Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany MapID < 2009 Post datesort ascending
Umzimkhulu CHC HERITAGE SURVEY OF THE PROPOSED UMZIMKHULU COMMUNITY HEALTH CENTRE (CHC), LOCATED ON PORTION 420 OF THE FARM CLYDESDALE, UMZIMKHULU LOCAL MUNICIPALITY, SISONKE DISTRICT MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 14/04/2013 Frans Prins Active Heritage CC Afzelia Environmental Consultants Pty Ltd 02/12/2013 - 12:14
DTP TradeZone 2_Phase 1 Cultural Heritage Impact Assessment Phase 1_ Cultural Heritage Impact Assessment HIA Phase 1 02/01/2013 Mamoluoane Seliane KwaZulu-Natal Amafa and Research Institute Strategic Environmental Focus (Pty) Ltd - KwaZulu-Natal 02/12/2013 - 10:44
HIA Mooi-mgeni transfer scheme MOOI-MGENI TRANSFER SCHEME, PHASE 2, KWA-ZULU NATAL HERITAGE IMPACT ASSESSMENT HIA Phase 1 01/07/2013 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management 02/12/2013 - 09:34
Nsuze HIA Cultural Heritage Impact Assessment of the Proposed Ngomankulu/Nsuze Bridge, Ward 11, Nkandla Municipality HIA Phase 1 Frans Prins Terratest (Pty) Ltd 02/12/2013 - 08:35
LERATONG & TSEPONG BORROW PITS THABA NCHU LETTER OF RECOMMENDATION FOR THE EXEMPTION FROM A FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED BORROW PIT DEVELOPMENTS AT LERATONG 835 & TSEPONG 836, THABA NCHU, FREE STATE Heritage Impact Assessment Specialist Reports 26/11/2013 Cobus Dreyer Greenmined Environmental 01/12/2013 - 21:40
Vaalbult 3IT HIA A Report on A Heritage Assessment for the Proposed Vaalbult Mining Project on portions of the farm Vaalbult 3IT, Gert Sibande District Municipality, West of Carolina, Mpumalanga Province. APAC013/07 HIA Phase 1 14/02/2013 Anton Pelser Vaalbult Mining Company (Pty) Ltd 29/11/2013 - 19:51
134 Helen Joseph Road 134 Helen Joseph Road, Bulwer, Durban, Kwazulu Natal, eThekwini Municipality 29/11/2013 - 14:06
MOGALAKWENA WATER SUPPLY INFRASTRUCTURE PROJECT Proposed Water Supply Infrastructure for the Residential Clusters of Tshamahansi, Sekuruwe, Seema, Phafola, Maala Perekisi, Witrivier and Millennium Park in the Mogalakwena Local Municipality, Waterberg District, Limpopo Province. HIA Phase 1 07/11/2013 Marko Hutten PGS Heritage and Grave Relocation Consultants Tekplan Environmental 29/11/2013 - 10:41
Upgrade to the R545 towards Kusile Power Station APPLICATION FOR EXEMPTION FROM AN ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED ROAD UPGRADE TO THE R545 TOWARDS KUSILE POWER STATION, MPUMALANAGA PROVINCE HIA Letter of Exemption 28/11/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Zitholele Consulting 28/11/2013 - 19:54
Lamberts Bay Soopies (DSS) mitigation preliminary report PRELIMINARY REPORT ON PHASE TWO ARCHAEOLOGICAL EXCAVATIONS AT SOOPJESHOOGTE, CLANWILLIAM MAGISTERIAL DISTRICT, WESTERN CAPE Archaeological Permit Report 05/03/2009 Jayson Orton 28/11/2013 - 16:58
HERITAGE SURVEY OF A PROPOSED QUARRY IN LADYSMITH 28/11/2013 - 10:46
Middelburg R575 Re-alignment A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED DEVIATION OF ROAD 575 (P127-2) NEAR MIDDELBURG) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 13/09/2013 Julius CC Pistorius 28/11/2013 - 09:37
Phase 1 HIA Wilkoppies Extension 108 Report on a Phase 1 HIA for the Proposed Wilkoppies Ext. 108 Township Development on Holdings 19, 20, 21, 22, 23 and 48, Wilkoppies Agricultural Holdings (Elandsheuvel 402IP) in Klerksdorp, North West Province HIA Phase 1 14/11/2013 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 27/11/2013 - 16:40
