THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 12551 - 12600 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 |
Post date![]() |
---|---|---|---|---|---|---|---|---|
HERITAGE IMPACT ASSESSMENT: PROPOSED LOW COST HOUSING PROJECT ERF 666 (SITE B), KEIMOES, NORTHERN CAPE | HERITAGE IMPACT ASSESSMENT SPECIALIST ARCHAEOLOGICAL STUDY PROPOSED LOW COST HOUSING PROJECT ERF 666 (SITE B), KEIMOES, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 01/03/2013 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | 06/06/2013 - 15:15 | |
HIA for Sorata-Witsieshoek 132kV Line, Phuthaditjhaba, Free State Province, South Africa | A PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED 132kV LINES - SORATA-WITSIESHOEK, PHUTHADITJHABA, FREE STATE PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 10/02/2013 | Nkosinathi Godfrey Tomose | Margen Industrial Service cc | 06/06/2013 - 15:03 | ||
HIA for Camden Waste Disposal Sites, Camden, Mpumalanga Province, South Africa | A HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED CAMDEN WASTE DISPOSAL SITES, CAMDEN POWER STATION, MSUKALINGWA LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT, MPUMALANGA PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 29/05/2013 | Nkosinathi Godfrey Tomose | BAAGI ENVIRONMENTAL CONSULTANCY | 06/06/2013 - 14:46 | ||
Medupi-Borutho HIA 400kV Transmission Line, Limpopo Province, South Africa | A HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED MEDUPI-BORUTHO 400kV TRANSMISSION LINE, LIMPOPO PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 22/02/2013 | BAAGI ENVIRONMENTAL CONSULTANCY | CTS_121363 | 06/06/2013 - 14:20 | ||
Borutho-Witkop HIA, Limpopo Province, South Africa | A HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED BORUTHO-WITKOP 400kV TRANSMISSION LINE, LIMPOPO PROVINCE, SOUTH AFRICA. | HIA Phase 1 | 04/04/2013 | BAAGI ENVIRONMENTAL CONSULTANCY | 06/06/2013 - 14:02 | |||
A Phase 1 Heritage Impact Assessment Study, Charlestown, KwaZulu-Natal Province, South Africa | A PHASE 1 HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED CHARLESTOWN HOUSING DEVELOPMENT, KWAZULU-NATAL, SOUTH AFRICA. PROJECT NO: K12020009 | HIA Phase 1 | 20/03/2013 | Nkosinathi Godfrey Tomose | ENPROCON (Pty) Ltd | 06/06/2013 - 13:42 | ||
HIA Deo Gloria | FINAL HERITAGE IMPACT ASSESSMENT REPORT: PROPOSED LAND USE CHANGE TO PROVIDE FOR THE DEO GLORIA OLIVE ESTATE ON PORTION 67 AND THE REMAINDER OF THE FARM VAALKOPPIES 40 NEAR UPINGTON, KAI! GARIB MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 05/11/2010 | Robert de Jong | Cultmatrix CC | Van Zyl Environmental Consultants | 05/06/2013 - 16:12 | |
HIA Soutfontein | Report on a Desktop Study with regards to the Cultural Heritage Relating to a Prospecting Right Application for Soutfontein, Close to Garies in the Namaqualand District, Northern Cape Province | Heritage Scoping | 01/03/2013 | Anton van Vollenhoven | Archaetnos CC | MSA Group | 05/06/2013 - 12:08 | |
HIA Avontuur | Report on a Desktop Study with regards to the Cultural Heritage Relating to a Prospecting Right Application for Avontuur, Close to Garies in the Namaqualand District, Northern Cape Province | Heritage Scoping | 01/03/2013 | Anton van Vollenhoven | Archaetnos CC | MSA Group | 05/06/2013 - 12:08 | |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT: THE PROPOSED SUNNY SOUTH HOUSING DEVELOPMENT, BUFFALO CITY METROPOLITAN MUNICIPALITY, EASTERN CAPE, SOUTH AFRICA | AIA Phase 1 | 20/05/2013 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | 05/06/2013 - 08:34 | ||
