THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 2801 - 2850 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
PIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, Nelson Mandela Bay Municipality, Eastern Cape | PIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, Nelson Mandela Bay Municipality, Eastern Cape | PIA Phase 1 | 19/11/2021 | Elize Butler | 19/11/2021 - 11:17 | ||
AIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, Nelson Mandela Bay Municipality, Eastern Cape | AIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, Nelson Mandela Bay Municipality, Eastern Cape | AIA Phase 1 | 19/11/2021 | Karen Van Ryneveld | 19/11/2021 - 11:10 | ||
PIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, NMBM, Eastern Cape | PIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, NMBM, Eastern Cape | PIA Phase 1 | 19/11/2021 | Elize Butler | 19/11/2021 - 10:37 | ||
AIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, NMBM, Eastern Cape | AIA – Despatch Park Mixed-Use Development, Portion 0 of Erf 700, Despatch, NMBM, Eastern Cape | AIA Phase 1 | 19/11/2021 | Karen Van Ryneveld | 19/11/2021 - 10:27 | ||
Keno C Diamonds (Pty) Ltd- NC 12924 PR | BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A PROSPECTING RIGHT SITUATED ON THE REMAINDER OF THE FARM KLEIN TORQUAY 249, IN THE MAGISTERIAL DISTRICT OF HERBERT | 19/11/2021 - 10:09 | |||||
Tweefontein | Tweefontein HIA | HIA Phase 1 | 17/05/2021 | Leonie Marais-Botes | Leonie Marais Heritage Practitioner | EnviroSynergy Consulting (Pty) Ltd | 17/11/2021 - 11:12 |
HIA for Fumani Game Lodge on the farm Hartbeestlaagte 252KR. | Section 24G Rectification Process for Activities Commenced with at Fumani Game Lodge Situated on Portion 4 of the Farm Hartbeestlaagte 252 KR within the Modimolle-Mookgophong Municipality of Waterberg District, Limpopo Province. | HIA Phase 1 | 17/11/2021 | Frans Roodt | 17/11/2021 - 10:27 | ||
Heritage Impact Assessment for the proposed Acorn City Mixed Use Township, Limpopo Province_1 | Heritage Impact Assessment for the proposed Acorn City Mixed Use Township, Limpopo Province | HIA Phase 1 | Jaco van der Walt | Beyond Heritage | Eco8 Environmental Planners | 17/11/2021 - 08:53 | |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | THE PROPOSED MINING RIGHT AMENDMENT APPLICATION ON A PORTION OF PORTION 129 OF THE FARM ZANDFONTEIN 447-JQ WITHIN THE JURISDICTION OF THE MADIBENG LOCAL MUNICIPALITY, MAGISTERIAL DISTRICT OF BRITS, NORTH-WEST PROVINCE | AIA Phase 1 | Munyadziwa Magoma | Holistic Environmental Service | 17/11/2021 - 07:37 | ||
Lephalale PV | HERITAGE SURVEY OF THE PROPOSED LEPHALALE SOLAR PROJECT, LEPHALALE LOCAL MUNICIPALITY WATERBERG DISTRICT, LIMPOPO PROVINCE | HIA Phase 1 | 05/06/2021 | Gavin Anderson, Frans Roodt | Umlando: Archaeological Surveys & Heritage Management | K2021699383 (South Africa) Proprietary Limited | 16/11/2021 - 16:55 |
PIA - 12852PR | Palaeontological Impact Assessment for the proposed Prospecting on the Remainder and Portions 3, 4, 5, 6, 7, 8 & 10 of Farm Ezelsfontein 214, Namakwaland Magisterial District, Northern Cape Province | PIA Desktop | 13/11/2021 | Marion Bamford | University of the Witwatersrand | ASHA Consulting(Pty) Ltd | 16/11/2021 - 16:13 |
Palaeontological Impact Assessment | Palaeontological Impact Assessment: Phase 1 Field Study | PIA Phase 1 | Heidi Fourie | Dr Heidi Fourie | BTW Consulting (Pty) Ltd | 16/11/2021 - 08:33 | |
Heritage Impact Assessment | Phase 1 Cultural Heritage Impact Assessment: GENERAL WASTE DISPOSAL SITE AT THE ESKOM MAJUBA POWER STATION, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE | HIA Phase 1 | 30/04/2018 | J | J A van Schalkwyk | BTW Consulting (Pty) Ltd | 16/11/2021 - 08:29 |
Heritage Screener - Nku PV (Great Karoo) | Desktop Heritage Screening Assessment for the Proposed Nku Solar PV Facility to be developed as part of the Great Karoo Renewable Energy Development near Richmond in the Northern Cape | Heritage Scoping | 01/09/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/11/2021 - 17:19 |
