THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 7451 - 7500 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | MapID < 2009 | Post date |
---|---|---|---|---|---|---|---|---|
AIA: PROPOSED UPGRADING OF THE CHARLESFORD PUMP STATION AND ASSOCIATED RISING MAIN IN KNYSNA | ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED UPGRADING OF THE CHARLESFORD PUMP STATION AND ASSOCIATED RISING MAIN IN KNYSNA, WESTERN CAPE | AIA Phase 1 | 28/05/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | Sharples Environmental Services cc | CTS_406211 | 27/07/2017 - 11:54 |
AIA: Fisantekraal Roads Project | Archaeological Impact Assessment: Fisantekraal Roads Project | AIA Phase 1 | 01/03/2010 | Andrew Smith | Planning Services | CTS_406210 | 27/07/2017 - 11:12 | |
PALAEONTOLOGICAL MITIGATION REPORT COASTAL MARINE DEPOSITS DWARSKERSBOS | PALAEONTOLOGICAL MITIGATION REPORT COASTAL MARINE DEPOSITS DWARSKERSBOS | PIA Phase 2 | 01/09/2004 | John Pether | Kersbos Strand Development BKS (Pty) Ltd | CTS_406208 | 27/07/2017 - 11:02 | |
Desktop PIA for Namakwa Heavy Minerals Prospecting | PALAEONTOLOGICAL ASSESSMENT (Desktop Study) PROPOSED HEAVY MINERAL SAND PROSPECTING ON ALEXKOR MINE VAST MINERAL SAND (PTY) LTD Namakwa District, Northern Cape | PIA Desktop | 25/07/2017 | John Pether | 26/07/2017 - 13:13 | |||
Letaba Heritage Impact assessment | Letaba Heritage Impact Assessment report | Eskom Holdings SOC Ltd: Land Development and Environment | 25/07/2017 - 18:53 | |||||
Heritage Statement: PROPOSED RAND STREET EXTENSION, GEORGE | Heritage Statement: PROPOSED RAND STREET EXTENSION, GEORGE | Heritage Statement | 25/02/2010 | Stefan de Kock | Perception Heritage Planning | Andrew West Environmental Consultancy | CTS_406138 | 25/07/2017 - 12:53 |
HIA: PROPOSED IMIZAMO YETHU SPORTS GROUND ERF 673 HOUT BAY | Heritage Impact Assessment: PROPOSED IMIZAMO YETHU SPORTS GROUND ERF 673 HOUT BAY | HIA Phase 1 | 01/08/2010 | Ute Seemann | AIKMAN ASSOCIATES HERITAGE MANAGEMENT | CTS_406135 | 25/07/2017 - 12:05 | |
HIA SCREENING REPORT: AECI SOMERSET WEST REDEVELOPMENT OF THE REMAINING WESTERN PRECINCT | HIA SCREENING REPORT: AECI SOMERSET WEST REDEVELOPMENT OF THE REMAINING WESTERN PRECINCT | Heritage Scoping | 01/01/2010 | Rocco Bosman | RB Architects & Heritage Specialist Practitioners | Heartland Properties | CTS_406134 | 25/07/2017 - 11:21 |
AIA: PROPOSED CONSTRUCTION OF A POLICE STATION ON ERF 14702, PORTION OF ERF 558 WELLINGTON | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED CONSTRUCTION OF A POLICE STATION ON ERF 14702, PORTION OF ERF 558 WELLINGTON | AIA Phase 1 | 14/04/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | EnviroDinamik | CTS_406126 | 25/07/2017 - 11:02 |
Desktop Study: ERVEN 38, 3886,4000 and 4001, KRAAIFONTEIN, CITY OF CAPE TOWN | ARCHIVAL AND DEEDS RESEARCH for ERVEN 38, 3886,4000 and 4001, KRAAIFONTEIN, CITY OF CAPE TOWN | AIA Desktop | 01/07/2010 | Bridget O'Donoghue | EnviroDinamik | CTS_406121 | 25/07/2017 - 10:49 | |
