FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
HERITAGE IMPACT ASSESSMENT FOR MULTIPLE PROPOSED SOLAR ENERGY FACILITIES ON DE AAR 180/1 (BADENHORST DAM FARM), DE AAR, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT FOR MULTIPLE PROPOSED SOLAR ENERGY FACILITIES ON DE AAR 180/1 (BADENHORST DAM FARM), DE AAR, NORTHERN CAPE Heritage Study 09/07/2013 Jayson Orton, Lita Webley ACO Associates CC 27/09/2013 - 10:00
Sand Winning Operation, Winterton, KZN CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTABLISHMENT OF A SAND MINING OPERATION, FOR THE AUTHORISED BHEKUZULU-EMPANGENI WATER SUPPLY SCHEME, LOCATED NEAR WINTERTON,UTHUKELA DISTRICT MUNICIPALITY, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 25/09/2013 Frans Prins Active Heritage CC Green Door Environmental 26/09/2013 - 14:42
Cooper's Cave Permit Report Cooper's Cave Permit Report 2010 - 2013 Palaeontological Permit Report 26/09/2013 Christine M. Steininger 26/09/2013 - 10:08
Palaeontological Report - Blackwood Palaeontological Desktop Evaluation of the Blackwood Solar Energy Facility, Boshof District, FS Province. PIA Phase 1 03/09/2014 Palaeo Field Services Savannah Environmental (Pty) Ltd 25/09/2013 - 15:15
SUNNYSIDE BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED MIXED LAND USE DEVELOPMENT AT SUNNYSIDE 2620, BLOEMFONTEIN AIA Phase 1 10/09/2013 Cobus Dreyer NSVT Consultants NSVT Consultants 25/09/2013 - 13:53
HIA Viletskuil & other Farm Archaeological and Heritage Investigation of the Proposed Diamond Prospecting and Mining Activities at Viletskuil 198, Koringdal, Kareelaagte, Bitterput and Paardekraal, Wonderput, De Voor, Tevreden, Annex Springbokrug, Teleurgesteld, Strydenburg District, Northern Cape. HIA Phase 1 04/11/2010 Cobus Dreyer Oblimanzi (Pty) Ltd 25/09/2013 - 13:05
HIA FOR THE PROPOSED MIDDELBURG EASTERN BYPASS ROUTE (AS REVISED), MIDDELBURG, MPUMALANGA PROVINCE A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MIDDELBURG EASTERN BYPASS ROUTE (AS REVISED), MIDDELBURG, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 24/06/2012 Anton van Vollenhoven Archaetnos CC Wandima Environmental Services cc 25/09/2013 - 13:01
PIA: Wits Rural Facility Palaeontological Scoping Report for the Wits Rural Training Facility, Limpopo PIA Desktop 17/09/2013 Bruce Rubidge 25/09/2013 - 10:18
Coega_IDZ_History_Built_Environment_BGG HISTORICAL ASSESSMENT - (Historical component relating to the built environment and graves) Coega Industrial Development Zone near Port Elizabeth, Eastern Cape Province HIA Phase 1 01/05/2010 Jenny Bennie Coega Development Corporation (Pty) Ltd 25/09/2013 - 10:16
AIA Erf 330 Crown Mines Archaeological Impact Assessment For the proposed filling station on Erf 330 Crown Extension 18, Crown Mines, Gauteng AIA Phase 1 15/08/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Marinda le Roux Consulants 23/09/2013 - 16:59
Mooihoek Tubatse pipeline 4D Proposed Mooihoek Tubatse Pipeline 4D in the Greater Tubatse local Municipality, Greater Sekhukhune Municipality, Limpopo HIA Phase 1 31/07/2013 Liesl Stegmann South African Heritage Resources Agency Sekhukhune District Municipality 23/09/2013 - 13:15
Mooihoek Tubatse bulk water pipeline 4C Mooihoek Tubatse bulk water supply pipe line phase 4C, Greater Tubatse Local Municipality, Greater Sekhukhune District, Limpopo HIA Phase 1 31/07/2013 Liesl Stegmann South African Heritage Resources Agency Sekhukhune District Municipality 23/09/2013 - 13:01
Ixopo Railway Station Heritage Impact Assessment of the old railway shed situated on the site of the taxi rank, Ixopo, Sisonke District Municipality Heritage Impact Assessment Specialist Reports 20/09/2013 Deborah Whelan Archaic Consulting Sivest - PMB 23/09/2013 - 08:29
