FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort descending
Amended BOSA Phase 1 Heritage Impact Assessment Report Heritage Impact Assessment for the Proposed Botswana South Africa (BOSA) Transmission Project (Project no. 112581). HIA Phase 1 24/08/2017 Stephan Gaigher G & A Heritage Aurecon - Cape Town 17/08/2020 - 11:56
Amended BOSA Palaeontological specialist assessment: desktop study PROPOSED BOTSWANA-SOUTH AFRICA (BOSA) TRANSMISSION INTERCONNECTION PROJECT: SOUTH AFRICAN SECTOR, NORTH WEST PROVINCE PIA Desktop 10/08/2018 John E. Almond Natura Viva CC Aurecon South Africa (Pty) Ltd 17/08/2020 - 12:11
Heritage Report Upgrading for the upgrading of the Rural Access Road D281 between Volksrust and Daggakraal Heritage Desktop assessment for the Upgrading of Rural Access Road D281 between Volksrust and Daggakraal (17 Km) in the Gert Sibande District of Mpumalanga Province HIA Phase 1 19/04/2016 Wouter Fourie PGS Heritage (Pty) Ltd NCC Environmental Services (Pty) Ltd 17/08/2020 - 12:54
Zandspruit Extensions 93-96 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR PROPOSED ZANDSPRUIT EXTENSIONS 93-96 TOWNSHIP ESTABLISHMENT ON VARIOUS PORTIONS OF THE FARM ZANDSPRUIT 191IQ (SONNEDAL AREA C), GAUTENG - APAC020/14 HIA Phase 1 03/02/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bokamoso Landscape Architects and Environmental Consultants CC 18/08/2020 - 10:40
Zandspruit Extensions 97-103 A PHASE 1 HERITAGE IMPACT ASSESSMENT & REPORT FOR PROPOSED ZANDSPRUIT Extensions 97, 103 and 104 TOWNSHIP ESTABLISHMENTS ON VARIOUS PORTIONS OF THE FARM ZANDSPRUIT 191IQ (SONNEDAL AREA B), GAUTENG - APAC020/13 HIA Phase 1 03/02/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bokamoso Landscape Architects and Environmental Consultants CC 18/08/2020 - 10:50
Inkosi Mkhuphukile High School HIA Report Phase 1 Cultural Heritage Impact Assessment: PROPOSED NKOSI MKUPHUKILE HIGH SCHOOL, ALFRED DUMA LOCAL MUNICIPALITY WITHIN UTHUKELA DISTRICT, KWAZULU-NATAL HIA Phase 1 31/03/2020 J.A. van Schalkwyk 18/08/2020 - 11:10
Inkosi Mkhuphukile High School PIA Report Palaeontological Impact Assessment: Phase 1 Field Study for the Proposed Construction of the New Inkosi Mkhuphukeli Secondary School within Uthukela District Municipality Alfred Duma Local Municipality, Uthukela District Municipality within the Kwa-Zulu Natal Province. PIA Phase 1 11/08/2020 Dr. Heidi Fourie 18/08/2020 - 11:40
Zelpy Mining Right Appliocation Phase 1 Archaeological and Heritage Impact Assessment for Proposed Mining Right Application on the farm Kafferskraal 400 IP, Klerksdorp, in City of Matlosana Local Municipality, North West Province Heritage Impact Assessment Specialist Reports 20/05/2020 Trust Mlilo Integrated Specialist Services Joan Construction and Projects (Pty) Ltd 18/08/2020 - 13:06
Wepcor Mining and Minerals (Pty) Ltd- FS 10298 EM Basic Assessment Report and Environmental Management Programme for a Mining Permit application situated in the remaining extent of the Wepener Dorpsgronden Heritage Impact Assessment Specialist Reports 10/08/2020 18/08/2020 - 14:39
Proof of Correspondence As per interim comment please find the proof of correspondence sent to the Rock Art Research Institute to request comment. No response was received. Non Impact Assessment Related Reports 16/08/2019 Lizinda Dickson Waterberg JV Resources (Pty) Ltd Bateleur Environmental & Monitoring Services (Pty) Ltd 18/08/2020 - 16:44