Heritage Statement: BRAKKLOOF 443/1, PLETTENBERG BAY | Heritage Statement: BRAKKLOOF 443/1, PLETTENBERG BAY | Heritage Statement | 28/01/2010 | Stefan de Kock | Perception Heritage Planning | CTS_406118 | 25/07/2017 - 10:39 | |
Archaeological Excavation during Construction Work at Railway Station Concourse, Cape Town | EXCAVATION OF ARCHAEOLOGICAL FEATURES DISCOVERED DURING CONSTRUCTION WORK AT THE RAILWAY STATION CONCOURSE, CENTRAL CAPE TOWN | AIA Phase 2 | 01/04/2010 | Dave Halkett | ACO Associates CC | Vidamemoria Heritage Consultants | CTS_406114 | 25/07/2017 - 10:17 |
AIA: PROPOSED AAN DE DOORNS SPORTS FIELD AND COMMUNITY CENTRE WESTERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED AAN DE DOORNS SPORTS FIELD AND COMMUNITY CENTRE WESTERN CAPE | AIA Phase 1 | 15/05/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | BOLAND ENVIRO | CTS_406110 | 25/07/2017 - 10:05 |
AIA: Farm 820 a portion of Portion 1 Somerset West | First Phase Archaeological Investigation: Farm 820 a portion of Portion 1 Somerset West | AIA Phase 1 | 01/02/2010 | Mary Patrick | Cape Archaeological Survey CC | City Of Cape Town Fire Service | CTS_406105 | 25/07/2017 - 09:49 |
AIA: PROPOSED UPGRADE OF THE PIEKENIERSKLOOF PASS, WESTERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED UPGRADE OF THE PIEKENIERSKLOOF PASS, WESTERN CAPE | AIA Phase 1 | 15/03/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | Jeffares & Green - Cape Town | CTS_406100 | 25/07/2017 - 09:21 |
AIA FOR THE PROPOSED PHOSPHORIC ACID PLANT, STANDERTON, MPUMALANGA | AIA FOR THE PROPOSED PHOSPHORIC ACID PLANT, STANDERTON, MPUMALANGA | AIA Phase 1 | 15/12/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Terra Pacis Environmental (Pty) Ltd | 25/07/2017 - 09:14 | |
Heritage Statement: Heritage Significance of Erf 808, Khayelitsha | A Brief Statement Of Heritage Significance in regard to erf 808, Khayelitsha | Heritage Statement | 01/02/2010 | Tin-Roof Heritage Consultancy | CTS_406097 | 25/07/2017 - 09:13 | ||
Heritage Statement: Proposed Residential Development on Erven 3075, 4637 & 4638 | Heritage Statement: Proposed Residential Development on Erven 3075, 4637 & 4638 (Great Brak River) Mossel Bay District | Heritage Statement | 01/12/2009 | Stefan de Kock | Perception Heritage Planning | CTS_406095 | 25/07/2017 - 08:56 | |
HIA: PROPOSED GEORGE SOUTHERN ARTERIAL ROAD | HERITAGE IMPACT ASSESSMENT: PROPOSED GEORGE SOUTHERN ARTERIAL ROAD | HIA Phase 1 | 08/09/2009 | Stefan de Kock | Perception Heritage Planning | Sharples Environmental Services cc | CTS_406094 | 25/07/2017 - 08:50 |
AIA: Koekedouw Dam Pipeline Erf 1001 Ceres | Archaeological Impact Assessment: Proposed Construction of the Koekedouw Dam Pipeline on Erf 1001, Ceres | AIA Phase 1 | 01/11/2009 | Jonathan Kaplan | Agency for Cultural Resources Management | Enviroafrica CC | CTS_406093 | 25/07/2017 - 08:35 |
Heritage Statement: Proposed Riethuise Camp at Sanbona Wildlife Reserve | HERITAGE STATEMENT FOR A PROPOSED RIETHUISE CAMP AT SANBONA WILDLIFE RESERVE, MONTAGU AND SWELLENDAM MAGISTERIAL DISTRICTS | Heritage Statement | 14/01/2010 | Jayson Orton | ACO Associates CC | Sanbona Game Reserve(Pty) Ltd | CTS_406092 | 25/07/2017 - 08:28 |
