THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 12201 - 12250 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany |
Post date![]() |
---|---|---|---|---|---|---|---|
Meepo Heritage report | Meepo Ya Mmu (PTY) LTD - ARCHAEOLOGICAL IMPACT ASSESSMENT (PHASE 1) (Draft) | AIA Phase 1 | 14/09/2012 | Tobias Coetzee | 13/09/2013 - 11:33 | ||
Proposed limestone mining on the farms Buffelskraal 554 KQ Portion1 and Krokodilkraal 545 KQ, Limpopo Province | PALAEONTOLOGICAL REPORT in support of Proposed limestone mining on the farms Buffelskraal 554 KQ Portion1 and Krokodilkraal 545 KQ, Limpopo Province | Palaeontological Specialist Reports | 10/09/2013 | JF Durand | Skarab CC | African Litany cc | 13/09/2013 - 10:34 |
SUNNYSIDE BLOEMFONTEIN | FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED MIXED LAND USE DEVELOPMENT AT SUNNYSIDE 2620, BLOEMFONTEIN | AIA Phase 1 | 10/09/2013 | Cobus Dreyer | NSVT Consultants | 12/09/2013 - 20:12 | |
Spring Grove Tee Powerline | Cultural Heritage Impact assessment of the Proposed construction of the New 88kV Pring Grove Tee Powerline, Nottingham Road, Kwa Zulu Natal | Heritage Impact Assessment Specialist Reports | 22/05/2013 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 12/09/2013 - 11:31 |
129 Rosetta Road, Durban | Historical Significance: Nil Architectural Significance: Minor; The period character of the buildings has been destroyed by partial demolition due to borer and structural damage (see 'Motivation'). Minimal fret-work and a balustrade remain on a first floor Verandah which will be retained. Detail of work: Substantial reconstruction / replacement of damaged and unsound roof structure, floors and walls and opportune redesign of the dwelling, mainly internally. | 12/09/2013 - 08:21 | |||||
NID Phantom | Eskom Phantom substation | 11/09/2013 | Anton van Vollenhoven | Archaetnos CC | Eskom - NWOU | 11/09/2013 - 20:02 | |
St James | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE | Heritage Impact Assessment Specialist Reports | 26/04/2012 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 11/09/2013 - 13:53 |
PPC Old Shed | Cultural Heritage Investigation of Historical Steel-Framed Building on the Property of PPC Slurry Operation, near Mafikeng, North West Province | Archaeological Permit Report | 18/12/2012 | Francois P Coetzee, Graham Reeks | Pretoria Portland Cement Company Limited | 11/09/2013 - 10:45 | |
Lemana College Restoration | HIA for the proposed restoration of the Lemana College Campus | HIA Phase 1 | 10/09/2013 | Stephan Gaigher | G & A Heritage | ELARCH | 10/09/2013 - 16:18 |
Heritage report for Ekangala Quarry | Heritage impact assessment report for the PROPOSED EXTENSION OF THE EKANGALA BORROW PIT, CITY OF TSHWANE, GAUTENG PROVINCE | Heritage Impact Assessment Specialist Reports | 15/05/2013 | Johnny Van Schalkwyk | National Cultural History Museum | Royal Haskoning DHV | 10/09/2013 - 15:37 |
HIA REPORT- REPLACEMENT OF NSELENI BRIDGE | PHASE 1 HERITAGE IMPACT ASSESSMENT: NSELENI RIVER BRIDGE (DC28/0013/2013) | HIA Phase 1 | 03/09/2013 | Albert van Jaarsveld | University of Zululand - History | Triplo4 Sustainable Solutions | 10/09/2013 - 13:48 |
Palaeontological Report - Blackwood Solar Facility | Palaeontological Desktop Evaluation of the Blackwood PV solar facility, Boshof District, FS Province | PIA Desktop | 02/09/2013 | Lloyd Rossouw | Palaeo Field Services | Savannah Environmental (Pty) Ltd | 10/09/2013 - 10:41 |
REPORT LOTUSVILLE HARRISMITH | FIRST PHASE ARCHAEOLOGICAL AND CULTURAL HERITAGE INVESTIGATION OF THE PROPOSED RESIDENTIAL DEVELOPMENTS NEAR LOTUSVILLE ALONG THE N3 AT HARRISMITH, FREE STATE | AIA Phase 1 | 01/09/2013 | Cobus Dreyer | NSVT Consultants | 10/09/2013 - 10:34 | |
