FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
PHASE 1 HIA REPORT FOR THE KHUTALA 5 Seam Mining Project PHASE 1 HIA REPORT FOR THE KHUTALA 5 Seam Mining Project MINING PROJECT ON THE FARMS COLOGNE 34 IS, SCHOONGEZICHT 218 IR, LEEUWFONTEIN 219 IR, ZONDAGSVLEI 9 IS AND KLEINZUIKERBOSCHPLAAT 5 IS BETWEEN OGIES AND eMALAHLENI IN MPUMALANGA - APAC020/93 HIA Phase 1 01/10/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Licebo Environmental and Mining (Pty) Ltd 22/09/2021 - 16:02
APPLICATION FOR EXEMPTION FROM A HERITAGE IMPACT ASSESSMENT FOR 128 GRIFFITHS STREET, EQUESTRIA APPLICATION FOR EXEMPTION FROM A HERITAGE IMPACT ASSESSMENT FOR 128 GRIFFITHS STREET, EQUESTRIA HIA Letter of Exemption 17/08/2021 Jaco van der Walt Beyond Heritage Exigent Environmental Management 22/09/2021 - 09:59
Phase 1 PIA Senqu Bulk Water PALAEONTOLOGICAL IMPACT ASSESSMENT (PIA) for the proposed Senqu Rural Water Supply (Project no 1304), near Sterkspruit in the village of Masekeleng, in the Joe Gqabi District Municipality, Eastern Cape Province PIA Phase 1 18/09/2021 Gideon Groenewald Joe Gqabi District Municipality Joe Gqabi District Municipality 21/09/2021 - 22:28
Heritage Report - Nonoti Housing Heritage Impact Assessment of Nonoti Housing Development, Local Municipality, KZN South Africa Heritage Impact Assessment Specialist Reports 30/03/2009 Len van Schalkwyk eThembeni Cultural Heritage eThembeni Cultural Heritage 21/09/2021 - 15:36
Erf 428, Mafikeng PHASE 1 HIA REPORT FOR PROPOSED TOWNSHIP ESTABLISHMENT ON ERF 428 MAFIKENG LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 24/03/2021 Anton Pelser A Pelser Archaeological Consulting AB Enviro Consult CC 21/09/2021 - 11:06
Makhokhoba Road PROPOSED MAKHOKHOBA ROAD, MKHAMBATHINI LOCAL MUNICIPALITY, KWAZULU-NATAL HIA Phase 1 10/03/2021 Jean Beater JLB Consulting 21/09/2021 - 10:58
ATKA EXPLORATION AND MINING (PTY) LTD_NW 10190 MR SCOPING AND ENVIRONMENTAL MANAGEMENT PROGRAMM REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON PORTION 1,2,3,4,5,6,7,8,9,10 & 15 OF FARM THE LEEUWKRAAL 181 IP, PORTION 1,2,3,4,5,6,7,8,9 AND 10 OF FARM BRUIDEGOMSKRAAL 179 IP, PORTION 1 OF FARM DROOGPAN 178 IP, PORTION 1,2,3,4,5,6 AND REMAINDER OF FARM THE DROONPLAAT 177 IP, PORTION 1,2,13 & 14 OF FARM ROODEPAN 180 IP AND REMAINDER OF FARM OOG VAN SCHOONSPRUIT 186, IN THE MAGISTERIAL DISTRICT OF VENTERSDORP 20/09/2021 - 15:42
HIA Mapesu Filling Station Heritage Impact Assessment Report. Proposed Filling Station and Convenience Centre on the Farm Nekel 45MS, Vhembe District Municipality, Limpopo Province HIA Phase 1 20/03/2020 Frans Roodt Hannes Lerm & Associates Town Planners 20/09/2021 - 15:39
Palaeontological Impact Assessment for the proposed clearing for agriculture on farm River 141 MS, west of Musina, Vhembe District, Limpopo Province Palaeontological Impact Assessment for the proposed clearing for agriculture on farm River 141 MS, west of Musina, Vhembe District, Limpopo Province PIA Desktop 19/09/2021 Marion Bamford Prof Marion Bamford Tua Conserva Environmental 20/09/2021 - 12:00