Phase 1 HIA Wilkoppies Extension 108 Report on a Phase 1 HIA for the proposed Wilkoppies Extension 108 Township Development on Holdings 19, 20, 21, 22, 23 and 48, Wilkoppies Agricultural Holdings (Elandsheuvel 402IP) in Klerksdorp, Northwest Province HIA Phase 1 14/11/2013 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 27/11/2013 - 16:29
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DRIEFONTEIN PIPELINE DEVELOPMENT ADDENDUM REPORT Heritage Impact Assessment Specialist Reports 13/11/2013 Frans Prins 26/11/2013 - 15:23
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DRIEFONTEIN PIPELINE DEVELOPMENT Heritage Impact Assessment Specialist Reports 31/01/2013 Frans Prins 26/11/2013 - 15:12
Halfgewonnen Colliery Heritage Report A Report on a Cultural Heritage Impact Assessment for a proposed mining right amendment application at the Halfgewonnen Colliery, between Bethal and Hendrina, Mpumalanga Province HIA Phase 1 05/03/2013 Anton van Vollenhoven South African Heritage Resources Agency Archaetnos CC 26/11/2013 - 15:11
Heritage & Archaeological Opinion Rietvley 28KU LETTER OF RECOMMENDATION FOR EXEMPTION FROM UNDERTAKING A HERITAGE AND ARCHAEOLOGICAL IMPACT ASSESSMENT: REM OF PTN 4 AND PTN 8 OF THE FARM RIETVLEY 28KU, SHARE BLOCK DEVELOPMENT (SEF REFERENCE: 505596) HIA Letter of Exemption 06/11/2013 Mamoluoane Seliane Strategic Environmental Focus (Pty) Ltd - KwaZulu-Natal NuLeaf Planning & Environmental 26/11/2013 - 15:09
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED DRIEFONTEIN PIPELINE DEVELOPMENT, EMNAMBITHI/LADYSMITH LOCAL MUNICIPALITY Heritage Impact Assessment Specialist Reports 31/01/2013 Frans Prins 26/11/2013 - 15:02
HIA The Mills First Phase Archaeological and heritage assessment of the borrow pit at "The Mills" near Hanover, Northern Cape HIA Phase 1 01/11/2010 Cobus Dreyer 26/11/2013 - 14:42
Proposed Establishment of a Proposed Piggery on Erf 189, Weenen, Umtshezi Municipality Cultural Heritage Impact Assessment of a Proposed Establishment of a Proposed Piggery on Erf 189, Weenen, Umtshezi Municipality Heritage Impact Assessment Specialist Reports 13/11/2013 Frans Prins Active Heritage CC 26/11/2013 - 10:40
Paleo - Tranalloys Desktop Palaeontological Heritage Impact Assessement Report on the site of the Proposed Transalloys (Pty) Ltd's Power Station to be Location within Portions 25, 26, 33, 34, 35, 36 and 37 of the Farm Elandsfontein 309 JS and Portions 20, 24 and 38 of the Farm Schoongezicht 308 JS, Mpumalanga Province PIA Desktop 01/11/2013 Barry Millsteed Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/11/2013 - 15:57
Heritage - Transalloys Archaeological Scoping Report for the Proposed Establishment of the Transalloys Coal-Fired Power Plant near Witbank, Mpumalanga Province Archaeological Specialist Reports 01/11/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/11/2013 - 15:54
Aliwal North FET Colleges APPLICATION FOR EXEMPTION ON THE PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN ALIWAL NORTH, EASTERN CAPE PROVINCE. HIA Letter of Exemption 14/02/2014 Makhosazana Mngomezulu 25/11/2013 - 15:37
Balfour FET College Phase1 Heritage Impact Assessment for the Proposed Further Education Training (FET) College in Balfour. HIA Phase 1 25/11/2013 Makhosazana Mngomezulu 25/11/2013 - 14:44