Desktop Paleontological Study | PALAEONTOLOGICAL ASSESSMENT OF SUNNY SOUTH HOUSING FACILITY, BUFFALO CITY METROPOLITAN MUNICIPALITY, EASTERN CAPE | PIA Desktop | 16/05/2013 | Gideon Groenewald | Private | 05/06/2013 - 08:28 | ||
HMP NCWANE - OKUKU 88 KV POWERLINE ESTABLISHMENT IN ZULULAND | HERITAGE MANAGEMENT PLAN FOR PROPOSED NCWANE - OKUKU 88 KV POWERLINE ESTABLISHMENT IN ZULULAND DISTRICT MUNICIPALITY (EIA REF NO 12/12/20/2108) | Conservation Management Plan | 25/05/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | Ugu District Municipality | 04/06/2013 - 12:11 | |
UTRECHT LOW COST HOUSING PROJECT | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR PROPOSED 'UTRECHT LOW COST' HOUSING PROJECT ERF 1176,EMADLANGENI LOCAL MUNICIPALITY,KWAZULU NATAL PROVINCE | Archaeological Specialist Reports | 01/05/2013 | McEdward Murimbika | Nzumbululo Heritage Solutions | Ugu District Municipality | 04/06/2013 - 11:29 | |
De Wittekrans Mining Heritage Report | Heritage Impact Assessment, The De Wittekrans Project, Mashala Resources, Hendrina, Mpumalanga | Heritage Impact Assessment Specialist Reports | 27/07/2010 | Wouter Fourie | GCS Water and Environmental Consultants - Durban | 04/06/2013 - 10:01 | ||
PIA_Gumeni Bosloop | Gumeni - Bosloop 132kV line – Eskom Emakhazeni Local Municipality, Machadadorp, Mpumalanga Province Farms: Prinsloo 382 JT, Elandsfontein 389 JT, Bermondsey 391 JT, Gemsbokhoek 397JT | Palaeontological Specialist Reports | 27/05/2013 | Heidi Fourie | Ditsong Museums of South Africa | Royal Haskoning DHV | 03/06/2013 - 16:07 | |
HIA Lomoteng | Baseline Archaeological Reconnaissance Report on the Farm Lomoteng 669, North of Postmasburg in the Siyanda District Municipality of the Northern Cape Province | HIA Letter of Exemption | 26/11/2011 | Peter Beaumont | McGregor Museum | M&S Consulting | 03/06/2013 - 15:36 | |
HIA_Ermelo Uitkoms Line | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT OF THE PROPOSED NEW ERMELO UITKOMS 88 kV POWER LINE SOUTH OF ERMELO MPUMALANGA PROVINCE | HIA Phase 1 | 23/03/2013 | Udo Kusel | African Heritage Consultants CC | Texture Environmental Consultants | 03/06/2013 - 14:41 | |
PIA_Ermelo Uitkoms Line | Ermelo – Uitkoms 88kV line – Eskom, Msukaligwa Local Municipality, Mpumalanga Province | PIA Phase 1 | 05/04/2013 | Heidi Fourie | Ditsong Museums of South Africa | Texture Environmental Consultants | 03/06/2013 - 14:38 | |
Waterval Farm, Wartburg, KZN | Heritage Impact Assessment Specialist Reports | 24/12/2012 | Frans Prins | Active Heritage CC | Green Door Environmental | 03/06/2013 - 13:39 | ||
Chatty Valley Sewer, NMBM PIA | Desktop Palaeontological Impact Assessment for the proposed replacement of the Chatty Valley collector sewer (nodes 20-24) and construction of link sewer, Bethelsdorp, Nelson Mandela Bay Municipality | PIA Desktop | 01/04/2013 | Robert Gess | Rob Gess Consulting | Jeffares & Green - Port Elizabeth | CTS_121110 | 03/06/2013 - 11:52 |
Chatty Valley Sewer, NMBM | REPLACEMENT OF THE CHATTY VALLEY COLLECTOR SEWER & CONSTRUCTION OF THE LINK SEWER, BETHELSDORP, NELSON MANDELA BAY MUNICIPALITY, EASTERN CAPE, SOUTH AFRICA | AIA Phase 1 | 18/03/2013 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | Jeffares & Green - Port Elizabeth | CTS_121109 | 03/06/2013 - 11:47 |
