THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 3501 - 3550 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Palaeontological Impact Assessment for the proposed Nquthu Pipeline, east of Dundee, KwaZulu Natal Province | Palaeontological Impact Assessment for the proposed Nquthu Pipeline, east of Dundee, KwaZulu Natal Province | PIA Desktop | 14/03/2021 | Marion Bamford | Prof Marion Bamford | ASHA Consulting(Pty) Ltd | 21/05/2021 - 05:54 |
Heritage Impact Assessment for the proposed water Pipeline, Nqutu Magisterial District Kwa Zulu Natal | Heritage Impact Assessment for the proposed water Pipeline, Nqutu Magisterial District Kwa Zulu Natal | HIA Phase 1 | 12/04/2021 | Jayson Orton, Jaco van der Walt | ASHA Consulting(Pty) Ltd | Ecosphere Environmental Management Services | 21/05/2021 - 05:49 |
PIA for construction of Culvert on L1511 | Palaeontological Impact Assessment for the proposed culverts on Road L1511, Bergville, Okhahlamba Local Municipality, KwaZulu Natal Province | PIA Phase 1 | 20/03/2021 | Marion Bamford | Prof Marion Bamford | Prof Marion Bamford | 20/05/2021 - 13:43 |
AIA FOR THE PROPOSED BERLIN NDEVANA BULK WATER PIPELINE PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) IN THE NDEVANA COMMONAGE FOR THE PROPOSED BERLIN NDEVANA BULK WATER PIPELINE PROJECT, BUFFALO CITY MUNICIPALITY, EASTERN CAPE PROVINCE | AIA Phase 1 | 30/03/2021 | Neels Kruger | Exigo Sustainability | AGES (PTY) Ltd - East London | 20/05/2021 - 09:15 |
HIA PROPOSED RIVERBANK REHABILITATION OF 52 MAIN STREET, BODEREAUX | PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED RIVERBANK REHABILITATION OF 52 MAIN STREET, BODEREAUX WITHIN THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY IN GAUTENG PROVINCE | HIA Phase 1 | 25/11/2020 | Trust Mlilo | Integrated Specialist Services (Pty) Ltd | Johannesburg Roads Agency | 19/05/2021 - 22:16 |
Droogfontein 3 BESS | PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED DROOGFONTEIN 3 SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY LOCATED NEAR KIMBERLEY IN THE SOL PLAATJE LOCAL MUNICIPALITY, FRANCIS BAARD DISTRICT MUNICIPALITY, IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 02/11/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 19/05/2021 - 17:01 |
Obed Nkosi | PHASE 1 HIA REPORT FOR A PROPOSED RESIDENTIAL AND MIXED USE TOWNSHIP DEVELOPMENT AND RELATED INFRASTRUCTURE ON VARIOUS PORTIONS OF THE FARMS BOSCHOEK 385IR & BOSCHFONTEIN 386IR NEAR HEIDELBERG IN THE LESEDI LOCAL MUNICIPALITY OF GAUTENG | HIA Phase 1 | 21/05/2019 | Anton Pelser | A Pelser Archaeological Consulting | AB Enviro Consult CC | 19/05/2021 - 16:35 |
Impumelelo ext 5 | REPORT ON A PHASE 1 HERITAGE ASSESSMENT FOR PROPOSED DEVELOPMENT (IMPUMELELO EXT.5) ON A PORTION OF THE FARM NOOITGEDACHT 294IR NEAR DEVON, GAUTENG PROVINCE | HIA Phase 1 | 18/11/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | AB Enviro Consult CC | 19/05/2021 - 16:26 |
PIA Report for the Transnet Coal Link Upgrade Projects | Palaeontological Impact Assessment: Phase 1 Field study for the Transnet Coal Link Upgrade Projects | PIA Phase 1 | 31/03/2021 | Dr. Heidi Fourie | 19/05/2021 - 14:02 | ||
Vryheid 2x 88 kV Turn-In Power Lines HIA Report | Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE VRYHEID 2X 88KV TURN-IN POWER LINES IN THE ABAQULUSI LOCAL MUNICIPALITY, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 31/03/2021 | J.A. van Schalkwyk | 19/05/2021 - 13:58 | ||
Nzalo 2x 88kV power lines HIA Report | Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE NZALO 2X 88KV TURN-IN POWER LINES NEAR VRYHEID, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 31/03/2021 | J.A. van Schalkwyk | 19/05/2021 - 13:38 | ||
