THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 11801 - 11850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 |
Post date![]() |
---|---|---|---|---|---|---|---|---|
AIA - Deo Gloria | AIA - Proposed Deo Gloria Bulk Water Supply Line & Reservoir | AIA Phase 1 | 06/12/2012 | Peter Nilssen | Deo Gloria Olive Estate | 24/01/2014 - 17:00 | ||
Phase 1 AIA Boikarabelo Digby Wells | Archaeological Impact Assessment (AIA) for the Proposed Boikarabelo Coal Project in the Waterberg Area, Limpopo Province | AIA Phase 1 | Marike De Klerk , Wouter Fourie | Digby Wells Environmental, PGS Heritage and Grave Relocation Consultants | Resource Generation | 24/01/2014 - 15:03 | ||
AIA Boikarabelo | Archaeological Impact Assessment. Res Gen SA Boikarabelo Coal Mine Project on Portions of the Farms Orsono 700 LQ, Zeekoevley 421 LQ, Vischpan 274 LQ, Kruishout 271 LQ, Kalkpan 243 LQ, Witkopje 238 LQ, and Diepspruit 386 LQ, District Lephalale, Limpopo | AIA Phase 1 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Digby Wells Environmental | 24/01/2014 - 14:38 | ||
Letter of exemption | Letter of recommendation for the exemption from a first phase archaeological & heritage investigation of the proposed borrow pit developments at Tsepong 836, Thaba Nchu, Free State | HIA Letter of Exemption | 26/11/2013 | Cobus Dreyer | 24/01/2014 - 12:15 | |||
HERITAGE IMPACT ASSESSMENT - INGONYAMA LINK ROAD EXTENSION | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DIEPSLOOT PEDESTRIAN BRIDGE DEVELOPMENT, RANDBURG MAGISTERIAL DISTRICT, GAUTENG PROVINCE | HIA Phase 1 | 23/01/2014 - 15:53 | |||||
Namies HIA & AIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED NAMIES WIND ENERGY FACILITY NEAR AGGENEYS, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 23/01/2014 | Jayson Orton | ACO Associates CC | ACO Associates CC | 23/01/2014 - 12:06 | |
AIA: Pofadder Low Income Housing Development | AN ASSESSMENT OF IMPACTS ON ARCHAEOLOGICAL HERITAGE RESULTING FROM PROPOSED RESIDENTIAL DEVELOPMENT (LOW COST HOUSING) AT POFADDER, NORTHERN CAPE | AIA Phase 1 | Dave Halkett | ACO Associates CC | Van Zyl Environmental Consultants | 21/01/2014 - 12:59 | ||
Langebaanweg bird fossils | Interim report ongoing studies on fossil birds from Langebaanweg | Palaeontological Permit Report | 20/01/2014 | 21/01/2014 - 12:55 | ||||
water sluice Documentation | PHASE II DOCUMENTATION OF A WATER SLUICE FORMING PART OF THE OLIFANTSNEK IRRIGATION SCHEME, RUSTENBURG MAGISTERIAL DISTRICT, NORTH WEST PROVINCE. | Heritage Impact Assessment Specialist Reports | 01/10/2013 | Johnny Van Schalkwyk | National Cultural History Museum | Interdesign Landscape Architects | 21/01/2014 - 09:32 | |
PIA: Vaalbult Colliery | PALAEONTOLOGICAL DESKTOP STUDY VAALBULT COLLIERY, ALBERT LUTHULI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE | PIA Desktop | 20/01/2013 | Bruce Rubidge | 21/01/2014 - 08:45 | |||
Documentation report of RDR 1, 2 & 7 of Rooidraai, Lydenburg | Documentation report for Late Iron Age stone walled settlements RDR 1, 2 & & within the proposed development area (Morning Tide Complex) on the remain of portion 7 of the farm Rooidraai 34 JT, Lydenburg, Mashishing, Mpumalanga Province | Archaeological Specialist Reports | 19/01/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 19/01/2014 - 09:55 | |