Heritage Screener - Moriri PV (Great Karoo) | Desktop Heritage Screening Assessment for the Proposed Moriri Solar PV Facility to be developed as part of the Great Karoo Renewable Energy Development near Richmond in the Northern Cape | Heritage Scoping | 01/09/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/11/2021 - 17:17 |
Heritage Screener - Kwana PV (Great Karoo) | Desktop Heritage Screening Assessment for the Proposed Kwana Solar PV Facility to be developed as part of the Great Karoo Renewable Energy Development near Richmond in the Northern Cape | Heritage Scoping | 01/09/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/11/2021 - 17:12 |
Heritage Screener: Merino WEF (Great Karoo) | Desktop Heritage Screening Assessment for the Proposed Merino Wind Farm which forms part of the Great Karoo Wind Energy Facility development near Richmond in the Northern Cape | Heritage Scoping | 01/09/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/11/2021 - 17:04 |
Heritage Screener - Angora REF (Great Karoo) | Desktop Heritage Screening Assessment for the Proposed Angora Wind Farm which forms part of the Great Karoo Wind Energy Facility development near Richmond in the Northern Cape | Heritage Scoping | 01/09/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/11/2021 - 17:00 |
2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | 2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | 31/10/2021 | 15/11/2021 - 15:04 | ||||
DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT Venetia Mine | DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT Venetia Mine - Water Management Development | PIA Desktop | 28/09/2021 | Bruce Rubidge | 15/11/2021 - 15:03 | ||
2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | 2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | 31/10/2021 | 15/11/2021 - 15:00 | ||||
1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | 31/05/2021 | 15/11/2021 - 14:58 | ||||
Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | HIA Phase 1 | 31/10/2021 | 15/11/2021 - 14:57 | |||
1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project | 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. | HIA Phase 1 | 31/05/2021 | 15/11/2021 - 14:54 | |||
Newmarket Housing HIA for comment | Newmarket Social Housing Integrated Phase 1 Heritage Impact Assessment Submitted in Terms of Section 38(3) of the NHRA (1999): Newmarket Housing Development, Newmarket Street, Woodstock, Erf 14888-0-1 | HIA Phase 1 | 16/11/2021 | Mike Scurr, Katie Smuts, Wendy Wilson | Rennie Scurr Adendorff | GladAfrica Consulting (Pty) Ltd | 15/11/2021 - 14:22 |
CMP Voortrekker Monument | A BASIC CULTURAL HERITAGE MANAGEMENT PLAN FOR THE VOORTREKKER MONUMENT AND NATURE RESERVE, PRETORIA | Conservation Management Plan | 09/12/2021 | Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Voortrekker Monument and Nature Reserve | 15/11/2021 - 12:47 |
Heritage Scoping: Phakwe Richards Bay Gas Power 3 2000 MW Combined Cycle Gas to Power Plant (PRBGP3) | Heritage Scoping Report and Letter of Exemption: Proposed Phakwe Richards Bay Gas Power 3 2000 MW Combined Cycle Gas to Power Plant (PRBGP3), Richards Bay | HIA Letter of Exemption | 15/11/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 15/11/2021 - 09:57 |
PIA for the proposed new 33kV/132kV substation & associated infrastructure for the Sutherland & Rietrug WEFs | PROPOSED NEW 132KV POWERLINE, 132KV SWITCHING STATION WITH A 33KV/132KV SUBSTATION AND RELATED INFRASTRUCTURE FOR THE AUTHORISED SUTHERLAND CLUSTER WIND ENERGY FACILITIES ON THE REMAINING EXTENT OF NOOITGEDACHT FARM 148, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | Palaeontological Specialist Reports | 08/11/2021 | John Almond | Natura Viva CC | 15/11/2021 - 09:21 | |
HIA Report for the 33kV/132kV substation and associated infrastructure for the Sutherland & Rietrug WEFs | HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 04/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 15/11/2021 - 09:18 | |
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT | A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG | HIA Phase 1 | 06/08/2021 | 15/11/2021 - 08:55 | |||