PIA Report for the Transnet Coal Link Upgrade Projects | Palaeontological Impact Assessment: Phase 1 Field study for the Transnet Coal Link Upgrade Projects | PIA Phase 1 | 30/03/2021 | Dr. Heidi Fourie | 19/05/2021 - 13:26 | ||
Nzalo 2x 88kV power lines HIA Report | Phase 1 Cultural Heritage Impact Assessment: TRANSNET COAL LINK UPGRADE PROJECTS: THE PROPOSED CONSTRUCTION OF THE NZALO 2X 88KV TURN-IN POWER LINES NEAR VRYHEID, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 30/03/2021 | J.A. van Schalkwyk | 19/05/2021 - 13:18 | ||
Mining of existing borrow pits, P77 road | Proposed mining of two existing borrow pits for upgrade of road P77, Vulamehlo Local Municipality, KwaZulu-Natal | HIA Phase 1 | 08/03/2021 | Jean Beater | JLB Consulting | ECA CONSULTING | 19/05/2021 - 09:12 |
Botha's Hill SS & SC | A LETTER OF EXEMPTION FOR BOTHAS HILL SERVICE STATION AND SH0PPING CENTRE | HIA Letter of Exemption | 16/05/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Mondli Consulting | 18/05/2021 - 21:16 |
HIA_GEMSBOK | HERITAGE SURVEY OF THE GEMSBOKSPRUIT HOUSING DEVELOPMENT | 18/05/2021 - 14:36 | |||||
PHASE 1 CULTURAL HERITAGE IMPACT ASSESSMENT REPORT | PROPOSED ESKOM ALOE 132KV SUBSTATION AND LILO POWERLINES POLOKWANE LOCAL MUNICIPALITY CAPRICORN DISTRICT LIMPOPO PROVINCE | HIA Phase 1 | 18/06/2020 | Frans Roodt | Vhufa Hashu Heritage Consultancy CC | Vhufa Hashu Heritage Consultancy CC | 18/05/2021 - 12:36 |
HIA_SIK | HERITAGE DESKTOP STUDY OF THE PROPOSED SKHWAHLANE SETTLEMENT PLAN, NKOMAZI LOCAL MUNICIPALITY, MPUMALANGA | 18/05/2021 - 10:59 | |||||
HIA for Reatlegile Lodge | Archaeological Impact Assessment Relating to the Proposed Reatlegile Lodge Near Jane Furse, within the Makhuduthamaga Local Municipality of the Sekhukhune, Limpopo Province, South Africa | Archaeological Specialist Reports | 06/02/2021 | Eric Ndivhuho Mathoho | Millennium Heritage Group (PTY) LTD | 17/05/2021 - 15:34 | |
EIA 446PR - Paleontological Desktop Study | PALEONTOLOGICAL DESKTOP ASSESSMENT FOR THE THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION OF AAA MINING CC FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS IN KIMBERLITE, DIAMONDS GENERAL & DIAMONDS ON THE REMAINING EXTENT OF THE FARM KAMEELDRIFT 285, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE. (NC30/5/1/1/2/12632PR) | PIA Desktop | 24/03/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | Milnex | 17/05/2021 - 14:11 |
EIA446- Heritage Impact Assessment | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Prospecting Right application combined with a Waste License Application for the Prospecting of Diamonds Alluvial (DA), Diamonds in Kimberlite (DK), Diamonds General (D) & Diamonds (DIA) on the remaining extent of the farm Kameeldrift 285, near Hopetown, Thembelihle Local Municipality, Pixley ka Seme District Municipality, Northern Cape Province | HIA Phase 1 | 29/03/2021 | Francois Coetzee | Francois Coetzee | Milnex | 17/05/2021 - 14:06 |
EIA 446PR - Paleontological Desktop Study | PALEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION OF AAA MINING CC FOR THE PROSPECTING OF DIAMONDS ALLUVIAL, DIAMONDS IN KIMBERLITE, DIAMONDS GENERAL & DIAMONDS ON THE REMAINING EXTENT OF THE FARM KAMEELDRIFT 285, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE. (NC30/5/1/1/2/12632PR) | PIA Desktop | 26/03/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | Milnex | 17/05/2021 - 14:04 |
Heritage Walk-Down (Feb2020) | Eland PV Heritage Walk-Down Report (Feb2020) | 15/02/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 17/05/2021 - 13:29 | ||
