THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 17301 - 17350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Salvokop Bulk Water Supply Pipeline Phase 1 Heritage Impact Assessment | THE PROPOSED CONSTRUCTION OF BULK WATER SUPPLY PIPELINE FOR SALVOKOP EXTENSION 5, CITY OF TSHWANE, GAUTENG PROVINCE | AIA Phase 1 | 31/10/2022 | Johnny van Schalkwyk | SPOOR Environmental Services (PTY) Ltd. | 10/10/2022 - 10:14 | |
Salvokop Bulk Water Supply Pipeline Phase 1 Palaeontological Impact Assessment | Palaeontological Impact Assessment for the proposed Salvokop Bulk Water Line and Servitude, Freedom Park, Pretoria, Gauteng Province | PIA Desktop | 11/10/2022 | Prof Marion Bamford | SPOOR Environmental Services (PTY) Ltd. | 10/10/2022 - 10:19 | |
Heritage Screener: Zondereinde PV | Desktop Heritage Screening Assessment: BASIC ASSESSMENT FOR 100MW NORTHAM ZONDEREINDE SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LIMPOPO PROVINCE | Heritage Statement | 12/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 10/10/2022 - 13:31 |
TRP Section 24G Rectification HIA | Phase 1 Archaeological and Cultural Heritage Impact Assessment Scan for Activities Located within Mining Right of TRP | HIA Phase 1 | 01/06/2022 | Richard Munyai | Vhufa Hashu Heritage Consultancy CC | Two Rivers Platinum (Pty) Ltd | 11/10/2022 - 05:56 |
Durban Harbour Heritage Scoping Report | Durban Harbour Heritage Scoping Report | Heritage Scoping | 05/10/2022 | Mike Scurr | Rennie Scurr Adendorff | Transnet National Ports Authority - Durban | 11/10/2022 - 09:25 |
Executive Summary - Scoping - Durban Harbour | Executive Summary | Heritage Statement | 05/10/2022 | Mike Scurr | Rennie Scurr Adendorff | Transnet National Ports Authority - Durban | 11/10/2022 - 09:30 |
Strachan Memorial Hall | Strachan Memorial Hall Impact Assessment | Heritage Impact Assessment Specialist Reports | 30/11/2012 | Deborah Whelan | Archaic Consulting | 11/10/2022 - 10:41 | |
SANRAL R33 Road Upgrade Project | Heritage Impact Assessment for the SANRAL R33 Road Upgrade Project located along the R33 between the N1 Highway and the town of Modimolle, Modimolle-Mookgopong Local Municipality, Waterberg District Municipality, Limpopo Province | Heritage Impact Assessment Specialist Reports | 11/09/2022 | Polke Birkholtz | PGS Heritage (Pty) Ltd | Environmental Edge | 11/10/2022 - 16:49 |
Environmental Basic Assessment Report | DRAFT BASIC ASSESSMENT REPORT ENVIRONMENTAL AUTHORISATION PROCESS FOR THE PROPOSED MIXED RESIDENTIAL DEVELOPMENT ON PORTION 149 OF THE FARM ROOIKOPPIES 297 JQ IN MARIKANA, NORTHWEST PROVINCE | 02/05/2022 | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | 12/10/2022 - 10:37 | |
Survey of cultural Resources | Cultural Heritage report for the Proposed establishment of Pienaarsrivier cemetery on ERF 607 in Pienaarsrivier Extension 1 within Bela-Bela Local Municipality, Waterberg District, Limpopo Province. | Heritage Impact Assessment Specialist Reports | 13/09/2022 | J A van Schalkwyk | J A van Schalkwyk | 12/10/2022 - 10:52 | |
HIA-Doornpan | PROPOSED TOWNSHIP ESTABLISHMENT ON PORTION 3 OF THE FARM DOORNPAN 193 IP, SITUATED OUTSIDE VENTERSDORP, JB MARKS LOCAL MUNICIPALITY, DR KENNETH KAUNDA DISTRICT MUNICIPALITY, NORTH WEST PROVINCE | HIA Phase 1 | 28/01/2022 | Polke Birkholtz, Cherene de Bruyn | 12/10/2022 - 14:38 | ||