Mpolweni and Thokozani Cultural Heritage Impact Assessment CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED THOKOZANI MPOLWENI WATER SUPPLY SCHEME, WITHIN THE UMSHWATHI LOCAL AND UMGUNGUNDLOVU DISTRICT MUNICIPALITIES, KWAZULU-NATAL. 26/04/2020 Frans Prins Active Heritage CC 19/08/2020 - 15:40
Mpolweni and Thokozani Palaeontological Impact Assessment Palaeontological Impact Assessment for the proposed Mpolweni and Thokozani Water Supply, near Albert Falls, KwaZulu Natal Province PIA Phase 1 27/04/2020 Marion Bamford Prof Marion Bamford 19/08/2020 - 15:50
Ericure Proposed Coal Mine HIA Heritage Impact Assessment for Ericure Mining Right HIA Phase 1 20/06/2020 Trust Mlilo Integrated Specialist Services (Pty) Ltd Integrated Specialist Services (Pty) Ltd 19/08/2020 - 16:01
PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL PHASE 1 HIA REPORT FOR THE PROPOSED SENWABARWANA MALL DEVELOPMENT ON PORTION 6 OF THE FARM BORKUM 143LS IN SENWABARWANA, LIMPOPO PROVINCE - APAC019/53 HIA Phase 1 01/05/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Molshe Business Solutions 19/08/2020 - 22:32
Rapadi Palaentological Desktop Study Palaentological Desktop Study PIA Desktop 20/06/2020 Eskom - LOU 20/08/2020 - 00:03
HIA For Olifantsnek School Heritage Impact Assessment for Olifantsnek School Heritage Impact Assessment Specialist Reports Prof. Anton van Vollenhoven HydroScience Archaetnos CC 20/08/2020 - 04:56
PHASE 1 HERITAGE IMPACT ASSESSMENT SCOPING REPORT PROPOSED SWAZI MNYAMANE ACCESS BRIDGE,SEALANE, LIMPOPO PROVINCE HIA Phase 1 11/12/2019 Liesl Stegmann-Roodt Shasa Heritage Consultants CC Polygon Environmental Planning CC 20/08/2020 - 11:14
MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT MOTIVATION FOR EXEMPTION FROM FULL PHASE 1 HERITAGE IMPACT ASSESSMENT – PROPOSED MUNYAKA PEDESTRIAN BRIDGE DEVELOPMENT ON A PORTION OF THE REMAINING EXTENT OF PORTION 1 OF THE FARM WATERVAL 5IR, CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY, GAUTENG HIA Letter of Exemption 23/05/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bokamoso Landscape Architects and Environmental Consultants CC 20/08/2020 - 13:34
Status quo Report for Westgate Substation STATUS QUO REPORT FOR ACCIDENTALLY EXPOSED ARCHAEOLOGICAL RESOURCES AT WESTGATE SUBSTATION LOCATED IN KAGISO AREA OF MOGALE LOCAL MUNICIPALITY IN WEST RAND DISTRICT OF GAUTENG PROVINCE. Heritage Impact Assessment Specialist Reports 10/04/2018 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Eskom - CROU 20/08/2020 - 17:37
HIA: Goliatsvlei Proposed enlargement of Goliatsvlei dam onto Farms 8/441,9/441, RE/439 and 689, the enlargement of Wittekop dam on. Farm RE/441, the expansion of cultivated land on Farms 9/441, 1/441, RE/700 and RE/441, together with a pipeline / pumping scheme crossing various properties between the Goliatsvlei dam and a pump station in the Breede River on the farm Rooilandia No. RE/472, Worcester district. 21/08/2020 Jenna Lavin Cedar Tower Services 21/08/2020 - 13:10
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw Paleo Field Services NSVT Consultants 21/08/2020 - 13:11
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw NSVT Consultants 21/08/2020 - 14:15
Paul Roux Sewer Pipeline and Bridge HIA Phase 1 Heritage Impact Assessment for proposed new 1.5 km-long underground sewerage pipeline in Paul Roux, Thabo Mofutsanyane District Municipality, Free State Province. HIA Phase 1 16/02/2020 Lloyd Rossouw Paleo Field Services NSVT Consultants 21/08/2020 - 14:20