Dassierand HIA | PHASE 1 HIA FOR PROPOSED SOCIAL HOUSING DASSIERAND TOWNSHIP APAC02136 | Heritage Impact Assessment Specialist Reports | 11/05/2021 | Anton Pelser | 17/05/2021 - 09:53 | ||
VR003: Excavation Report May 2021 | Report on excavations at the archaeological rock shelter site Varsche Rivier 003 (VR003), 2014 - 2016, conducted under HWC permits #X120417JL07 & #16062111AS0622E | Archaeological Permit Report | 10/05/2021 | Teresa Steele, Alex Mackay, Jayson Orton | 17/05/2021 - 09:33 | ||
Permit Report: VR003 Export Permit Case 8015 | Varsche Rivier 003 Sector I lithic and faunal export report 2021 | Export Permit Report | 14/05/2021 | Alex Mackay, Teresa Steele | 17/05/2021 - 09:20 | ||
PIA for Construction of Culvert on L2013 in Bergville | Paleontological Impact Assessment for the proposed Culvert on Road L2013, Bergville, Okhahlamba Local Municipality, KwaZulu Natal Province | PIA Phase 1 | 20/03/2021 | Marion Bamford | Prof Marion Bamford | Prof Marion Bamford | 14/05/2021 - 20:24 |
HIA for Construction of Culvert on L2013 in Bergville | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED CONSTRUCTION OF THREE CULVERTS NEAR BERGVILLE, OKHAHLAMBA LOCAL MUNICIPALITY KWAZULU NATAL. | HIA Phase 1 | 08/03/2021 | Frans Prins | Active Heritage CC | Active Heritage CC | 14/05/2021 - 19:15 |
Trentra Vlaklaagte Phase 1 AIA | A Phase 1 Archaeological Impact Assessment for the Proposed Trentra Mining Development near Kriel, Mpumalanga | AIA Phase 1 | 01/09/2020 | Tobias Coetzee | Tobias Coetzee | Eco Elementum (Pty) Ltd | 14/05/2021 - 13:55 |
Emzinoni HIA Phase 1 | Phase 1 Heritage Impact Assessment Report for the proposed township establishment of 3000 sites on portion of the remainder of portion 6 of the farm Blesbokspruit 150 IS within Govan Mbeki Local Municipality, Gert Sibande District of Mpumalanga Province. | HIA Phase 1 | 27/11/2020 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 14/05/2021 - 10:09 | |
Nqubisini mast | A LETTER OF EXEMPTION FOR TELECOMMUNICTATION TOWERS AT MHLONTLO NATURE RESERVE | HIA Letter of Exemption | 22/03/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Independent Environmental Advisor | 13/05/2021 - 18:01 |
KwaFish Heritage Assessment | KwaFish Heritage Assessment | HIA Phase 1 | 26/02/2021 | Frans Prins | Active Heritage CC | Greenbelt Projects(Pty) Ltd | 13/05/2021 - 16:23 |
Gugwini Palaeontological | Gugwini Palaeontological Assessment | PIA Desktop | 26/02/2021 | Marion Bamford | Prof Marion Bamford | Greenbelt Projects(Pty) Ltd | 13/05/2021 - 13:57 |
Gugwini Road Heritage Assessment | Gugwini Road Heritage Assessment | HIA Phase 1 | Frans Prins | Active Heritage CC | Greenbelt Projects(Pty) Ltd | 13/05/2021 - 13:51 | |
Nigel Road Heritage Impact Assessment | Nigel Road Heritage Impact Assessment | HIA Phase 1 | 24/02/2021 | Frans Prins | Active Heritage CC | Greenbelt Projects(Pty) Ltd | 13/05/2021 - 13:17 |
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on several Portions of the Farms Blaauwbank 505 JQ, Delarey 164 IQ, Delarey 168 IQ, Delarey 171 IQ, Greenway 715 IQ, Malonys Eye 169 IQ, Steenekoppie 153 IQ, Vlakplaats 160 IQ, Wallis Haven 154 IQ, Wolvekrans 156 IQ and Zuikerboschfontein 151 IQ, Magaliesburg, Gauteng | 18/04/2021 | Tobias Coetzee | 13/05/2021 - 13:07 | |||
ARCHAEOLOGICAL DESKTOP STUDY | ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on several Portions of the Farms Golden Valley 621 IQ, Kaalfontein 44 IQ, Koestersfontein 45 IQ, Migalsoord 152 IQ, Rietpoort 395 JQ, Sluis 46 IQ, Vaalbank 512 JQ and Zuikerboschfontein 151 IQ, Magaliesburg, Gauteng | AIA Desktop | 18/04/2021 | Tobias Coetzee | 13/05/2021 - 13:02 | ||
