FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort descending
HIA FOR TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A TOWNSHIP ON THE REMAINDER OF THE FARM RIETKUIL 558-IS, NEAR KRIEL, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 03/11/2020 Makhosazana Mngomezulu Barzani Mining (Pty) Ltd Barzani Mining (Pty) Ltd 02/11/2021 - 22:33
ARCHAEOLOGICAL DESKTOP STUDY ARCHAEOLOGICAL DESKTOP STUDY for the Application of a Prospecting Right on Several Portions of the Farm Roodepoort 504 JR, Bronkhorstspruit, Gauteng AIA Desktop 26/10/2021 Tobias Coetzee 03/11/2021 - 07:33
HIA for the Proposed 100MW PV Plant at the Samancor Chrome Operations, Steelpoort, Limpopo HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED 100MW PV PLANT AT THE SAMANCOR CHROME OPERATIONS, STEELPOORT, LIMPOPO Heritage Impact Assessment Specialist Reports 20/05/2021 Wouter Fourie PGS Heritage (Pty) Ltd Royal Haskoning DHV 03/11/2021 - 16:50
Clapham HIA Heritage Impact Assessment for the proposed Clapham Dam upgrades and associated infrastructure near Burgersfort, Limpopo Province Heritage Impact Assessment Specialist Reports 18/10/2021 Jaco van der Walt Beyond Heritage Alta van Dyk Environmental Consultants cc 04/11/2021 - 11:41
Phase 1 – Heritage Impact Assessment for THE PROPOSED ESKOM AZAADVILLE 4KM 400kV DEVIATION POWER LINE Phase 1 – Heritage Impact Assessment THE PROPOSED ESKOM AZAADVILLE 4KM 400kV DEVIATION POWER LINE, ESKOM WESTRAND STRENGTHENING PHASE I, MOGALE CITY AND RANDWEST CITY LOCAL MUNICIPALITY, GAUTENG PROVINCE HIA Phase 1 27/09/2021 Wouter Fourie PGS Heritage (Pty) Ltd GA Environment (Pty) Ltd 04/11/2021 - 13:45
Proposed Letter of Exemption construction of a telecommunication mast on the Farm Klipheuwel 291 ARCHAEOLOGICAL HERITAGE: PROPOSED LETTER OF EXEMPTION FROM FURTHER SPECIALIST STUDIES & MITIGATION. PROPOSED CONSTRUCTION OF A 35M HIGH TELECOMMUNCATION MAST ON PORTION 62 OF THE FARM KLIPHEUVEL 291, JOUBERTINIA RD, SARAH BAARTMAN DISTRICT MUNICIPALITY, EASTERN CAPE HIA Letter of Exemption 05/11/2021 Alan Smith Enviroafrica CC 05/11/2021 - 15:16
Erf 7134 Section 38 application: Erf 7134, Cape Town: 80 Sir Lowry Road Block bound by Sir Lowry Road, Reform Street, Muir Street and Selkirk Street Heritage Impact Assessment Specialist Reports 25/10/2021 Quahnita Samie Vidamemoria Heritage Consultants Private 07/11/2021 - 14:33
HIA report Manyeding Mothibistad 22 kV powerline HIA report Manyeding Mothibistad 22 kV powerline HIA Phase 1 03/11/2021 08/11/2021 - 10:13
PIA report Manyeding Mothibistad 22 kV powerline PIA report Manyeding Mothibistad 22 kV powerline PIA Phase 1 30/10/2021 08/11/2021 - 10:16
Ngwenya Expansion HIA Cultural Heritage Impact Assessment: Phase 1 investigation for a basic assessment of the proposed extension of Ngwenya Lodge near Kruger National Park, Nkomazi Local Municipality in the Ehlanzeni District Municipality, Mpumalanga Province HIA Phase 1 03/12/2018 Francois Coetzee 08/11/2021 - 14:31
Desktop Study Phase 1 Paleontological Impact Assessment for the proposed Wembezi shopping centre, Farm K;ipplaat Drift 1009, Estcourt, KwaZulu Natal Province PIA Phase 1 22/08/2021 Marion Bamford Prof Marion Bamford 09/11/2021 - 09:11
40884 De Put De-Sludge Heritage Impact Assessment of the De Put de-sludge area, Sandspruit, Senekal, Setsotso Local Municipality, FS Province. HIA Phase 1 31/08/2021 Lloyd Rossouw 09/11/2021 - 10:49