Heritage Statement and Notification of Intent to Develop for the Vedanta IPP Project | Heritage Statement for the Vedanta IPP Project, Lephalale, Limpopo Province | Heritage Statement | 31/05/2013 | Shahzaadee Karodia Khan, Natasha Higgitt | Digby Wells Environmental | Vedanta Resources PLC | 31/05/2013 - 12:25 | |
Bakoni Platinum Watching brief | Report on Archaeological Watching Brief Bakoni Platinum. | Archaeological Specialist Reports | 10/08/2012 | Shahzaadee Karodia Khan | Digby Wells Environmental | Digby Wells Environmental | 31/05/2013 - 11:57 | |
Garona Groblershoop | 31/05/2013 - 11:19 | |||||||
HIA Borrow Pit 2 Griekwastad | First Phase Archaeological and Heritage Assessment of the Borrow Pit Development, Griekwastad, Northern Cape | HIA Phase 1 | 11/11/2012 | Cobus Dreyer | MDA Town and Regional Planners | 31/05/2013 - 09:23 | ||
MR191 | Application for Road widening and proposed landscaping work of the R45 M191 Between Paarl and Franschoek | 30/05/2013 - 11:56 | ||||||
AIA for the Proposed Upgrade of Boshof Combined School | PHASE 1 ARCHAEOLOGICAL IMPACT ASESSMENT OF THE PROPOSED DEVELOPMENT OF THE BOSHOF COMBINED SCHOOL IN THE TOKOLOGO MUNICIPALITY, LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | AIA Phase 1 | 28/05/2013 | Munyadziwa Magoma | BoPhelo Environmental Consultant and GIS Specialist | 30/05/2013 - 10:42 | ||
AIA for the Proposed Upgrade of Boshof Combined School | Phase 1 Archaeological Impact Assessment for the Proposed Upgrade of Boshof Combined School. Tokolong Local Municipality, Lejweleputswa District, Free State Province | AIA Phase 1 | 28/05/2013 | Munyadziwa Magoma | BoPhelo Environmental Consultant and GIS Specialist | BoPhelo Environmental Consultant and GIS Specialist | 29/05/2013 - 16:41 | |
HIA Turbine Placements | An Archaeological Ground-Truthing Walk-Through For The Nobelsfontein Wind Energy Facility Situated On A Site South Of Victoria West On The Farms Nobelsfontein 227, Annex Nobelsfontein 234, Ezelsfontein 235, And Rietkloofplaaten 239, Northern Cape Province | HIA Phase 1 | 01/12/2012 | Celeste Booth | Albany Museum - Archaeology | Savannah Environmental (Pty) Ltd | 29/05/2013 - 14:44 | |
Hendrina - Gumeni Heritage Assessment | Compilation of a construction environmental management programme for a section of the Gumeni Hendrina 400 kV power-line: Heritage Resources Assessment | Heritage Impact Assessment Specialist Reports | 06/05/2013 | Johnny Van Schalkwyk | Iliso Consulting (Pty) Ltd | Eskom Holdings SOC Ltd | 29/05/2013 - 13:26 | |
AIA for PE Airport Stormwater Upgrade | Archaeological Impact Assessment for the proposed Port Elizabeth Airport Stormwater Upgrade | AIA Phase 1 | 29/05/2013 | Celeste Booth | Albany Museum - Archaeology | SRK Consulting (Pty) Ltd - Pretoria | 29/05/2013 - 10:32 | |
Protea Ridge, Kommetjie HIA | Heritage Impact Assessment: Proposed development of portion of Remainder of Farm 948, Kommetjie (Protea Ridge) | HIA Phase 2 | 25/04/2013 | Lize Malan | Doug Jeffery Environmental Consultants | 29/05/2013 - 10:16 | ||
HIA Protea Ridge, Kommetjie | Heritage Impact Assessment, Proposed Development of Portion of Remainder of Farm 948, Kommetjie (Protea Ridge) | HIA Phase 2 | 25/04/2013 | Lize Malan | Doug Jeffery Environmental Consultants | 29/05/2013 - 09:51 | ||
