THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 2951 - 3000 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Mbeki Sun Heritage Report | Heritage Studies for Mbeki Sun | Heritage Impact Assessment Specialist Reports | 09/10/2019 | A Abzhanov | HMS Auckland and HMS Londondery | Crane Registered Quantity Surveyors | 07/10/2021 - 15:54 |
PIA Prt350 THE WILLOWS | Paleontological Impact Assessment: Phase 1: Field Study of Portion 350 of the Farm The Willows 340-JR, City of Tshwane – Gauteng. By Dr. Fourie, H. Dr heidicindy@yahoo.com 012 322 7632/079 940 6048. Commissioned by: A. Pelser Archaeological Consulting cc. 833B St Bernard Street, Garstfontein, 0081. 083 459 3091 Ref: Pending. 2021/08/30)] | PIA Phase 1 | 30/09/2021 | Dr Heidi Fourie | Dr Heidi Fourie | PIERRE JOUBERT LANDSCAPE ARCHITECT & ENVIRONMENTAL PLANNER | 07/10/2021 - 14:15 |
HIA Prt350-THE-WILLOWS | A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR RESIDENTIAL DEVELOPMENT ON PORTION 350 OF THE FARM THE WILLOWS 350JR TSHWANE METROPOLITAN AREA, GAUTENG. For: Pierre Joubert Professional Landscape Architect & Environmental Planner [15 Marikana Street, WIERDAPARK, CENTURION, 0157]. REPORT: APAC021/71. by: APAC – APELSER ARCHAEOLOGICAL CONSULTING (Accredited member of ASAPA) , September 2021 .Member: AJ Pelser BA (UNISA), BA (Hons) (Archaeology), MA (Archaeology) [WITS]. [P.O.BOX 73703 LYNNWOOD RIDGE0040 Tel: 083 459 3091 Fax: 086 695 7247 Email: apac.heritage@gmail.com Comprehensive and Professional Solutions for all Heritage Related Matters. CK 2006/014630/23 VAT NO.: 4360226270. | HIA Phase 1 | 30/09/2021 | Anton Pelser | Anton Pelser | PIERRE JOUBERT LANDSCAPE ARCHITECT & ENVIRONMENTAL PLANNER | 07/10/2021 - 14:10 |
Phase 1 Heritage Impact Assessment | Bluegum Bosch Shopping Mall | HIA Phase 1 | 01/09/2021 | Lloyd Rossouw | Paleo Field Services | 07/10/2021 - 11:49 | |
Mnambithi Straffontein PIA | Palaeontological Impact Assessment for the Mining Rights Application for Mnambithi Straffontein Colliery, southwest of Kendal, Mpumalanga Province | PIA Phase 2 | 13/06/2021 | Prof Marion Bamford | Prof Marion Bamford | Eco Elementum (Pty) Ltd | 07/10/2021 - 07:32 |
Mnambithi Straffontein - Delmas - Phase 1 AIA | Phase 1 Archaeological Impact Assessment for the Proposed Mnambithi Straffontein Mining Project on Portion 4 of the Farm Straffontein 252 IR, Delmas, Mpumalanga | AIA Phase 1 | 16/07/2021 | Tobias Coetzee | Tobias Coetzee | Eco Elementum (Pty) Ltd | 07/10/2021 - 07:21 |
UCD6587 - Draft EIA Appendix L (Heritage) | Heritage Impact Assessment: Environmental Regulatory Process for the Middeldrift Resources within the Existing New Clydesdale Colliery Mining Right, Nkangala Magisterial District, Mpumalanga Province | HIA Phase 1 | 28/06/2021 | Shannon Hardwick, Johan Nel | Digby Wells Environmental | Universal Coal (Pty) Ltd | 06/10/2021 - 18:48 |
PAL6882 - BAR Appendix E (HBAR Addendum) | Environmental Authorisation Process for the Moorddrift Prospecting Right Application Heritage Basic Assessment Report Addendum | HIA Phase 1 | 02/07/2021 | Shannon Hardwick, Johan Nel | Digby Wells Environmental | PalRho Exploration (Pty) Ltd | 06/10/2021 - 18:21 |