AIA FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON MAHINGAS 258MT, MAHINGA'S EXTENSION 259MT, TSHIKUNDU 262MT, PAGELEE 274MT AND KLUSTER 293MT FOR THE PROPOSED ESKOM MHINGA ROUTE DEVIATION PROJECT, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 20/01/2021 Neels Kruger Exigo Sustainability Kantey & Templer Consulting Engineers 20/09/2021 - 10:51
HIA_RE PTN166 & PTN168 TWEEFONTEIN 915LS Heritage Scoping 20/09/2021 Liesl Stegmann Shasa Heritage Consultants CC AGES (PTY) Ltd - Limpopo 20/09/2021 - 07:59
Mokolo-Crocodile Water Augmentation Project Phase 2 (MCWAP2) Heritage Impact Assessment for the Mokolo-Crocodile Water Augmentation Project Phase 2 (MCWAP2). Hanover 667 KQ, Donkerpoort 344 KQ Portion 10 , Mooivalei 342 KQ Portions 0,10,8,64, & 1, Paarl 124 KQ Portion 6, Leeuwbosch 129 KQ Portion 1, Zondaskuil 130 KQ Portion 0, Diepkuil 135 KQ Portion 2,4 &3, Blaauwpan 133 KQ Portion 0,Ruigtevley 97 KQ Portion 4, 5, 6, Witklip KQ 665 Portion 4, Groenrievier 95 KQ Portion RE/37, Matsulan 98 KQ, Matlabas 94 kQ Portion 2, Haarlem OOST 51 KQ Portion 0,16,13,15 ,13 and Pontes Estates 744 LQ. Waterberg District, Limpopo Province. HIA Phase 1 31/08/2020 Stephan Gaigher G&A Heritage Management Consultants GIBB (Pty) Ltd 19/09/2021 - 22:10
PIA - D2809 Provincial Road Realignment Phase 1 PIA for the permanent realignment of the D2809 Provincial Road PIA Phase 1 31/08/2021 Elize Butler Banzai Environmental (Pty) Ltd CIGroup Environmental (Pty) Ltd 18/09/2021 - 13:57
PIA - NBC Consolidation Project Palaeontological Impact Assessment for the NBC Consolidation Project PIA Phase 1 31/08/2021 Elize Butler Banzai Environmental (Pty) Ltd CIGroup Environmental (Pty) Ltd 18/09/2021 - 13:54
HIA Ergo SEF (Phase 1) HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ERGO MINING SOLAR (PV) ENERGY: PHASE 1 PROJECT, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 15/07/2021 Jaco van der Walt Tshedza 1 Pre Project Development (Pty) Ltd HCAC Heritage Consultants 17/09/2021 - 17:25
Mitigation report - Phase 2 archaeological mitigation for the Nkomati Anthracite Mine MITIGATION PERMIT – INTERIM REPORT Phase 2 archaeological mitigation for the Nkomati Anthracite Mine, Nkomazi Local Municipality, in the Ehlanzeni District Municipality, Mpumalanga Province Archaeological Permit Report 16/09/2021 Wouter Fourie, Nicholas Fletcher PGS Heritage (Pty) Ltd Nkomati Anthracite(Pty)Ltd 17/09/2021 - 16:49
K-WWTW Phase 1 Cultural Heritage Impact Assessment Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED UPGRADE AND EXPANSION OF THE KAMEELMOND WASTEWATER TREATMENT WORKS IN UPINGTON, NORTHERN CAPE PROVINCE HIA Phase 1 24/05/2021 Johnny van Schalkwyk Nemai Consulting 17/09/2021 - 13:51
Palaeontological Impact Assessment for the proposed Eskom West Rand Strengthening Project Phase 2 Palaeontological Impact Assessment for the proposed Eskom West Rand Strengthening Project Phase 2 Pluto Substation to Westgate Substation, Gauteng Province PIA Phase 2 11/09/2021 Marion Bamford AHSA AHSA 17/09/2021 - 11:56
borehole electrification mopani district project no: TZA BJM B416436034 WL electrification of boreholes at mopani district ga-ramoroka limpopo impacted area co-ordinates are Transformer constructed fromBJM78/84A/4 23°30'46.04377"S 30°21'41.26162"E to borehole BJM78/84A/14 :23°30'48.48055"S 30°21'45.75737"E 536 meters line none environmental,burial or heriatage site shall be impacted during the construction regards (pro-con electrical) Non Impact Assessment Related Reports 17/09/2021 Pro-Con Electrical (pty) Ltd Pro-Con Electrical (pty) Ltd 17/09/2021 - 07:29