Prospecting Right Application | EIA for Prospecting Right | Heritage Study | 31/10/2022 | 13/10/2022 - 07:12 | |||
HIA: Ummbila Emoyeni WEF | Heritage Impact Assessment in terms of section 38(3) of the NHRA for the proposed development of the Ummblia Emoyeni Wind Energy Facility, Mpumalanga | HIA Phase 1 | 23/09/2022 | Jenna Lavin, Heidi Fivaz, Gideon Groenewald | CTS Heritage | Savannah Environmental (Pty) Ltd | 13/10/2022 - 09:23 |
Sishen Expansion Project | 2023 Addendum Sishen Expansion Project | Site Inspection Report | 14/02/2023 | Siegwalt Udo Kusel | Sidney Miller | 13/10/2022 - 09:51 | |
ADDENDUM 10 | 1st phase H.I.A. of a proposed extension and upgrading, also known as THE SISHEN IRON ORE MINE EXPANSION PROJECT For Sishen Mine | HIA Phase 1 | 01/08/2022 | Siegwalt Udo Kusel | Sidney Miller | Sidney Miller | 13/10/2022 - 10:06 |
Desktop Paleontological study | DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT Shishen Iron Ore Mine Expansion Project, Northern Cape Province | PIA Desktop | 26/08/2022 | Bruce Rubidge | Bruce Rubidge | 13/10/2022 - 10:09 | |
Addendum 10 | 1st phase H.I.A. of a proposed extension and upgrading, also known as THE SISHEN IRON ORE MINE EXPANSION PROJECT | HIA Phase 1 | 01/08/2022 | Siegwalt Udo Kusel | Sidney Miller | Sidney Miller | 13/10/2022 - 10:14 |
Lion Valley Fuel Depot Heritage Report | Phase 1 Heritage Impact Assessment for the Proposed Lion Valley Truck Stop on Portion 42 of the Farm Rooidraai 34 JT, Mashishing, Mpumalanga | AIA Phase 1 | 02/09/2022 | Tobias Coetzee | Lokisa Environmental Consulting CC | 13/10/2022 - 10:46 | |
ptn 54 Mmabatho town and townlands | PHASE 1 HIA REPORT FOR PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 54 OF THE FARM MMABATHO TOWN AND TOWNLANDS NO. 301-JO MAFIKENG LOCAL MUNICIPALITY, NORTH WEST PROVINC | HIA Phase 1 | 21/09/2021 | Anton Pelser | Maxim Planning Solutions | 13/10/2022 - 11:33 | |
Deviations to Eskom Nhlavuko-Tshebela 132 kV powerline HIA | Deviations to Eskom Nhlavuko-Tshebela 132 kV powerline HIA | HIA Phase 1 | 04/08/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | ACER (Africa) Environmental Management Consultants | 14/10/2022 - 12:13 |
HIA for proposed Witkop-Pietersburg 132 kV Line3 | HIA for proposed Witkop-Pietersburg 132 kV Line3 | HIA Phase 1 | 04/08/2022 | Nikki Mann | PGS Heritage (Pty) Ltd | Eskom | 14/10/2022 - 12:54 |
PHASE 1 HIA HARVARD 1 SOLAR BLOEMFONTEIN | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 8 (HARVARD 1), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 28/09/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 14/10/2022 - 14:16 |
PHASE 1 HIA HARVARD 2 SOLAR BLOEMFONTEIN | PHASE 1 HIA FOR THE PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY ON THE FARM SPES BONA NO. 2355, PORTION 5 (HARVARD 2), BLOEMFONTEIN, MANGAUNG METROPOLITAN MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 28/09/2022 | Sky-Lee Fairhurst, Heidi Fivaz, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 14/10/2022 - 14:19 |
