FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
HIA_Sub Precinct 1_WCFP Impact Assessment Report and Permit Application: Site Development Plan: Sub Precinct 1, including the visitors centre, fossil dig site and related infrastructure: (NHRA Section 27 [16, 18] & comment in terms of NEMA Section 24) for Farm 1223, Saldanha Bay Heritage Impact Assessment Specialist Reports 01/03/2013 Melanie Attwell Melanie Attwell & Associates West Coast Fossil Park Trust 22/05/2013 - 15:47
Oryx Solar Energy Facility - Palaeontological Report Desktop Palaeontological Heritage Impact Assessment Report for the Oryx Solar Energy Facility PIA Desktop Barry Millsteed Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 22/05/2013 - 15:40
Oryx Solar Energy Facility - Heritage Report Archaeological Scoping Report for the Proposed Oryx Solar Energy Facility Heritage Scoping 08/05/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 22/05/2013 - 15:29
A REVISION OF PHASE 1 HIA A REVISION OF PHASE 1 HIA FOR THE PROPOSED WONDERFONTEIN COLLIERY NEAR BELFAST IN MPUMALANGA HIA Phase 1 13/05/2013 Anton Pelser A Pelser Archaeological Consulting Shanduka Coal (Pty) Ltd 22/05/2013 - 14:29
HIA D3 Power Line and Substation Proposed construction of a 132kV power line, substation and the extension of Homestead substation associated with the 75mw Concentrating Photovoltaic (CPV) / Photovoltaic (PV) plant (PV3) on the farm Droogfontein in Kimberley, Northern Cape Province: Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 25/04/2013 Wouter Fourie 22/05/2013 - 10:56
Various Farms in Humansdorp PRELIMINARY HERITAGE IMPACT ASSESSMENT REPORT FOR PROSPECTING FOR STONE & ASSOCIATED MINERALS ON VARIOUS FARMS IN THE HUMANSDORP DISTRICT. HIA Phase 1 01/02/2010 Stellenryck Environmental Solutions Brickrush (Pty) Ltd 22/05/2013 - 09:51
13/EPD/Ntuzuma Phase 1 Heritage Impact Assessment Report: Proposed Construction of Ntuzuma Sewer Reticulation, eThekwini Metropolitan Municipality, KwaZulu-Natal HIA Phase 1 21/05/2013 Elizabeth Wahl, Len van Schalkwyk eThembeni Cultural Heritage Environmental Planning and Design cc 21/05/2013 - 11:53
HIA for Eskom Platreef project PROPOSED ESKOM PLATREEF POWER LINE AND SUBSTATION PROJECT WITHIN MOGALAKWENA LOCAL MUNICIPALITY, WATERBERG DISTRICT IN LIMPOPO PROVINCE: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSESSMENT REPORT HIA Phase 1 30/07/2012 McEdward Murimbika Nzumbululo Heritage Solutions Nzumbululo Heritage Solutions 21/05/2013 - 10:58
HIA on a portion of the farm schuitdrift-west 5 HIA phase 1 on a portion of the farm schuitdrift-west 5 HIA Phase 1 05/03/2008 Peter Beaumont McGregor Museum MEG Environmental Impact Studies 20/05/2013 - 21:44
Extension Hotazel Extention of the town of Hotazel phase III HIA Phase 1 16/05/2010 de Jong SAHRA Council SAHRA Council 20/05/2013 - 21:18
DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQUEDUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQUEDUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL HIA Phase 1 24/10/2012 Gavin Anderson Knight Piesold Consultants KwaZulu-Natal Amafa and Research Institute 20/05/2013 - 16:29
DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL HIA Phase 1 24/10/2012 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Knight Piesold Consultants 20/05/2013 - 15:30
DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL HIA Phase 1 24/10/2012 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Knight Piesold Consultants 20/05/2013 - 15:30
13/Gibb/Melkhout Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Melkhout-Dieprivier, Kouga Local Municipality, Cacadu District, Eastern Cape Province, South Africa AIA Phase 1 08/05/2013 Elizabeth Wahl, Len van Schalkwyk eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 20/05/2013 - 14:43
13/Gibb/Patensie Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Melkhout-Patensie, Kouga Local Municipality, Cacadu District, Eastern Cape Province, South Africa AIA Phase 1 08/05/2013 Elizabeth Wahl, Len van Schalkwyk eThembeni Cultural Heritage GIBB Engineering & Science - Port Elizabeth 20/05/2013 - 14:38
