Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

The proposed development of hydroponics farming in Molote City, North West Province

CaseViews

CaseHeader

Status: 

HeritageAuthority(s): 

ProposalDescription: 

LMC Food Group proposes a project of Hydroponics tunnel Farming in Molote City, North West Province. The proposed hydroponics project will consist of two phases. The project will start off with 20 multispan hydroponic tunnels covering 0.7 ha on a 20 ha property, while the second phase will comprise of another multispan tunnel system measuring at 0.7 ha on a 20ha property, in the future. The proposed project is located on a 20ha portion of Plot 133 where one(1) borehole will be used to pump and provide approximately 35 000 litres per day in ensuring the water requirements in the Hydroponics system. The water will be used for watering the hydroponic plants and for domestic needs. The 20 tunnels will have 2000 seedling trays (3m wide) and will produce cucumber seedlings for sale to other farmers. LMC Food Group proposes a project of Hydroponics tunnel Farming in Molote City, North West Province. The proposed hydroponics project will consist of two phases. The project will start off with 20 multispan hydroponic tunnels covering 0.7 ha on a 20 ha property, while the second phase will comprise of another multispan tunnel system measuring at 0.7 ha on a 20ha property, in the future. The proposed project is located on a 20ha portion of Plot 133 whereone(1) borehole will be used to pump and provide approximately 35 000 litres per day in ensuring the water requirements in the Hydroponics system. The water will be used for watering the hydroponic plants and for domestic needs. The 20 tunnels will have 2000 seedling trays (3m wide) and will produce beetroot, cabbage and spinach seedlings for sale to other farmers. The following is the planned development proposed by LMC Food Group: Phase 1 • Construction of 20 multispan tunnels measuring at 0.7 ha, (each tunnel measuring at 10.6 x30 m2); • Construction of administration offices and Parking Bay (6m x 12m); • Construction of security guard room, toilet & power box (2m x 3m); • Construction of guard sleeping quarters and kitchen (15m x 6m); • Construction of workshop for repairs (40m x 20m); • Tractor Parking Shed (10m x 20m) ; • Construction of Laundry and Shower (12m x 6m); • Tank Floor ( 3m x 6m); and • Construction of Laundry Room ( 12m x 4m); Phase 2 The project will be expanded in the future by constructing another multispan tunnel system measuring at 0.7 hectares on a 20ha property. Please refer to phase one for the specifics.

ApplicationDate: 

Thursday, November 28, 2019 - 11:01

CaseID: 

14630

ReferenceList: 

Images
 
 

Search form