Heritage Cases

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

SAHRA Application Closure

Please note the following concerning applications submitted to the South African Heritage Resources Agency (SAHRA) during the December 2023 to January 2024 period.

The full notice is available here: Notice

Special Notice

Following comments received on the proposed Revised Schedule of Fees for applications made to the South African Heritage Resources Agency (SAHRA), made in terms of Section 25(2)(l) of the National Heritage Resources Act No. 25 of 1999 (NHRA) and published in the Government Gazette of 22 July 2022, SAHRA hereby publishes the final Revised Schedule of Fees for Applications made to SAHRA. Applications for provision of services submitted to the South African Heritage Resources Authority (SAHRA), in terms of the National Heritage Resources Act, No. 25 of 1999 (NHRA) must be accompanied by a payment of the appropriate fee, taking effect from 1 January 2023

Revised Schedule of Fees for Applications made to the South African Heritage Resources Agency (SAHRA)

Upgrade of the N3 Toll Highway - Howick KZN

CaseViews

CaseHeader

HeritageAuthority(s): 

Development Type: 

ProposalDescription: 

The South African National Roads Agency SOC Limited (hereafter referred to as SANRAL) has identified the need to improve road safety and ease road congestion by undertaking the required widening and upgrade of the N3 Toll Road from a current four lane dual carriageway to a six lane dual carriageway road between Cedara (KwaZulu-Natal) interchange (N3-4 km 1, 6) and km 15, 0 in the Umngeni area.

Expanded_Motivation: 

The South African National Roads Agency SOC Limited (hereafter referred to as SANRAL) has identified the need to improve road safety and ease road congestion by undertaking the required widening and upgrade of the N3 Toll Road from a current four lane dual carriageway to a six lane dual carriageway road between Cedara (KwaZulu-Natal) interchange (N3-4 km 1, 6) and km 15, 0 in the Umngeni area. The widening and upgrading will take place inside the existing median, within the current road reserve and no additional land will be required. The works would relate to road, drainage, culvert, bridge and all associated work inside the median. Bridge widening is only anticipated at the Umgeni River as the other structures are wide enough to accommodate the planned road widening in the median. Some of the specific activities that would be undertaken are listed below: • Removal of existing median hedges and grass • Removal of existing concrete line drains. Guard rails and barriers inside the median. • Construction of new storm water connections linking with the existing storm water infrastructure inside the median. • Construction of an additional new carriageway lines in both directions inside the current median. • Construction of retaining structures and barriers at certain points inside the median. • Reconstruction of the median portion at the following areas: • Merrivale Underpass • Merrivale interchange • Cedara College Subway. • Widening of the Umngeni Bridge. • Repairs, refurbishment and strengthening of culvert and bridge structures associated with the road widening. • Clearing, de-silting and cleaning of structures associated with the road widening. N3 Toll Concession (Pty) Ltd (hereafter referred to as N3TC) entered into a 30-year Toll Road Concession Contract with SANRAL for the section of Highway between Heidelberg (Gauteng) to Cedara (KwaZulu-Natal). Over this period, the N3TC is responsible for managing inter alia, the physical asset namely, the N3 Toll Road. N3TC will manage and implement the proposed widening and upgrading of the N3 Toll Road on behalf of SANRAL.

ApplicationDate: 

Wednesday, February 5, 2014 - 19:44

CaseID: 

4730

OtherReferences: 

CaseReferenceDepartmentApplicationTypeDeadlineDateContactPerson
14/12/16/3/3/1/932
14/02/2014

ReferenceList: 

 
 