELKOM | 06/10/2023 - 12:36 | |||||
Rhino Andalusite Mine PV Solar Plant Development Palaeontological Impact Assessment: Phase 1: Field Study | Rhino Andalusite Mine PV Solar Plant Development Palaeontological Impact Assessment: Phase 1: Field Study | PIA Phase 1 | 30/05/2023 | Dr. Heidi Fourie | Dr Heidi Fourie | Dr Heidi Fourie | 06/10/2023 - 09:24 |
HIA: Proposed Welanga Solar Photovoltaic Solar Energy Facility and Grid Connection Infrastructure near Charl Cilliers, Mpumalanga Province | 06/10/2023 - 09:09 | ||||||
HIA: Proposed Welanga Solar Photovoltaic Solar Energy Facility and Grid Connection Infrastructure near Charl Cilliers, Mpumalanga Province | 06/10/2023 - 08:53 | ||||||
N3 Improvement - Harrismith to Warden | THE PROPOSED ROAD SAFETY IMPROVEMENTS ON THE EXISTING N3 TOLL ROAD BETWEEN HARRISMITH (N3/7X KM 37.0) AND WARDEN (N3-8X KM 10.9) | HIA Phase 1 | 31/07/2023 | Johnny Van Schalkwyk | National Cultural History Museum | Environamic | 05/10/2023 - 11:47 |
230830 Witfontein 444 BP HIA | Phase 1 Heritage Impact Assessment for extension of an existing Borrow Pit on Remainder of farm Witfontein 444 near Viljoenskroon, FS Province. | HIA Phase 1 | 28/08/2023 | 04/10/2023 - 17:05 | |||
DESKTOP PIA FOR HYDRA-KRONOS POWERLINE | Palaeontological Impact Assessment for the proposed construction of Kronos-Hydra second 400kV powerline and associated infrastructure, Pixley ka Seme District Municipality, Northern Cape Province | PIA Desktop | 01/07/2023 | Marion Bamford | University of the Witwatersrand | DIGES Group | 03/10/2023 - 19:31 |
PHASE 1 ARCHAELOGICAL AND CULTURAL HERITAGE ASSESSMENT FOR HYDRA-KRONOS POWERLINE | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED CONSTRUCTION OF ARIES – KRONOS – HYDRA 400 kV POWER LINE AND ASSOCIATED INFRASTRUCTURE WITHIN PIXLEY KA SEME DISTRICT MUNICIPALITY OF NORTHERN CAPE PROVINCE. | AIA Phase 1 | 12/06/2023 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultance Cc | DIGES Group | 03/10/2023 - 19:24 |
HIA report for the upgrading of Gravel Road D2919 from Tshikanosi to Malebitsa. | Phase I Heritage Gravel Road D2919 from Tshikanosi to Malebitsa Development Project. Ephraim Local Municipality. Sekhukhune District Municipality. Limpopo Province. | HIA Phase 1 | 28/09/2023 | Frans Roodt | Delta Built Environment Consultants (Pty) Ltd | 03/10/2023 - 15:46 | |
Zibulo Colliery 132 kV Powerline and Substation Project | Zibulo Colliery 132 kV Powerline and Substation Project | Palaeontological Specialist Reports | 30/08/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 03/10/2023 - 13:56 |
Zibulo North Shaft Project – 132KV Overhead Powerlines | Zibulo North Shaft Project – 132KV Overhead Powerlines | Heritage Impact Assessment Specialist Reports | 28/08/2023 | Jessica Angel | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 03/10/2023 - 13:21 |
RELOCATION OF 10 GRAVES FROM SIBANYE-STILLWATER WESTERN PLATINUM LIMITED | REPORT ON THE RELOCATION OF GRAVES RELOCATION OF 10 GRAVES FROM SIBANYE-STILLWATER WESTERN PLATINUM LIMITED (WPL) ON THE FARM ROOIKOPPIES 297 JQ, NEAR MARIKANA, NORTH-WEST | Burial Grounds and Graves Specialist Reports | 04/08/2023 | Michelle Sachse | PGS Heritage (Pty) Ltd | 03/10/2023 - 11:48 | |