CMP: Overlooked Colliery A CONSERVATION MANAGEMENT PLAN FOR CULTURAL HERITAGE SITES IDENTIFIED AT THE OVERLOOKED COLLIERY, MPUMALANGA PROVINCE HIA Phase 3 01/11/2013 Anton van Vollenhoven Archaetnos CC Cabanga Concepts 25/11/2013 - 11:41
Bronkhorstspruit Poultry abbatoir Phase 1 Archaeological Impact Assessment in respect of the Proposed Funda Mlimi Poultry Abbatoir on the farm Gemsbokfontein 231 JR, Gauteng Province. AIA Phase 1 14/10/2013 Jean-Pierre Celliers Kudzala Antiquity Aurecon - Nelspruit CTS_145847 25/11/2013 - 11:40
Boschrand Phase 2, Nelspruit Phase 1 Archaeological Survey on Portions of the farm Boschrand 283 JT, in respect of the Boschrand Heights Phase 2 residential development by Hall’s Properties, Nelspruit, Mpumalanga Province. AIA Phase 1 11/11/2013 Jean-Pierre Celliers Kudzala Antiquity Enpact Environmental Consultants CC CTS_145844 25/11/2013 - 11:19
Emthonjeni Extension 5 Township Phase 1 Archaeological Survey on the Remainder of Portion 23 of the farm Schoongezicht 364 JT, Emthonjeni Township, Emakhazeni Municipality, Machadodorp. AIA Phase 1 29/10/2013 Jean-Pierre Celliers Kudzala Antiquity Enpact Environmental Consultants CC CTS_145841 25/11/2013 - 10:49
Proposed Private Hospital Site, Polokwane, Limpopo Proposed Private Hospital Site, Polokwane. Portion 175 of the farm Tweefontein 915 LS, Limpopo HIA Phase 1 28/08/2013 Hester Marie Roodt Kamekho Consulting CC CTS_145813 22/11/2013 - 22:59
Proposed Hotel & Conference Centre, Ba-Phalaborwa Local Municipality Proposed Hotel & Conference Centre, Portion 24 & 42 (a portion of Portion 38) of the farm Laaste 24 LU, Ba-Phalaborwa Local Municipality, Limpopo HIA Phase 1 02/09/2013 Hester Marie Roodt, Frans Roodt Idada Environmental Consultants CTS_145811 22/11/2013 - 22:45
Proposed Township: Marulaneng Proposed Township of Marulaneng, Portion of the farm Hartebeestlaagte 529 KS HIA Phase 1 27/07/2013 Hester Marie Roodt Kamekho Consulting CC CTS_145810 22/11/2013 - 22:29
Proposed Extension of Ga-Ramokadi-kadi, Matlala Proposed Extension of Ga-Ramokadi-kadi, Matlala. Portion of the farm Vlakfontein 588 LS, Limpopo HIA Phase 1 20/08/2013 Kamekho Consulting CC 22/11/2013 - 21:58
Proposed Township: Guyuni, Mutale Local Municipality, Limpopo Proposed Township: Guyuni. Portion of the Farm Rambuda 438 MT, Mutale Local Municipality, Vhembe District Municipality, Limpopo HIA Phase 1 22/09/2013 Hester Marie Roodt, Frans Roodt Idada Environmental Consultants 22/11/2013 - 21:16
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBURG PLATINUM MINES’ (PPM) PROPOSED ROCK WASTE DUMP EXTENSION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA HIA Phase 1 06/06/2009 Julius CC Pistorius Pilanesberg Platinum Mines (Pty) Ltd SLR Consulting (Africa) 21/11/2013 - 17:18
(PPM) PROPOSED ROCK WASTE DUMP EXTENSION A HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR PILANESBURG PLATINUM MINES’ (PPM) PROPOSED ROCK WASTE DUMP EXTENSION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE OF SOUTH AFRICA 21/11/2013 - 17:15
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, ERVEN 1935 AND 7006, WALMER, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE, SOUTH AFFRICA AIA Phase 1 08/03/2013 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Mbombela Local Municipality 21/11/2013 - 16:27