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT - Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Township Development on Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng AIA Phase 1 10/11/2021 Tobias Coetzee 10/11/2021 - 09:57
Request for Exemption of any Palaeontological Impact Assessment for the proposed Kilo Sands Township on Knoppieslaagte 385JR, Centurion, Gauteng Province. Request for Exemption of any Palaeontological Impact Assessment for the proposed Kilo Sands Township on Knoppieslaagte 385JR, Centurion, Gauteng Province. Palaeontological Specialist Reports Prof Marion Bamford 10/11/2021 - 09:58
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Township Development on Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Township Development on Portions 814, 815 and 816 of the Farm Knopjeslaagte 385 JR, Gauteng AIA Phase 1 Tobias Coetzee 10/11/2021 - 10:00
HIA Waterkloof Open Cast Mine The proposed development of the Waterkloof Section Opencast Project. Samancor WCM Falls Under the Jurisdiction of the Bojanala Platinum District Council and the Rustenburg Local Municipality, in the Northwest Province. The Mine is located on portions of Waterkloof 305 JQ, Northwest Province. HIA Phase 1 02/06/2021 Wouter Fourie, Michelle Sachse, Ruan van der Merwe PGS Heritage (Pty) Ltd Samancor Chrome Limited: Western Chrome Mines 10/11/2021 - 10:16
Palaeontological Impact Assessment for the proposed residential development on Griffiths Road, Equestria Ext 283, Gauteng Province Palaeontological Impact Assessment for the proposed residential development on Griffiths Road, Equestria Ext 283, Gauteng Province PIA Desktop 09/08/2021 Marion Bamford Prof Marion Bamford Exigent Environmental 10/11/2021 - 11:00
PIA Siza Gary Trower Gary Trower University of Johannesburg-Palaeo-Research Institute (P-R I) 10/11/2021 - 11:44
PHASE 1 HIA REPORT FOR THE PROPOSED CAVALIER ABATTOIR EXPANSION PROJECT PHASE 1 HIA REPORT FOR THE PROPOSED CAVALIER ABATTOIR EXPANSION PROJECT ON PORTION 83 OF THE FARM TWEEFONTEIN 288JR, NEAR CULLINAN, GAUTENG - APAC021/76 HIA Phase 1 02/08/2021 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Bokamoso Landscape Architects and Environmental Consultants CC 10/11/2021 - 12:43
APPLICATION FOR EXEMPTION FROM A HERITAGE IMPACT ASSESSMENT FOR 82 FURROW ROAD, EQUESTRIA (00049 WILLOWGLEN A/H) AND PORTION 708 (A PORTION OF PORTION 81) OF THE FARM WILLOWS APPLICATION FOR EXEMPTION FROM A HERITAGE IMPACT ASSESSMENT FOR 82 FURROW ROAD, EQUESTRIA (00049 WILLOWGLEN A/H) AND PORTION 708 (A PORTION OF PORTION 81) OF THE FARM WILLOWS HIA Letter of Exemption 17/08/2021 Jaco van der Walt Beyond Heritage Exigent Environmental Management 10/11/2021 - 12:48
Palaeontological Impact Assessment for the proposed residential development on Furrow Road, Equestria Ext 283, Gauteng Province Palaeontological Impact Assessment for the proposed residential development on Furrow Road, Equestria Ext 283, Gauteng Province PIA Desktop 09/08/2021 Marion Bamford Prof Marion Bamford Exigent Environmental Management 10/11/2021 - 12:53
HIA Jouberton X34 & Kanana X16 REPORT ON A PHASE 1 HIA FOR THE PROPOSED TOWNSHIP DEVELOPMENTS OF JOUBERTON EXTENSION 34 & KANANA EXTENSION 16 ON A PORTION OF PORTION 100 OF THE FARM NOOITGEDACHT 434IP CITY OF MATLOSANA LOCAL MUNICIPALITY, NORTHWEST PROVINCE HIA Phase 1 01/09/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Maxim Planning Solutions 10/11/2021 - 16:13