Heritage Report - Blackwood Solar Energy Facility | Proposed Blackwood Solar Energy Facility on Portion 1 of Pandamsfontein 1593, south east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input | Heritage Impact Assessment Specialist Reports | 01/08/2014 | David Morris | McGregor Municipality | Savannah Environmental (Pty) Ltd | 10/09/2013 - 10:25 |
Heritage Report - Blackwood Solar Energy Facility | Proposed Blackwood Solar Energy Facility on Portion 1 of Pandamsfontein 1593, south east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input | Heritage Scoping | 06/09/2013 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 10/09/2013 - 10:18 |
Heritage Report - Blackwood Solar Energy Facility | Proposed Blackwood Solar Energy Facility on Portion 1 of Pandamsfontein 1593, south east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input | Heritage Scoping | 06/09/2013 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 10/09/2013 - 10:13 |
Heritage Report - Boundary Solar Energy Facility | Proposed Boundary Solar Energy Facility on the farm Karreeboom 1716, east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input | HIA Phase 1 | 31/01/2014 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 10/09/2013 - 09:43 |
Palaeontological Report - Boundary Solar Facility | Phase 1 Palaeontological Impact Assessment of the Boundary PV Solar Facility on Farm Karreeboom 1716, Boshof Distric, FS Province | PIA Phase 1 | 31/01/2014 | Lloyd Rossouw | Palaeo Field Services | Savannah Environmental (Pty) Ltd | 10/09/2013 - 09:15 |
ILI2395_KOSMOSDAL_HERITAGE_STATEMENT_REPORT | HERITAGE STATEMENT REPORT FOR THE KOSMOSDAL SEWER PIPE BRIDGE UPGRADE | Heritage Statement | 09/09/2013 | Natasha Higgitt, Shahzaadee Karodia Khan | Digby Wells Environmental | Iliso Consulting (Pty) Ltd | 10/09/2013 - 09:11 |
Heritage Report - Boundary Solar Energy Facility | Proposed Boundary Solar Energy Facility on the farm Karreeboom 1716, east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input | Heritage Scoping | 06/09/2013 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 10/09/2013 - 09:03 |
ILI2395_WILGESPRUIT_HERITAGE_STATEMENT_REPORT | HERITAGE STATEMENT REPORT FOR THE WILGESPRUIT BRIDGE UPGRADE | Heritage Statement | 09/09/2013 | Natasha Higgitt, Shahzaadee Karodia Khan | Digby Wells Environmental | Iliso Consulting (Pty) Ltd | 10/09/2013 - 08:59 |
Cultural Heritage Report for EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE | Heritage Impact Assessment Specialist Reports | 26/04/2012 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 09/09/2013 - 16:34 |
CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EXTENSION OF THE EMONDLO. ST JAMES AND LEKSAND SUBSTATION YARDS, INCLUDING THE RECONSTRUCTION OF THE EXISTING LEKSAND-ST JAMES 88/22kV POWERLINE AND THE CONSTRUCTION OF THE NEW EMONDLO-ST JAMES 88/22kV POWERLINE | Heritage Impact Assessment Specialist Reports | 26/04/2012 | Frans Prins | Active Heritage CC | Kerry Seppings Environmental Management | 09/09/2013 - 16:21 |
WALLMANNSTHAL FLUORSPAR MINE AIA FINAL, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT ON PORTION 4 OF THE FARM WALLMANNSTHAL 278 JR FOR THE WALLMANNSTHAL FLUORSPAR MINE, GAUTENG PROVINCE | AIA Phase 1 | 24/11/2013 | Neels Kruger | AGES (PTY) Ltd - Pretoria | Ulipac (Pty) Ltd. | 09/09/2013 - 08:34 |
VAAL GAMAGARA WATER PIPE LINE | FIRST PHASE ARCHAEOLOGICAL AND CULTURAL HERITAGE ASSESSMENT OF THE PROPOSED VAAL-GAMAGARA WATER PIPELINE PROJECT, NORTHERN CAPE. | AIA Phase 1 | 20/09/2012 | Cobus Dreyer | MDA Town and Regional Planners | 06/09/2013 - 21:11 | |
ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED UPGRADING OF THE KWV UPINGTON EFFLUENT MANAGEMENT FACILITY | ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED UPGRADING OF THE KWV UPINGTON EFFLUENT MANAGEMENT FACILITY NORTHERN CAPE PROVINCE | Archaeological Specialist Reports | 01/02/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 06/09/2013 - 15:53 |
WATER SUPPLY PIPELINE AND SEWEGE TREATMENT PLANT | WATER SUPPLY PIPELINEAND SEWEGE TREATMENT PLANT IN INGWAVUMA TOWN, JOZINI LOCAL MUNICIPALITY IN THE KWAZULU NATAL PROVINCE. | Heritage Impact Assessment Specialist Reports | 06/09/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | Enaq Consulting | 06/09/2013 - 12:10 |
ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR WATER SUPPLY PIPELINE AND SEWEGE TREATMENT PLANT IN INGWAVUMA TOWN | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR PROPOSED WATER SUPPLY PIPELINE AND SEWEGE TREATMENT PLANT IN INGWAVUMA TOWN, JOZINI LOCAL MUNICIPALITY IN THE KWAZULU NATAL PROVINCE. | Heritage Impact Assessment Specialist Reports | 06/09/2013 | McEdward Murimbika | Enaq Consulting | Nzumbululo Heritage Solutions | 06/09/2013 - 11:39 |
Paleo - Kison Solar Facility | Palaeontological Studies for the Kison Solar Energy Facility near Polokwane, Polokwane Local Municipality, Limpopo Province | Palaeontological Specialist Reports | 01/08/2013 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 06/09/2013 - 10:15 |
ASR - Kison Solar Facility | Archaeological Scoping Report for the Proposed Kison Solar Energy Facility and Associated Infrastructure, Polokwane, Limpopo Province | Heritage Scoping | 19/08/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 06/09/2013 - 10:12 |
Canyon Springs PIA | SAHRA’s request for a Palaeontological Impact Assessment for development of an opencast mine by Canyon Springs Investments 82 (Pty) Ltd, near Bela-Bela, Mpumalanga – on behalf of Prime Resources, Parktown North, Johannesburg (Ms Zoë Gebhardt) | PIA Desktop | 06/09/2013 | Marion Bamford | Prime Resources (Pty) Ltd | 06/09/2013 - 09:09 | |
Desktop PIA - Gunstfontein Project | Desktop Palaeontological Heritage Impact Assessment Report on the Site of Proposed Solar and Wind Energy Generation Facilities (Gunsfontein Project) to be Located on Various Farms Near Sutherland, Northern Cape Province | PIA Desktop | 10/07/2013 | Barry Millsteed | BM Geological Services | Savannah Environmental (Pty) Ltd | 06/09/2013 - 09:05 |
ASR - Gunstfontein Project | Achaeological Scoping Report for the Proposed Gunstfontein Renewable Energy Project: Wind and Solar Energy Facilities and The Associated Grid Connection Infrastructure, Northern Cape | Heritage Scoping | 28/06/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 06/09/2013 - 08:58 |
Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot | A Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot Upgrade as part of PRASA Railway Modernization Project | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 06/09/2013 - 07:05 | ||
HIA for the Proposed Durban Yard PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Durban Yard PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 15/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 06/09/2013 - 06:41 | |
HIA for the Proposed Springfield PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Springfield PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:28 | |
HIA for the Proposed Springfield PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Springfield PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:28 | |
