FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
AIA FOR THE DEVELOPMENT OF THE NEW HOPE 132KV POWERLINES PROJECT, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE DEVELOPMENT OF THE NEW HOPE 132KV POWERLINES PROJECT ON REMAINING EXTENT OF THE FARM ONDER RUGZEER 168, AND/OR REMAINING EXTENT OF THE FARM BOVEN RUGZEER 169, AND/OR FARM 420, AND/OR PORTION 1 OF THE FARM N’ROUGAS ZUID 121, AND/OR PORTION 2 OF THE FARM N’ROUGAS ZUID 121, AND/OR PORTION 4 OF THE FARM N’ROUGAS Z, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 20/04/2021 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 12/07/2021 - 09:44
96 Jabu Ndlovu st-KZNMuseum-HIA Heritage Impact Assessment of structures and proposed new Museum and archives at 96 Jabu Ndlovu street, Pietermaritzburg, KZN HIA Phase 2 01/11/2021 Lindsay Napier Lindsay Napier Architect Sakhisizwe Architects and Interiors 11/07/2021 - 18:39
Palaeontological Assessment for the Relocation of the authorised Main Transmission Substation PROPOSED PART 2 AMENDMENT FOR THE AUTHORISED MAIN TRANSMISSION SUBSTATION FOR THE SUTHERLAND 1 AND RIETRUG WIND ENERGY FACILITIES NEAR MERWEVILLE, CENTRAL KAROO DISTRICT, WESTERN CAPE PROVINCE Palaeontological Specialist Reports 06/07/2021 John Almond Natura Viva CC 11/07/2021 - 14:06
Heritage Impact Assessment for the Relocation of the authorised Main Transmission Substation HERITAGE IMPACT ASSESSMENT: PART 2 AMENDMENT TO RELOCATE AN AUTHORISED MAIN TRANSMISSION SUBSTATION ON PORTION 7 OF HAMELKRAAL 16, LAINGSBURG MAGISTERIAL DISTRICT, WESTERN CAPE 06/07/2021 Jayson Orton ASHA Consulting(Pty) Ltd 11/07/2021 - 14:03
HIA for Khobab Switching station HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 4 WIND ENERGY FACILITY, CALVINIA MAGISTERIAL DISTRICT, ORTHERN CAPE Jayson Orton ASHA Consulting(Pty) Ltd 09/07/2021 - 16:56
HIA for the Kokerboom 4 Grid connection PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 4 WIND ENERGY FACILITY, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE Jayson Orton ASHA Consulting(Pty) Ltd 09/07/2021 - 16:33
HIA for KOKERBOOM 1, KOKERBOOM 2 AND KOKERBOOM 3 PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 1, KOKERBOOM 2 AND KOKERBOOM 3 WIND ENERGY FACILITIES, CALVINIA MAGISTERIAL DISTRICT, ORTHERN CAPE 03/07/2021 Jayson Orton ASHA Consulting(Pty) Ltd 09/07/2021 - 16:02
HIA: GRID CONNECTION K1, K2 and K3 PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 1, KOKERBOOM 2 AND KOKERBOOM 3 WIND ENERGY FACILITIES, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE 03/07/2021 09/07/2021 - 15:45
96 Jabu Ndlovu st-KZNMuseum-HIA HERITAGE IMPACT ASSESSMENT Assessment of Structures and proposed new museum and archives at 96 Jabu-Ndlovu st. Pietermaritzburg, KwaZulu Natal HIA Phase 2 24/06/2021 Lindsay Napier Lindsay Napier Architect Sakhisizwe Architects and Interiors 09/07/2021 - 15:37
HIA: GRID CONNECTION K1, K2 and K3 HERITAGE IMPACT ASSESSMENT: PROPOSED GRID CONNECTION INFRASTRUCTURE TO SUPPORT THE KOKERBOOM 1, KOKERBOOM 2 AND KOKERBOOM 3 WIND ENERGY FACILITIES, CALVINIA MAGISTERIAL DISTRICT, NORTHERN CAPE 03/07/2021 Jayson Orton ASHA Consulting(Pty) Ltd 09/07/2021 - 15:33
Veld PV South Heritage Letter VELD PV NORTH AND VELD PV SOUTH EA AMENDMENTS AND APPROVAL OF FINAL LAYOUTS: HERITAGE 06/06/2021 Jayson Orton ASHA Consulting(Pty) Ltd 09/07/2021 - 14:51
Veld North Heritage Letter VELD PV NORTH AND VELD PV SOUTH EA AMENDMENTS AND APPROVAL OF FINAL LAYOUTS: HERITAGE 06/06/2021 Jayson Orton ASHA Consulting(Pty) Ltd 09/07/2021 - 14:33