PHASE 1 HIA DOORNRIVIER SOLAR 3 VIRGINIA | PHASE 1 HIA PROPOSED DEVELOPMENT OF SOLAR PHOTOVOLTAIC (PV) FACILITY (DOORNRIVIER SOLAR 3) ON THE FARM, DOORNRIVIER 330 RESTANT, VIRGINIA, MATJHABENG LOCAL MUNICIPALITY, LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE | HIA Phase 1 | 31/08/2022 | Heidi Fivaz, Sky-Lee Fairhurst, Elize Butler | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 15/10/2022 - 11:41 |
9 Forest Place Heritage Statement | Heritage Statement for Demolition Application for house on 9 Forest Place, Sea View, outlining architectural and contextual significance. | Heritage Statement | 17/10/2022 | Amanda Lead | Kiltor Property CC | 17/10/2022 - 09:03 | |
HIA: Wagt PV Grid Connection | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Wagt Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:09 |
HIA: Riet Fountain PV Grid | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Riet Fountain Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:20 |
HIA: Fountain Solar PV Grid | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Fountain Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:24 |
HIA: Carolus PV Grid | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Development of the grid connection infrastructure for the Carolus Solar PV1 Facility near De Aar, Northern Cape Province | HIA Phase 1 | 21/09/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/10/2022 - 09:26 |
KZN ASP Heritage Reports | A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED ILLOVO AUTOMOTIVE SUPPLIER PARK (ASP) AND INDUSTRIAL DEVELOPMENT ON THE REMAINDER OF THE FARM NOGI NO. 17469, ILLOVO, WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED 11KV AND 132KV TRANSMISSION POWERLINES FROM THE EXISTING KINGSBURGH SUBSTATION TO THE PROPOSED SUBSTATION AT THE KZN AUTOMOTIVE SUPPLIER PARK AT ILLOVO, DURBAN SOUTH, WITHIN ETHEKWINI MUNICIPALITY. A PHASE 1 ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT FOR THE PROPOSED SEWERLINE ROUTE FROM THE KZN ASP SITE TO THE EXISTING KINGSBURGH WASTEWATER TREATMENT WORKS (WWTW) AT ILLOVO, DURBAN SOUTH. WITHIN ETHEKWINI MUNICIPALITY, KWAZULU-NATAL. | Heritage Impact Assessment Specialist Reports | 06/07/2022 | Trust Mlilo | Sativa Travel and Environmental Consultants | Sativa Travel and Environmental Consultants | 17/10/2022 - 11:22 |
MANAGEMENT PLAN FOR ITHALA MANAGEMENT UNIT | MANAGEMENT PLAN FOR ITHALA MANAGEMENT UNIT | Conservation Management Plan | 24/03/2021 | Celeste Rossouw | KwaZulu-Natal Amafa and Research Institute | KwaZulu-Natal Amafa and Research Institute | 17/10/2022 - 15:16 |
Emzinoni PIA | EMZINONI TOWNSHIP DEVELOPMENT: DESK-TOP PALAEONTOLOGY REPORT | PIA Desktop | 20/08/2021 | Alan Smith | Alan Smith Consulting | 18/10/2022 - 07:58 | |
Botterblom Heritage Impact Assessment | Heritage Impact Assessment for the proposed Botterblom Wind Energy Facility | Heritage Impact Assessment Specialist Reports | 30/03/2022 | J. van der Walt | Beyond Heritage | Enviro-Insight CC | 18/10/2022 - 09:16 |
Phase 1 Cultural Heritage Impact Assessment: | THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE) & DIAMONDS NEAR DOUGLAS ON PORTION 1 OF THE FARMS VALS PAN 26, PORTION 2 & 3 OF THE FARM VRAAI PLAATS 27, PORTION 1 OF THE FARM ANNEX DIAMOND VALLEY, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE | HIA Phase 1 | 31/10/2022 | J A van Schalkwyk | J A van Schalkwyk | Milnex 189 CC | 19/10/2022 - 07:46 |
