THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 12601 - 12650 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany |
Post date![]() |
---|---|---|---|---|---|---|---|
HIA_Sub Precinct 1_WCFP | Impact Assessment Report and Permit Application: Site Development Plan: Sub Precinct 1, including the visitors centre, fossil dig site and related infrastructure: (NHRA Section 27 [16, 18] & comment in terms of NEMA Section 24) for Farm 1223, Saldanha Bay | Heritage Impact Assessment Specialist Reports | 01/03/2013 | Melanie Attwell | Melanie Attwell & Associates | West Coast Fossil Park Trust | 22/05/2013 - 15:47 |
Oryx Solar Energy Facility - Palaeontological Report | Desktop Palaeontological Heritage Impact Assessment Report for the Oryx Solar Energy Facility | PIA Desktop | Barry Millsteed | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/05/2013 - 15:40 | |
Oryx Solar Energy Facility - Heritage Report | Archaeological Scoping Report for the Proposed Oryx Solar Energy Facility | Heritage Scoping | 08/05/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 22/05/2013 - 15:29 |
A REVISION OF PHASE 1 HIA | A REVISION OF PHASE 1 HIA FOR THE PROPOSED WONDERFONTEIN COLLIERY NEAR BELFAST IN MPUMALANGA | HIA Phase 1 | 13/05/2013 | Anton Pelser | A Pelser Archaeological Consulting | Shanduka Coal (Pty) Ltd | 22/05/2013 - 14:29 |
HIA D3 Power Line and Substation | Proposed construction of a 132kV power line, substation and the extension of Homestead substation associated with the 75mw Concentrating Photovoltaic (CPV) / Photovoltaic (PV) plant (PV3) on the farm Droogfontein in Kimberley, Northern Cape Province: Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 25/04/2013 | Wouter Fourie | 22/05/2013 - 10:56 | ||
Various Farms in Humansdorp | PRELIMINARY HERITAGE IMPACT ASSESSMENT REPORT FOR PROSPECTING FOR STONE & ASSOCIATED MINERALS ON VARIOUS FARMS IN THE HUMANSDORP DISTRICT. | HIA Phase 1 | 01/02/2010 | Stellenryck Environmental Solutions | Brickrush (Pty) Ltd | 22/05/2013 - 09:51 | |
13/EPD/Ntuzuma | Phase 1 Heritage Impact Assessment Report: Proposed Construction of Ntuzuma Sewer Reticulation, eThekwini Metropolitan Municipality, KwaZulu-Natal | HIA Phase 1 | 21/05/2013 | Elizabeth Wahl, Len van Schalkwyk | eThembeni Cultural Heritage | Environmental Planning and Design cc | 21/05/2013 - 11:53 |
HIA for Eskom Platreef project | PROPOSED ESKOM PLATREEF POWER LINE AND SUBSTATION PROJECT WITHIN MOGALAKWENA LOCAL MUNICIPALITY, WATERBERG DISTRICT IN LIMPOPO PROVINCE: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSESSMENT REPORT | HIA Phase 1 | 30/07/2012 | McEdward Murimbika | Nzumbululo Heritage Solutions | Nzumbululo Heritage Solutions | 21/05/2013 - 10:58 |
HIA on a portion of the farm schuitdrift-west 5 | HIA phase 1 on a portion of the farm schuitdrift-west 5 | HIA Phase 1 | 05/03/2008 | Peter Beaumont | McGregor Museum | MEG Environmental Impact Studies | 20/05/2013 - 21:44 |
Extension Hotazel | Extention of the town of Hotazel phase III | HIA Phase 1 | 16/05/2010 | de Jong | SAHRA Council | SAHRA Council | 20/05/2013 - 21:18 |
DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQUEDUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL | DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQUEDUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL | HIA Phase 1 | 24/10/2012 | Gavin Anderson | Knight Piesold Consultants | KwaZulu-Natal Amafa and Research Institute | 20/05/2013 - 16:29 |
DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL | DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL | HIA Phase 1 | 24/10/2012 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Knight Piesold Consultants | 20/05/2013 - 15:30 |
DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL | DESKTOP SURVEY OF THE PROPOSED NORTHERN AUQAUADUCT AUGMENTATION, PHASE 4, KWA-ZULU NATAL | HIA Phase 1 | 24/10/2012 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Knight Piesold Consultants | 20/05/2013 - 15:30 |
13/Gibb/Melkhout | Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Melkhout-Dieprivier, Kouga Local Municipality, Cacadu District, Eastern Cape Province, South Africa | AIA Phase 1 | 08/05/2013 | Elizabeth Wahl, Len van Schalkwyk | eThembeni Cultural Heritage | GIBB Engineering & Science - Port Elizabeth | 20/05/2013 - 14:43 |
13/Gibb/Patensie | Phase 1 Archaeological Impact Assessment Report: Proposed 132kV Power Line and Substation Infrastructure, Melkhout-Patensie, Kouga Local Municipality, Cacadu District, Eastern Cape Province, South Africa | AIA Phase 1 | 08/05/2013 | Elizabeth Wahl, Len van Schalkwyk | eThembeni Cultural Heritage | GIBB Engineering & Science - Port Elizabeth | 20/05/2013 - 14:38 |
Drostdy Hotel, Graaff Reinet - Heritage Statement [Draft 1 April 2013] | Drostdy Hotel Graaff Reinet - Draft Heritage Statement for comment | Heritage Statement | 17/05/2013 | Helen May | Urban Concepts Pty Ltd | South African College of Tourism | 17/05/2013 - 11:19 |
Heritage Impact Assessment for the Cornubia Development | Heritage Impact Assessment for the Cornubia Developmen | HIA Phase 1 | 17/05/2013 | Len van Schalkwyk | eThembeni Cultural Heritage | Royal Haskoning DHV | 17/05/2013 - 10:06 |
AIA MELKSTROOM UPINGTON 4 | FIRST PHASE ARCHAEOLOGICAL & HERITAGE ASSESSMENT OF THE HOUSING DEVELOPMENTS AT MELKSTROOM 563, UPINGTON, NORTHERN CAPE | AIA Phase 1 | 06/05/2013 | Neil Devenish | MDA Town and Regional Planners | MDA Town and Regional Planners | 16/05/2013 - 19:41 |
243 Currie Road | St Thomas Road Historical Impact Assessment | Heritage Impact Assessment Specialist Reports | 20/07/2012 | Deborah Whelan | 241 Currie Road (Pty) Ltd | 16/05/2013 - 17:57 | |
Report on examination and assessment of firearm/weapon as a Heritage Object | Heritage Impact Assessment Specialist Reports | 14/05/2013 | SAHRA HOU | 16/05/2013 - 16:30 | |||
Robben Island Upliftment Program | Robben Island & Mcelimgeni Mzanzi Africa Framework Agreement: ‘Making History’ Making History; a sporting roadmap for the future | Site Inspection Report | 06/05/2013 | Grant Kunneke | Mcelemgeni Mzanzi Africa | 15/05/2013 - 10:31 | |
Veremo Holdings Iron Ore Mine | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED VEREMO HOLDINGS IRON ORE MINE, MIDDLEBURG MAGISTERIAL DISTRICT, LIMPOMPO PROVINCE. | HIA Phase 1 | 01/04/2011 | Francois P Coetzee | Department of Anthropology and Archaeology, UNISA | MSA Group | 14/05/2013 - 15:22 |
ORO AFRICA BO-KAAP | STATEMENT OF SIGNIFICANCE & MOTIVATION FOR ERF 176383 (newly consolidated erf 130164 & erf 1614291) CAPE TOWN (170 BUITENGRACHT & 17 JORDAAN STREET, BO-KAAP) | Heritage Statement | Kathy Dumbrell | ZOLLNER ARCHITECTS | 14/05/2013 - 15:20 | ||
Follow Up HIA_Kwagga North | FOLLOW-UP EVALUATION AS REQUIRED BY HIA COMPILED FOR OPTIMUM COLLIERY – KWAGGA NORTH PROJECT | HIA Phase 2 | 09/09/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 14/05/2013 - 13:08 | |