HIA for Wolmerton PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Wolmerton PRASA Depot Upgrade as part of PRASA Railway Modernization Project | 09/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:21 | ||
HIA for the Proposed Braamfontein PRASA Depot Upgrade | A Phase 1 Heritage Impact Assessment Report for the Proposed Braamfontein PRASA Depot Upgrade as part of PRASA Railway Modernization Project | HIA Phase 1 | 16/07/2013 | Nkosinathi Godfrey Tomose | Ecosolve (Pty) Ltd | 05/09/2013 - 22:06 | |
NAS 2011 Barrel Wreck Report | Nautical Archaeological Society Report Course Part II February 2011, Robben Island, Cape Town The Barrel Wreck | Research Publication | 02/04/2012 | South African Heritage Resources Agency | 04/09/2013 - 13:58 | ||
PIA Study Loskop Quarry Estcourt KwaZulu Natal | A Phase 1 Palaeontological Impact Assessment Study for the Proposed Loskop Quarry Re-mining Project, Estcourt, KwaZulu Natal Province | PIA Phase 1 | 28/05/2013 | Nonhlanhla Vilakazi | Evolutionary Studies Institute | ENPROCON (Pty) Ltd | 04/09/2013 - 12:37 |
HIA Exemption: Muslim Cemetery, Newcastle | Application for Exemption from a Phase 1 Heritage Impact Assessment of Proposed Muslim Cemetery, Newcastle Municipality, KwaZulu-Natal, South Africa | HIA Letter of Exemption | 22/08/2013 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | Udidi Project Development Company (Pty) Ltd | 04/09/2013 - 12:18 |
Application for Exemption | Application for Exemption from a Phase 1 Heritage Impact Assessment of Proposed Muslim Cemetery, Newcastle Municipality, KwaZulu-Natal, South Africa | HIA Letter of Exemption | 22/08/2013 | Len van Schalkwyk | eThembeni Cultural Heritage | eThembeni Cultural Heritage | 04/09/2013 - 11:01 |
Application for Exemption | Application for Exemption from a Phase 1 Heritage Impact Assessment of Proposed Muslim Cemetery, Newcastle Municipality, KwaZulu-Natal, South Africa | HIA Letter of Exemption | 22/08/2013 | eThembeni Cultural Heritage | eThembeni Cultural Heritage | 04/09/2013 - 11:01 | |
Two grave sites along the Qunu-Zimbane powerline | The assessment of two grave sites along the Qunu-Zimbane powerline, Mthatha, Eastern Cape, South Africa | Archaeological Specialist Reports | 02/08/2013 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | GIBB Engineering & Science - Port Elizabeth | 04/09/2013 - 10:59 |
ESKOM Neptune-Chaba and Qunu-Tyalara 132kV powerline | ESKOM POWER LINES – NEPTUNE TO CHABA, NEAR EAST LONDON AND TYALARA TO QUNU, NEAR MTHATHA, EASTERN CAPE, SOUTH AFRICA | Archaeological Specialist Reports | 31/08/2013 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | GIBB Engineering & Science - East London | 04/09/2013 - 10:34 |
Blurock HIA Report | CULTURAL HERITAGE IMPACT ASSESSMENT OF A PROPOSED POWERLINE AT BLUROCK NEAR ESTCOURT, KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | 16/05/2013 | 03/09/2013 - 23:25 | |||
NQABENI/EROS/ORIBI 132kV LOOP-IN-LOOP-OUT POWERLINE | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED NQABENI/EROS/ORIBI 132KV LOOP-IN-LOOP-OUT POWERLINE, UGU DISTRICT MUNICIPALITY. | Heritage Impact Assessment Specialist Reports | 30/06/2013 | 03/09/2013 - 22:59 | |||
Ikwezi Mining Powerline and Substation Heritage Report | Ingagane/Utrecht/Ikwezi 88kV powerline and Ikwezi 20MVA 88/22kV substation and associated access roads | Heritage Impact Assessment Specialist Reports | 23/05/2013 | Frans Prins | Ludloko Developments | 03/09/2013 - 19:13 | |
Ikwezi Mining Powerline and Substation Heritage Report | CULTURAL HERITAGE IMPACT ASSESSMENT OF G IKWEZI MINING 20 MVA 88/22KV SUBSTATION AND ASSOCIATED INGAGANE/UTRECHT/IKWEZI 88KV POWERLINE | Heritage Impact Assessment Specialist Reports | 23/05/2013 | 03/09/2013 - 18:48 |