HIA FOR THE CONSTRUCTION OF A PEDESTRIAN PATHWAY AND CYCLE PATH IN THE Olievenhoutbos AREA OF GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A CYCLE PATH AND SIDEWALK AT OLIEVENHOUTBOSCH 389 JR CENTURION GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 20/09/2013 - 16:08
HIA FOR THE CONSTRUCTION OF A PEDESTRIAN PATHWAY AND CYCLE PATH IN THE MABOPANE AREA OF GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 20/09/2013 - 15:59
HIA FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH IN THE MABOPANE AREA OF GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT MABOPANE GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 20/09/2013 - 15:55
HIA Lehating Mine Heritage Impact Assessment for the Proposed Lehating Mining (Pty) Ltd underground manganese mine on Portions 1 of the Farm Lehating 714 and Portion 2 of the farm Wessels, 227, approximately 20km northwest of Hotazel, Northern Cape Province HIA Phase 1 Wouter Fourie PGS Heritage and Grave Relocation Consultants 20/09/2013 - 10:35
Heritage Assessment-Mqangqala Access Road HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MQANGQALA ACCESS ROAD, UMZUMBE MUNICIPALITY Heritage Impact Assessment Specialist Reports 18/09/2013 Frans Prins Active Heritage CC Active Heritage CC 20/09/2013 - 10:26
Heritage Assessment-Mqangqala Access Road HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MQANGQALA ACCESS ROAD, UMZUMBE MUNICIPALITY Heritage Impact Assessment Specialist Reports 18/09/2013 Frans Prins Active Heritage CC Active Heritage CC 20/09/2013 - 10:25
Lonmin Paleontological Opinion Palaeontological Impact Assessment for expansion of Lonmin’s Eastern Platinum (EPL) and Western Platinum (WPL) mines. PIA Phase 1 18/09/2013 Marion Bamford Evolutionary Studies Institute Lonmin Platinum 20/09/2013 - 10:24
HIA FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 19/09/2013 - 18:16
CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 19/09/2013 - 17:55
CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT TEMBA GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT TEMBA GAUTENG PROVINCE Archaeological Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 19/09/2013 - 17:23
CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT HAMMANSKRAAL GAUTENG PROVINCE Archaeological Specialist Reports 22/05/2013 Udo Kusel African Heritage Consultants CC SPOOR Environmental Services (PTY) Ltd. 19/09/2013 - 17:05
Patensie PIA Palaeontological specialist assessment: combined field-based and desktop study PROPOSED MELKHOUT - PATENSIE 132 kV TRANSMISSION LINE PROJECT, HUMANSDORP & HANKEY MAGISTERIAL DISTRICTS, EASTERN CAPE. PIA Phase 1 01/05/2013 John E Almond Natura Viva CC GIBB Engineering & Science - Port Elizabeth 19/09/2013 - 13:13
HIA Prieska's Poort Phase 1 Archaeological Impact Assessment Specialist Study Report For The Proposed Development Of Prospecting Rights Of Zink On Portion 5, Of The Farm Karabee 50, Portions 1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13, 13, 14, 16, 17 And Remaining Extent Of The Farm Prieska Poorts 51 In The Magisterial District Of Prieska, Within The Siyathemba Local Municipality Of Northern Cape HIA Phase 1 01/08/2013 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants PMG Resources Holdings (Pty) Ltd 19/09/2013 - 10:39