Phase 1 Cultural Heritage Impact Assessment: | THE PROSPECTING RIGHT APPLICATION COMBINED WITH A WASTE LICENCE APPLICATION FOR THE PROSPECTING OF DIAMONDS (ALLUVIAL, GENERAL & IN KIMBERLITE) & DIAMONDS NEAR DOUGLAS ON PORTION 1 OF THE FARMS VALS PAN 26, PORTION 2 & 3 OF THE FARM VRAAI PLAATS 27, PORTION 1 OF THE FARM ANNEX DIAMOND VALLEY, REGISTRATION DIVISION: HOPETOWN, NORTHERN CAPE PROVINCE | HIA Phase 1 | 14/10/2022 | J A van Schalkwyk | J A van Schalkwyk | Milnex 189 CC | 19/10/2022 - 08:59 |
PALAEONTOLOGICAL DESKTOP ASSESSMENT | PALAEONTOLOGICAL DESKTOP ASSESSMENT: DIAMOND PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION NEAR DOUGLAS, IN THE NORTHERN CAPE PROVINCE NC30/5/1/1/2/12983PR | PIA Desktop | 14/10/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | Milnex 189 CC | 19/10/2022 - 09:03 |
Field-based PIA: Pixley Park | PALAEONTOLOGICAL FIELD-BASED SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a Proposed Development of the Pixley Park REF and associated infrastructure near De Aar | PIA Phase 1 | 19/10/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | Savannah Environmental (Pty) Ltd | 19/10/2022 - 09:27 |
GGV Amendment Palaeontological Impact Assessment | PIA Desktop | 18/10/2022 | Dr. Heidi Fourie | Dr Heidi Fourie | Jacana Environmental cc | 19/10/2022 - 13:10 | |
GGV Cultural Heritage Management Plan | Conservation Management Plan | 01/08/2022 | Marietjie Eksteen, Anton Pelser | Jacana Environmental cc | Glencore Operations South Africa (Ptd) Ltd | 19/10/2022 - 13:14 | |
Mercury PL HIA | 19/10/2022 - 15:43 | ||||||
Mercury PL PIA | 19/10/2022 - 15:43 | ||||||
HIA Final Report Oct 2022 | Heritage Impact Assessment Specialist Reports | 19/10/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Umlando: Archaeological Surveys & Heritage Management | 20/10/2022 - 08:36 | |
HIA Bruintjieslaagte 465 JT, Geluk 299 JT and Koedoeshoek 301 JT, Mpumalanga | Phase 1 Archaeological and Heritage Impact Assessment on the farms Bruintjieslaagte 465 JT, Geluk 299 JT and Koedoeshoek 301 JT in respect of proposed agricultural development, Mpumalanga Province. | HIA Phase 1 | 17/02/2021 | Jean- Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 20/10/2022 - 11:04 |
Final Plans for Founders Estates FE 9 | 29/09/2022 | Studio Mas | Boschendal (Pty) Ltd | 20/10/2022 - 11:10 | |||
Founders Estates FE 9 Landscape Plan | 29/09/2022 | 20/10/2022 - 11:14 | |||||
Founders Estates FE 9 Heritage Report | 31/08/2022 | 20/10/2022 - 11:16 | |||||
HIA Fife 44 KU Klaserie PNR | Phase 1 Archaeological and Heritage Impact Assessment on the farm Fife 44 KU in respect of the proposed expansion and construction of accommodation facilities in the Klaserie Private Nature Reserve, Mpumalanga Province. | HIA Phase 1 | 10/01/2022 | Jean- Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 20/10/2022 - 11:20 |
Founders Estates FE 9 Visual Study | 29/09/2022 | 20/10/2022 - 11:20 | |||||
Founders Estates FE 9 Cover Letter | 30/09/2022 | 20/10/2022 - 11:25 | |||||
HIA Schoongezicht 66 KU | Phase 1 Archaeological and Heritage Impact Assessment on the farm Schoongezight 66 KU in respect of proposed housing development, Limpopo Province. | HIA Phase 1 | 11/05/2021 | Jean-Pierre Celliers | Kudzala Antiquity | Henwood Environmental Services | 20/10/2022 - 11:48 |