THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 3251 - 3300 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Heritage Impact Assessment for the clearing of indigenous vegetation for citrus and crop lands on the farm River 141 MS within Musina Local Municipality, Vhembe District, Limpopo Province | Heritage Impact Assessment for the clearing of indigenous vegetation for citrus and crop lands on the farm River 141 MS within Musina Local Municipality, Vhembe District, Limpopo Province | HIA Phase 1 | 12/03/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tua Conserva Environmental | 22/07/2021 - 17:34 |
HIA Kabida Dam en Lande, Limpopo Province | HIA Kabida Dam en Lande, Limpopo Province | HIA Phase 1 | 21/01/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tua Conserva Environmental | 22/07/2021 - 17:19 |
Addendum to the Proposed amendment of the authorised grid connection between the renewable energy Project DAO and the existing Garona Substation near Groblershoop, Northern Cape Province | Addendum to the Proposed amendment of the authorised grid connection between the renewable energy Project DAO and the existing Garona Substation near Groblershoop, Northern Cape Province | 26/06/2021 | John E Almond | Natura Viva CC | ACWA Power Energy Africa (Pty) Ltd | 22/07/2021 - 15:34 | |
HIA for the Proposed 400kV Loop In Loop Out Powerline and Expansion of the Garona Substation for Project DAO, !Kheis Local Municipality | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTRUCTION OF THE FERRUM – GARONA AND GARONA – NIEWEHOOP 400KV LILO ROUTE AND EXPANSION OF THE GARONA SUBSTATION FOR PROJECT DAO NEAR GROBLERSHOOP, !KHEIS LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/06/2021 | Johnny Van Schalkwyk | Royal Haskoning DHV | 22/07/2021 - 15:20 | |
Palaeontological Impact Assessment: Eskom Badhope Buckface Farm Dikgatlong Local Municipality, Frances Baard District Municipality, Northern Cape Province | Palaeontological Impact Assessment: Eskom Badhope Buckface Farm Dikgatlong Local Municipality, Frances Baard District Municipality, Northern Cape Province. | PIA Desktop | 21/05/2021 | Dr. Heidi Fourie | Kantey & Templer Consulting Engineers | 22/07/2021 - 11:59 | |
HIA: Badhope 22 KV Powerline on Parcel 687 OF BARKLEY WEST | Badhope 22 KV Powerline On Parcel 687 Of Barkley West, Barkley West Area, Northern Cape Province | HIA Phase 1 | 22/07/2021 | Alexander Antonites | Kantey & Templer Consulting Engineers | 22/07/2021 - 11:55 | |
HIA township establishment | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT OF 300 SITES ON REMAINDER OF PORTION 1 OF THE FARM NATURALLE LOKSASIEW 272 LS WITHIN MAKHADO LOCAL MUNICIPALITY OF VHEMBE DISTRICT, LIMPOPO PROVINCE. | HIA Phase 1 | 28/05/2021 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 22/07/2021 - 11:35 | |
Phase 1 HIA Demarcation | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED DEMARCATION OF 350 SITES ON A PORTION OF THE FARM KEERWEDER 169 MT LOCATED IN DOLIDOLI VILLAGE WITHIN MAKHADO LOCAL MUNICIPALITY OF VHEMBE DISTRICT, LIMPOPO PROVINCE. | HIA Phase 1 | 28/05/2021 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 22/07/2021 - 11:21 | |
PLANGE PHASE 1 HIA REPORT | PHASE 1 HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT IN PLANGE VILLAGE WITHIN COLLINS CHABANE LOCAL MUNICIPALITY OF VHEMBE DISTRICT, LIMPOPO PROVINCE. | HIA Phase 1 | 21/02/2020 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 22/07/2021 - 10:40 | |
COP6679 Draft EIA Appendix L (PIA) | Palaeontological Impact Assessment for the Copper Sunset sand mining operation near Viljoensdrif, northern Free State Province | PIA Phase 2 | 08/07/2021 | Marion Bamford | Digby Wells Environmental | Copper Sunset Sand (Pty) Ltd | 21/07/2021 - 18:54 |
COP6679 Draft EIA Appendix L (HIA) | Heritage Impact Assessment: Environmental Authorisation Process for the Expansion of the Copper Sunset Mining Right Area | HIA Phase 1 | 08/07/2021 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Copper Sunset Sand (Pty) Ltd | 21/07/2021 - 18:49 |