Drostdy Hotel, Graaff Reinet - Heritage Statement [Draft 1 April 2013] Drostdy Hotel Graaff Reinet - Draft Heritage Statement for comment Heritage Statement 17/05/2013 Helen May Urban Concepts Pty Ltd South African College of Tourism 17/05/2013 - 11:19
Heritage Impact Assessment for the Cornubia Development Heritage Impact Assessment for the Cornubia Developmen HIA Phase 1 17/05/2013 Len van Schalkwyk eThembeni Cultural Heritage Royal Haskoning DHV 17/05/2013 - 10:06
AIA MELKSTROOM UPINGTON 4 FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE HOUSING DEVELOPMENTS AT MELKSTROOM 563, UPINGTON, NORTHERN CAPE AIA Phase 1 06/05/2013 Neil Devenish MDA Town and Regional Planners MDA Town and Regional Planners 16/05/2013 - 19:41
243 Currie Road St Thomas Road Historical Impact Assessment Heritage Impact Assessment Specialist Reports 20/07/2012 Deborah Whelan 241 Currie Road (Pty) Ltd 16/05/2013 - 17:57
Report on examination and assessment of firearm/weapon as a Heritage Object Heritage Impact Assessment Specialist Reports 14/05/2013 SAHRA HOU 16/05/2013 - 16:30
Robben Island Upliftment Program Robben Island & Mcelimgeni Mzanzi Africa Framework Agreement: ‘Making History’ Making History; a sporting roadmap for the future Site Inspection Report 06/05/2013 Grant Kunneke Mcelemgeni Mzanzi Africa 15/05/2013 - 10:31
Veremo Holdings Iron Ore Mine CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED VEREMO HOLDINGS IRON ORE MINE, MIDDLEBURG MAGISTERIAL DISTRICT, LIMPOMPO PROVINCE. HIA Phase 1 01/04/2011 Francois P Coetzee Department of Anthropology and Archaeology, UNISA MSA Group 14/05/2013 - 15:22
ORO AFRICA BO-KAAP STATEMENT OF SIGNIFICANCE & MOTIVATION FOR ERF 176383 (newly consolidated erf 130164 & erf 1614291) CAPE TOWN (170 BUITENGRACHT & 17 JORDAAN STREET, BO-KAAP) Heritage Statement Kathy Dumbrell ZOLLNER ARCHITECTS 14/05/2013 - 15:20
Follow Up HIA_Kwagga North FOLLOW-UP EVALUATION AS REQUIRED BY HIA COMPILED FOR OPTIMUM COLLIERY – KWAGGA NORTH PROJECT HIA Phase 2 09/09/2012 Wouter Fourie PGS Heritage and Grave Relocation Consultants 14/05/2013 - 13:08
Middelburg Borrow Pits PHASE 1 PALAEONTOLOGICAL IMPACT ASSESSMENT OF 17 BORROW PITS NEAR MIDDELBURG, EASTERN CAPE PROVINCE. PIA Phase 1 24/09/2008 Lloyd Rossouw KV3 Engineers: Environmental & Waste Management Division 13/05/2013 - 15:57
Upgrading of the DR2629, Middelburg Area UTILIZATION OF 17 QUARRIES FOR UPGRADING OF THE DR2629, ROAD NR 654 AND THE DR2631, MIDDELBURG AREA, EASTERN CAPE AIA Phase 1 06/10/2008 Karen Van Ryneveld ArchaeoMaps Archaeological Consultancy KV3 Engineers: Environmental & Waste Management Division 13/05/2013 - 15:47
HIA Upington CSP and Integration HERITAGE IMPACT ASSESSMENT REPORT Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province HIA Phase 1 10/10/2012 Stephan Gaigher G & A Heritage Zitholele Consulting 13/05/2013 - 14:25
Wesselsrust Farm House Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E 10/05/2013 Russellstone Group represented by Russell du Preez 10/05/2013 - 21:57
Wesselsrust Farm House Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E 10/05/2013 Russellstone Group represented by Russell du Preez 10/05/2013 - 21:57
Wesselsrust Farm House Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E 10/05/2013 Russellstone Group represented by Russell du Preez 10/05/2013 - 21:57
Wesselsrust Farm House Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E 10/05/2013 Russellstone Group represented by Russell du Preez 10/05/2013 - 21:57
Wesselsrust Farm House Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E 10/05/2013 Russellstone Group represented by Russell du Preez 10/05/2013 - 21:57
HIA ADDCAR Project ADDCAR PROJECT - Proposed Coal Mining on Sections of the Farms Blesbokfontein 31 IS, Klippoortje 32 IS, Nooitgedacht 37 IS, Blesbokfontein 38 IS, Hartbeestfontein 39 IS, Roodepoort 40 IS, Frischgewaagd 60 IS and Vierfontein 61 IS, Emalahleni Local Municipality, Mpumalanga Province. HIA Phase 1 05/03/2013 Polke Birkholtz PGS Heritage and Grave Relocation Consultants Xstrata Coal South Africa 10/05/2013 - 13:30
Architectural Report_Wonderfontein Colliery A phase 2 architectural documentation of two farmyards on the farm Wonderfontein 428 JS district Belfast, Mpumalanga Province. Significance Report 01/03/2013 Sidney Miller 10/05/2013 - 13:03