borehole electrification mopani district project no:B416436031 electrification of boreholes at mopani district ga-ramoroka limpopo impacted area co-ordinates are Transformer constructed from bjm78/84A/12 23°30'45.96151"S 30°21'48.22749"E to borehole bjm78/84A/12/1: 23°30'47.82506"S 30°21'50.43645"E 85meters line none environmental,burial or heriatage site shall be impacted during the construction regards (pro-con electrical) Non Impact Assessment Related Reports 03/09/2021 Pro-Con Electrical (pty) Ltd Pro-Con Electrical (pty) Ltd 17/09/2021 - 07:15
Derby Extension 4 HIA REPORT ON A PHASE 1 HIA FOR THE PROPOSED DERBY EXTENSION 4 TOWNSHIP DEVELOPMENT ON A PORTION OF THE REMAINING EXTENT OF PORTION 25 OF THE FARM RIETFONTEIN 372JQ IN THE KGETLENGRIVIER LOCAL MUNICIPALITY DERBY, NORTHWEST PROVINCE HIA Phase 1 01/06/2020 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 16/09/2021 - 16:16
Itekeng Extension 3 HIA REPORT ON A PHASE 1 HIA FOR THE PROPOSED ITEKENG EXTENSION 3 TOWNSHIP ESTABLISHMENT CLOSE TO BIESIESVLEI IN THE DITSOBOLA LOCAL MUNICIPALITY OF THE NORTHWEST PROVINCE HIA Phase 1 02/11/2020 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 16/09/2021 - 15:47
Screener: Portion 31 of ERF 3083 Pietermaritzburg Desktop Heritage Screening Assessment for the Proposed extension of current waste treatment operations onto vacant industrial land located to the west of the current Alumicor premises located at 31 Barnsley Road, Camps Drift in Pietermaritzburg HIA Letter of Exemption 16/09/2021 Jenna Lavin CTS Heritage 16/09/2021 - 13:57
Archaeological survey on the proposed Casino Site Archaeological survey for Tongaat Hulett on the proposed Casino Site AIA Phase 1 04/06/1997 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Tongaat Hulett 16/09/2021 - 12:12
HIA for the proposed upgrade and increase in the scoping activities at the existing arbor railway siding, Delmas region. Heritage Impact Assessment for the proposed upgrade and increase in the scoping activities at the existing arbor railway siding, Delmas region, Nkangala District Municipality, Mpumalanga province. Heritage Impact Assessment Specialist Reports J.A. van Schalkwyk Gijima Supply Chain Management Services (Pty) Ltd Myezo Environmental Management Services 16/09/2021 - 11:00
COTTONLANDS AGRO PROCESSING COTTONLANDS AGRO PROCESSING EGGLAYING FARM HIA Phase 1 10/08/2021 THOBILE ZIKHATHILE COUNTRY PRIDE TRADING 7 Iyanda Holdings Pty (Ltd) 15/09/2021 - 18:51
VAN NIEKERK BROERS VERVOER CC- NW 10885 MP BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON PORTION OF PORTION 60 OF THE FARM RIETPOORT 518 IQ, IN THE MAGISTERIAL DISTRICT OF POTCHEFSTROOM, NORTH WEST 15/09/2021 - 15:05
Phase 1 for AIA for Rietfontein Mining Permits A Phase 1 Archaeological Impact Assessment for the Proposed Mining Development on Three Portions intersecting Portion 2 of the Farm Rietfontein 314 JS near Middelburg, Mpumalanga AIA Phase 1 15/08/2021 Tobias Coetzee 15/09/2021 - 10:55