Heritage Impact Assessment for the proposed Bothaville Solar Photovoltaic Solar Energy Facility and Grid Connection Infrastructure near Bothaville, Free State Province | 03/10/2023 - 11:14 | ||||||
Palaeontological Impact Assessment | Desktop Palaeontological Impact Assessment of Application for a Prospecting Right for Iron and Manganese ore on the Remaining Extent of Consolidated Farm Kappies Kareeboom 540, Portion 1 of Consolidated Farm Kappies Kareeboom 540, Remaining Extent of the Farm 544 and Portion 1 of the Farm 616, Postmasburg, Northern Cape Province | PIA Desktop | 03/10/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 03/10/2023 - 09:27 | |
Heritage Impact Assessment | Heritage Impact Assessment for the proposed Prospecting Right application over the Remaining Extent of Consolidated Farm Kappies Kareeboom 540, Portion 1 of Consolidated Farm Kappies Kareeboom 540, Remaining Extent of the Farm 544 and Portion 1 of the Farm 616, Hay District, Northern Cape Province | HIA Phase 1 | 03/10/2023 | Joseph Chikumbirike | Pulafel 4D Consulting (Pty) Ltd | 03/10/2023 - 09:24 | |
HIA Bethulie Extension | Heritage Impact Assessment for the Proposed Bethulie Extension residential area, Bethulie east, Free State Province | HIA Phase 1 | 26/05/2023 | Jaco van der Walt | Beyond Heritage | Setala Environmental | 02/10/2023 - 18:46 |
Phase 1 Cultural Heritage Impact Assessment: | Phase 1 Cultural Heritage Impact Assessment: ENVIRONMENTAL IMPACT ASSESSMENT (SCOPING AND EIR-PHASE) FOR THE PROPOSED PROSPECTING RIGHT APPLICATION TO PROSPECT FOR DIAMONDS ALLUVIAL (DA), DIAMONDS GENERAL (D) AND DIAMONDS (DIA) NEAR WOLMARANSSTAD ON PORTION 8, 16, 19, 21, 22 AND 27 OF THE FARM KATBOSCHFONTEIN 164, REGISTRATION DIVISION: HO, NORTH WEST PROVINCE | HIA Phase 1 | 26/09/2023 | Johnny van Schalkwyk | 28/09/2023 - 13:34 | ||
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT: PROSPECTING RIGHT APPLICATION FOR DIAMONDS NEAR WOLMARANSSTAD ON FARM KATBOSCHFONTEIN 164, NORTH WEST PROVINCE, 2023 | PIA Desktop | 27/09/2023 | Banzai Environmental (Pty) Ltd | 28/09/2023 - 13:25 | ||
PHASE 1 HIA PLOT 2386 KAKAMAS-SOUTH NORTHERN CAPE | PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED AGRICULTURAL DEVELOPMENT PLOT 2386, (PORTION OF PLOT 2189), KAKAMAS-SOUTH SETTLEMENT, KAI !GARIB LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | Heidi Fivaz, Jan Engelbrecht, Elize Butler | UBIQUE HERITAGE CONSULTANTS | ECO Balance Planning Co | 28/09/2023 - 13:22 | |
Grave exhumation and reburial at Richtersveld National Park | Site Inspection Report | 28/09/2023 - 10:21 | |||||
VIA for the Padloper EGI 4, NC & WC | VISUAL IMPACT ASSESSMENT REPORT: COMPILED TO PROVIDE INPUTS FOR BASIC ASSESSMENTS FOR THE PROPOSED DEVELOPMENT OF PADLOPER ELECTRICAL GRID INFRASTRUCTURE PROJECTS 1 - 4 , NEAR MURRAYSBURG IN THE WESTERN AND NORTHERN CAPE PROVINCES | Visual Impact Assessment | 31/08/2023 | Kerry Schwartz | SLR Consulting (South Africa) (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 15:19 |
PIA for the Padloper EGI 4, NC & WC | PALAEONTOLOGICAL IMPACT ASSESSMENT: FOUR PROPOSED 132 kV OVERHEAD POWERLINES ASSOCIATED WITH PADLOPER SOLAR FACILITIES 1-4 NEAR MURRAYSBURG, WESTERN CAPE AND NORTHERN CAPE PROVINCES | Palaeontological Specialist Reports | 14/07/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 15:17 |