PIA for the Proposed new grid infrastructure for the Sutherland & Rietrug WEFs | PROPOSED NEW 132KV POWERLINE, 132KV SWITCHING STATION WITH A 33KV/132KV SUBSTATION AND RELATED INFRASTRUCTURE FOR THE AUTHORISED SUTHERLAND CLUSTER WIND ENERGY FACILITIES ON THE REMAINING EXTENT OF NOOITGEDACHT FARM 148, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE | Palaeontological Specialist Reports | 08/11/2021 | John Almond | Natura Viva CC | 15/11/2021 - 08:29 | |
HIA Report Sutherland & Rietrug WEF Grid Infrastructure | HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 04/11/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | 15/11/2021 - 08:26 | |
AIA for Proposed Cubhu Water Treatment Plant and Pipeline | A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF CUBHU WATER TREATMENT PLANT (WTP) AND 9KM RISING MAIN LINE FROM CUBHU WTP TO EXISTING FOREST RESERVOIR IN UMHLATHUZE LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE | HIA Phase 1 | 15/10/2021 | Trust Mlilo | Sativa Travel and Environmental Consultants | Umhlatuze Local Municipality | 14/11/2021 - 20:02 |
HIA FOR A CAUSTIC-SODA MAKE UP PLANT, GAUTENG | Phase 1 Heritage Impact Assessment Study report for the proposed Caustic -Soda Make up Plant in Ekurhuleni Municipality area of Gauteng Province. | HIA Phase 1 | 11/08/2021 | Mabuda Mmbudziseni Moses | Mulaifa Development Projects cc | 12/11/2021 - 18:25 | |
Heritage Impact Assessment (Nov'21) | Solaris Fields App I - HIA | Heritage Impact Assessment Specialist Reports | 12/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 18:05 |
Heritage Impact Assessment (Nov'21) | Sun Garden App I - HIA | Heritage Impact Assessment Specialist Reports | 12/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 17:43 |
PHASE 1 HIA -MATWABENG | PHASE 1 HIA REPORT FOR THE MATWABENG TOWNSHIP EXPANSION IN THE SETSOTO (SENEKAL) MUNICIPALITY OF THE FREE STATE PROVINCE | HIA Phase 1 | 12/11/2021 - 15:42 | ||||
PIA for Expansion of Infrastructure at 99 Colwyn Drive, Sheffield. | Palaeontological Impact Assessment for the proposed project on 99 Colwyn Drive, Sheffield Beach, North Coast, KwaZulu Natal Province | PIA Desktop | 06/07/2021 | Marion Bamford | 12/11/2021 - 12:33 | ||
PIA 57A North BEach Road, Westbrook | Palaeontological Impact Assessment for the proposed residential development on 57A North Beach Road, Westbrook, KwaZulu Natal Province | PIA Desktop | 09/06/2021 | Marion Bamford | 12/11/2021 - 12:15 | ||
PIA 57A North Beach Road | Paleontological Impact Assessment for the Proposed Residential Development on 57A North Beach Road, Westbrook, KZN | PIA Desktop | 09/06/2021 | Marion Bamford | 12/11/2021 - 12:08 | ||
Heritage Impact Assessment (Nov'21) | AppH - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 09:10 |
Heritage Impact Assessment (Nov'21) | Appendix I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 08:53 |
Heritage Impact Assessment (Nov'21) | Appendix I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 08:41 |
Heritage Impact Assessment (Nov'21) | Appendix I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 08:28 |
Heritage Impact Assessment (Nov'21) | Appendix I - Heritage Impact Assessment | Heritage Impact Assessment Specialist Reports | 11/11/2021 | Cherene de Bruyn | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 12/11/2021 - 08:23 |
Phase 1 HIA New Luckhoff SWS | Phase 1 Heritage Impact Assessment of a proposed new Waste Disposal Site in Luckhof, Free State Province. | HIA Phase 1 | 31/08/2021 | Lloyd Rossouw | Paleo Field Services | NSVT Consultants | 11/11/2021 - 20:52 |
HIA Taaiboschfontein EIA | THE PROPOSED NEW CULTIVATION (PIVOT) AREAS ON PORTION 2 OF THE FARM TAAIBOSCHFONTEIN 168, DOUGLAS, SOL PLAATJE LOCAL MUNICIPALITY, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 11/11/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | Environmental Impact Management Services (Pty) Ltd | 11/11/2021 - 12:48 |
HIA report | Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 08/11/2021 | 11/11/2021 - 11:36 | |||
PIA report | PIA report Pampierstad 22 kV line | PIA Desktop | 29/10/2021 | 11/11/2021 - 11:33 | |||
HIA report | Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 08/11/2021 | 11/11/2021 - 11:26 |