Maralla Transmission Line Palaeontological Report | PROPOSED 400 KV POWERLINE CONNECTION FOR THE MARALLA WEST & MARALLA EAST WIND ENERGY FACILITIES NEAR SUTHERLAND, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT | PIA Phase 1 | 15/12/2016 | John E Almond | Natura Viva CC | WSP Environmental Pty Ltd - Johannesburg | 24/07/2017 - 16:03 | |
Historical Survey and Structural Investigation 18thC Barn Harmonie Farm 744 Vergelegen | HISTORICAL SURVEY AND STRUCTURAL INVESTIGATIONS OF THE 18th CENTURY BARN (WORKSHOP) ON HARMONIE FARM 744 PORTION OF VERGELEGEN, SOMERSET WEST | Heritage Study | 01/06/2009 | Hennie Vos, Harriet Clift | ArCape | Nicolas Baumann Urban Conservation and Planning | CTS_406077 | 24/07/2017 - 15:56 |
Maralla Transmission Palaeontological Report | PROPOSED 400 KV POWERLINE CONNECTION FOR THE MARALLA WEST & MARALLA EAST WIND ENERGY FACILITIES NEAR SUTHERLAND, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE: PALAEONTOLOGICAL HERITAGE BASIC ASSESSMENT | PIA Phase 1 | 15/12/2016 | John E Almond | Natura Viva CC | WSP Environmental Pty Ltd - Johannesburg | 24/07/2017 - 15:46 | |
HIA Scoping: construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro | Scoping Heritage Impact Assessment for the construction of two 400kV transmission lines between Koeberg 2 and the Stikland substation, Cape Town Metro, Western Cape | Heritage Scoping | 23/10/2009 | Timothy Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 24/07/2017 - 15:33 | |
Hazia Addendum PIA | Hazia Palaeontological Impact Assessment Addendum | PIA Desktop | 24/07/2017 | Dr Heidi Fourie | Dr Heidi Fourie | Munghana Leisure and Tourism (Pty) Ltd | 24/07/2017 - 15:23 | |
HIA Scoping: construction of three 400kV transmission lines between Koeberg 2 and the Omega substation, Cape Town Metro | Scoping Heritage Impact Assessment for the construction of three 400kV transmission lines between Koeberg 2 and the Omega substation, Cape Town Metro, Western Cape | Heritage Scoping | 23/10/2009 | Timothy Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | CTS_406072 | 24/07/2017 - 15:22 |
AIA: MODIFICATIONS AT THE WASTE WATER TREATMENT WORKS ON THE REMAINDER OF FARM 241, PIKETBERG | AN ARCHAEOLOGICAL IMPACT ASSESSMENT OF PROPOSED MODIFICATIONS AT THE WASTE WATER TREATMENT WORKS ON THE REMAINDER OF FARM 241, PIKETBERG | AIA Phase 1 | 01/11/2009 | Dave Halkett, Liesbet Schietecatte | ACO Associates CC | Aurecon South Africa (Pty) Ltd | CTS_406070 | 24/07/2017 - 15:09 |
AIA: PROPOSED "PARMALAT DAM" ON PORTION 103 (A PORTION OF PORTION6) OF THE FARM BOSJESMANSDRIFT 174 | AN INITIAL ASSESSMENT OF THE SITE FOR THE PROPOSED "PARMALAT DAM" ON PORTION 103 (A PORTION OF PORTION6) OF THE FARM BOSJESMANSDRIFT 174 | AIA Phase 1 | 01/08/2009 | Dave Halkett | ACO Associates CC | Storey Engineering (Pty) Ltd | CTS_406068 | 24/07/2017 - 14:58 |
AIA: HEXPACK PACKING SHED (PORTION 8 OF FARM 119 ORCHARD) DE DOORNS WESTERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT DEVELOPMENT OF THE HEXPACK PACKING SHED (PORTION 8 OF FARM 119 ORCHARD) DE DOORNS WESTERN CAPE | AIA Phase 1 | 30/04/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | BOLAND ENVIRO | CTS_406066 | 24/07/2017 - 14:46 |