Klerksdorp Filling Station PHASE 1 HIA REPORT FOR THE CONSTRUCTION OF A FILLING STATION LOCATED ON PORTION 1 OF THE REMAINDER OF ERF 10 MATLOSANA ESTATE EXTENSION 2 CITY OF MATLOSANA LOCAL MUNICIPALITY (KLERKSDORP NORTHWEST PROVINCE HIA Phase 1 15/06/2021 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 09/07/2021 - 14:15
HIA Ipelegeng REPORT ON A PHASE 1 HIA FOR THE PROPOSED IPELEGENG EXTENSION 12 TOWNSHIP ESTABLISHMENT AT SCHWEIZER-RENEKE IN THE MAMUSA LOCAL MUNICIPALITY OF THE NORTHWEST PROVINCE HIA Phase 1 10/11/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Maxim Planning Solutions 09/07/2021 - 14:01
Heritage Impact Assessment 1st phase Heritage Impact Assessment (“HIA”) of a portion of Nooitgedacht 37 IS in the Ogies district, Mpumalanga for Glencore Operations Limited – Nooitgedacht Project (“Glencore”). HIA Phase 1 01/07/2019 09/07/2021 - 12:30
Rietfontein HIA Rietfontein Heritage Impact Assessment Report HIA Phase 1 01/06/2021 Anton Pelser 09/07/2021 - 10:21
HIA MTHOMBOWESIZWE HERITAGE IMPACT ASSESSMENT(HIA) FOR PROPOSED ALTERATIONS TO MTHOMBOWESIZWE SECONDARY SCHOOL HIA Phase 1 01/05/2021 JENNIFER MUKAKABYE PLANET DEVELOPMENT SYSTEMS DELCA SYSTEMS (PTY) LTD 08/07/2021 - 15:44
Thembathina Heritage Report PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THEMBATINA MINING PROJECT AT UTRECHT, KWAZULU-NATAL Heritage Impact Assessment Specialist Reports 03/02/2021 Frans Prins Active Heritage CC 07/07/2021 - 11:12
AIA Kangala Discard EIA ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED KANGALA COAL MINE ON PORTIONS 1 AND REMAINING EXTENT OF PORTION 2 OF WOLVENFONTEIN 244 IR IN THE DELMAS AREA, MPUMALANGA PROVINCE Archaeological Specialist Reports Wouter Fourie, Marike Fourie Digby Wells Environmental, PGS Grave Solutions Environmental Impact Management Services (Pty) Ltd 06/07/2021 - 15:12
Sol Invictus Pv powerline Sol Invictus Pv powerline - cover letter requesting desktop HIA 06/07/2021 Dave Halkett ACO Associates CC WSP Environmental Pty Ltd - Johannesburg 06/07/2021 - 12:18
Dawid Kruiper AIA Version 2 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED SANPARKS DAWID KRUIPER REST CAMP AND PICNIC SITES DEVELOPMENT PROJECT IN THE KGALAGADI TRANSFRONTIER PARK, MIER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT, NORTHERN CAPE PROVINCE AIA Phase 1 25/06/2021 06/07/2021 - 11:21
PIA EIA Phase PALAEONTOLOGICAL FIELD ASSESSMENT FOR THE PROPOSED ENVIRONMENTAL AUTHORISATION AND AMENDMENT PROCESSES FOR ELANDSFONTEIN COLLIERY, NKANGALA DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE Palaeontological Specialist Reports 17/11/2020 Elize Butler PGS Heritage (Pty) Ltd, Banzai Environmental (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 06/07/2021 - 11:09
HIA EIA Phase HERITAGE IMPACT ASSESSMENT REPORT, FOR INCLUSION IN THE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED ANKER ELANDSFONTEIN COLLIERY PROJECT, WITBANK, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 17/11/2020 Jennifer Kitto PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 06/07/2021 - 11:04
(HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF AGRICULTURAL FACILITIES ON THE FARM WELTEVREDEN 278-JP, ZEERUST, NORTH WEST PROVINCE HIA Phase 1 07/07/2021 Leonie Marais Heritage Practitioner Leonie Marais Heritage Practitioner EnviroSynergy Consulting (Pty) Ltd 06/07/2021 - 06:38
Richbay Vosloorys Palaeontological Assessment Richbay, Vosloorus Filling Plant - Impact Assessment: Phase 1: Field Study PIA Phase 1 14/02/2020 Heidi Fourie WSP Environmental Pty Ltd - Johannesburg 05/07/2021 - 21:27