White River Cultural and Creativity Hub, Mpumalanga | Phase 1 Archaeological / HIA for proposed construction of Cultural and Creativity Hub on the remainder of the farm Agricultural Holding no 56 JU, White River Mpumalanga Province | HIA Phase 1 | 19/01/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 19/01/2014 - 09:10 | |
Generaal Heritage Impact Assessment | The report is a Heritage Impact Assessment (HIA) for the Generaal Project area, Vhembe District, Limpopo Province, which describes potential adverse and positive effects of the proposed mining operations on heritage resources. The report builds on a scoping survey conducted earlier and adds results of fieldwork which followed. The report will inform decisions on intervention strategies for sustainable management of the heritage resources in the mining area. The Heritage Impact Assessment follows the requirements of the National Heritage Resources Act (No 25: 1999), the relevant regulations of which are Section 38 (Heritage Impact Assessment process), Section 34 (Buildings and Structures older than 60 years) Section 35 (Archaeological and Palaentological sites) and Section 36 (Graves and Burial Grounds). | Heritage Impact Assessment Specialist Reports | 10/12/2013 | Matodzi Silidi, Innocent Pikirayi | Mbofho Consulting and Project Managers | Jacana Environmental cc | 17/01/2014 - 08:04 | |
TSEPONG BORROWPITS THABA NCHU | LETTER OF RECOMMENDATION FOR THE EXEMPTION FROM A FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED BORROW PIT DEVELOPMENTS AT TSEPONG 836, THABA NCHU, FREE STATE | HIA Letter of Exemption | 26/10/2013 | Cobus Dreyer | B & E International (Pty) Ltd | B & E International (Pty) Ltd | 16/01/2014 - 21:57 | |
BORROW PITS LERATONG THABA NCHU | LETTER OF RECOMMENDATION FOR THE EXEMPTION FROM A FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED BORROW PIT DEVELOPMENTS AT LERATONG 835, THABA NCHU, FREE STATE | HIA Letter of Exemption | 26/10/2013 | Cobus Dreyer | Raubex Construction (Pty) Ltd. | 16/01/2014 - 21:52 | ||
BHP BILLITON MITIGATION REPORT | Status Quo and Pre-mitigation Heritage Impact Assessment Report for Burials Identified during Phase 1 Impact Assessment Study for BMK East mining expansion Development in Steve Tshwete Local Municipality, in Mpumalanga Province. | Burial Grounds and Graves Specialist Reports | 01/08/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | BHP BILLITON | 16/01/2014 - 15:53 | |
Pembani Grave Assessment | A REPORT ON THE ASSESSMENT OF GRAVE SITES AT THE PEMBANI COLLIERY CLOSE TO CAROLINA IN THE MPUMALNAGA PROVINCE | HIA Phase 1 | 01/11/2013 | Anton van Vollenhoven | South African Heritage Resources Agency | Cabanga Concepts | 16/01/2014 - 13:22 | |
AIA for Mining Right Application on Dikpens 182 Portions 2 and 4 | Archaeological Specialist Reports | 05/08/2013 | Jaco van der Walt | Site Plan Consulting | 16/01/2014 - 09:59 | |||
UMFOLOZI THETHA FINAL WALKDOWN REPORT | Archaeological and Heritage Phase 2 EMP Walk down for proposed 765kv Umfolozi –Thetha powerline from Umfolozi Substation to the new Empangeni substationsin KwaZulu NatalProvince | Archaeological Specialist Reports | 01/09/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | Eskom - Megawatt Park | 16/01/2014 - 08:30 | |
