THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 1 - 50 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA Zuurwater 62 Boesmanland 75 MW PV 2602 | DRAFT PHASE ONE INTEGRATED HERITAGE IMPACT ASSESSMENT COMPILED IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999) PROPOSED BOESMANLAND SOLAR FARM (75MW): PORTION (300HA) OF THE FARM ZUURWATER 62/6, NAMAQUALAND DISTRICT, NORTHERN CAPE PROVINCE | 01/04/2012 | Stefan de Kock | Perception Heritage Planning | Perception Heritage Planning | 04/06/2012 - 09:02 | |
AIA Zuurwater 62 Boesmanland 75 MW PV 2602 | ARCHAEOLOGICAL REPORT Proposed 75MW Solar Facility on Farm 62 Zuurwater, Aggeneys, Northern Cape Province | AIA Phase 1 | 01/03/2012 | Andrew B Smith | Cape Environmental Assessment Practitioners | 04/06/2012 - 09:17 | |
PIA LOE Zuurwater 62 Boesmanland 75 MW PV 2602 | RECOMMENDED EXEMPTION FROM FURTHER SPECIALIST PALAEONTOLOGICAL STUDIES OR MITIGATION: PROPOSED 75 MW SOLAR FACILITY ON FARM ZUURWATER 62 (PORTIONS 2 & 3) NEAR AGGENEYS, NORTHERN CAPE PROVINCE | PIA Phase 1 | 01/03/2012 | John E Almond | Natura Viva CC | Cape Environmental Assessment Practitioners | 04/06/2012 - 09:23 |
HIA Kabi Vaalkop PV | HIA Phase 1 | 01/04/2012 | Francois P Coetzee | Savannah Environmental (Pty) Ltd | 04/06/2012 - 09:47 | ||
PIA Kabi Vaalkop PV | Palaeontological Impact Assessment for Kabi Vaalkop Solar PV Facility | PIA Phase 1 | 18/05/2012 | Marion Bamford | Savannah Environmental (Pty) Ltd | 04/06/2012 - 09:53 | |
Arriesfontein Solar Plant 2647-2648 PIA | Palaeontological Specialist Study: Desktop Assessment - Proposed Solar Thermal Energy Power Park on Farm Arriesfontein, near Danielskuil, Postmasburg District, Northern Cape Province | PIA Phase 1 | 04/06/2012 | John E Almond | Natura Viva CC | Worley Parsons RSA (Pty) Ltd | 04/06/2012 - 16:45 |
Arriesfontein Solar Plant 2647-2648 HIA | Heritage Scoping: Proposed Arriesfontein Solar Thermal Energy Power Plant near Danielskuil, Northern Cape Province | Heritage Statement | 04/06/2012 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | PGS Heritage and Grave Relocation Consultants | 04/06/2012 - 17:19 |
2nd HIA Transnet Glosam Siding for PMG's Bishop Mine | A 2ND REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE UPGRADE OF TRANSNET’S GLOSAM SIDING FOR PMG’S BISHOP MINE (LOADING BAY) ON PORTION 2 AND THE REMAINDER OF GLOUCESTER 674 NEAR POSTMASBURG, TSANTSABANE LOCAL MUNICIPALITY, NORTHERN CAPE | HIA Phase 1 | 06/06/2012 | Anton Pelser | Kai Batla Holdings (Pty) Ltd | 06/06/2012 - 08:29 | |
AIA for Boichoko Township Development, Postmasburg | A REPORT ON A ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE PROPOSED BOICHOKO TOWNSHIP DEVELOPMENT ON PORTIONS 11 & 12 OF PENS FONTEIN 449, POSTMASBURG, NORTHERN CAPE PROVINCE | AIA Phase 1B | 06/06/2012 | Anton Pelser | 06/06/2012 - 08:35 | ||
AIA for Housing Development Erf 675 Kuruman | A REPORT ON AN ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR A PROPOSED HOUSING DEVELOPMENT ON ERF 675, KURUMAN, IN THE NORTHERN CAPE | AIA Phase 1 | 06/06/2012 | Anton Pelser | 06/06/2012 - 08:43 | ||
Thombo access roads | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THOMBO COMMUNITY ACCESS ROADS IN THE PORT ST JOHNS MUNICIPALITY, EASTERN CAPE | HIA Phase 1 | 01/05/2012 | Frans Prins | Active Heritage CC | CCA ENVIRONMENTAL (Pty) Ltd | 06/06/2012 - 12:18 |
HIA Skuitdrift 10 MW PV - 2604 | DRAFT PHASE ONE INTEGRATED HERITAGE IMPACT ASSESSMENT COMPILED IN TERMS OF SECTION 38(8) OF THE NATIONAL HERITAGE RESOURCES ACT, 1999 (ACT 25 OF 1999) PROPOSED 10MW SOLAR FACILITY: PORTION (45HA) OF THE FARM SKUITDRIFT 426, KENHARDT DISTRICT, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/04/2012 | Stefan de Kock | Perception Heritage Planning | Cape Environmental Assessment Practitioners | 06/06/2012 - 14:33 |