AIA - FARM LOMBARD’S POST 289 A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED MINING RIGHT APPLICATION FOR THE MINING OF DOLOMITE, LIMESTONE, SAND (GENERAL), STONE AGGREGATE, GRAVEL AND SAND ON PORTIONS OF PORTION 17 AND THE REMAINDER OF THE FARM LOMBARD’S POST 289, BATHURST, EASTERN CAPE PROVINCE. AIA Phase 1 01/07/2013 Celeste Booth, Amy van Wenzel, Abenicia Henderson Albany Museum - Archaeology Algoa Consulting mining Engineers CC (ACME) 19/09/2013 - 10:05
Grave Management Report Recommendations for the management of possible grave sites at the Tshamahansi borrow pit extension Heritage Impact Assessment Specialist Reports 10/01/2013 Stephan Gaigher G & A Heritage Tekplan Environmental 19/09/2013 - 09:11
Thabo Mbeki Township Proposed Thabo Mbeki Township development of approximately 4 700 erven on Remainder of the farm Richards Lager 124 LR, Lephalale Local Municipality, Waterberg District Municipality, Limpopo AIA Phase 1 04/06/2013 Liesl Stegmann Limpopo - Department of Cooperative Governance, Human Settlement and Traditional Affairs 18/09/2013 - 13:50
HIA Kimberley Diamonds A Heritage Impact Assessment for the proposed Kimberley Diamonds Prospecting Application HIA Phase 1 01/09/2013 David Morris Ladybrand Municipality Geoscientific Mineral Resources Cc 18/09/2013 - 12:45
Melkhout-Dieprivier 132kV v.1 Phase 1 Heritage Impact Assessment Report: Melkhout-Dieprivier 132kV Power Line and Substation Infrastructure, Kouga Local Municipality, Cacadu District Municipality, Eastern Cape Province, South Africa Heritage Scoping 30/05/2012 Len van Schalkwyk, Elizabeth Wahl eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 18/09/2013 - 12:23
Melkhout-Dieprivier PIA v.2 Palaeontological specialist assessment: combined field-based and desktop study PROPOSED DIEPRIVIER - MELKHOUT 132 kV TRANSMISSION LINE PROJECT, HUMANSDORP MAGISTERIAL DISTRICT, EASTERN CAPE PIA Phase 1 01/05/2013 John E Almond Natura Viva CC GIBB Engineering & Science - Port Elizabeth 18/09/2013 - 12:13
Dieprivier- Melkhout AIA v.2 Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Melkhout-Dieprivier, Kouga Local Municipality, Cacadu District, Eastern Cape Province, South Africa AIA Phase 1 08/05/2013 Len van Schalkwyk, Elizabeth Wahl eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 18/09/2013 - 11:58
PIA - KAREEDOUW-DIEPRIVIER Palaeontological specialist assessment: combined field-based and desktop study PROPOSED KAREEDOUW-DIEPRIVIER 132 kV TRANSMISSION LINE PROJECT, HUMANSDORP MAGISTERIAL DISTRICT, EASTERN CAPE. PIA Phase 1 01/05/2013 John E Almond Natura Viva CC GIBB Engineering & Science - Port Elizabeth 18/09/2013 - 10:33
HIAR 3 Alternative Sites for Relocating Devon Landfill Site HIA for the three Alternative site for the Relocation of the Devon Landfill Site Heritage Impact Assessment Specialist Reports 28/02/2013 Stephan Gaigher Zitholele Consulting 18/09/2013 - 10:30
Dieprivier-Kareedouw Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Dieprivier-Kareedouw, Kou-Kamma Local Municipality, Cacadu District, Eastern Cape Province, South Africa AIA Phase 1 08/05/2013 Len van Schalkwyk, Elizabeth Wahl eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 18/09/2013 - 10:19
Nsuze Irrigation Scheme CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED NSUZE IRRIGATION SCHEME NEAR NKANDLA Heritage Impact Assessment Specialist Reports 01/12/2012 Frans Prins Active Heritage CC Green Door Environmental 18/09/2013 - 09:57
Dieprivier to Kareedouw Substations Phase 1 Heritage Impact Assessment Report: 132kV Power Line and Substation Infrastructure, Dieprivier-Kareedouw, Kouga Local Municipality, Cacadu District Municipality, Eastern Cape Province, South Africa AIA Desktop 30/05/2012 Len van Schalkwyk, Elizabeth Wahl eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 18/09/2013 - 09:49