AIA: BULK ENGINEERING SERVICES & PROPOSED UPGRADING OF EXISTING WASTEWATER TREATMENT WORKS AND BULK WATER SUPPLY FOR KLAPMUTS WESTERN CAPE | ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT OF BULK ENGINEERING SERVICES & PROPOSED UPGRADING OF EXISTING WASTEWATER TREATMENT WORKS AND BULK WATER SUPPLY FOR KLAPMUTS WESTERN CAPE | AIA Phase 1 | 01/01/2010 | Jonathan Kaplan | Agency for Cultural Resources Management | Stellenbosch Municipality | CTS_406064 | 24/07/2017 - 14:36 |
Autumn leaf Palaeontological Addendum | Autumn leaf Palaeontological Impact Assessment Addendum | PIA Desktop | 24/07/2017 | Dr Heidi Fourie | Dr Heidi Fourie | Akani Properties | 24/07/2017 - 14:32 | |
Monitoring Report: 132kv Electricity Cables from Foreshore Switching Station to New Green Point Stadium | A REPORT ON THE ARCHAEOLOGICAL MONITORING OF THE LAYING OF THE 132 KV ELECTRICITY CABLES FROM THE FORESHORE SWITCHING STATION TO THE NEW GREEN POINT STADIUM | Archaeological Monitoring | 01/11/2009 | Dave Halkett | ACO Associates CC | Jeffares & Green - Cape Town | 24/07/2017 - 14:23 | |
PIA: Merweville Waste Water Treatment Works | PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY Merweville Waste Water Treatment Works, Beaufort West Municipality, Western Cape | PIA Desktop | 01/01/2010 | John Almond | Natura Viva CC | CTS_406058 | 24/07/2017 - 14:02 | |
AIA: Merweville Waste Water Treatment Works, Central Karoo | Archaeological Impact Assessment: Proposed upgrade of Merweville Waste Water Treatment Works, Merweville, Beaufort West Municipality, Central Karoo | AIA Phase 1 | 27/01/2010 | Peter Nilssen | Centre for Heritage and Archaeological Resource Management cc | Aurecon South Africa (Pty) Ltd | CTS_406057 | 24/07/2017 - 13:56 |
Norlim powerlines near Taung, North West Province | ESKOM: HIA STUDY FOR THE HOUSEHOLD ELECTRIFICATION INFRASTRUCTURE OF THE PROPOSED 22KV POWERLINE FOR EITHER NORLIM-TAUNG (15KM) AND NORLIM-DIKHUTING (13KM) IN THE BUXTON AREA, GREATER TAUNG MUNICIPALITY, NORTH WEST PROVINCE. | AIA Phase 1 | 24/04/2017 | Trust Mlilo | Sativa Travel and Environmental Consultants | Eskom - NOU | 24/07/2017 - 11:59 | |
Borrow pit D3232 | Proposed new borrow pit (2) on the road d3232, on the Farm Blinkwater 165 LT, near Morebeng (Moekmekaar), Limpopo Province | Heritage Scoping | 24/07/2017 - 08:41 | |||||
Borrow pit 1 D3150 | Proposed new borrow pit (1) on the road d3150, on the remaining extent of the Farm Mosterthoek 163 LT, near Morebeng (Soekmekaar), Limpopo Province | Heritage Scoping | 24/07/2017 - 08:20 | |||||
Koppie Residential Development in Postmasburg | Phase 1 Heritage Impact Assessment of the proposed new Koppie Riemvasmaak Residential development in Postmasburg, NC Province. | HIA Phase 1 | 29/06/2017 | Lloyd Rossouw | National Museum Bloemfontein | Tsantsabane Municipality | 22/07/2017 - 11:12 | |
