Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

PROPOSED BATTERY ENERGY STORAGE SYSTEM AND ASSOCIATED GRID INFRASTRUCTURE AT THE KARUSA WIND ENERGY FACILITY, NORTHERN CAPE

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

Enel Green Power South Africa (Pty) Ltd proposes the construction and operation of a Battery Energy Storage System (BESS) and associated grid infrastructure ~45km south of the town of Sutherland along the R354 and 47km north west of the town of Laingsburg along the R323 in the Northern Cape Province. The project will be located on Farm De Hoop 202 within the Karoo Hoogland Local Municipality which lies within the jurisdiction of the Namakwa District Municipality. The BESS will store and supply dispatchable energy as and when required by the off-taker. The proposed project will include the following infrastructure: A BESS with a capacity of up to 2 000 MWh, inside containers with a footprint of up to 6ha in extent and a maximum height of 3m. Both lithium-ion and Redox-flow technology are being considered for the project, depending on which is most feasible at the time of implementation. Access roads to the BESS (10m in width, approximately 70m long) branching off of the existing roads, and internal roads (up to 8m wide) to be located within the total BESS footprint area. 33kV MV cabling between the BESS and the MV/HV substation and up to 132kV HV cabling to the HV substation Fencing around the BESS for increased security measures. Up to 132kV overhead or underground power line to be connected to the existing Hidden Valley Substation. Temporary laydown area to be located within the BESS footprint. Firebreak to be located within the BESS footprint. A Substation with a maximum height of - HV bus-bar up to10 m max and an HV Building up to 4 m max The general purpose and utilisation of a BESS is to save and store electricity from the network, allowing for a timed release of electricity to the grid when the capacity is required. BESS systems therefore provide flexibility in the efficient operation of the electricity grid through decoupling of the energy supply and demand. The following is being considered within the Basic Assessment process for this project: Buffer around the BESS site of 200m Power line corridor (100m) with 50m either side of centre line Buffer around Hidden Valley Substation of 200m

ApplicationDate: 

Wednesday, March 23, 2022 - 08:52

CaseID: 

18206

OtherReferences: 

ReferenceList: 

 
 