AIA Scuitdrift 10 MW PV - 2604 | ARCHAEOLOGICAL REPORT Proposed 10MW Solar Facility on Farm 426 Skuitdrift, Northern Cape Province | AIA Phase 1 | 01/04/2012 | Andrew B Smith | University of Cape Town - Archaeology | Cape Environmental Assessment Practitioners | 06/06/2012 - 14:41 |
PIA Skuitdrift 10 MW PV - 2604 | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES & MITIGATION: PROPOSED 10 MW SOLAR FACILITY ON FARM SKUITDRIFT 426, KENHARDT DISTRICT, NORTHERN CAPE | Palaeontological Specialist Reports | 01/03/2012 | John E Almond | Natura Viva CC | Cape Environmental Assessment Practitioners | 06/06/2012 - 14:46 |
Middelburg Solar Park 1 and 2 AIA | A Phase 1 AIA for the proposed establishment of the ACED Middelburg Solar park (Park 1 and Park 2) on the Farm Tweetfontein Remiander of Farm 11 (Solar Park 1) and Tweetfontein Portion 4 of Farm 11 (Solar Park 2), Middelburg, Eastern Cape Province | AIA Phase 1 | 01/02/2012 | Albany Museum - Archaeology | Savannah Environmental (Pty) Ltd | 06/06/2012 - 16:00 | |
Middelburg Solar Park 1 and 2 PIA | PIA for the proposed establishment of the Middelberg Solar park, Eastern Cape | PIA Phase 1 | 01/03/2012 | Robert Gess | Savannah Environmental (Pty) Ltd | 06/06/2012 - 16:06 | |
AIA Khumani Housing Erven 83 & 2467, Kuruman | A REPORT ON ARCHAEOLOGICAL IMPACT ASSESSMENTS (AIA’S) FOR PROPOSED HOUSING DEVELOPMENTS ON ERVEN 83 AND 2467, KURUMAN, IN THE NORTHERN CAPE | AIA Phase 1 | 01/06/2012 | Anton Pelser | Erioloba Consulting | 07/06/2012 - 12:16 | |
HIA Voelklip Solar 557 | HERITAGE IMPACT ASSESSMENT REPORT BASIC ASSESSMENT Proposed establishment of the BQR Energy South Africa Photovoltaic Solar Park on a Portion of the Farm Voëlklip near Sprinbok in the Northern Cape Province | HIA Phase 1 | 01/05/2012 | Stephan Gaigher | G & A Heritage | Savannah Environmental (Pty) Ltd | 07/06/2012 - 16:16 |
Scoping Report Garob Wind | Proposed Garob Wind Energy Facility Project, Northern Cape Province (DEA Ref No. 14/12/16/3/3/2/279) | Heritage Statement | 11/06/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 11/06/2012 - 08:47 | |
AIA Styldrift 132kV Power Line | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT INVESTIGATIONS FOR THE PROPOSED ESTABLISHMENT OF 132KV POWER LINE TURN OFF TO STYLDRIFT SUBSTATION WITH IN THE JURISDICTION OF MOSES KOTANE LOCAL MUNICIPALITY, BOJANALA PLATINUM DISTRICT, NORTH WEST PROVINCE | AIA Phase 1 | 01/02/2012 | Eric Ndivhuho Mathoho | Vhufa Hashu Heritage Consultants | 11/06/2012 - 09:42 | |
AIA Leithlo Resort | Cultural Heritage Resources Impact Assessment of Erf 5041 (Portion of Erf 1) Kuruman Municipality Ga-Segonyana Administrative District Northern Cape | AIA Phase 1 | 02/06/2011 | Udo Kusel | African Heritage Consultants CC | AB Enviro Consult CC | 11/06/2012 - 11:59 |
HIA Orlight Aggeneys Aroams PV | HERITAGE IMPACT ASSESSMENT: PROPOSED AGGENEYS PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 1 OF THE FARM AROAMS 57, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/04/2012 | Lita Webley, Dave Halkett | ACO Associates CC | Digby Wells Environmental | 11/06/2012 - 14:17 |
AIA Kenhardt Transmission Lines Orlight | HERITAGE IMPACT ASSESSMENT: PROPOSED KENHARDT PHOTO-VOLTAIC SOLAR POWER PLANT ON REMAINDER OF THE FARM KLEIN ZWART BAST 188, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/04/2012 | Lita Webley, Dave Halkett | ACO Associates CC | Digby Wells Environmental | 11/06/2012 - 14:29 |
AIA Loeriesfontein Orlight Transmission Lines | HERITAGE IMPACT ASSESSMENT: PROPOSED LOERIESFONTEIN PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 5 OF THE FARM KLEIN ROOIBERG 227, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/04/2012 | Lita Webley, Dave Halkett | ACO Associates CC | Digby Wells Environmental | 11/06/2012 - 14:34 |