Application for bulk water infrastructure on the farm Nosilla 27JU, White River / Hazyview A Phase 1 AIA / HIA for bulk water infrastructure (dams & weirs) on the farm Nosilla 27JU, White River / Hazyview, Mpumalanga Province AIA Phase 1 10/11/2021 Christine Van Wyk Rowe Adansonia Heritage Consultants Rhengu Environmental Services 10/11/2021 - 20:29
34 Bishop Road, Windermere, Berea Proposed alterations and remedial work to Erf 12714 (Erf R/1452 and 1/1452) , 34 Bishop Road, Windermere, Berea, Durban, Ethekwini, KwaZulu-Natal Heritage Statement 02/11/2021 Gerhard Gustav Theron 11/11/2021 - 09:12
PIA desktop PIA report Pampierstad 22 kV line PIA Desktop 29/10/2021 11/11/2021 - 11:20
HIA report Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province Heritage Impact Assessment Specialist Reports 08/11/2021 11/11/2021 - 11:26
PIA report PIA report Pampierstad 22 kV line PIA Desktop 29/10/2021 11/11/2021 - 11:33
HIA report Heritage Impact Assessment for the Pampierstad 22Kv Powerline, Northern Cape Province Heritage Impact Assessment Specialist Reports 08/11/2021 11/11/2021 - 11:36
HIA Taaiboschfontein EIA THE PROPOSED NEW CULTIVATION (PIVOT) AREAS ON PORTION 2 OF THE FARM TAAIBOSCHFONTEIN 168, DOUGLAS, SOL PLAATJE LOCAL MUNICIPALITY, FRANCES BAARD DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 11/11/2020 Wouter Fourie PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 11/11/2021 - 12:48
Phase 1 HIA New Luckhoff SWS Phase 1 Heritage Impact Assessment of a proposed new Waste Disposal Site in Luckhof, Free State Province. HIA Phase 1 31/08/2021 Lloyd Rossouw Paleo Field Services NSVT Consultants 11/11/2021 - 20:52
Heritage Impact Assessment (Nov'21) Appendix I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 08:23
Heritage Impact Assessment (Nov'21) Appendix I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 08:28
Heritage Impact Assessment (Nov'21) Appendix I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 08:41
Heritage Impact Assessment (Nov'21) Appendix I - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 08:53
Heritage Impact Assessment (Nov'21) AppH - Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 11/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 09:10
PIA 57A North Beach Road Paleontological Impact Assessment for the Proposed Residential Development on 57A North Beach Road, Westbrook, KZN PIA Desktop 09/06/2021 Marion Bamford 12/11/2021 - 12:08
PIA 57A North BEach Road, Westbrook Palaeontological Impact Assessment for the proposed residential development on 57A North Beach Road, Westbrook, KwaZulu Natal Province PIA Desktop 09/06/2021 Marion Bamford 12/11/2021 - 12:15
PIA for Expansion of Infrastructure at 99 Colwyn Drive, Sheffield. Palaeontological Impact Assessment for the proposed project on 99 Colwyn Drive, Sheffield Beach, North Coast, KwaZulu Natal Province PIA Desktop 06/07/2021 Marion Bamford 12/11/2021 - 12:33
PHASE 1 HIA -MATWABENG PHASE 1 HIA REPORT FOR THE MATWABENG TOWNSHIP EXPANSION IN THE SETSOTO (SENEKAL) MUNICIPALITY OF THE FREE STATE PROVINCE HIA Phase 1 12/11/2021 - 15:42
Heritage Impact Assessment (Nov'21) Sun Garden App I - HIA Heritage Impact Assessment Specialist Reports 12/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 17:43