Chapudi Coal Project Heritage Impact Assessment | The report is a Heritage Impact Assessment (HIA) for the Chapudi Project area which describes potential adverse and positive effects of the proposed mining operations on heritage resources. The report builds on a scoping survey conducted earlier and adds results of fieldwork which followed. The report will inform decisions on intervention strategies for sustainable management of the heritage resources in the mining area. The Impact Assessment follows the requirements of the National Heritage Resources Act (No 25: 1999), the relevant sections of which are Section 38 (Heritage Impact Assessment process), Section 34 (Buildings and Structures older than 60 years) Section 35 (Archaeological and Palaentological sites) and Section 36 (Graves and Burial Grounds). | Heritage Impact Assessment Specialist Reports | 18/11/2013 | Matodzi Silidi, Innocent Pikirayi | Mbofho Consulting and Project Managers | Jacana Environmental cc | 15/01/2014 - 18:13 | |
Mopane Coal Project - Heritage Resources Impact Assessment | The attached report is a Heritage Impact Assessment (HIA) for the Mopane Project Area which describes potential adverse and positive effects of the proposed mining operations on heritage resources. The Impact Assessment has been carried out in accordance with the National Heritage Resources Act (No 25: 1999), the relevant sections of which are Section 38 (Heritage Impact Assessment process), Section 34 (Buildings and Structures older than 60 years) Section 35 (Archaeological and Palaentological sites) and Section 36 (Graves and Burial Grounds). | Heritage Impact Assessment Specialist Reports | 04/10/2013 | Matodzi Silidi, Innocent Pikirayi | Mbofho Consulting and Project Managers | Jacana Environmental cc | 15/01/2014 - 14:46 | |
Kalahari Solar Power Project Heritage Impact Report | Kalahari Solar Power Project Heritage Impact Assessment Report and Heritage Management Plan developed by Robert De Jong and Associates | Heritage Impact Assessment Specialist Reports | 22/02/2011 | Robert de Jong | SAHRA Council | WSP Environmental Pty Ltd - Johannesburg | 15/01/2014 - 12:04 | |
Kalahari Solar Power Project Heritage Impact Report | Kalahari Solar Power Project Heritage Impact Assessment Report and Heritage Management Plan developed by Robert De Jong and Associates | Heritage Impact Assessment Specialist Reports | 22/02/2011 | Robert de Jong | Cultmatrix CC | WSP Environmental Pty Ltd - Johannesburg | 15/01/2014 - 12:02 | |
HIA: Granite Prospecting near Pofadder | HERITAGE IMPACT ASSESSMENT FOR PROPOSED GRANITE PROSPECTING NEAR POFADDER, NORTHERN CAPE | HIA Phase 1 | 28/01/2013 | Jayson Orton, Lita Webley | ACO Associates CC | Sizisa Ukhanyo Trading 830 cc | 14/01/2014 - 16:15 | |
CMSA | Proposed addition and alterations to current buildings situated on 10/12/14/16 Lichfield road Umbilo Durban | Site Inspection Report | 31/01/2014 | Llewellyn Cronje | COLLEGES OF MEDICINE SOUTH AFRICA DURBAN | 14/01/2014 - 15:31 | ||
HIA Boskopdam | FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED HOUSING & OFFICE DEVELOPMENTS AT BOSKOP DAM, POTCHEFSTROOM, NORTH WEST PROVINCE | HIA Phase 1 | 19/09/2013 | Cobus Dreyer | Greenmined Environmental | 13/01/2014 - 11:51 | ||
PIA Mmamethlake | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED MMAMETHLAKE LANDFILL SITE, FARM BULFONTEIN NO. 74-JR, DR JS MOROKA LOCAL MUNICIPALITY, MPUMALANGA | PIA Desktop | 04/11/2013 | John E Almond | Natura Viva CC | Marinda le Roux Consulants | 13/01/2014 - 11:48 | |
AIA For Libangeni and Mmamethlake Landfills | Archaeological Impact Assessment For the Proposed Libangeni and Mmamethlake Landfill Sites, Located within the Dr JS Moroka Local Municipality, Limpopo Province | AIA Phase 1 | 04/11/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Marinda le Roux Consulants | 13/01/2014 - 11:39 | |