PAL6882 - BAR Appendix E (HBAR) | Environmental Authorisation Process for the Moorddrift Prospecting Right Application Heritage Basic Assessment Report | HIA Phase 1 | 02/07/2021 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | PalRho Exploration (Pty) Ltd | 06/10/2021 - 18:19 |
UCD6802 - Draft EIA Appendix M (HIA) | Heritage Impact Assessment: Proposed Arnot South Coal Mining Project, located near Hendrina, Mpumalanga Province | HIA Phase 1 | 01/09/2021 | Shannon Hardwick, Johan Nel | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 06/10/2021 - 17:36 |
Bhambayi Housing Project, eThekwini Municipality | Bhambayi Housing Project Phase 1 Extension (Juba Blose), eThekwini Municipality, KwaZulu-Natal | HIA Phase 1 | 26/05/2021 | Jean Beater | JLB Consulting | eThekwini Department of Human Settlements | 06/10/2021 - 16:21 |
Economic Freedom Fighters’ (EFF) – Heritage Day, 24 September 2021, Protest March Request for the Removal of the Kruger Statue, Church Square, Pretoria | Economic Freedom Fighters’ (EFF) – Heritage Day, 24 September 2021, Protest March Request for the Removal of the Kruger Statue, Church Square, Pretoria | 06/10/2021 | Karen Van Ryneveld | 06/10/2021 - 09:34 | |||
Tahiti - Fontein PIA | Proposed rebuilding of the existing Tahiti Fontein (TF) powerline route in the farming area east of the N1 Vaal tollgate, Free State PALAEONTOLOGICAL IMPACT ASSESSMENT | PIA Phase 1 | 03/10/2021 | JF Durand | Vhubvo Archaeo-Heritage Consultants | Eskom - FSOU | 05/10/2021 - 16:53 |
Tahiti - Fontein PIA | Proposed rebuilding of the existing Tahiti Fontein (TF) powerline route in the farming area east of the N1 Vaal tollgate, Free State PALAEONTOLOGICAL IMPACT ASSESSMENT | PIA Phase 1 | 03/10/2021 | JF Durand | Vhubvo Archaeo-Heritage Consultants | Eskom - FSOU | 05/10/2021 - 16:47 |
Tahiti - Fontein PIA | Proposed rebuilding of the existing Tahiti Fontein (TF) powerline route in the farming area east of the N1 Vaal tollgate, Free State PALAEONTOLOGICAL IMPACT ASSESSMENT | PIA Phase 1 | 03/10/2021 | JF Durand | Vhubvo Archaeo-Heritage Consultants | Eskom - FSOU | 05/10/2021 - 16:35 |
Palaeontological Impact Assessment: Desktop Study: Quarry 4 | Environmental Impact Assessment Process for the Proposed Mining of Quarry 4 Associated with the Upgrade of National Road R573 (Moloto Road), Gauteng Province. Palaeontological Impact Assessment: Desktop Study | PIA Desktop | 06/07/2020 | Dr Heidi Fourie | Dr Heidi Fourie | 01/10/2021 - 21:23 | |
Phase 1 Cultural Heritage Impact Assessment:Quarry 4 | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED ESTABLISHMENT OF QUARRY 4 FOR SOURCING MATERIAL TO BE USED FOR THE UPGRADE OF SECTION 1 OF NATIONAL ROAD R573 (MOLOTO ROAD), GAUTENG PROVINCE | HIA Phase 1 | 30/05/2020 | J van Schalkwyk | J van Schalkwyk | 01/10/2021 - 21:19 | |
Desktop Palaeontological Impact Assessment | Environmental Impact Assessment Process for the Proposed Mining of Quarry 5 Associated with the Upgrade of National Road R573 (Moloto Road), Gauteng Province. Palaeontological Impact Assessment: Desktop Study | PIA Phase 1 | 07/07/2020 | Dr Heidi Fourie | GA Environment (Pty) Ltd | 01/10/2021 - 18:08 | |
Desktop Palaeontological Impact Assessment | Environmental Impact Assessment Process for the Proposed Mining of Quarry 5 Associated with the Upgrade of National Road R573 (Moloto Road), Gauteng Province Palaeontological Impact Assessment: Desktop Study | PIA Desktop | 07/07/2020 | Dr Heidi Fourie | GA Environment (Pty) Ltd | 01/10/2021 - 18:04 | |