Heritage Impact Assessment (Nov'21) Solaris Fields App I - HIA Heritage Impact Assessment Specialist Reports 12/11/2021 Cherene de Bruyn PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 12/11/2021 - 18:05
HIA FOR A CAUSTIC-SODA MAKE UP PLANT, GAUTENG Phase 1 Heritage Impact Assessment Study report for the proposed Caustic -Soda Make up Plant in Ekurhuleni Municipality area of Gauteng Province. HIA Phase 1 11/08/2021 Mabuda Mmbudziseni Moses Mulaifa Development Projects cc 12/11/2021 - 18:25
AIA for Proposed Cubhu Water Treatment Plant and Pipeline A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED UPGRADE OF CUBHU WATER TREATMENT PLANT (WTP) AND 9KM RISING MAIN LINE FROM CUBHU WTP TO EXISTING FOREST RESERVOIR IN UMHLATHUZE LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE HIA Phase 1 15/10/2021 Trust Mlilo Sativa Travel and Environmental Consultants Umhlatuze Local Municipality 14/11/2021 - 20:02
HIA Report Sutherland & Rietrug WEF Grid Infrastructure HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 04/11/2021 Jayson Orton ASHA Consulting(Pty) Ltd 15/11/2021 - 08:26
PIA for the Proposed new grid infrastructure for the Sutherland & Rietrug WEFs PROPOSED NEW 132KV POWERLINE, 132KV SWITCHING STATION WITH A 33KV/132KV SUBSTATION AND RELATED INFRASTRUCTURE FOR THE AUTHORISED SUTHERLAND CLUSTER WIND ENERGY FACILITIES ON THE REMAINING EXTENT OF NOOITGEDACHT FARM 148, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE Palaeontological Specialist Reports 08/11/2021 John Almond Natura Viva CC 15/11/2021 - 08:29
PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT A PHASE 1 HIA & REPORT FOR THE PROPOSED RIETVLEI EXTENSION 24 TOWNSHIP DEVELOPMENT LOCATED ON PORTION 712 OF THE FARM DOORNKLOOF 391JR TSHWANE METROPOLITAN AREA, GAUTENG HIA Phase 1 06/08/2021 15/11/2021 - 08:55
HIA Report for the 33kV/132kV substation and associated infrastructure for the Sutherland & Rietrug WEFs HERITAGE IMPACT ASSESSMENT: PROPOSED 33KV/132KV SUBSTATION, 132KV POWERLINE WITH A 132KV SWITCHING STATION AND ASSOCIATED INFRASTRUCTURE FOR THE SUTHERLAND AND RIETRUG WIND ENERGY FACILITIES, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE Heritage Impact Assessment Specialist Reports 04/11/2021 Jayson Orton ASHA Consulting(Pty) Ltd 15/11/2021 - 09:18
PIA for the proposed new 33kV/132kV substation & associated infrastructure for the Sutherland & Rietrug WEFs PROPOSED NEW 132KV POWERLINE, 132KV SWITCHING STATION WITH A 33KV/132KV SUBSTATION AND RELATED INFRASTRUCTURE FOR THE AUTHORISED SUTHERLAND CLUSTER WIND ENERGY FACILITIES ON THE REMAINING EXTENT OF NOOITGEDACHT FARM 148, SUTHERLAND MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE Palaeontological Specialist Reports 08/11/2021 John Almond Natura Viva CC 15/11/2021 - 09:21
Heritage Scoping: Phakwe Richards Bay Gas Power 3 2000 MW Combined Cycle Gas to Power Plant (PRBGP3) Heritage Scoping Report and Letter of Exemption: Proposed Phakwe Richards Bay Gas Power 3 2000 MW Combined Cycle Gas to Power Plant (PRBGP3), Richards Bay HIA Letter of Exemption 15/11/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 15/11/2021 - 09:57
CMP Voortrekker Monument A BASIC CULTURAL HERITAGE MANAGEMENT PLAN FOR THE VOORTREKKER MONUMENT AND NATURE RESERVE, PRETORIA Conservation Management Plan 09/12/2021 Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Voortrekker Monument and Nature Reserve 15/11/2021 - 12:47

Pages

CSV
 
 

Search form