PIA Libangeni | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED LIBANGENI LANDFILL SITE, FARM LEEUWFONTEIN NO. 188JR, DR JS MOROKA LOCAL MUNICIPALITY, MPUMALANGA | PIA Desktop | 04/11/2013 | John E Almond | Natura Viva CC | Marinda le Roux Consulants | 13/01/2014 - 10:58 | |
AIA For Libangeni and Mmamethlake Landfills | Archaeological Impact Assessment For the Proposed Libangeni and Mmamethlake Landfill Sites, Located within the Dr JS Moroka Local Municipality, Limpopo Province | AIA Phase 1 | 04/11/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Marinda le Roux Consulants | 13/01/2014 - 10:50 | |
MMTS 2 Heritage Impact assesment | Mooi Mgeni Transfer Scheme Phase 2 Heritage Impact Assesment Report | Heritage Impact Assessment Specialist Reports | 08/07/2012 | Gavin Anderson | Coastal & Environmental Services - Grahamstown | Trans Caledon Tunnel Authority | 13/01/2014 - 10:38 | |
PIA Libangeni | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED LIBANGENI LANDFILL SITE, FARM LEEUWFONTEIN NO. 188JR, DR JS MOROKA LOCAL MUNICIPALITY, MPUMALANGA | Palaeontological Specialist Reports | 04/11/2013 | John E Almond | Natura Viva CC | Marinda le Roux Consulants | 13/01/2014 - 10:25 | |
AIA For Libangeni and Mmamethlake Landfills | Archaeological Impact Assessment For the Proposed Libangeni and Mmamethlake Landfill Sites, Located within the Dr JS Moroka Local Municipality, Limpopo Province | AIA Phase 1 | 04/11/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Marinda le Roux Consulants | 13/01/2014 - 10:13 | |
Nkambeni cemetery | Phase 1 Archaeological / HIA for proposed Nkambeni Cemetery, Portion A (portion of portion 148) of the farm Kaap Block section F Numbi, Hazyview, Mpumalanga | Heritage Impact Assessment Specialist Reports | 12/01/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Wandima Environmental Services cc | 12/01/2014 - 11:16 | |
Kolomela Heritage Management Plan | Heritage Management Plan for Kolomela Mine In the Postmasburg District Municipality of the Northern Cape Province | Conservation Management Plan | 01/11/2011 | Udo Kusel | Sishen Iron Ore Company (Pty) Ltd | 10/01/2014 - 11:42 | ||
Proposed raw water supply pipeline for KiPower (Pty) Ltd near Delmas | A Phase I Heritage Impact Assessment (HIA) Study for a proposed raw water supply pipeline for KiPower (Pty) Ltd near Delmas on the highveld and eastern highveld in the Gauteng and Mpumalanga provinces of South Africa | HIA Phase 1 | 22/10/2013 | Julius CC Pistorius | Private | Jones & Wagener Engineering and Environmental Consultants | 09/01/2014 - 09:35 | |
NGCEBO WATER TREATMENT WORKS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED NGCEBO WATER TREATMENT WORKS, LOCATED WITHIN THE MAPHUMULO LOCAL MUNICIPALITY | Heritage Impact Assessment Specialist Reports | 06/09/2013 | Frans Prins | Active Heritage CC | Green Door Environmental | 09/01/2014 - 09:18 | |
HIA - Hopefield | Heritage Impact Assessment of a Proposed Wind Energy Facility (Hopefield Community Wind Farm) to be situated on Farm Leliefontein 1/317 Hopefield District, South Western Cape | Heritage Impact Assessment Specialist Reports | 20/12/2013 | Timothy Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 07/01/2014 - 15:24 | |