Sani Pass groynes DESKTOP HERITAGE SURVEY OF THE PROPOSED GROYNES ON THE MKHONOZANA RIVER , SANI PASS, KZN HIA Letter of Exemption 23/08/2020 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Hanslab (Pty) Ltd 23/08/2020 - 12:37
AIA for IGE Solutions Proposed Waste Treatment Facility, Limeroc, Centurion, Gauteng Archaeological Impact Assessment for IGE Solutions’ Proposed Waste Treatment Facility, Limeroc Business Park, Farm No. 385 Knopjeslaagte, Centurion, Gauteng Province AIA Phase 1 04/08/2020 Matt Lotter, Tim Forssman EScience Associates (Pty) Ltd 24/08/2020 - 13:55
TopFruit NID NID application Farm 1833 Simondium HIA Letter of Exemption 14/08/2020 Jayson Orton ASHA Consulting(Pty) Ltd 24/08/2020 - 14:08
The Heritage Crime reported on pertains to a tweet by Ms. Mandela, member of the ruling African National Congress (ANC) and South African ambassador to Denmark at the time of the incident. The tweet, dated 13 June 2019, reads as follows: “When you came h The Heritage Crime reported on pertains to a tweet by Ms. Mandela, member of the ruling African National Congress (ANC) and South African ambassador to Denmark at the time of the incident. The tweet, dated 13 June 2019, reads as follows: “When you came here without land you found the original people making fire. Next you’ll claim you taught us. Just like Chris Barnard learnt the basics of heart surgery from his Black gardener. What you’re good at is fantasy #Sterkfontein”. (With the ‘Black gardener’ referring to Hamilton Naki). It is argued that the tweet evidences Ms. Mandela’s use of heritage for purposes of political gain [See NHRA 1999, Section 5(1)(d): “Heritage resources management must guard against the use of heritage for sectarian purposes or political gain”], and that she did so intently, through the use of #Sterkfontein (coined with the reference to fire) in her initial post (13 June) and the follow up primary hashtag #OurLand in the twitter debate that ensued, thereby linking heritage, in this case the Sterkfontein site, a well-known site, being one of the Cradle of Humankind World Heritage Sites (COHWHS), one of ten of South Africa’s United Nations Educational, Scientific and Cultural Organization’s (UNESCO) World Heritage Sites, directly with the current land debate, centred on the ‘The Stolen Land’ paradigm and Expropriation Without Compensation (EWC). It is further argued that Ms. Mandela’s initial tweet (13 June), as well as certain follow up tweets, represent, in terms of the NHRA 1999, Section 51(5)(b): “…statement(s) or representation(s) knowing it to be false or not knowing or believing it to be true”, with basic information on South Africa’s heritage and history readily available in books, academic journal and commercial papers and articles and importantly, easily accessible on the internet. The initial tweet by Ms. Mandela (13 June), and the ‘Twitter Storm’ that ensued marked the last prominent socio-political social media endeavour by her and with lasting impact, as evidenced by the referral thereto by President Cyril Ramaphosa during an online funerary tribute to her, 17 July 2020. The President stated: “…She was brave enough to articulate her forthright views about the question of land. She did believe that indeed land was a key determinant of how our people would finally get their economic freedom. We draw many lessons from her life. Her love for motherland, South Africa, to fight against Apartheid rulers of our beautiful land. That love that she had