Middelburg Borrow Pits | PHASE 1 PALAEONTOLOGICAL IMPACT ASSESSMENT OF 17 BORROW PITS NEAR MIDDELBURG, EASTERN CAPE PROVINCE. | PIA Phase 1 | 24/09/2008 | Lloyd Rossouw | KV3 Engineers: Environmental & Waste Management Division | 13/05/2013 - 15:57 | |
Upgrading of the DR2629, Middelburg Area | UTILIZATION OF 17 QUARRIES FOR UPGRADING OF THE DR2629, ROAD NR 654 AND THE DR2631, MIDDELBURG AREA, EASTERN CAPE | AIA Phase 1 | 06/10/2008 | Karen Van Ryneveld | ArchaeoMaps Archaeological Consultancy | KV3 Engineers: Environmental & Waste Management Division | 13/05/2013 - 15:47 |
HIA Upington CSP and Integration | HERITAGE IMPACT ASSESSMENT REPORT Proposed Establishment of Several Electricity Distribution Lines within the Northern Cape Province | HIA Phase 1 | 10/10/2012 | Stephan Gaigher | G & A Heritage | Zitholele Consulting | 13/05/2013 - 14:25 |
Wesselsrust Farm House | Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E | 10/05/2013 | Russellstone Group represented by Russell du Preez | 10/05/2013 - 21:57 | |||
Wesselsrust Farm House | Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E | 10/05/2013 | Russellstone Group represented by Russell du Preez | 10/05/2013 - 21:57 | |||
Wesselsrust Farm House | Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E | 10/05/2013 | Russellstone Group represented by Russell du Preez | 10/05/2013 - 21:57 | |||
Wesselsrust Farm House | Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E | 10/05/2013 | Russellstone Group represented by Russell du Preez | 10/05/2013 - 21:57 | |||
Wesselsrust Farm House | Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E | 10/05/2013 | Russellstone Group represented by Russell du Preez | 10/05/2013 - 21:57 | |||
HIA ADDCAR Project | ADDCAR PROJECT - Proposed Coal Mining on Sections of the Farms Blesbokfontein 31 IS, Klippoortje 32 IS, Nooitgedacht 37 IS, Blesbokfontein 38 IS, Hartbeestfontein 39 IS, Roodepoort 40 IS, Frischgewaagd 60 IS and Vierfontein 61 IS, Emalahleni Local Municipality, Mpumalanga Province. | HIA Phase 1 | 05/03/2013 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Xstrata Coal South Africa | 10/05/2013 - 13:30 |
Architectural Report_Wonderfontein Colliery | A phase 2 architectural documentation of two farmyards on the farm Wonderfontein 428 JS district Belfast, Mpumalanga Province. | Significance Report | 01/03/2013 | Sidney Miller | 10/05/2013 - 13:03 | ||
Orania - Boskamp | First phase archaeological and cultural heritage assessment of the proposed residential developments next to and on portions of plots 52 and 38. Orania | HIA Phase 1 | 10/05/2013 - 09:49 | ||||
Supplementary Archaeological Survey | N2 Wild Coast Toll HIghway. Supplementary Archaeological Survey. Field Survey Conducted from 24 to 28 October 2011. FInal Report December 2012. | AIA Phase 1B | 07/03/2013 | Andrie Meyer | CCA ENVIRONMENTAL (Pty) Ltd | 08/05/2013 - 11:34 | |
Hia Study for Eskom Legogote/Gutshwa Powerlines | Proposed Eskom Legogote to Gutshwa Powerlines and Substation, Mbombela Local Municipality | HIA Phase 1 | 05/04/2013 | Anton van Vollenhoven | Wandima Environmental Services cc | Archaetnos CC | 08/05/2013 - 11:17 |
HIA Study for Eskom Khanyazwe/Buffelspruit | Proposed Eskom Khanyazwe - Buffelspruit 132kV Powerline. | HIA Phase 1 | 27/02/2013 | Anton van Vollenhoven | Wandima Environmental Services cc | Archaetnos CC | 08/05/2013 - 09:52 |
