Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Development of the Bultfontein MainTransmission Substation (up to 400kV) and Overhead Powerline (275kV or 400kV) to support the Bultfontein Cluster of Solar Photovoltaic (PV) facilities located near Bultfontein in the Free State

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

South Africa Mainstream Renewable Power Developments (Pty) Ltd ("Mainstream") is proposing to develop a Main Transmission Substation (up to 400kV) and Overhead Powerline (275kV or400kV) and associated Electrical Grid Infrastructure support the Bultfontein Cluster of Solar Photovoltaic (PV) facilities located near Bultfontein in the Free State Province. The proposed grid connection infrastructure is required to evacuate and feed electricity generated by the PV facility to the national grid.

Expanded_Motivation: 

The proposed development of the Main Transmission Substation (up to 400kV) and overhead powerline (275kV or 400kV) electrical grid infrastructure will support nine SEFs collectively referred to as the “Bultfontein Solar PV Cluster”, with a total combined capacity of up to 960 MW. Each individual SEF within the Bultfontein Solar PV Cluster will connect to the grid by way of its own supporting grid connection infrastructure. The Main Transmission Substation [MTS] (up to 400kV) and it’s associated OHL (275kV or 400kV) is required to evacuate and feed the electricity generated by the Bultfontein Solar PV Cluster into the national grid. The power line will be within a 600m wide corridor (300m on either side of the centre line), and this corridor will be applied to the perimeter of the MTS. Ten (10) separate applications will be submitted for the grid connection infrastructure projects i.e. Nine (9) applications for the 132kV switching stations and 132kV overhead power lines connecting to the MTS and one (1) application for the MTS and 275kV or 400kV overhead power line connecting to the existing Eskom power line. The ten (10) grid connection infrastructure projects are located within the Central Strategic Transmission Corridor. The focus of this application is the proposed development of the Main Transmission Substation (up to 400kV) and Overhead Powerline (275kV or 400kV) and associated electrical grid infrastructure to support the Bultfontein Solar PV Cluster located near Bultfontein in the Free State Province.

ApplicationDate: 

Thursday, August 17, 2023 - 10:11

CaseID: 

22180