MPC HIA | STATUS QUO REPORT FOR THE PROPOSED CONSTRUCTION OF 2.5ML RESERVOIR IN JEROME VILLAGE WITHIN COLLINS CHABANE LOCAL MUNICIPALITY OF LIMPOPO PROVINCE. | HIA Phase 1 | 31/01/2021 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | MPC Developers (Pty) Ltd | 01/10/2021 - 16:18 |
Palaeontological Desktop Assessment: Hertzogville Phase 1 Township Development | Palaeontological Desktop Assessments for the proposed Township Developments on Erven 1315 and 1316 AND Erven 848, 1174, 1175 and 2233. | PIA Desktop | 30/08/2021 | Elize Butler | Banzai Environmental (Pty) Ltd | Lefatse EPS (Pty) Ltd t/a GreenRSA (Pty) Ltd | 01/10/2021 - 15:01 |
Phase 1 Archaeological Desktop Study for Malebogo Township | Phase 1 Archaeological Desktop Study for the proposed development of Malebogo Township | AIA Desktop | 30/08/2021 | Sky-Lee Fairhurst | UBIQUE HERITAGE CONSULTANTS | Lefatse EPS (Pty) Ltd t/a GreenRSA (Pty) Ltd | 01/10/2021 - 14:57 |
ARCHAEOLOGICAL DESKTOP STUDY FOR Petrusburg | ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on the Farm Standard Salt Pan 1959 and Portions 1 & 3 of the Farm Witkraal 878, Petrusburg, Free State. | AIA Desktop | 25/09/2021 | Tobias Coetzee | 30/09/2021 - 16:23 | ||
Archaeological Impact Assessment | GLENCORE MERAFE VENTURE OPERATIONS: PROPOSED FOR THE PROPOSED GLENCORE KROONDAL MINE RESIDUE EXPANSION PROJECT, GLENCORE KROONDAL MINE, BOJANALA PLATINUM DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | AIA Phase 1 | 18/03/2021 | Neels Kruger | Exigo3 Sustainability | Glencore Operations South Africa (Pty) Ltd | 30/09/2021 - 15:46 |
Palaeontological Impact Assessment: Desktop Study. Sturdee Energy PPC Slurry Solar Project Mahikeng Local Municipality, Ngaka Modiri District Municipality, North West Province | Palaeontological Impact Assessment: Desktop Study. Sturdee Energy PPC Slurry Solar Project Mahikeng Local Municipality, Ngaka Modiri District Municipality, North West Province | PIA Desktop | 07/03/2021 | Dr. Heidi Fourie | Dr Heidi Fourie | Coastal & Environmental Services - East London | 29/09/2021 - 14:55 |
HIA FOR THE PROPOSED STURDEE ENERGY PPC SLURRY SOLAR PROJECT, NGAKA MODIRI MOLEMA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | HERITAGE IMPACT ASSESSMENT (HIA) ON PORTIONS OF THE FARM SLURRY 96 JO FOR THE PROPOSED STURDEE ENERGY PPC SLURRY SOLAR PROJECT, NGAKA MODIRI MOLEMA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 04/09/2021 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 29/09/2021 - 14:53 |
Palaeontological Impact Assessment: Desktop Study. Sturdee Energy PPC Dwaalboom Solar Project, Thabazimbi Local Municipality, Waterberg District Municipality, Limpopo Province | Palaeontological Impact Assessment: Desktop Study. Sturdee Energy PPC Dwaalboom Solar Project, Thabazimbi Local Municipality, Waterberg District Municipality, Limpopo Province | PIA Desktop | 05/03/2021 | Dr. Heidi Fourie | Dr Heidi Fourie | Coastal & Environmental Services - East London | 29/09/2021 - 14:40 |