HIA Study for Eskom Khanyazwe/Buffelspruit | Proposed Eskom Khanyazwe - Buffelspruit 132kV Powerline. | HIA Phase 1 | 27/02/2013 | Anton van Vollenhoven | Wandima Environmental Services cc | Archaetnos CC | 08/05/2013 - 09:52 |
HIA Study for Siyathuthuka Ext 5 | Proposed residential township: Extension 5 of portion 13 of the farm Klipfontein | HIA Phase 1 | 22/11/2012 | Christine Van Wyk Rowe | Wandima Environmental Services cc | Adansonia Heritage Consultants | 08/05/2013 - 09:21 |
PIA Potfontein | PALAEONTOLOGICAL DESKTOP REPORT PROPOSED POTFONTEIN PHOTOVOLTAIC FACILITY Potfontein Photovoltaic Facility, Farm: Koens Draai 36, Emthanjeni Local Municipality, Pixley ka Seme District Municipality, Northern Cape Province of South Africa | PIA Desktop | 29/04/2013 | Gideon Groenewald | Geological and Palaeontological Consultant | Scatec Solar SA (Pty) Ltd | 08/05/2013 - 08:24 |
Nessie Knight Hospital Sulenkama demolition and Mjanyana Hospital Mjanyana | Heritage Impact Assessment of the Nessie Knight Hospital near Qumbu, and the Mjanana District Hospital near Encobo, both Eastern Cape | Heritage Impact Assessment Specialist Reports | 30/04/2013 | Deborah Whelan | Archaic Consulting | Terreco Environmental | 07/05/2013 - 16:20 |
Not applicable | 07/05/2013 - 15:50 | ||||||
Heritage impact scoping report: Eskom Highveld | Heritage impact scoping report for the PROPOSED ESKOM HIGHVELD NORTH, WEST LOWVELD STRENTGHENING PROJECT, MPUMALANGA AND LIMPOPO PROVINCES | Heritage Impact Assessment Specialist Reports | 02/05/2009 | Johnny Van Schalkwyk | Nemai Consulting | 07/05/2013 - 15:17 | |
Gamsberg PIA | Environmental and Social Impact Assessment [ESIA] for the Gamsberg Zinc Mine and Associated Infrastructure, Northern Cape Province PALAEONTOLOGICAL IMPACT ASSESSMENT Desktop Study | PIA Desktop | 20/03/2013 | John Pether | Geological and Palaeontological Consultant | ERM South Africa | 07/05/2013 - 15:13 |
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE | COMPILATION OF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE AND THE STEELPOORT INTEGRATION PROJECT:HERITAGE RESOURCES ASSESSMENT | Heritage Impact Assessment Specialist Reports | 25/01/2013 | Johnny Van Schalkwyk | Iliso Consulting (Pty) Ltd | 07/05/2013 - 15:11 | |
Gamsberg HIA | Archaeological and Cultural Heritage Investigation for the Environmental and Social Impact Assessment (ESIA) for the Gamsberg Zinc Mine and Associated Infrastructure in Northern Cape, South Africa | HIA Phase 1 | 01/03/2013 | David Morris | McGregor Museum | ERM South Africa | 07/05/2013 - 15:11 |
STEELPOORT TO MARBELHALL 400KV POWER-LINE | COMPILATION OF CONSTRUCTION ENVIRONMENTAL MANAGEMENT PROGRAMMES FOR THE STEELPOORT TO MARBELHALL 400KV POWER-LINE AND THE STEELPOORT INTEGRATION PROJECT: HERITAGE RESOURCES ASSESSMENT | Heritage Impact Assessment Specialist Reports | 10/12/2012 | Johnny Van Schalkwyk | Iliso Consulting (Pty) Ltd | 07/05/2013 - 15:06 | |
Deviation to existing building | Deviation to an existing building over 60 years old | Heritage Study | 07/05/2013 | Luke Naidoo | LCN Architecture cc | LCN Architecture cc | 07/05/2013 - 12:52 |
1494 - Rietfontein LCH HIA Report | Heritage Impact Assessment Report: Proposed Low Income Housing Project Rietfontein, Remainder Farm No. 585, Gordonia Road, Groot Mier Municipality, Northern Cape. | HIA Phase 1 | 22/04/2013 | Liezl van Pletzen-Vos, Renee Rust | Pro-Active Archaeology | Enviroafrica CC | 07/05/2013 - 09:36 |