Orania - Boskamp First phase archaeological and cultural heritage assessment of the proposed residential developments next to and on portions of plots 52 and 38. Orania HIA Phase 1 10/05/2013 - 09:49
Supplementary Archaeological Survey N2 Wild Coast Toll HIghway. Supplementary Archaeological Survey. Field Survey Conducted from 24 to 28 October 2011. FInal Report December 2012. AIA Phase 1B 07/03/2013 Andrie Meyer CCA ENVIRONMENTAL (Pty) Ltd 08/05/2013 - 11:34
Hia Study for Eskom Legogote/Gutshwa Powerlines Proposed Eskom Legogote to Gutshwa Powerlines and Substation, Mbombela Local Municipality HIA Phase 1 05/04/2013 Anton van Vollenhoven Wandima Environmental Services cc Archaetnos CC 08/05/2013 - 11:17
HIA Study for Eskom Khanyazwe/Buffelspruit Proposed Eskom Khanyazwe - Buffelspruit 132kV Powerline. HIA Phase 1 27/02/2013 Anton van Vollenhoven Wandima Environmental Services cc Archaetnos CC 08/05/2013 - 09:52
HIA Study for Eskom Khanyazwe/Buffelspruit Proposed Eskom Khanyazwe - Buffelspruit 132kV Powerline. HIA Phase 1 27/02/2013 Anton van Vollenhoven Wandima Environmental Services cc Archaetnos CC 08/05/2013 - 09:52
HIA Study for Siyathuthuka Ext 5 Proposed residential township: Extension 5 of portion 13 of the farm Klipfontein HIA Phase 1 22/11/2012 Christine Van Wyk Rowe Wandima Environmental Services cc Adansonia Heritage Consultants 08/05/2013 - 09:21
PIA Potfontein PALAEONTOLOGICAL DESKTOP REPORT PROPOSED POTFONTEIN PHOTOVOLTAIC FACILITY Potfontein Photovoltaic Facility, Farm: Koens Draai 36, Emthanjeni Local Municipality, Pixley ka Seme District Municipality, Northern Cape Province of South Africa PIA Desktop 29/04/2013 Gideon Groenewald Geological and Palaeontological Consultant Scatec Solar SA (Pty) Ltd 08/05/2013 - 08:24
Nessie Knight Hospital Sulenkama demolition and Mjanyana Hospital Mjanyana Heritage Impact Assessment of the Nessie Knight Hospital near Qumbu, and the Mjanana District Hospital near Encobo, both Eastern Cape Heritage Impact Assessment Specialist Reports 30/04/2013 Deborah Whelan Archaic Consulting Terreco Environmental 07/05/2013 - 16:20
Not applicable 07/05/2013 - 15:50
Heritage impact scoping report: Eskom Highveld Heritage impact scoping report for the PROPOSED ESKOM HIGHVELD NORTH, WEST LOWVELD STRENTGHENING PROJECT, MPUMALANGA AND LIMPOPO PROVINCES Heritage Impact Assessment Specialist Reports 02/05/2009 Johnny Van Schalkwyk Nemai Consulting 07/05/2013 - 15:17
Gamsberg PIA Environmental and Social Impact Assessment [ESIA] for the Gamsberg Zinc Mine and Associated Infrastructure, Northern Cape Province PALAEONTOLOGICAL IMPACT ASSESSMENT Desktop Study PIA Desktop 20/03/2013 John Pether Geological and Palaeontological Consultant ERM South Africa 07/05/2013 - 15:13
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE COMPILATION OF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE AND THE STEELPOORT INTEGRATION PROJECT:HERITAGE RESOURCES ASSESSMENT Heritage Impact Assessment Specialist Reports 25/01/2013 Johnny Van Schalkwyk Iliso Consulting (Pty) Ltd 07/05/2013 - 15:11
Gamsberg HIA Archaeological and Cultural Heritage Investigation for the Environmental and Social Impact Assessment (ESIA) for the Gamsberg Zinc Mine and Associated Infrastructure in Northern Cape, South Africa HIA Phase 1 01/03/2013 David Morris McGregor Museum ERM South Africa 07/05/2013 - 15:11
STEELPOORT TO MARBELHALL 400KV POWER-LINE COMPILATION OF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE AND THE STEELPOORT INTEGRATION PROJECT: HERITAGE RESOURCES ASSESSMENT Heritage Impact Assessment Specialist Reports 10/12/2012 Johnny Van Schalkwyk Iliso Consulting (Pty) Ltd 07/05/2013 - 15:06
Deviation to existing building Deviation to an existing building over 60 years old Heritage Study 07/05/2013 Luke Naidoo LCN Architecture cc LCN Architecture cc 07/05/2013 - 12:52
1494 - Rietfontein LCH HIA Report Heritage Impact Assessment Report: Proposed Low Income Housing Project Rietfontein, Remainder Farm No. 585, Gordonia Road, Groot Mier Municipality, Northern Cape. HIA Phase 1 22/04/2013 Liezl van Pletzen-Vos, Renee Rust Pro-Active Archaeology Enviroafrica CC 07/05/2013 - 09:36

Pages

CSV
 
 

Search form