Finfoot HIA | Cultural Heritage Impact Assessment: Phase 1 Investigation of the Proposed Holiday Resort Development, Finfoot Lake Reserve, Vaalkop Dam, Rustenburg Local Municipality, Bojanala Platinum District Municipality, North West Province | HIA Phase 1 | 01/12/2021 | Francois Coetzee | NuLeaf Planning & Environmental | 21/07/2021 - 16:55 | |
Sibanye Gold PV Facility Project - Transmission lines | Heritage Impact Assessment as part of the Environmental Impact Assessment Report for the 132 KV Transmission Lines for the Photovoltaic Energy Facility Proposed for Sibanye Gold, West Rand District, Gauteng | Heritage Impact Assessment Specialist Reports | 15/02/2016 | Wouter Fourie | PGS Heritage (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 21/07/2021 - 12:56 |
Sibanye Gold PV Facility Project | Heritage Impact Assessment as part of the Environmental Impact Assessment Report for the new 200MW Photovoltaic Energy Facility Proposed for Sibanye Gold, Gauteng | Heritage Impact Assessment Specialist Reports | 15/02/2016 | Wouter Fourie | PGS Heritage (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 21/07/2021 - 12:51 |
Palaeontological Heritage Report: Desktop Study | Palaeontological Heritage Report: Desktop Study Proposed mineral prospecting on the farms Spitz Kop 168, Bingap 184 and Cairnpoint 195 near Groblershoop, Hay Magisterial District, Northern Cape Province | PIA Desktop | 30/10/2019 | John E. Almond | Natura Viva CC | 20/07/2021 - 15:36 | |
Desktop Heritage Impact Assessment Report | Blue Lounge Trading 107 (Pty) Ltd: Prospecting Activities, Desktop Heritage Impact Assessment Report, September 2019 | Heritage Impact Assessment Specialist Reports | 06/09/2019 | Stephan Gaigher | G&A Heritage Management Consultants | 20/07/2021 - 15:33 | |
Heritage Impact Assessment for Transmission Lines | Environmental Impact Assessment Process for the proposed 132 kV Powerlines for the Photovoltaic Energy Facility for Sibanye Gold, Gauteng: Heritage Impact Assessment | HIA Phase 1 | 15/02/2016 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 20/07/2021 - 15:32 |
Heritage Impact Assessment for Transmission Lines | Environmental Impact Assessment Process for the proposed 132 kV Powerlines for the Photovoltaic Energy Facility for Sibanye Gold, Gauteng: Heritage Impact Assessment | HIA Phase 1 | 15/02/2016 | Jennifer Kitto | PGS Heritage (Pty) Ltd | Aurecon South Africa (Pty) Ltd | 20/07/2021 - 15:19 |
Mapungubwe Consolidated HIA and PIA Jul. 2021 Review | Mapungubwe National Park and WHS: Heritage and Palaeontological Impact Assessment for Several Proposed Developments. July 2021 Review. | HIA Phase 1 | 06/01/2020 | Stephan Gaigher | G&A Heritage Management Consultants | SANParks | 20/07/2021 - 15:01 |
HIA_FT_899_RietSpruit_14 | Phase One Cultural Heritage Impact Assessment of Portion 14 (of 8) of the Farm Riet Spruit No. 899, Registration Division FT | HIA Phase 1 | 30/06/2021 | Frans Prins | Active Heritage CC | Active Heritage CC | 20/07/2021 - 14:52 |
Thusi Access Road HIA | Thusi Access Road Heritage Impact Assessment | HIA Phase 1 | 17/02/2021 | Frans Prins | Active Heritage CC | Greenbelt Projects(Pty) Ltd | 20/07/2021 - 13:24 |
HIA Rondavelskraal 290 JP | DRAFT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORIZATION APPLICATION FOR LEGARE MINING SERVICES (PTY)LTD WITHIN ALL PORTIONS OF FARM RONDAVELSKRAAL 290 JP, SITUATED UNDER THE MAGISTERIAL DISTRICT OF MARICO, NORTH-WEST PROVINCE. | HIA Phase 1 | 13/06/2021 | Trust Mlilo | 20/07/2021 - 11:27 | ||
HIA Rondavelskraal 290 JP | DRAFT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORIZATION APPLICATION FOR LEGARE MINING SERVICES (PTY)LTD WITHIN ALL PORTIONS OF FARM RONDAVELSKRAAL 290 JP, SITUATED UNDER THE MAGISTERIAL DISTRICT OF MARICO, NORTH-WEST PROVINCE. | HIA Phase 1 | 13/06/2021 | Trust Mlilo | 20/07/2021 - 11:16 | ||
HIA Rondavelskraal 290 JP | DRAFT PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORIZATION APPLICATION FOR LEGARE MINING SERVICES (PTY)LTD WITHIN ALL PORTIONS OF FARM RONDAVELSKRAAL 290 JP, SITUATED UNDER THE MAGISTERIAL DISTRICT OF MARICO, NORTH-WEST PROVINCE. | HIA Phase 1 | 13/06/2021 | Trust Mlilo | 20/07/2021 - 11:06 | ||