Richbay Vosloorus Heritage Assessment A REPORT ON AN ARCHAEOLOGICAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED RICHBAY FILLING PLANT, CLOSE TO VOSLOORUS, GAUTENG PROVINCE AIA Phase 1 22/11/2019 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants WSP Environmental Pty Ltd - Johannesburg 05/07/2021 - 21:25
PALAEONTOLOGICAL DESKTOP STUDY Mosikwe PALAEONTOLOGICAL DESKTOP STUDY - Prospecting Rights Application on remaining extent and portion 1 of the Farm Bakhoutrantje 205JP, near Rustenburg, North West Province PIA Desktop 05/05/2019 JF Durand 05/07/2021 - 15:12
Phase 1 Cultural Heritage Impact Assessment Mosikwe Phase 1 Cultural Heritage Impact Assessment: MINING RIGHT APPLICATION OF CHROME ORE ON THE FARM BAKHOUTRANTJE 205JP, NEAR PILANESBERG, MOSES KOTANE LOCAL MUNICIPALITY, BOJANALA MUNICIPAL DISTRICT,NORTH WEST PROVINCE HIA Phase 1 31/03/2019 Johnny van Schalkwyk 05/07/2021 - 15:09
HIA Heritage Impact Assessment 14/04/2019 Nangamso Zizo Siwendu NGT ESHS Solutions Shango Solutions 05/07/2021 - 13:07
Heritage Screener: Swartbooisberg PV Desktop Heritage Screening Assessment for the Proposed development of Swartbooisberg PV, Upington HIA Letter of Exemption 11/06/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 05/07/2021 - 10:48
PIA for Khutsong South ext. 8 Housing development Desk-Top Palaeontological Impact Assessment for Proposed Khutsong South Extension 8 Development situated in the West Rand District Municipality, Gauteng Province PIA Desktop 06/07/2020 Alan Smith Alan Smith Consulting Alan Smith Consulting 05/07/2021 - 06:09
Heritage Crime - SEIA for the Expropriation Bill, 2019 Heritage Crime - SEIA for the Expropriation Bill, 2019 Non Impact Assessment Related Reports 04/07/2021 Karen Van Ryneveld 04/07/2021 - 16:09
RE Capital 3C BESS Amendment Heritage Statement Heritage Statement David Morris Archaeology department, McGreggor Museum Cape Environmental Assessment Practitioners 04/07/2021 - 14:36
Dyasonsklip Solar Energy Facility 1 Heritage statement for BESS Heritage Statement 01/03/2021 Lita Webley Cape Environmental Assessment Practitioners 03/07/2021 - 15:18
Palaeontological Assessment Extension of Electrical Grid Corridor for Impofu Wind Farms Palaeontological heritage assessment: combined desktop & field-based study Extension of the electrical grid corridor for the authorized Impofu Wind Farms (East, West and North), between the Chatty and DEDISA Substations, Gqeberha (Port Elizabeth), Nelson Mandela Bay Municipality, Eastern Cape PIA Phase 1 30/06/2021 John E Almond Natura Viva CC CEN Integrated Environmental Management Unit 03/07/2021 - 15:01
Phase 1a AIA Extension of Electrical Grid Corridor Impofu Wind Farms Phase 1a Archaeological Impact Assessment Proposed extension of the electrical grid corridor for the Impofu Wind Farms (East, West and North), between the Chatty and DEDISA Substations, Gqeberha (Port Elizabeth), Eastern Cape AIA Phase 1 22/06/2021 Peter Nilssen CEN Integrated Environmental Management Unit 03/07/2021 - 14:50
Postmasburg Solar Energy Facility 2 - Heritage Statement relating to proposed BESS Heritage Statement 01/03/2021 Lita Webley Cape Environmental Assessment Practitioners 02/07/2021 - 15:35
Heritage Addendum Letter Final Heritage Addendum Letter Final Heritage Statement 02/07/2021 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 02/07/2021 - 14:45