Heritage Impact Assessment report for Dwarsloop. Heritage Impact Assessment for the Dwarsloop Township Development, Mpumalanga Province. Heritage Impact Assessment Specialist Reports Jaco van der Walt LEAGO ENVIRONMENTAL SOLUTIONS Nkanivo Development Consultants 15/09/2021 - 07:38
Mahlubi Hard Rock Quarry Proposed Mahlubi Hard Rock Quarry, uMuziwabantu and uMzimkhulu Local Municipalities, KwaZulu-Natal HIA Phase 1 23/08/2021 Jean Beater JLB Consulting EnviroPro 14/09/2021 - 11:16
LETTER FOR HIA EXEMPTION REQUEST LETTER FOR HIA EXEMPTION REQUEST: THE PROPOSED LAEZONIA TOWNSHIP, CITY OF TSHWANE, GAUTENG PROVINCE HIA Letter of Exemption 19/03/2021 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Setala Environmental 14/09/2021 - 10:33
Mediro The Proposed Construction of Six Poultry Houses on Portion 44 of the Farm Lanric 59 JO, Ngaka Modiri Molema District Municipality within the Mahikeng Local Municipality, North West Province HIA Letter of Exemption 07/09/2021 Francois Coetzee Francois Coetzee Francois Coetzee 14/09/2021 - 10:29
Mafoko Brothers The Proposed Construction of a Piggery on Portion 5 of the Farm Verlies 120 JO situated near Lichtenburg in the Ditsobotla Local Municipality, Ngaka Modiri Molema District Municipality, North West Province HIA Letter of Exemption 07/09/2021 Francois Coetzee Francois Coetzee Francois Coetzee 14/09/2021 - 10:06
Palaeontological Desktop Assessment for the Heidelberg Municipal Cemetery Expansion Palaeontological Desktop Assessment for the Proposed Expansion of the Heidelberg Municipal Cemetery located within the Lesedi Local Municipality, Sedibeng District Municipality, Gauteng Province PIA Desktop 08/08/2021 Elize Butler Banzai Environmental (Pty) Ltd Marang Environmental and Associates (Pty) Ltd 14/09/2021 - 09:17
HIA JACKAL CREEK GOLF ESTATE PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR ERF 647 ZANDSPRUIT X 19, JACKAL CREEK GOLF ESTATE, BOUNDARY ROAD, NORTHRIDING, GAUTENG PROVINCE HIA Phase 1 15/11/2018 Leonie Marais Leonie Marais Heritage Practitioner ZANDEVCO (PTY) LTD 14/09/2021 - 08:53
PHASE 1 HIA - DOVHENI DEMARCATION OF SITES A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE DEMARCATION OF SITES AS PART OF TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF THE FARM GOEDVERWACHTING 19LT MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 06/09/2021 Anton Pelser ASSOCIATION OF SOUTH AFRICAN PROFESSIONAL ARCHEAOLOGISTS APELSER ARCHAEOLOGICAL CONSULTING 13/09/2021 - 11:11
PHASE 1 HIA - DOVHENI DEMARCATION OF SITES A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR THE DEMARCATION OF SITES AS PART OF TOWNSHIP ESTABLISHMENT ON THE REMAINDER OF THE FARM GOEDVERWACHTING 19LT MAKHADO LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 06/09/2021 Anton Pelser ASSOCIATION OF SOUTH AFRICAN PROFESSIONAL ARCHEAOLOGISTS APELSER ARCHAEOLOGICAL CONSULTING 13/09/2021 - 10:57
HMP: Sannaspos PV HERITAGE CONSERVATION MANAGEMENT PLAN for the approved Sannaspos Photovoltaic Facility near Bloemfontein in the Free State Province Conservation Management Plan 27/08/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 13/09/2021 - 09:43
PIA: Sannaspos PV Field based palaeontological assessment for the approved Sannaspos Photovoltaic Facility near Bloemfontein in the Free State Province PIA Phase 1 04/08/2021 Marion Bamford Savannah Environmental (Pty) Ltd 13/09/2021 - 09:41