(HIA) EXEMPTION FOR UNIVERSITY OF PRETORIA ONDERSTEPOORT VETERINARY CAMPUS INCINERATOR DECOMMISSIONING | MOTIVATION FOR PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) EXEMPTION FOR UNIVERSITY OF PRETORIA ONDERSTEPOORT VETERINARY CAMPUS INCINERATOR DECOMMISSIONING | HIA Letter of Exemption | 06/07/2021 | 20/07/2021 - 10:04 | |||
HIA | HIA Wansley | 01/10/2020 | Jaco van der Walt | HCAC Heritage Consultants | 20/07/2021 - 09:37 | ||
Doveton Dam LoE | A LETTER OF EXEMPTION FOR THE DOVETON DAM, RAMSGATE, KZN | HIA Letter of Exemption | 16/03/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Green-Scene Environmental | 19/07/2021 - 17:10 |
HIA: Northam Mine PV | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Northam PV facility near Thabazimbi, North West Province | HIA Phase 1 | 07/06/2021 | Jenna Lavin, Nicholas Wiltshire | CTS Heritage | Savannah Environmental (Pty) Ltd | 19/07/2021 - 12:59 |
PIA report for the proposed Olifantsnek Mast, North West Province | PIA report for the proposed Olifantsnek Mast, North West Province | PIA Desktop | 09/05/2021 | Marion Bamford | Prof Marion Bamford | Tekplan Environmental | 19/07/2021 - 11:19 |
Proposed construction of the Nkobongweni Community Water Supply System at Nxamalala, Msinga LM | Heritage Scoping Report Proposed construction of the Nkobongweni Community Water Supply System at Nxamalala, Msinga LM, Mzinyathi District DM, KwaZulu-Natal. | Heritage Scoping | 15/06/2021 | Len van Schalkwyk | eThembeni Cultural Heritage | Enviro Pro | 19/07/2021 - 07:15 |
Proposed upgrade of two one-kilometre sections of existing dirt roads within Ward 6 and Ward 11 of the Mandeni Local Municipality | Heritage Scoping Report Proposed upgrade of two one-kilometre sections of existing dirt roads within Ward 6 and Ward 11 of the Mandeni Local Municipality, Ilembe DM KwaZulu-Natal. | Heritage Scoping | 18/06/2021 | Len van Schalkwyk | eThembeni Cultural Heritage | EnviroPro | 19/07/2021 - 04:25 |
DEPLOYMENT OF A FIBRE NETWORK WITHIN THE SOL PLAATJE MUNICIPAL AREA REDUCED SCALE | DEPLOYMENT OF A FIBRE NETWORK WITHIN THE SOL PLAATJE MUNICIPAL AREA REDUCED SCALE (JULY 2021) REV 1 | Heritage Impact Assessment Specialist Reports | 22/07/2021 | christine havenga | Frogfoot Networks | 18/07/2021 - 19:59 | |
Renewal Report | CaseID: 8488 PermitID: 2821 Sao Jose SHIPWRECKID2658 | Archaeological Permit Report | 16/07/2021 | Jaco Jacques Boshoff | Iziko Museums of South Africa | 16/07/2021 - 11:17 | |
SIONE TRUST- FS 10332 MP | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON PORTION OF THE REMAINING EXTENT OF THE FARM VLEISSENTRAL 2518 IN THE MAGISTERIAL DISTRICT OF KROONSTAD | 15/07/2021 - 11:16 | |||||
N2ME (PTY) LTD- LP 14052 PR | SCOPING REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT WITH BULK SAMPLING IN THE REMAINING EXTENT OF THE FARM BUFFELSPOORT 222 IN THE MAGISTERIAL DISTRICT OF SOUTPANSBERG | 15/07/2021 - 11:13 | |||||
Heritage Impact Assessment | Heritage Resources Management Process for the Rustenburg Base Metals Refinery Bulk Chemical Storage Facility Relocation Project, North West Province | Heritage Impact Assessment Specialist Reports | 02/11/2020 | Shannon Hardwick | Digby Wells Environmental | 15/07/2021 - 10:03 | |
A heritage survey of the proposed upgrade and construction of tourist facilities within the King Sabata Dalindyebo local Municipality, Coffee Bay & Hole in the Wall, Eastern Cape identified no archaeological or historical sites on the two proposed devel | A heritage survey of the proposed upgrade and construction of tourist facilities within the King Sabata Dalindyebo local Municipality, Coffee Bay & Hole in the Wall, Eastern Cape identified no archaeological or historical sites on the two proposed development nodes. No graves older than 60 years old and/or belonging to victims of conflict occur on the footprint. However, the Hole in the Wall geological feature is also a ‘living hertage site’ associated with local amaBomvana notions of the waterpeople or abantubomlambo – a category of ancestral beings. A buffer zone of 50m must be maintained around this feature. None of the proposed development actions, however, will