Nyala Heritage Walk-Down Report (Feb2020) | HIA : THE PROPOSED NYALA SOLAR PV FACILITY NEAR WELKOM, FREE STATE PROVINCE | Heritage Study | 01/02/2020 | Jaco van der Walt | HCAC Heritage Consultants | Savannah Environmental (Pty) Ltd | 13/05/2021 - 12:26 |
Jilongo HIA Phase 1 | Phase 1 Heritage Impact Assessment Report for the proposed township establishment in Jilongo Village within Collins Chabane Local Municipality of Vhembe District, Limpopo Province. | HIA Phase 1 | 28/02/2020 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | 13/05/2021 - 12:22 | |
HIA township establishment | Heritage Impact Assessment for the Township Establishment on the remainder of Portion1 of the Farm Naturelle Lokasie 272 LS | Heritage Impact Assessment Specialist Reports | 27/11/2020 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 13/05/2021 - 11:07 | |
Heritage and Cultural Resources Impact Assessment Report | Heritage Scoping Report, for Inclusion in the Environmental Scoping Report for the Proposed Kalgold Expansion Project, North West Province. | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 12/05/2021 - 21:57 | ||
giyani aia | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Kusile Invest 133 Giyani Gold Mine Project on the demarcated portions of Un-Surveyed State Land of Greater Giyani 891 LT, Giyani, Limpopo | AIA Phase 1 | 20/04/2021 | Tobias Coetzee | Tobias Coetzee | 12/05/2021 - 17:47 | |
Giyani AIA | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Kusile Invest 133 Giyani Gold Mine Project on the demarcated portions of Un-Surveyed State Land of Greater Giyani 891 LT, Giyani, Limpopo | AIA Phase 1 | 20/04/2021 | Tobias Coetzee | Tobias Coetzee | 12/05/2021 - 17:32 | |
Heritage and Cultural Resources Impact Assessment Report | Heritage Scoping Report, for Inclusion in the Environmental Scoping Report for the Proposed Kalgold Expansion Project, North West Province | Heritage Scoping | 01/03/2021 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 12/05/2021 - 13:31 |
Heritage and and Cultural Resources Impact Assessment Report | HERITAGE SCOPING REPORT, FOR INCLUSION IN THE ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED KALGOLD EXPANSION PROJECT, NORTH WEST PROVINCE | 12/05/2021 - 12:52 | |||||
47 Alpine Road, Application Form A | 47 Alpine Road, Application Form A | 12/05/2021 | Nilesh Lakraj | 12/05/2021 - 11:29 | |||
HIA: PROPOSED JUNO WIND ENERGY FACILITY ON DE BOOM 273/REMAINDER, VREDENDAL MAGISTERIAL DISTRICT, WESTERN CAPE | HERITAGE IMPACT ASSESSMENT: PROPOSED JUNO WIND ENERGY FACILITY ON DE BOOM 273/REMAINDER, VREDENDAL MAGISTERIAL DISTRICT, WESTERN CAPE | HIA Phase 1 | 11/06/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | AMDA Developments (Pty) Ltd | 12/05/2021 - 10:06 |
HIA – Eskom Entokozweni and Tekwane North Substations and 132kV Power Lin | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ESKOM ENTOKOZWENI AND TEKWANE NORTH SUBSTATIONS AND 132KV POWER LINE, CITY OF MBOMBELA MUNICIPALITY IN THE MPUMALANGA PROVINCE | HIA Phase 1 | 30/03/2021 | Jaco van der Walt | HCAC Heritage Consultants | Setala Environmental | 12/05/2021 - 10:05 |
AIA Solar PV | REPORT 02107V Halfgewonnen solar AIA_Final | Anton van Vollenhoven | 11/05/2021 - 15:59 | ||||
Heritage Impact Assessment- Akanani Mining | A Phase I Heritage Impact Assessment (HIA) Study for the proposed Akanani Mining (Pty) Ltd project near Mokopane in the Limpopo Province | HIA Phase 1 | 01/03/2020 | Dr Julius CC Pistorius | 11/05/2021 - 15:40 |