PIA-Rippon Palaeontological Impact Assessment for the proposed development of a cluster of renewable energy facilities between Somerset East and Grahamstown n Eastern Cape Palaeontological Specialist Reports 25/11/2020 Elize Butler Banzai Environmental (Pty) Ltd Savannah Environmental (Pty) Ltd 10/09/2021 - 20:11
HIA-Rippon Rippon Wind Farm, between Makanda and Somerset East, Eastern Cape Heritage Impact Assessment Specialist Reports 29/08/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 10/09/2021 - 20:07
HIA-Hamlett Wind Farm HAMLETT WIND FARM, BETWEEN MAKHANDA AND SOMERSET EAST, EASTERN CAPE Heritage Impact Assessment Specialist Reports 29/08/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 10/09/2021 - 16:29
PIA for Park Rynie Asphalt Plant Palaeontological Impact Assessment for the proposed Park Rynie Asphalt Plant, South Coast, KwaZulu Natal Province PIA Phase 1 25/07/2021 Marion Bamford Prof Marion Bamford EnviroPro 10/09/2021 - 10:47
Heritage Impact Assessment for the Upgrade of the existing access road for the authorised Rietrug WEF Heritage Impact Assessment for the Upgrade of the existing access road for the authorised Rietrug WEF Palaeontological Assessment for the Upgrade of the existing access road for the authorised Rietrug WEF Heritage Impact Assessment Specialist Reports 25/07/2021 Jayson Orton, John Almond ASHA Consulting(Pty) Ltd, Natura Viva CC 10/09/2021 - 09:57
Heritage Impact Assessment for the Upgrade of the existing access road for the authorised Sutherland WEF Heritage Impact Assessment for the Upgrade and Widening of the existing access road for the authorised Sutherland WEF Palaeontological Assessment for the Upgrade and Widening of the existing access road for the authorised Sutherland WEF Heritage Impact Assessment Specialist Reports 25/07/2021 Jayson Orton, John Almond ASHA Consulting(Pty) Ltd, Natura Viva CC 10/09/2021 - 09:41
HIA: Woodhouse PV 1 and 2 Grid Connection HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed grid connection infrastructure to connect the authorised Woodhouse 1 and Woodhouse 2 PV facilities to the Eskom grid near Vryburg, North West Province HIA Phase 1 01/09/2021 Jenna Lavin, William Archer CTS Heritage Savannah Environmental (Pty) Ltd 10/09/2021 - 09:08
PALAEONTOLOGICAL ASSESSMENT KENHARDT ACCESS ROAD PALAEONTOLOGICAL ASSESSMENT: PROPOSED EXEMPTION FROM FURTHER SPECIALIST PALAEONTOLOGICAL STUDIES Proposed integrated access road to authorised Scatec Solar photovoltaic energy facilities on Remaining Extent and Portion 4 of Onder Rugzeer Farm 168 near Kenhardt, Northern Cape Province PIA Desktop 18/12/2020 John Almond Natura Viva CC Kenhardt Access Road (Pty) Ltd 10/09/2021 - 09:00
HERITAGE IMPACT ASSESSMENT: PROPOSED KENHARDT ACCESS ROAD HERITAGE IMPACT ASSESSMENT: PROPOSED ACCESS ROAD ON THE REMAINDER AND PORTION 4 OF THE FARM ONDER RUGZEER 168, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. HIA Phase 1 18/12/2020 Jayson Orton ASHA Consulting(Pty) Ltd Kenhardt Access Road (Pty) Ltd 10/09/2021 - 08:56
Gamma Power Line BA Heritage Impact Report 09/09/2021 - 15:14
Gamma HIA Gamma Power Line BAR Heritage Impact Assessment 09/09/2021 - 15:06

Pages

CSV
 
 

Search form