HIA FOR THE PROPOSED STURDEE ENERGY PPC DWAALBOOM SOLAR PROJECT, THABAZIMBI LOCAL MUNICIPALITY, LIMPOPO PROVINCE | HERITAGE IMPACT ASSESSMENT (HIA) ON PORTIONS OF THE FARMS SCHOONGEZICHT 238KP AND JAKHALSKRAAL 239KP FOR THE PROPOSED STURDEE ENERGY PPC DWAALBOOM SOLAR PROJECT, THABAZIMBI LOCAL MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 04/07/2021 | Neels Kruger | Exigo Sustainability | Coastal & Environmental Services - East London | 29/09/2021 - 14:38 |
Sylvania Turffontein to Buffelsfontein water pipeline | 29/09/2021 - 13:13 | ||||||
AIA Birmingham Mine | AIA Proposed Birmingham Mining Project | AIA Phase 1 | 20/09/2021 | Tobias Coetzee | 29/09/2021 - 12:10 | ||
HIA 12854PR | HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON FARM 632 AND VARIOUS PORTIONS OF FARM MELKBOSCHKUIL 132, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | AIA Desktop | 06/07/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 29/09/2021 - 09:13 |
HIA 12852PR | HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON THE REMAINDER AND PORTIONS 3, 4, 5, 6, 7, 8 & 10 OF FARM EZELSFONTEIN 214, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | AIA Desktop | 06/07/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 29/09/2021 - 08:58 |
Phase 1 AIA: MPUME TO GATE ACCESS ROAD (2.3 KM), | A PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED CONSTRUCTION OF MPUME TO GATE ACCESS ROAD (2.3 KM), WARD 29, MBASHE LOCAL MUNICIPALITY, AMATHOLE DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Phase 1 | 15/09/2021 | Celeste Booth | Booth Heritage Consulting | All Green Environmental Consultant | 29/09/2021 - 07:18 |
ARCHAEOLOGICAL DESKTOP ASSESSMENT: SIPHAFENI ACCESS ROAD | AN ARCHAEOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE SIPHAFENI ACCESS ROAD, SAKHISIZWE LOCAL MUNICIPALITY, CHRIS HANI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Desktop | 31/08/2021 | Celeste Booth | Booth Heritage Consulting | All Green Environmental Consultant | 29/09/2021 - 06:39 |
ARCHAEOLOGICAL DESKTOP ASSESSMENT: REBBELSKLOOF ACCESS ROAD | AN ARCHAEOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF THE REBBELSKLOOF ACCESS ROAD, SAKHISIZWE LOCAL MUNICIPALITY, CHRIS HANI DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Desktop | 31/08/2021 | Celeste Booth | Booth Heritage Consulting | All Green Environmental Consultant | 29/09/2021 - 06:04 |
zenzero exemption letter | LETTER OF EXEMPTION OF HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ZENZERO PIGGERY FOR 50 SOWS, ON NAVALHILL FARM 1, COLENSO. INKOSI LANGALIBALELE LOCAL MUNICIPALITY, UTHUKELA DISTRICT | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Nature's Environmental Agency | 28/09/2021 - 20:32 | ||
Storm water Pipeline along Webster Street | Phase 1 heritage impact assessment (HIA) for the proposed Storm water Pipeline along Webster Street in Polokwane Local Municipality area, Capricorn District, Limpopo Province. | HIA Phase 1 | 31/10/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Nemai Consulting | 28/09/2021 - 20:09 |
zenzero exemption | LETTER OF EXEMPTION OF HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED ZENZERO PIGGERY FOR 50 SOWS, ON NAVALHILL FARM 1, COLENSO. INKOSI LANGALIBALELE LOCAL MUNICIPALITY, UTHUKELA DISTRICT | HIA Letter of Exemption | 11/08/2021 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Nature's Environmental Agency | 28/09/2021 - 11:02 |