HIA Alternatives site for relocation of Devon Landfill Site HIA for three Alternative sites for the Relocation of the Devon Landfill Site Heritage Impact Assessment Specialist Reports 28/02/2013 Stephan Gaigher Lesedi Local Municipality 18/09/2013 - 07:40
HIA Relocation of Devon Landfill Site Heritage Impact Assessment or Three Alternative Sites for the Relocation of the Devon Landfill Site Heritage Impact Assessment Specialist Reports 28/02/2013 Stephan Gaigher Zitholele Consulting 17/09/2013 - 20:22
HIA for Solar-Ferrum 400kV Power Line Proposed Establishment of Several Electricity Distribution Lines Within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2013 Stephan Gaigher Zitholele Consulting 17/09/2013 - 20:04
Farm Vischgat 467 IR, Vereeniging, Gauteng Cultural Heritage Assessment of a Portion of Portion 1 of the Farm Vischgat 467IR, Sedibeng District Municipality, Midvaal Local Municipality, Gauteng HIA Phase 1 17/09/2013 Francois P Coetzee Umhlaba Environmental Consulting CC 17/09/2013 - 13:18
HIA Orania plot A100 2013 First phase archaeological and cultural heritage assessment of the proposed residential development on plot A100, Orania, Northern Cape HIA Phase 1 01/08/2013 H Opperman C & C Eiendoms Trust 17/09/2013 - 09:39
Pentlands quarry HERITAGE SURVEY OF THE PROPOSED PENTLANDS QUARRY, EMPANGENI, KWAZULU-NATAL AIA Phase 1 Gavin Anderson Site Plan Consulting masa mzantsi (Pty) Ltd 16/09/2013 - 18:18
Proposed Perseus Gamma 765 kV transmission line. Heritage impact assessment of the proposed additional Perseus-Gamma 765kV Transmission Line Prepared for Mokgope (Pty) Ltd March 2013 Draft 2 HIA Phase 1 16/09/2013 Timothy Hart ACO Associates CC Mokgope Consulting 16/09/2013 - 10:18
Nongoma Causeways along the P736 Road, Nongoma, KZN HERITAGE IMPACT ASSESSMENT OF THREE CAUSEWAYS AND THE EXPANSION OF THE EXISTING CAUSEWAY ON THE P736 ROAD, NONGOMA, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 16/09/2013 Frans Prins Active Heritage CC Green Door Environmental 16/09/2013 - 09:00
HIA Ndebele & Bangamaye Causeways HERITAGE IMPACT ASSESSMENT OF THE NDEBELE AND BANGAMAYE CAUSEWAYS, ZULULAND DISTRICT MUNICIPALITY Heritage Impact Assessment Specialist Reports 13/09/2013 Frans Prins Active Heritage CC Green Door Environmental 16/09/2013 - 08:55
WELTEVREDE 190 QWAQWA FIRST PHASE ARCHAEOLOGICAL AND HERITAGE INVESTIGATION OF THE PROPOSED RESIDENTIAL DEVELOPMENTS AT WELTEVREDE 190, PHUTHADITJABA, QWAQWA AIA Phase 1 06/09/2013 Cobus Dreyer NSVT Consultants NSVT Consultants 15/09/2013 - 21:05
226 Ninth Avenue & 78 Madeline Road, Morningside, Durban Historical: Nil Architectural: Building A - Although somewhat dilapidated and spoiled by various and inappropriate alterations and additions, a significant fair to large proportioned example of buildings of its style and era, worthy of restoration. Building B - Of little architectural significance due to modernisation through extensive alteration and addition. Urban Setting & Adjoining Properties: Both building A & B find themselves blending with adjoining and street opposite buildings of similar style and era, most of which have been altered and modernised to some extent including some conversion to Business use. (Please refer photographs attached) Significance Report 13/09/2013 - 17:52
HIA Solar-Aries 400kV Power Lines Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province Heritage Impact Assessment Specialist Reports 22/02/2013 Stephan Gaigher Zitholele Consulting 13/09/2013 - 14:25

Pages

CSV
 
 

Search form