HIA - Roggeveld | Heritage Impact Assessment Report for the Phase 1 Roggeveld Wind Farm | HIA Phase 1 | 20/12/2013 | Timothy Hart, Lita Webley | ACO Associates CC | Savannah Environmental (Pty) Ltd | 06/01/2014 - 12:29 | |
Klip-Kruisfontein | A CULTURAL HERITAGE MANAGEMENT PLAN FOR THE KLIP-KRUISFONTEIN RESORT, CITY OF TSHWANE | Conservation Management Plan | 25/11/2013 | Anton van Vollenhoven | Archaetnos CC | City of Tshwane - Environmental Management Department | 06/01/2014 - 10:43 | |
Ga-Mothakge | A CULTURAL HERITAGE MANAGEMENT PLAN FOR THE GA-MOTHAKGE RESORT, CITY OF TSHWANE | Conservation Management Plan | 16/09/2013 | Anton van Vollenhoven | Archaetnos CC | City of Tshwane - Environmental Management Department | 06/01/2014 - 10:38 | |
AIA For the proposed Mine on De Roodepoort 435, IS, Mpumalanga Province | Archaeological Impact Assessment For the proposed Mine on De Roodepoort 435, IS, Mpumalanga Province | AIA Phase 1 | 31/10/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Greenmined Environmental | 20/12/2013 - 22:14 | |
Letter of Exemption Roodepoort 435, Ermelo, Mpumalanga | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED AGGREGATE MINE ON PORTION 7 OF FARM ROODEPOORT 435 NEAR ERMELO, MPUMALANGA | PIA Desktop | 31/10/2013 | John E Almond | Natura Viva CC | Heritage Contracts and Archaeological Consulting | 20/12/2013 - 21:58 | |
Rietfontein EA Amend HIA 10 dec13 | A Report on a Heritage Impact Assessment for an amendment to the Proposed Eskom Rietfontein Pumps Lilo Line, Mpumalanga Province | HIA Phase 1 | 31/10/2013 | Anton van Vollenhoven | Texture Environmental Consultants | 19/12/2013 - 15:19 | ||
Umgeni Water Grave Monitoring | Monitoring of graves adjacent to construction of the Richmond and Umlaas Bulk Water Supply Pipelines, Umgungungdlovu District Municipality, KwaZulu-Natal | Site Inspection Report | 13/12/2013 | Len van Schalkwyk | eThembeni Cultural Heritage | Umgeni Water | CTS_152311 | 18/12/2013 - 14:13 |
AIA Report Bestwood Kathu | FIRST PHASE ARCHAEOLOGICAL AND CULTURAL HERITAGE ASSESSMENT OF THE PROPOSED RESIDENTIAL DEVELOPMENTS AT A PORTION OF THE REMAINDER OF THE FARM BESTWOOD 459RD, KATHU, NORTHERN CAPE | AIA Phase 1 | 11/08/2008 | Cobus Dreyer | Rock Environmental Consulting (Pty) Ltd | 18/12/2013 - 09:21 | ||
PROPOSED RESIDENTIAL DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE ON A 200 HA PORTION OF THE FARM BESTWOOD 429 RD | HERITAGE IMPACT ASSESSMENT REPORT: PROPOSED RESIDENTIAL DEVELOPMENT AND ASSOCIATED INFRASTRUCTURE ON A 200 HA PORTION OF THE FARM BESTWOOD 429 RD AT KATHU, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 03/09/2008 | Robert de Jong | Cultmatrix CC | Rock Environmental Consulting (Pty) Ltd | 18/12/2013 - 09:18 | |
P1AIA - Ngcizele Phase 2 Village Water Supply, Centane, EC | Phase 1 Archaeological Impact Assessment - Ngcizele Phase 2 Village Water Supply, near Centane, Eastern Cape, South Africa | AIA Phase 1 | 18/12/2013 | Karen Van Ryneveld | Merryweather Environmental | 18/12/2013 - 08:06 | ||
DPIA - Ngcizele Phase 2 Village Water Supply, Centane, EC | Desktop Palaeontological Impact Assessment for the Ngcizele Water Project | PIA Desktop | 18/12/2013 | Robert Gess | Merryweather Environmental | 18/12/2013 - 07:57 | ||
HIA KALAHARI GHOLF &JAG LANDGOED | Heritage impact assessment for the proposed estate development on the farm Kalahari Golf and Jag Landgoed 775, KATHU, NORTHERN CAPE PROVINCE | HIA Phase 1 | 15/05/2012 | Johnny Van Schalkwyk | SAHRA Council | MEG Environmental Impact Studies | 17/12/2013 - 23:32 |