to do that was expansive. We cannot even imagine what freedom would be, had people like Zindzi not stood up for the freedom of our people…”. Not at the time of the initial tweet (13 June) or the twitter debate that ensued did the South African Heritage Resources Agency (SAHRA), the Cradle of Humankind World Heritage Site (COHWHS) Management Authority or the Department of Environment, Forestry and Fisheries (DEFF), on whose behalf the COHWHS Management Authority manages the COHWHS comment on the incident, not on their own accord and in the absence of evidence that such comment was directly requested from another party, not at the request from such a party. The initial tweet by Ms. Mandela (13 June) bears further reference: 1) The ease with which heritage is used for purposes of political gain, be it party political or policy specific in recent years, with legislative repercussions unaddressed or ignored; 2) The heritage status quo of sites used in such cases, in the Heritage Crime reported on here on national (Sterkfontein - National Heritage Site) and international (COHWHS – UNESCO World Heritage Site) level; and 3) The heritage type sites used in such cases, in the Heritage Crime reported on, the Plio-Pleistocene fossil hominin record (and these hominins’ technological achievements) to initiate and further contemporary socio-political debate. In closure, and highlighting the necessity of the reported Heritage Crime being suitably addressed by SAHRA (and other relevant authorities), the NHRA 1999, Section 3(1) states: “For the purposes of this Act, those heritage resources of South Africa which are of cultural significance or other special value for the present community and for future generations must be considered part of the national estate and fall within the sphere of operations of heritage resources authorities”, and further thereto the NHRA 1999, Section 11: “There is hereby established an organization to be known as the South African Heritage Resources Agency (SAHRA) which shall be a body corporate capable of suing and being sued in its corporate name and which shall be governed by a Council established in terms of Section 14”. RECOMMENDATIONS This Heritage Crime report is submitted posthumously. The Heritage Crime reported on had not been addressed by the relevant authorities (SAHRA, the COHWHS Management Authority and DEFF) at the time of its occurrence. It however remains the mandatory responsibility of the relevant authorities to address it, both on a site-specific and national level, with Sterkfontein being a declared National Heritage Site, and as part of the COHWHS, a UNESCO World Heritage Site, the incident needs to be reported to UNESCO. It is recommended that the incident be first addressed by the relevant authorities, prior to reporting to UNESCO. Ms. Mandela passed on 13 July and was laid to rest on 17 July 2020. The Heritage Crime reported on can thus at best be addressed in retrospect by the relevant authorities. In doing so, the following recommendations are made: 1) That the relevant authorities make use of a media-campaign (social / mainstream media, as may be suitable) to reach the relevant audience associated with the incident (participants of the ‘Twitter Storm’) as well as the general South African community at large. 2) The particulars of the incident be relayed in the media-campaign in a transparent, clear and concise manner. 