HIA for the Padloper EGI 4, NC & WC | HERITAGE IMPACT ASSESSMENT: BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A 132 KV OVERHEAD POWER LINE AND ASSOCIATED INFRASTRUCTURE BETWEEN THE PROPOSED PADLOPER SOLAR 4 AND THE PROPOSED AUTHORISED ISHWATI EMOYENI COLLECTOR SUBSTATION (i.e., PADLOPER EGI 4), NEAR MURRAYSBURG, MURRAYSBURG MAGISTERIAL DISTRICT, WESTERN CAPE AND RICHMOND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 08/09/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 15:11 |
VIA for the Padloper EGI 1, NC & WC | VISUAL IMPACT ASSESSMENT REPORT: COMPILED TO PROVIDE INPUTS FOR BASIC ASSESSMENTS FOR THE PROPOSED DEVELOPMENT OF PADLOPER ELECTRICAL GRID INFRASTRUCTURE PROJECTS 1 - 4 , NEAR MURRAYSBURG IN THE WESTERN AND NORTHERN CAPE PROVINCES | Visual Impact Assessment | 31/08/2023 | Kerry Schwartz | SLR Consulting (South Africa) (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:56 |
PIA for the Padloper EGI 1, NC & WC | PALAEONTOLOGICAL IMPACT ASSESSMENT: FOUR PROPOSED 132 kV OVERHEAD POWERLINES ASSOCIATED WITH PADLOPER SOLAR FACILITIES 1-4 NEAR MURRAYSBURG, WESTERN CAPE AND NORTHERN CAPE PROVINCES | Palaeontological Specialist Reports | 14/07/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:47 |
HIA for the Padloper EGI 1, NC & WC | HERITAGE IMPACT ASSESSMENT: BASIC ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF A 132 KV OVERHEAD POWER LINE AND ASSOCIATED INFRASTRUCTURE BETWEEN THE PROPOSED PADLOPER SOLAR 1 AND THE PROPOSED AUTHORISED ISHWATI EMOYENI COLLECTOR SUBSTATION (i.e., PADLOPER EGI 1), NEAR MURRAYSBURG, MURRAYSBURG MAGISTERIAL DISTRICT, WESTERN CAPE, AND RICHMOND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 08/09/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:41 |
VIA for the Padloper Solar PV Facility 1, NC | VISUAL IMPACT ASSESSMENT REPORT: COMPILED TO PROVIDE INPUT FOR BASIC ASSESSMENTS FOR THE PROPOSEDDEVELOPMENT OF THE PADLOPER SOLAR PROJECTS 1 - 4, NEAR MURRAYSBURG IN THE NORTHERN AND WESTERN CAPE PROVINCES | Visual Impact Assessment | 31/08/2023 | Kerry Schwartz | SLR Consulting (South Africa) (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:14 |
PIA for the Padloper Solar PV Facility 1, NC | PALAEONTOLOGICAL IMPACT ASSESSMENT: PROPOSED PADLOPER (PROJECTS 1, 2, 3 and 4) SOLAR PHOTOVOLTAIC (PV) FACILITIES AND THE ASSOCIATED 132 kV OVERHEAD POWER LINES AND ASSOCIATED INFRASTRUCTURE NEAR MURRAYSBURG, WESTERN CAPE AND NORTHERN CAPE PROVINCES | Palaeontological Specialist Reports | 14/06/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:08 |
HIA for the Padloper Solar PV Facility 1, NC | HERITAGE IMPACT ASSESSMENT: BASIC ASSESSMENT FOR THE PROPOSED PADLOPER PHOTOVOLTAIC FACILITY 1 NEAR MURRAYSBURG, RICHMOND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 08/09/2023 | Jayson Orton | ASHA Consulting(Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:02 |
CMP | Klerefontein Farm Conservation Management Plan | Brendan Hart | Digby Wells Environmental | South African Radio Astronomy Observatory | 27/09/2023 - 11:38 | ||
eTafuleni Housing | eTafuleni housing HIA | Heritage Impact Assessment Specialist Reports | 14/04/2023 | Phillipa Harrison | Land Matters Environmental Consulting | ECA CONSULTING | 27/09/2023 - 10:22 |