Heritage Addendum Letter Final Heritage Addendum Letter Final Heritage Statement 02/07/2021 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 02/07/2021 - 14:41
Phase I HIA Ikhuhu Farm PROPOSED IKHUHU POULTRY FARM ON 154 KATLAGTER IN KUTUMBA ESTATE, PRETORIA RURAL WITHIN THE CITY OF TSHWANE METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE, SOUTH AFRICA. HIA Phase 1 23/02/2020 Nkosinathi Godfrey Tomose MOKGOPE CONSULTING CC 01/07/2021 - 14:39
Draft H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine DRAFT 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa, For De Beers Consolidated Mines (Pty) Ltd. Project number DEB-VEN-21-02-03 HIA Phase 1 31/05/2021 Sidney Miller Shangoni Management Services 01/07/2021 - 09:57
Phase HIA Klofendal Nature Reserve PROPOSED INTERPRETATION CENTRE, PARKING AND STAFF QUARTERS FOR KLOOFENDAL NATURE RESERVE IN ROODEPOORT, WITHIN THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG PROVINCE, SOUTH AFRICA. HIA Phase 1 04/02/2020 Nkosinathi Godfrey Tomose IKAMVA Consulting 30/06/2021 - 19:55
PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE. PIA Desktop 30/04/2021 Francois Durand Francois Durand TSX Mining (Pty) Ltd 30/06/2021 - 19:50
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE. PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE ORE, ON PORTION 2 OF FARM EAST 270 IN JOE MOROLONG LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE. AIA Phase 1 30/04/2021 Trust Mlilo Integrated Specialist Services (Pty) Ltd TSX Mining (Pty) Ltd 30/06/2021 - 19:48
HIA for the Proposed SuperChicks Poultry Farm on Portion 68 of the Farm Kameelzynkraal No 547 Phase HIA for the proposed SuperChicks Poultry Farm on Portion 68 of the Farm Kameelzynkraal No 547 HIA Phase 1 30/06/2021 Nkosinathi Tomose MOKGOPE CONSULTING CC 30/06/2021 - 18:29
Mt Frere Police Station A LETTER OF EXEMPTION FOR MT FRERE POLICE STATION HIA Letter of Exemption 13/03/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Habitat Link Consulting (Pty) Ltd 30/06/2021 - 14:49
Constantia Kloof Stormwater Phase 2 HIA HIA Report for the Constantia Kloof Storm water phase2 HIA Phase 2 30/03/2021 Siegwalt Udo Kusel African Heritage Consultants CC African Heritage Consultants CC 30/06/2021 - 11:40
Phase 1 HIA Paledi Mall Phase 4 Expansion Phase 1 HIA Paledi Mall Phase 4 Expansion HIA Phase 1 01/03/2021 Anton Pelser Bokamoso Landscape Architects and Environmental Consultants CC APELSER ARCHAEOLOGICAL CONSULTING 30/06/2021 - 08:26
PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING LOCATED ON THE REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596 PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING LOCATED ON THE REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596. PIA Phase 1 30/04/2021 Francois Durand Francois Durand Integrated Specialist Services (Pty) Ltd 29/06/2021 - 17:38
PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE, COPPER AND IRON ORE LOCATED ON REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596 AND THE REMAINING EXTENT OF FARMJONES NO 595, IN THE HAY MAGISTERIA PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED PROSPECTING OF MANGANESE, COPPER AND IRON ORE LOCATED ON REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596 AND THE REMAINING EXTENT OF FARMJONES NO.595, IN THE HAY MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. AIA Phase 1 30/04/2021 Trust Mlilo Integrated Specialist Services (Pty) Ltd Ndi GEOLOGICAL CONSULTING SERVICES PTY LTD 29/06/2021 - 17:35

Pages

CSV
 
 

Search form