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, ERVEN 1935 AND 7006, WALMER, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE, SOUTH AFFRICA AIA Phase 1 08/03/2013 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Mbombela Local Municipality 21/11/2013 - 16:27
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT WALMER STORMWATER DETENTION PONDS AND ASSOCIATED INFRASTRUCTURE, ERVEN 1935 AND 7006, WALMER, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE, SOUTH AFFRICA AIA Phase 1 08/03/2013 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy Mbombela Local Municipality 21/11/2013 - 16:27
PPM updated HIA An updated Phase I Heritage Impact Assessment (HIA) for Pilanesberg Platinum Mine (PPM) near the Pilanesberg in the North-West Province of South Africa HIA Phase 1 30/08/2013 SLR Consulting (Africa) 21/11/2013 - 15:36
PHASE 1 AIA FOR THE PROPOSED ERMELO TOWNSHIP ESTABLISHMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT OF 5760 STANDS ON PORTION 6 OF FARM RIETSPRUIT 437-IS IN ERMELO REGION WITHIN MSUKALIGWA LOCAL MUNICIPALITY OF GERT SIBANDE DISTRICT, MPUMALANGA PROVINCE. AIA Phase 1 30/05/2011 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants 21/11/2013 - 14:57
Paleo - Zuurwater Palaeontological studies Palaeontological Specialist Reports 30/09/2011 John E Almond Natura Viva CC Savannah Environmental (Pty) Ltd 21/11/2013 - 13:19
Heritage Zuurwater Heritage Impact Assessment for Four Solar Energy Facilities on the Farm Zuurwater near Aggeneys, Northern Cape Heritage Impact Assessment Specialist Reports 31/05/2013 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 21/11/2013 - 13:15
ARCHAEOLOGICAL IMPACT ASSESSMENT MALABAR EXTENSION 6 PHASE 2 HOUSING DEVELOPMENT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT MALABAR EXTENSION 6 PHASE 2 HOUSING DEVELOPMENT, ERF/RE 349, NEW BRIGHTON & ERVEN 444 & 1086, MALABAR, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE, SOUTH AFRICA AIA Phase 1 17/01/2013 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy CTS_145619 21/11/2013 - 11:40
Waterval Propect Heritage Impact Assessment Report Heritage Impact Assessment for the proposed Waterval Retrofit E-Feed Project located in Rustenburg, North West Province. Heritage Impact Assessment Specialist Reports 30/09/2013 Anton van Vollenhoven Archaetnos CC 21/11/2013 - 09:42
Impala Mining Development – Palaeontological Impact Assessment Impala Mining Development – Palaeontological Impact Assessment PIA Desktop 31/05/2011 Bruce Rubidge Evolutionary Studies Institute 21/11/2013 - 08:50
Phase 1 Heritage report for Shaft 18 complex PHASE I HERITAGE IMPACT ASSESSMENT FOR IMPALA PLATINUM LIMITED (IMPLATS) PROPOSED NEW SHAFT 18 COMPLEX IN THE RUSTENBURG (BAFOKENG) DISTRICT IN THE NORTH-WEST PROVINCE ( WITH AMENDMENTS TO THE SHAFT 18 COMPLEX IN ORDER TO AVOID SITES LIA03 AND SITE LIA04) HIA Phase 1 31/05/2013 Julius CC Pistorius Heritage Archaeologist & Consultant 21/11/2013 - 08:44
52 Balmoral 52,balmoral drive, Durban north, 4001 20/11/2013 - 10:59
Cultural HIA MIER Heritage impact report for the proposed lodge development adjacent to the twee rivieren gate, MIER HIA Phase 1 17/04/2013 Johnny Van Schalkwyk SAHRA Council MEG Environmental Impact Studies 20/11/2013 - 10:50
Cultural HIA Augrabies Cultural heritage impact assessment for the proposed township development on a section of the farm Kakamas Suid 28, AUGRABIES HIA Phase 1 17/09/2013 Johnny Van Schalkwyk SAHRA Council MEG Environmental Impact Studies 20/11/2013 - 10:36