Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Bon Espirange substation and 132kv overhead power line for the authorised Roggeveld wind farm project

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Roggeveld Wind Power (Pty) Ltd received environmental authorisation for Phase 1 of the Roggeveld Wind Farm on 12 August 2014. In order to connect the Roggeveld Wind Farm to the high voltage electricity network (grid), an on-site substation (known as the Bon Espirange Substation Eskom Yard) and a new overhead power line is required to be constructed. The Bon Espirange Substation Eskom Yard applied for in this Basic Assessment process will be located directly adjacent to the authorised Bon Espirange Substation IPP Yard (overlapping with the area assessed through the Roggeveld Wind farm EIA). The entire extent of the Bon Espirange Substation, including both the Independent Power Producer (IPP) Yard and the proposed Eskom Yard, is located within the authorised Roggeveld Wind Farm Facility site. The 132kV overhead power line (6-7 km in length) will connect the Bon Espirange Substation to the Eskom Komsberg Substation. The authorised connection for the Roggeveld Wind Farm is no longer viable due to a proposed expansion of the Komsberg Substation. Therefore, the point of connection to the Komsberg Substation has been reconsidered, and the only viable connection solution for the Roggeveld Wind Farm is to connect to the Komsberg Substation on the eastern side of the substation. Limited upgrades might also be required to the Komsberg Substation including but not limited to additional feeder bay, limited access roads and cabling. Any upgrades to the Komsberg Substation would be determined by Eskom at a later stage, but would be within the Komsberg Substation high voltage yard boundary

ApplicationDate: 

Tuesday, March 15, 2016 - 08:47

CaseID: 

9258

OtherReferences: 

CaseReferenceDepartmentApplicationType
14/12/16/3/3/1/1544

Heritage Reports: 

ReferenceList: 

 
 