HIA Hondeklip Abalone Hatchery Town Site | Hondeklip Bay Abalone Project: Report No. 1; Heritage Impact Assessment Progress Report And Preliminary Findings | HIA Phase 1 | 31/07/2012 | Ronald Viney | Ad Astra Festina | Ecosense | 28/05/2013 - 10:21 | |
HIA Hondeklip Abalone Hatchery | .Heritage Impact Assessment For A Proposed Abalone Hatchery At Hondeklipbaai, Namakwaland Magisterial District, Western Cape | HIA Phase 1 | 15/08/2012 | Jayson Orton | ACO Associates CC | Ecosense | 28/05/2013 - 10:01 | |
EverestSolar Energy Facility - Palaeontological Report | Desktop Paleontological Heritage Impact Assessment Report for the Proposed Everest Solar Energy Facility. | PIA Desktop | Barry Millsteed | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 28/05/2013 - 09:12 | ||
EverestSolar Energy Facility - Heritage Report | Aracheological Impact Assessment report for the Proposed Everest Solar Energy Facility | Archaeological Specialist Reports | 30/08/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 28/05/2013 - 09:01 | |
PIA: PE Airport Stormwater Upgrade | Palaeontology Exemption letter for Port Elizabeth Airport Stormwater Upgrade | HIA Letter of Exemption | 27/05/2013 | Rosemary Prevec | Albany Museum | SRK Consulting (Pty) Ltd - Pretoria | 27/05/2013 - 14:43 | |
PIA: PE Airport Stormwater Upgrade | Palaeontological exemption for the proposed Port Elizabeth Airport Stormwater Upgrade | HIA Letter of Exemption | 27/05/2013 | Rosemary Prevec | SRK Consulting (Pty) Ltd - Pretoria | Airports Company South Africa | 27/05/2013 - 14:16 | |
PROJECT 2010/14 | HIA PROPOSED LAND USE CHANGE TO PROVIDE FOR THE EXTENSION OF THE TOWN OF HOTAZEL PHASE III | HIA Phase 1 | 16/05/2010 | Robert de Jong | Cultmatrix CC | Samancor Manganese | 26/05/2013 - 19:22 | |
Form A, 71 Florida Road | Historical: Nil Architectural The site accommodates a typical Berea cottage of the era. It is listed in Professor Kearney’s work. A copy of same is attached as “A”. The Applicant’s proposed works are internal and minor and will not effect the items referred to in the listing in any manner. We record that Applicant maintains this building in a very good state of repair; Woodstrip floors have recently been repaired and sealed, windows and other joinery are in a very good state of repair and the property has recently been re-decorated. Urban Setting To the right of the property is a somewhat modern (Age approximately 50 years), 5/6 storey apartment block. To the left is a former double storey house, restored and converted to offices some 5 or so years ago. Street opposite is a service station known as Windermere Garage. Proposed Work Applicant intends applying to Ethekwini Municipality for consent to utilize the property as offices. Accordingly, minimal partitioning in the two front left rooms of the building are proposed. All other aspects, including existing bathrooms and ablution facilities will be un-affected by the proposals. Motivation for Works The situation of the property, adjacent to offices and the busy Argyle Road and opposite a busy service station, has rendered it unsuitable and undesirable as a residence. It is considered that office usage is the only viable and appealing alternative use. | Significance Report | 24/05/2013 | 24/05/2013 - 18:28 | ||||
