Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

The proposed Construction of Instream Earth-Filled Dam for KZN Department of Agriculture and Rural Development, at ERF No. 1069, Kokstad Research Station

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

Case Type: 

Development Type: 

ProposalDescription: 

The proposed development of the instream earth-filled dam will entail the following features: -In-channel dam to un-named stream -Area occupied by a dam is 1.6ha -Two Spillways (Spillway A= Levelled Spillway & B= Natural Spillway): oLevelled spillway A width of 35.8m and Freeboard of 1,4 m o Natural spillway B width of 89.6m -Distance overland flow is 80m -Core trench width of 14.1m - Core Trench Volume of 808. 69m3 -Base Water Side of 27.18m - Base Dry Side of 18.62m -Earth banks height of 8.56m -Bank Volume of 13 752.43m3 -Total pitching of 4 746,04m2 (Pitching of crest, Upstream Stone Pitching, Downstream Stone Pitching). The project entails construction of 200m(600mmø) abstraction pipeline (dam outlet pipeline) which will join the existing pipeline at (30°30'41.82"S, 29°25'15.14"E) coming from raw water reservoir to Kokstad Research Station WTW.

Expanded_Motivation: 

Currently, the water for KRS farm is abstracted from the nearby spring and stored in the reservoir within the farm. This water from spring is currently not sufficient for agricultural use and consumption, as sometimes the spring dries out during the dry periods, as a result the farm experience sufficient water yield only during wet seasons (summer months). Therefore, in response to the growing urgency to secure adequate and sustainable water supply for the KRS Farm, the KZN DARD proposes the construction of an instream earth filled dam. The proposed in stream earth filled dam will increase the capacity of water supply to KRS farm throughout the year, thus improve capability of research station to conduct its activities for future planned research programmes.

ApplicationDate: 

Friday, May 12, 2023 - 11:32

CaseID: 

21308

OtherReferences: 

ReferenceList: 

Images
Instream Dam Position
Locality of the Instream  Dam
 
 