List of Developments

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Displaying 211 - 240 of 12408

Map view of current page items

Heritage Authority: SAHRA, NWPHRA
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
539 MV Power Lines - Wolmaranstad ZJB2N7F Notification of Medium Voltage (MV) Lines to be Built by Eskom Distribution Project Name: Minor... more Section 38 (8) -... Electrical Infrastructure 2012-09-11 08:38:00 Closed (Approved)
563 BRPM EMP Amendment AMENDMENT TO THE BAFOKENG RASIMONE PLATINUM MINE (BRPM) ENVIRONMENTAL MANAGEMENT PROGRAMME (EMPR)... more Section 38 (8) -... Minerals 2012-09-17 08:26:00 Closed (Approved)
Heritage Authority: SAHRA
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
540 Alldays Solar Facility PROPOSED ALLDAYS SOLAR FACILITY PHOTOVOLTAIC (PV)/ CONCENTRATED PHOTOVOLTAIC (CPV) SOLAR ENERGY... more Section 38 (8) -... Solar 2012-09-11 16:01:00 DRAFT
541 Thos Begbie and Company NOTICE OF CONVERSION OF AIR POLLUTION PREVENTION ACT (APPA), 1965 (ACT 45 OF 1965) CERTIFICATE TO... more Section 38 (8) -... Industrial 2012-09-11 17:04:00 Closed (Approved)
548 Kumba Thabazimbi - Mostert Tunnel Cave Heritage Impact Assessment for the Mosters Tunnel Cave (MTC) project Section 38 (8) -... Mining 2012-09-13 13:16:00 Returned to Applicant
551 Belfast-Sunbury Paarde Project Eskom Belfast-Sunbury-Paarde 2 X 0.08km 132 kV Loop-in Loop-out Project Section 38 (8) -... Electrical Infrastructure 2012-09-14 09:23:00 Closed (Approved)
556 Jejane Resort Jejane – Extension of Resort Rights, Portion 1 of the Farm Antwerpen 60 KU and Remainder Portion 1... more Section 38 (8) -... Luxury/Holiday Housing Developments 2012-09-14 10:43:00 Closed (Approved)
558 MEDIUM DENSITY FIBRE PLANT BASIC ASSESSMENT APPLICATION FOR THE MEDIUM DENSITY FIBRE PLANT ON PORTION 60 OF THE FARM LOTHAIR,... more Section 38 (8) -... Industrial 2012-09-14 14:34:00 For Noting
559 Mafikeng 10MW SEF PROPOSED 10MW SOLAR POWER FARM PLANT ON STAND 16066 OF FARM MMABATHO TOWN AND TOWNLANDS 301 IN... more Section 38 (8) -... Solar 2012-09-14 14:38:00 Closed (Approved)
562 De-Bottlenecking Project: Mogalakwena Mine Amendtment to the Environmental Management Programme Report for Anglo American Platinum's De-... more Section 38 (8) -... Mining 2012-09-14 15:58:00 For Noting
564 Mogalakwena Platinum Road Deviation Final Basic Assessment Report for the Proposed Road Deviation (D4380) at Mogalakwena Platinum Mine Section 38 (8) -... Roadworks 2012-09-17 09:40:00 Closed (Approved)
565 Sappi South Africa Waste Management Licence NOTICE OF LICENCE IN TERMS OF SECTION 20 (B) OF THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT (NO... more Section 38 (8) -... Agriculture 2012-09-17 14:13:00 Closed (Approved)
567 Temba Wastewater Treatment Expansion BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SLUDGE LAGOONS AT THE TEMBA WASTEWATER TREATMENT... more Section 38 (8) -... Infrastructure 2012-09-17 15:17:00 Closed (Approved)
568 Vangpan 294LQ Solar Draft Environmental Impact Assessment: Proposed Solar Farm on the Remainder of the Farm Vangpan 294... more Section 38 (8) -... Solar 2012-09-17 15:55:00 Closed (Approved)
573 West St. Bridge RECONSTRUCTION AND MODIFICATION OF WEST ST BRIDGE - MALAMALA Section 38 (8) -... Roadworks 2012-09-19 08:40:00 Closed (Approved)
