Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Draft Basic Assessment Report for the Proposed Ergo Mining Solar Energy Facility, Phase 1: 19.9MW on Farm Witpoortje 117 IR with associated Power Lines, South of Brakpan, Gauteng Province (REF: GP158MREA)

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Proposed ~68ha Solar Photovoltaic Project, with Battery storage and associated 22kV Overhead Power lines, on Portion 183 of Farm Witpoortje 117IR, 17th Road and 10th Street, South of Brakpan, Gauteng.

Expanded_Motivation: 

The need and desirability of the proposed Ergo Solar Energy Facility is two-fold. The mine firstly needs a stable supply of energy to sustainably meet its electricity consumption demands through the proposal of generating clean energy, and secondly, by generating its own power, the mine can alleviate the current pressure on the Eskom grid. The impact of the proposed project on heritage resources is low and any impact to accidental finds can be mitigated to an acceptable level and no further pre-construction mitigation is required based on approval from SAHRA. Furthermore, the socio-economic benefits also outweigh the possible impacts of the development if the correct mitigation measures (i.e. chance find procedure) are implemented for the project

ApplicationDate: 

Friday, September 17, 2021 - 17:49

CaseID: 

17157

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDateContactPerson
Mining Right: GP158MREA
11/10/2021

Heritage Reports: 