izinga | HIA SURVEY OF THE PROPOSED IZINGA DEVELOPMENT, UMHLANGA, KZN | HIA Phase 1 | 25/08/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Wallace and Green | 28/09/2021 - 10:03 |
ARCHAEOLOGICAL DESKTOP ASSESSMENT: MPUME TO GATE ACCESS ROAD (2.3 KM) | AN ARCHAEOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF MPUME TO GATE ACCESS ROAD (2.3 KM), WARD 29, MBASHE LOCAL MUNICIPALITY, AMATHOLE DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | AIA Desktop | 31/08/2021 | Celeste Booth | Booth Heritage Consulting | All Green Environmental Consultant | 28/09/2021 - 06:47 |
Phase I HIA Mapoch | A Phase I Heritage Impact Assessment for the Proposed Dream Resources Prospecting Right Application and Environmental Authorisation on Various Portions of the Farm Mapochsgronde in Elias Motsoaledi Local Municipality within Sekhukhune District Municipality, Limpopo Province, South Africa | HIA Phase 1 | 21/09/2021 | Nkosinathi Godfrey Tomose | IRL South Africa | 27/09/2021 - 12:00 | |
Phase 1 AIA for the proposed Koppie Mining Project | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Koppie Colliery near Bethal, Mpumalanga | AIA Phase 1 | 01/09/2021 | Tobias Coetzee | Tobias Coetzee | Eco Elementum (Pty) Ltd | 27/09/2021 - 09:24 |
P237 Sidewalk | LETTER OF EXEMPTION FOR THE PROPOSED EXTENSION OF THE SIDEWALK ALONG P237 ROAD IN ST. LUCIA, MTUBATUBA LOCAL MUNICIPALITY | HIA Letter of Exemption | 21/09/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Hanslab (Pty) Ltd | 26/09/2021 - 18:20 |
Maloutswa | Archaeological Permit Report | University of Pretoria - Archaic Heritage Project Management | University of Pretoria - Archaic Heritage Project Management | 26/09/2021 - 13:42 | |||
12672PR PIA | PALAEONTOLOGICAL IMPACT ASSESSMENT DANSILE NXIKWE DIAMONDS CC PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING ON A PORTION OF PLOT 516, PLOT 678 AND PLOT 668, PORT NOLLOTH RICHTERSVELD LOCAL MUNICIPALITY, NAMAKWA DISTRICT MUNICIPALITY NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE | PIA Phase 1 | 29/03/2021 | John Pether | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 23/09/2021 - 20:20 |
12672PR HIA | HERITAGE IMPACT ASSESSMENT: PROPOSED PROSPECTING ON PLOTS 516, 678 AND 668, PORT NOLLOTH, RICHTERSVELD MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 20/02/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 23/09/2021 - 20:15 |
Heritage Scoping Report | Heritage Scoping Report Proposed Newcastle Gas Engine Power Plant Newcastle Local Municipality (KZN252), Amajuba DM, KwaZulu-Natal | Heritage Scoping | 25/08/2021 | Len van Schalkwyk | eThembeni Cultural Heritage | SRK Consulting KZN | 23/09/2021 - 16:38 |
179 Moses Kotane Road | Application Form | 16/09/2021 | Patricia Marjorie Emmett | 23/09/2021 - 14:54 | |||
Mafusing 1 Archaeology Site | The MAF 1 site is an archaeological site located in the Eastern Cape province, in the Matatiele region. | Palaeontological Permit Report | 22/09/2021 - 21:15 | ||||
Heritage Impact Assessment for the Proposed Brandvlei P60 Truck Depot, Gauteng Province | Heritage Impact Assessment for the Proposed Brandvlei P60 Truck Depot, Gauteng Province | HIA Phase 1 | 07/07/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Eco Assessments | 22/09/2021 - 16:27 |