576 HIA - NGWENYA MINING AND EXPLORATION Heritage Scoping for the proposed mining permit application on a portion of Portion 19 of the farm... more Section 38 (8) -... Mining 2012-09-19 14:41:00 Closed (Approved)
577 Halfgewonnen 190 IS Prospecting NOTICE OF PROSPECTING RIGHT APPLICATION IN TERMS OF SECTION 16 OF THE MINERALS AND PETROLEUM... more Section 38 (8) -... Mining 2012-09-19 14:59:00 Decision Passed
578 HIA - Vlakvarkfontein Colliery Heritage Impact Assessment - Proposed Vlakvarkfontein Colliery Expansion Project, on the farm... more Section 38 (8) -... Mining 2011-06-06 15:34:00 Closed (Approved)
579 Dishaba Backfill Project DRAFT SCOPING REPORT PREPARED IN TERMS OF REGULATION 49 (NO. R527 OF 2004) OF THE MINERAL AND... more Section 38 (8) -... Mining 2012-09-20 10:46:00 For Noting
580 Uitgezocht Telecom Final Basic Assessment Report in terms of the National Environmental Management Act 1998 ("NEMA")... more Section 38 (8) -... Telecommunications Infrastructure 2012-09-19 14:36:00 Closed (Approved)
581 Mauchsberg North Telecom The establishment of a telecommunication mast – 9671 Mauchsberg North Section 38 (8) -... Telecommunications Infrastructure 2012-09-20 15:41:00 Closed (Approved)
582 Witkloof 408 JT Telecom The establishment of a telecommunication mast: T9534 Section 38 (8) -... Telecommunications Infrastructure 2012-09-20 16:59:00 Decision Passed
586 Grasdal 94 IT The establishment of a 54m high lattice mast – T8954 Grasdal Farm Section 38 (8) -... Telecommunications Infrastructure 2012-09-10 14:33:00 Closed (Approved)
Heritage Authority: SAHRA, NBKB
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
543 Olien SEF 371 PROPOSED OLIEN SOLAR ENERGY PROJECT on PORTION 4 OF THE FARM 300 BARKLY WEST, LIME ACRES Section 38 (8) -... Solar 2012-09-12 09:22:00 Closed (Approved)
560 MV Power Lines - Kuruman Notification of Medium Voltage (MV) Lines to be Built by Eskom Distribution Project Name: Minor... more Section 38 (8) -... Electrical Infrastructure 2012-09-14 15:08:00 Closed (Approved)
574 ACWA Power SolarReserve Redstone Solar Thermal Power Plant - Two 132kv Power Line and Switchyard Heritage Impact Assessment - Proposed Construction of two 132kv Power Line and Switchyard... more Section 38 (8) -... Electrical Infrastructure 2012-09-19 13:43:00 Studies Submitted
Heritage Authority: SAHRA, LIHRA
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
566 PLA1677_Platreef_Platinum_Project The proposed Platreef Platinum Project on the farms Bultongfontein 866 LR, Turfspruit 241 KR,... more Section 38 (8) -... Mining 2012-09-17 14:34:00 SUBMITTED
569 EXX564_Thabametsi_Project Heritage Impact Assessment for the Proposed Thabametsi Project, Lephalale, Limpopo Province Section 38 (8) -... Opencast Coal Mining 2012-09-17 17:11:00 Closed (Approved)
Heritage Authority: ECPHRA
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
570 HIA - Mgwali South Water Supply HIA - Proposed Mgwali South Water Supply, iDutywa, Mbhashe Municipality, Amatole District... more Section 38 (1) -... Municipal Infrastructure 2012-09-18 09:19:00 For Noting
Heritage Authority: SAHRA, HWC
CaseIDsort descending CaseRef ProposalDescription Case Type Development Type ApplicationDate Status
584 Dock Road, V&A Waterfront (Gateway Precinct) Phase One development proposal in terms of S 38(4) of the NHRA. The precinct comprises erven 173716... more Section 38 (1) -... Commercial, Luxury/Holiday Housing Developments 2012-09-21 10:53:00 Closed (Approved)

Pages

 
 