Makhado Colliery | Phase 1 Heritage Impact Assessment Report: Proposed Makhado Colliery | AIA Phase 1 | 11/06/2012 | R & R Cultural Resource Consultants | Jacana Environmental cc | 11/06/2012 - 16:11 | |
AIA Brakpoort Kliphokkies 75 MW | A Phase 1 Archaeological Impact Assessment for the Proposed 75 MW Brakfontein Photovoltaic Solar Farm, Victoria West, Northern Cape Province | AIA Phase 1 | 01/03/2012 | Celeste Booth | Albany Museum | SRK Consulting (Pty) Ltd - Pretoria | 11/06/2012 - 16:34 |
PIA Brakpoort Kliphokkies 75 MW | Palaeontological Assessment: Combined Desktop and Field-based Study - Proposed Brakpoort Solar Farm on Portion 3 of Farm Kliphokkies No 173 near Vicoria West, Northern Cape Province | Palaeontological Specialist Reports | 01/03/2012 | John E Almond | Natura Viva CC | SRK Consulting (Pty) Ltd - Pretoria | 11/06/2012 - 16:45 |
Residential Eco Estate_Groothoek 278 KQ | Heritage Impact Assessment for the proposed development of a Residential Eco Estate on the farm Groothoek 278 KQ approximately 15km north-east of Thabazimbi, Limpopo Province | AIA Phase 1 | 11/06/2012 | Marko Hutten | Hutten Heritage Consultants | Tekplan Environmental | 11/06/2012 - 16:57 |
Polokwane Residential Development | Phase 1 Heritage Resources Impact Assessment (Scoping & Evaluation) proposed new Residential Development Polokwane, Limpopo | AIA Phase 1 | 13/12/2011 | R & R Cultural Resource Consultants | AGES (PTY) Ltd - Limpopo | 12/06/2012 - 09:36 | |
Bela-Bela Agri Lifestyle Village_Noodhulp 592KR | Cultural Heritage Resources Impact Assessment of Portion Noodhulp 492KR of the Farm Bela-Bela, Limpopo | AIA Phase 1 | 19/11/2008 | Udo Kusel | Environmental Assurance | 12/06/2012 - 12:21 | |
Exxaro Matla Project | A Report on the Heritage Impact Assessment related to the Exxaro Matla Project near Kriel in the Mpumalanga Province | AIA Phase 1 | 01/01/2012 | Anton van Vollenhoven | Archaetnos CC | Ground Water Consulting Services | 12/06/2012 - 12:49 |
De Beers Venetia Prospecting | Heritage Impact Assessment for a prospecting application - Alldays Limpopo Province | AIA Phase 1 | 01/11/2009 | Stephan Gaigher | Gaigher & Associates | De Beers Consolidated Mines - Kimberley Mines | 12/06/2012 - 15:12 |
De Beers Venetia Prospecting | Heritage Impact Assessment for a prospecting application - Alldays Limpopo Province | AIA Phase 1 | 01/11/2009 | Stephan Gaigher | Gaigher & Associates | De Beers Consolidated Mines - Kimberley Mines | 12/06/2012 - 15:55 |
AIA WBJV Maseve Platinum | Archaeological Impact Assessment FOR THE PROPOSED WBJV MASEVE PLATINUM PROJECT ON PORTION 2 OF THE FARM ELANDSFONTEIN 102 JQ AND VARIOUS PORTIONS OF THE FARM FRISCHGEWAAGD 96 JQ | AIA Phase 1 | 30/09/2011 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 12/06/2012 - 17:19 | |
Schoongezicht Colliery | A Report on a Heritage Impact Assessment for Umthombo Schoongezicht Colliery, close to Delmas in the Mpumalanga Province | AIA Phase 1 | 01/04/2012 | Anton van Vollenhoven | Archaetnos CC | Ground Water Consulting Services | 13/06/2012 - 12:20 |
AIA Goegap Sanparks Upgrade | Archaeological Impact Assessment Phase 1 for inclusion in Basic Assessment Report 25/2011: Proposed upgrading of Goegap Nature Reserve, near Springbok, Northern Cape | AIA Phase 1 | 01/02/2012 | McGregor Museum | Van Zyl Environmental Consultants | 13/06/2012 - 12:20 | |
Schurvekop Coal Mine | A Report on a Heritage Impact Assessment for the Schurvekop Coal Mine Project near Bethal in the Mpumalanga Province. | AIA Phase 1 | 01/04/2012 | Anton van Vollenhoven | Archaetnos CC | Ground Water Consulting Services | 13/06/2012 - 12:26 |