Greenfields Residential Development in Postmasburg | Phase 1 Heritage Impact Assessment of the proposed new Greenfields Residential development in Postmasburg, NC Province. | HIA Phase 1 | 29/06/2017 | Lloyd Rossouw | National Museum Bloemfontein | Tsantsabane Municipality | 22/07/2017 - 10:21 | |
Borrow pit D3150 | Proposed new borrow pit (1) on the road d3150, on the remaining extent of the farm Mosterthoek 163 LT, near Morebeng (Soekmekaar), Limpopo Province | Heritage Scoping | 21/07/2017 - 15:33 | |||||
Borrow pit 1 D3232 | PROPOSED NEW BORROW PIT (1) ON THE ROAD D3232, ON THE FARM UITSPAN 172 LT, NEAR MOREBENG (SOEKMEKAAR), LIMPOPO PROVINCE | Heritage Scoping | 21/07/2017 - 15:10 | |||||
Borrow pit 3 D3232 | PROPOSED NEW BORROW PIT (3) ON THE ROAD D3232, ON THE FARM BLINKWATER 165 LT, NEAR MOREBENG (SOEKMEKAAR), LIMPOPO PROVINCE | Heritage Scoping | 21/07/2017 - 14:55 | |||||
Borrow pit 2 D3150 | PROPOSED NEW BORROW PIT (2) ON THE ROAD D3150, ON PORTION 1 OF THE FARM MOSTERTHOEK 163 LT, NEAR MOREBENG (SOEKMEKAAR), LIMPOPO PROVINCE | Heritage Scoping | 21/07/2017 - 14:29 | |||||
HIA Proposed Lanseria Outfall Sewer Pipeline, Johannesburg, Gauteng | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED LANSERIA OUTFALL SEWER, JOHANNESBURG | HIA Phase 1 | 17/05/2017 | Jessica Angel | PGS Heritage and Grave Relocation Consultants | Nemai Consulting | 21/07/2017 - 12:19 | |
Borrow pit 1 D13150 | proposed new borrow pit (1) on the road d3150, on the remaining extent of the farm mosterthoek 163 lt, near morebeng (soekmekaar), Limpopo Province | 21/07/2017 - 11:53 | ||||||
Esizayo Powerline heritage Report | HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF THE 132 kV POWERLINE FOR THE ESIZAYO WIND ENERGY FACILITY NEAR LAINGSBURG IN THE WESTERN CAPE | HIA Phase 2 | 02/01/2017 | Dave Halkett | ACO Associates CC | WSP Environmental Pty Ltd - Johannesburg | 21/07/2017 - 10:17 | |
Maralla Powerline Heritage Report | HERITAGE IMPACT ASSESSMENT: PROPOSED CONSTRUCTION OF THE 132Kv POWERLINE FOR THE MARALLA WIND ENERGY FACILITY NEAR SUTHERLAND NORTHERN CAPE | HIA Phase 2 | 02/01/2017 | Dave Halkett | ACO Associates CC | WSP Environmental Pty Ltd - Johannesburg | 21/07/2017 - 09:40 | |
MOTIVATION FOR EXEMPTION FROM UNDERTAKING A FULL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF CULVERTS IN THE KWAMBONAMBI AREA, UTHUNGULU DISTRICT MUNICIPALITY, KWAZULU-NATAL | MOTIVATION FOR EXEMPTION FROM UNDERTAKING A FULL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF CULVERTS IN THE KWAMBONAMBI AREA, UTHUNGULU DISTRICT MUNICIPALITY, KWAZULU-NATAL | HIA Letter of Exemption | 21/10/2016 | Mamoluoane Seliane | HENWOOD & NXUMALO CONSULTING ENGINEERS CC | HENWOOD & NXUMALO CONSULTING ENGINEERS CC | 20/07/2017 - 21:02 | |
Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. | Heritage Impact Walkdown Report for the Construction of a Substation and 132kV Power Line from Heilbron (via Frankfort) to Villiers, Free State Province. | HIA Phase 1 | 19/06/2017 | Stephan Gaigher | G&A Heritage Management Consultants | Eskom Distribution Free State Operating Unit | 20/07/2017 - 14:28 |