take place closer than 150m to this landmark site. Nevertheless, the local community has voiced concern regarding the proposed development having an impact of on the ‘sense of place’ associated with this feature. It is recommended that the meeting be scheduled with the local community to address their concerns prior to any development. The footprint falls within an area with a high fossil sensitivity. However, due to the minimum impact of the proposed development on the geological deposits it is recommended that no further paleontological studies be conducted. However, a protocol of finds should be implemented. Attention is drawn to the South African Heritage Resources Act, 1999 (Act no. 25 of 1999), which requires that operations that expose archaeological or historical remains as well as graves and fossil material should cease immediately, pending evaluation by the provincial heritage agency. | HIA Phase 1 | 14/07/2021 | Bobo Productions | 1World Consultants (Pty) Ltd | 14/07/2021 - 11:01 | |
Desktop PIA Cuchron Steamboat Project | Desktop Palaeontological Assessment for the Cuchron Mine Development and Steamboat Beneficiation Development | PIA Desktop | 08/03/2021 | Dr. Heidi Fourie | Dr Heidi Fourie | Diphororo Development (Pty) Ltd | 14/07/2021 - 10:08 |
Heritage Impact Assessment (Cuchron Mine & Steamboat Beneficiation) | The Phase 1 Heritage Impact Assessment for the Cuchron Mine Development and Steamboat Beneficiation Development. | HIA Phase 1 | 30/04/2021 | Johnny Van Schalkwyk | JA van Schalkwyk Heritage Consultant | Diphororo Development (Pty) Ltd | 14/07/2021 - 10:06 |
Siyanda Paleontological Impact Assessment | PROPOSED SIYANDA SOLAR POWER PLANT ON THE REMAINING EXTENT OF PORTION 1 OF THE FARM GROOTDRAAI 468 NEAR VILJOENSKROON, MOQHAKA LOCAL MUNICIPALITY, FREE STATE PROVINCE | PIA Phase 1 | 01/07/2021 | John E. Almond | Natura Viva CC | Siyanda Solar Power Plant (Pty) Ltd | 14/07/2021 - 09:33 |
Siyanda Heritage Impact Assessment | HIA: THE PROPOSED SIYANDA SOLAR POWER PLANT NEAR VILJOENSKROON, FREE STATE PROVINCE | HIA Phase 1 | 01/04/2021 | Johnny Van Schalkwyk | Environamics | 14/07/2021 - 09:32 | |
Paleso Paleontological Impact Assessment | PIA Phase 1 | 14/07/2021 - 09:11 | |||||
Paleso Heritage Impact Assessment | HIA Phase 1 | 14/07/2021 - 09:11 | |||||
Heritage Conservation Plan | SE2916 Appendix I - Heritage Conservation Plan | Conservation Management Plan | 13/07/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 14/07/2021 - 08:30 |
Heritage Conservation Management Plan | SE2916 Appendix I - Heritage Conservation Plan | Conservation Management Plan | 13/07/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 14/07/2021 - 08:18 |
Proposed Masterplan at DUT- Ph2 HIA Revised | Proposed Masterplan at Durban University of Technology : Phase 2-Heritage Impact Assessment of Structures | HIA Phase 2 | 09/11/2021 | Lindsay Napier | Lindsay Napier Architect | Durban University of Technology | 13/07/2021 - 20:34 |
HIA Oshoek Land Port Entry | Phase 1 Cultural Heritage Impact Assessment for the proposed upgrade of the Oshoek Land Port Entry, Swaziland Border | HIA Phase 1 | 01/01/2018 | Johnny van Schalkwyk | Delta Built Environment Consultants | 13/07/2021 - 14:39 | |
Kenhardt PV4-6 pre-con survey | KENHARDT PV4-6: COMPLIANCE WITH PRE-CONSTRUCTION CONDITION, HERITAGE SURVEY | Archaeological Specialist Reports | 09/07/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | Scatec Solar SA (Pty) Ltd | 12/07/2021 - 12:06 |
Palaeontological Impact Assessment: Phase 1 Field Study THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE | Palaeontological Impact Assessment: Phase 1 Field Study THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE | PIA Phase 1 | 24/02/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | Exigo Sustainability | 12/07/2021 - 10:03 |
AIA FOR THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON A PORTION OF THE FARM OLIFANTSFONTEIN 410JR FOR THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE | AIA Phase 1 | 26/05/2019 | Neels Kruger | Exigo Sustainability | Exigo3 Sustainability | 12/07/2021 - 10:02 |