List of Developments

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 331 - 360 of 12408

Map view of current page items

Heritage Authority: SAHRA, NBKB
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
716 Upington CSP Integration PROPOSED SOLAR PARK INTEGRATION PROJECT AND CONCENTRATING SOLAR POWER PLANT Section 38 (8) -... Electrical Infrastructure 2012-10-24 16:04:00 Returned to Applicant
717 Graspan PV Proposed 90 MW Graspan Photovoltaic (PV) Power Facility, Northern Cape Section 38 (8) -... Solar 2012-10-24 15:51:00 Closed (Approved)
725 Thathong Limestone EMP10560 THATHONG DEVELOPMENT CONSULTING ENVIRONMENTAL MANAGEMENT PLAN SUBMITTED IN TERMS OF SECTION 39 AND... more Section 38 (8) -... Sand Mining 2012-10-26 08:33:00 Studies Pending
727 Yas EMP10492 CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (... more Section 38 (8) -... Minerals 2012-10-26 09:12:00 Closed (Approved)
734 Lot 226 EMP10376 CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (... more Section 38 (8) -... Minerals 2012-10-26 11:28:00 Closed (Approved)
749 Ngqura Manganese Railway Upgrade Area 1 and 3 Nqgura railway upgrade Hotazel to Kimberley and De Aar to Port of Ngqura Section 38 (8) -... Infrastructure 2012-11-01 15:10:00 Closed (Approved)
752 Buchuberg EMP 10056 CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (... more Section 38 (8) -... Mining 2012-11-02 14:24:00 Closed (Approved)
753 PRIESKA'S POORT EMP 10414 CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (... more Section 38 (8) -... Mining 2012-11-02 15:15:00 Studies Pending
755 Schans EMP 10475 CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (... more Section 38 (8) -... Mining 2012-11-05 08:49:00 Studies Pending
758 Constantia EMP 10275 CONSULTATION IN TERMS OF SECTION 40 OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 2002, (... more Section 38 (8) -... Mining 2012-11-05 10:40:00 Studies Pending
Heritage Authority: Amafa
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
718 Clairwood Logistics Park Capital Property proposes to construct a Logistics Distribution Park and associated structures... more Section 38 (8) -... Commercial, Roadworks, Electrical Infrastructure, Municipal Infrastructure 2012-10-18 08:54:00 DRAFT
720 Schrordrs Foundry Proposed steel foundry on Portion D of Lot 183 New Hanover, uMshwati, uMgungundlovu Municipality,... more Section 38 (8) -... Industrial - Heavy 2012-10-25 11:35:00 For Noting
Heritage Authority: SAHRA
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
721 Alkmaar Industrial Park Alkmaar Industrial Park Section 38 (8) -... Industrial - Light 2012-10-25 17:34:00 Studies Pending
723 Filling Station Erf 15673 Stretford BAR Construction of a Filling Station on Erf 15673, Stretford, Orange Farm, Johannesburg Development Commercial 2012-10-16 08:47:00 Closed (Approved)
724 Brentwood Boulevard Centre Basic Assessment Process: Brentwood Boulevard Shopping Centre, Benoni Development Commercial 2012-10-26 09:00:00 Closed (Approved)
728 Klipfontein 268 JR Prospecting Platinum Group Metals Prospecting on Klipfontein 268 JR REFERENCE NO: GP 30/5/1/2/2(349) PR Section 38 (1) -... Mining 2012-10-25 09:19:00 For Noting
729 Spaarwater 171 Prospecting Victoblox (Pty) Ltd has applied for the Prospecting right for gold ore covering surface dumps on... more Section 38 (8) -... Mining 2012-10-26 10:52:00 Studies Pending
730 Vlakfontein 130 IR Prospecting Victoblox (Pty) Ltd has applied for the Prospecting right for gold ore covering surface dumps... more Section 38 (8) -... Mining 2012-10-22 11:08:00 For Noting
731 Poortje 389 IR prospecting Victoblox (Pty) Ltd has applied for the Prospecting right for gold ore covering surface dumps on... more Section 38 (8) -... Mining 2012-10-22 11:20:00 Studies Pending
733 Meyersdal Nature Estate Extension 11 Meyersdal Nature Estate Extension 11, gaut 006/12-13/E0030 Section 38 (8) -... Mining 2012-10-23 11:35:00 Studies Pending
739 Portion 20 Tweedraai139 IS Draft Basic Assessment Report: Establishment of a 30 m telecommunication mast for MTN (PTY) Ltd on... more Section 38 (8) -... Telecommunications Infrastructure 2012-10-29 12:00:00 Decision Passed
740 Rooipoort 144 IS Draft Basic Assessment Report: Establishment of a 54m telecommunication mast for MTN (Pty) Ltd on... more Section 38 (8) -... Telecommunications Infrastructure 2012-10-29 14:52:00 Closed (Approved)
741 Section 10 N11 Environmental Basic Assessment process for the proposed national road (N11) road rehabilitation... more Section 38 (8) -... Roadworks 2012-10-29 16:02:00 Closed (Approved)
748 Rooykop 181 JR Request for exemption from a full HIA on behalf of Eagle's Pride Development Agriculture 2012-08-31 09:18:00 Returned to Applicant
757 Char Manufacturing Plant Waste Management Licence Application For Waste Management Activities For The Char Manufacturing... more Section 38 (8) -... Industrial - Heavy 2012-11-05 10:41:00 Closed (Approved)
Heritage Authority: SAHRA, MPHRA
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
738 Changes to surface infrastructure at the Vanggatfontein Coal Mine Changes to the approved surface infrastructure layout at the Vanggatfontein Coal Mine as a result... more Section 38 (8) -... Mining 2012-10-29 08:20:00 Decision Passed
745 Everest North Mining Development ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED EVEREST NORTH PLATINUM MINE Section 38 (8) -... Minerals 2012-10-31 12:47:00 Closed (Approved)
756 Eskom Coal Gasification Project Draft Environmental Scoping Report for the Underground Coal Gasification Project and Associated... more Section 38 (8) -... Mining 2012-11-05 10:39:00 Closed (Approved)
Heritage Authority: SAHRA, NWPHRA
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
742 MV Power Lines - MOL37474328C Medium Voltage (MV) Lines to be Built by Eskom Distribution: Project Name: Minor Retic: MOL37474328C Section 38 (8) -... Electrical Infrastructure 2012-10-29 16:26:00 Studies Pending
744 Phoenix Platinum Mine Tailings Dam Proposed Phoenix Platinum Mine Tailings Dam Section 38 (8) -... Minerals 2012-10-30 15:44:00 Decision Passed

Pages

 
 

Search form