Form A, 71 Florida Road | Historical: Nil Architectural: The site accommodates a typical Berea cottage of the era. It is listed in Professor Kearney’s work. A copy of same is attached as “A”. The Applicant’s proposed works are internal and minor and will not effect the items referred to in the listing in any manner. We record that Applicant maintains this building in a very good state of repair; Wood – strip floors have recently been repaired and sealed, windows and other joinery are in a very good state of repair and the property has recently been re – decorated. Urban Setting: To the right of the property is a somewhat modern (Age approximately 50 years), 5/6 storey apartment block. To the left is a former double storey house, restored and converted to offices some 5 or so years ago. Street opposite is a service station known as Windermere Garage. | Significance Report | 24/05/2013 | 24/05/2013 - 17:44 | ||||
Paleontology Report for the Grootkop Solar Energy Facility | Desktop Paleontology Heritage Impact Assessment Report for the Grootkop Solar Energy Facility | PIA Desktop | Barry Millsteed | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 24/05/2013 - 14:46 | ||
Heritage Report for the Grootkop Solar Energy Facility | Archaeological Scoping Report for the Proposed Grootkop Solar Energy Facility | Archaeological Specialist Reports | 06/05/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | CTS_120509 | 24/05/2013 - 14:41 |
325 0n Cowey | DEMOLITION: 325 Problem Mkhize Road, Morningside, Durban | Heritage Scoping | 24/05/2013 | Mandisa Pepeta | 24/05/2013 - 13:04 | |||
Sabungu Mine on Portion 3 Farm No.860, East London | A LETTER OF RECOMMENDATION (WITH CONDITIONS) FOR THE EXEMPTION OF A FULL PHASE 1 ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED WEATHERED DOLERITE (SABUNGU) MINE ON PORTION 3 FARM NO.860, MOUNT COKE, EAST LONDON, AMATHOLE DISTRICT MUNICIPALITY, EASTERN CAPE. | HIA Phase 1 | 01/09/2009 | Johan Binneman | Albany Museum - Archaeology | Veduba Investments CC | 24/05/2013 - 11:40 | |
HIA Noblesfontein Tx and Substation | An archaeological ground-truthing walk-through for the proposed substation and associated overhead power line for the Nobelsfontein Wind Energy Facility situated on a site south of Victoria West on the Farm Nobelsfontein 227, Northern Cape Province | HIA Phase 1 | 01/12/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | Savannah Environmental (Pty) Ltd | 23/05/2013 - 11:05 | |
HIA Noblesfontein Tx and Substation | An archaeological ground-truthing walk-through for the proposed substation and associated overhead power line for the Nobelsfontein Wind Energy Facility situated on a site south of Victoria West on the Farm Nobelsfontein 227, Northern Cape Province | HIA Phase 1 | 01/12/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | Savannah Environmental (Pty) Ltd | 23/05/2013 - 10:32 | |
Exemption from Phase 1 HIA Request Letter | LETTER OF RECOMMENDATION FOR THE EXEMPTION FROM A FIRST PHASE ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED EXTENSION OF THE BLOEMFONTEIN CURRO SCHOOL ON PORTION 34 OF THE FARM GROENVLEI 2844, BLOEMFONTEIN | HIA Letter of Exemption | 22/05/2013 | Cobus Dreyer | Enviroworks | 22/05/2013 - 17:06 | ||
Phase 1 HIAR | Township Establishment Steenbokpan - Limpopo | HIA Phase 1 | 01/02/2009 | Frans Roodt | SAHRA HOU | Tekplan Environmental | 22/05/2013 - 16:34 |