Eskom Mantsole | Eskom Mantsole Substation and loop-in-loop line | PIA Desktop | 12/04/2012 | Heidi Fourie | Ditsong Museums of South Africa | Texture Environmental Consultants | 13/06/2012 - 12:52 |
HIA Klein Zwart Bast 2012 | A REPORT ON A HERITAGE IMPACT ASSESSMENT (HIA) FOR A PROPOSED PHOTO-VOLTAIC SOLAR POWER GENERATION PLANT ON KLEIN ZWART BAST 188, KENHARDT DISTRICT, NORTHERN CAPE | HIA Phase 1 | 01/04/2012 | Anton Pelser | Archaetnos CC | EScience Associates (Pty) Ltd | 13/06/2012 - 15:42 |
HIA Tutwa PV | Heritage Impact Assessment Report - Basic Assessment Phase: Proposed Establishment of the Tutwa Solar Energy Facility Located West of Upington on a Portion 4 of the Farm Narries 7, Northern Cape Province | HIA Phase 1 | 07/05/2012 | Stephan Gaigher | G & A Heritage | Savannah Environmental (Pty) Ltd | 14/06/2012 - 10:05 |
HIA Southern Cross PV | Heritage Impact Assessment Report - Basic Assessment Phase: Proposed Establishment of the Southern Cross Solar Energy Facility Located West of Upington on the Farm Southern Cross Farms 425, Northern Cape Province | HIA Phase 1 | 07/05/2012 | Stephan Gaigher | G & A Heritage | Savannah Environmental (Pty) Ltd | 14/06/2012 - 10:06 |
Proposed reconstruction Station Street to Fitzpatrick Street | Fleet Street East London - Proposed reconstruction Station Street to Fitzpatrick Street | Heritage Impact Assessment Specialist Reports | 01/05/2012 | Gillian Vernon | Environmental Impact Management Services (Pty) Ltd | 14/06/2012 - 11:25 | |
HIA Vryburg PV plants | Heritage impact assessment for the PROPOSED DEVELOPMENT OF PHOTOVOLTAIC POWER PLANTS ON FOUR DIFFERENT LOCATIONS IN NORTH WEST AND NORTHERN CAPE PROVINCES | HIA Phase 1 | 01/06/2012 | Johnny Van Schalkwyk | Sonvanger Solar Power Plant (Pty) Ltd., Enviroworks | 15/06/2012 - 09:45 | |
HIA Southern Cross PV amended | HERITAGE IMPACT ASSESSMENT REPORT BASIC ASSESSMENT PHASE Proposed establishment of the Southern Cross Solar Energy Facility located West of Upington on the Farm Southern Farms 425, Northern Cape Province | HIA Phase 1 | 07/05/2012 | Stephan Gaigher | G & A Heritage | Savannah Environmental (Pty) Ltd | 15/06/2012 - 11:34 |
HIA Tutwa PV amended | Heritage Impact Assessment Report - Basic Assessment Phase: Proposed Establishment of the Tutwa Solar Energy Facility Located West of Upington on a Portion 4 of the Farm Narries 7, Northern Cape Province | HIA Phase 1 | 07/05/2012 | Stephan Gaigher | G & A Heritage | Savannah Environmental (Pty) Ltd | 15/06/2012 - 11:36 |
AIA Herbert PV Initial | Archaeological Impact Assessment Phase 1: Proposed Development of PV Power Station at Herbert, near Douglas, Northern Cape | AIA Phase 1 | 01/06/2012 | David Morris | McGregor Museum | Van Zyl Environmental Consultants | 15/06/2012 - 16:15 |
108-110 Vos Land - archaeological monitoring of earth moving activities on erf 687 and erf 688 Cape Town | 108-110 Vos Land - archaeological monitoring of earth moving activities on erf 687 and erf 688 Cape Town | Archaeological Monitoring | 01/01/2006 | Belinda Mutti, Mary Patrick | 16/06/2012 - 08:54 | ||
29 Chiappini Street. Report on a Public Participation Process at Erf 741, Cape Town | 29 Chiappini Street. Report on a Public Participation Process at Erf 741, Cape Town | 07/01/2005 | Mary Patrick, Harriet Clift | Cape Archaeological Survey CC | 16/06/2012 - 08:54 | ||
34 Prestwich street, archaeological monitoring of earth moving activities erf 760, Cape Town | 34 Prestwich street, archaeological monitoring of earth moving activities erf 760, Cape Town | Archaeological Monitoring | 01/01/2006 | Mary Patrick | 16/06/2012 - 08:54 | ||
80 Strand St | 80 Strand St | AIA Phase 1 | 16/06/2012 | Martin Hall | 16/06/2012 - 08:54 |