3) That, with cognisance to the fact that the incident can only be addressed in retrospect, emphasis be placed on the particulars of legislative heritage management protocol, as well as the rights and responsibilities of all South Africans towards our heritage. With respect to Ms. Mandela’s recent passing and with sympathy to family, friends and colleagues, it is recommended that a six month period be allowed (prior to, or on 26 February 2021) for the relevant authorities to address the concern / indicate their intent to address the concern in a suitable manner different from the above recommended to ArchaeoMaps. 24/08/2020 Karen Van Ryneveld 24/08/2020 - 21:34
Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site Heritage Crime: Zindzi Mandela, Sterkfontein Tweet, 13 June 2019, Sterkfontein, COHWHS, a UNESCO World Heritage Site 24/08/2020 - 21:40
Heritage Crime: Zindzi Mandela - Sterkfontein Tweet, 13 June 2019, Sterkfontein & the COHWHS, a UNESCO World Heritage Site Heritage Crime: Zindzi Mandela - Sterkfontein Tweet, 13 June 2019, Sterkfontein & the COHWHS, a UNESCO World Heritage Site 24/08/2020 Karen Van Ryneveld 24/08/2020 - 21:46
HIA Kookfontein HERITAGE IMPACT REPORT, FOR INCLUSION IN THE ENVIRONMENTAL ASSESSMENT REPORT FOR THE PROPOSED KOOKFONTEIN PROSPECTING RIGHT APPLICATION, SEDIBENG DISTRICT MUNICIPALTY, GAUTENG PROVINCE Heritage Impact Assessment Specialist Reports 22/05/2020 PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 25/08/2020 - 11:18
PIA Kookfontein PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED KOOKFONTEIN PROSPECTING RIGHT APPLICATION WITHOUT BULK SAMPLING PIA Desktop 06/04/2020 PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 25/08/2020 - 13:03
Upilanga PV1 Heritage Impact Assessment Specialist Reports Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 25/08/2020 - 22:09
Upilanga PV2 Heritage Impact Assessment Specialist Reports Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 25/08/2020 - 22:13
HIA for Proposed Drilling at Greeffputs 169 Heritage Impact Assessment for proposed drilling site at Greeffputs 169, near Barkley West, Northern Cape HIA Phase 1 27/02/2020 David Morris McGregor Museum De Beers Consolidated Mines (Pty) Ltd 26/08/2020 - 12:10
Plastic and and Coal Gasification in Waltloo, Pretoria Plastic and Coal Gasification in Waltloo, Pretoria AIA Phase 1 03/12/2019 Matt Lotter EScience Associates (Pty) Ltd 27/08/2020 - 09:35
Draft BAR DRAFT BASIC ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF MBECUKA VEHICULAR BRIDGE AND MCADOLO TO THUNDEZA PEDESTRAIN BRIDGE UNDER RAY NKONYENI LOCAL MUNICIPALITY, IN THE UGU DISTRICT (DC21) OF THE PROVINCE OF KWAZULU-NATAL 26/08/2020 Londeka Jilimane Indaloenhle Environmental Consultants (Pty) Ltd Indaloenhle Environmental Consultants (Pty) Ltd 27/08/2020 - 11:36
Phase 1 Cultural Heritage Impact Assessment - Eland Mine Consolidation Project Phase 1 Cultural Heritage Impact Assessment: THE ELAND MINE CONSOLIDATION APPLICATION, CONSISTING OF PORTIONS OF THE FARMS ELANDSFONTEIN 440JQ AND DE KROON 444JQ (MAROELABULT) EAST OF BRITS IN THE LOCAL MUNICIPALITY OF MADIBENG, NORTH WEST PROVINCE HIA Phase 1 31/07/2020 J.A. van Schalkwyk JA van Schalkwyk Heritage Consultant JEMS Pty Ltd 27/08/2020 - 13:04
MONUMENT PARK STUDENT HOUSING HIA EXEMPTION LETTER MONUMENT PARK STUDENT HOUSING HIA EXEMPTION LETTER HIA Letter of Exemption 26/02/2020 Anton Pelser SAHRA Council APELSER ARCHAEOLOGICAL CONSULTING 27/08/2020 - 16:21
Soltech Hostels- Palaeontological Study PIA Soltech Hostels- Palaeontological Study PIA PIA Desktop 29/02/2020 Elize Butler SAHRA Council Banzai Environmental (Pty) Ltd 27/08/2020 - 16:25
CLAYVILLE TRUCK YARD HIA EXEMPTION LETTER CLAYVILLE TRUCK YARD HIA EXEMPTION LETTER HIA Letter of Exemption 16/03/2020 Anton Pelser SAHRA Council APELSER ARCHAEOLOGICAL CONSULTING 27/08/2020 - 16:53
HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTCOURT PRIVATE HOSPITAL PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE PROPOSED ESTCOURT PRIVATE HOSPITAL ON ERF 3299, INKOSI LANGALIBALELE MUNICIPALITY, KZN. HIA Phase 1 Frans Prins Active Heritage CC EnviroPro 27/08/2020 - 17:46
Letter of Exemption Pella Bulk Water Pipeline, NC Letter of Recommendation for Exemption of a Heritage Impact Assessment (HIA) for the Pella Bulk Water Pipeline Project, Northern Cape HIA Letter of Exemption 11/05/2020 Jaco van der Walt Heritage Contracts and Archaeological Consulting SLR Consulting (South Africa) (Pty) Ltd 28/08/2020 - 10:31
CLAYVILLE TRUCK YARD HIA EXEMPTION LETTER CLAYVILLE TRUCK YARD HIA EXEMPTION LETTER HIA Letter of Exemption 16/03/2020 Anton Pelser SAHRA Council APELSER ARCHAEOLOGICAL CONSULTING 28/08/2020 - 12:09
Clayville PIA Clayville PIA PIA Desktop 16/03/2020 Elize Butler SAHRA Council Banzai Environmental (Pty) Ltd 28/08/2020 - 12:11
Hartebeesthoek Residential Developement Palaeontological Desktop Study Hartebeesthoek Residential Developement Palaeontological Desktop Study PIA Desktop 07/02/2020 Elize Butler SAHRA Council Banzai Environmental (Pty) Ltd 28/08/2020 - 12:18
PHASE 1 HIA BAVIAANSPOORT ZWAVELPOORT SEWER LINE APAC02028 PHASE 1 HIA BAVIAANSPOORT ZWAVELPOORT SEWER LINE APAC02028 HIA Phase 1 02/02/2020 Anton Pelser SAHRA Council APELSER ARCHAEOLOGICAL CONSULTING 28/08/2020 - 12:28
Baviaanspoort sewer PIA_EButler May 2020 Baviaanspoort sewer PIA_EButler May 2020 PIA Desktop 01/05/2020 Elize Butler SAHRA Council Banzai Environmental (Pty) Ltd 28/08/2020 - 12:29
HIA for Palm Chrome Mining Heritage Impact Assessment for Palm Chrome Mining Heritage Impact Assessment Specialist Reports Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Prescali Environmental Consultants (pty) Ltd 30/08/2020 - 18:16
AIA FOR THE BOLUBEDU SOLAR PARK – ESKOM GRID CONNECTION ON THE FARM BOLOBEDU 1024LT, GREATER LETABA LOCAL MUNICIPALITY, MOPANI DISTRICT MUNICIPALITY, LIMPOPO PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF AREAS DEMARACTED FOR THE BOLUBEDU SOLAR PARK – ESKOM GRID CONNECTION ON THE FARM BOLOBEDU 1024LT, GREATER LETABA LOCAL MUNICIPALITY, MOPANI DISTRICT MUNICIPALITY, LIMPOPO PROVINCE AIA Phase 1 10/12/2019 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 31/08/2020 - 08:15
AIA FOR THE PROPOSED DOUBLE CIRCUIT 132KV POWERLINE FOR THE RHODES 1, RHODES 2, EAST 3, EAST 2 AND EAST PV PLANTS TO THE UMTU SUBSTATION NEAR HOTAZEL, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) ON VARIOUS PORTIONS OF ON THE FARM RHODES 269, THE REMAINDER AND PORTION 2 OF THE FARM EAST 270, THE FARM KIPLING 271, THE REMAINDER OF THE FARM HOTAZEL 280, THE FARM UMTU 281 AND THE REMAINDER OF THE FARM OLIVE PAN 282 FOR THE PROPOSED DOUBLE CIRCUIT 132KV POWERLINE FOR THE RHODES 1, RHODES 2, EAST 3, EAST 2 AND EAST PV PLANTS TO THE UMTU SUBSTATION NEAR HOTAZEL, JOE MOROLONG LOCAL MUNICIPALITY, JOHN TAOLO GAETSEWE DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE AIA Phase 1 15/08/2019 Neels Kruger Exigo Sustainability AGES (PTY) Ltd - Limpopo 31/08/2020 - 09:30

Pages

CSV
 
 

Search form