FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post datesort ascending
PIA Erf 9623 Makhanda Palaeontological Heritage Impact assessment for residential development (student accommodation) of Erf 9623, Makhanda/Grahamstown Palaeontological Specialist Reports 24/07/2023 10/08/2023 - 10:38
AIA Erf 9623 Makhanda PHASE 1 ARCHAEOLOGICAL AND CULTURAL HERITAGE ASSESSMENT FOR THE PROPOSED DEVELOPMENT OF STUDENT ACCOMODATION ON ERF 9623, MAKHANDA, MAKANA LOCAL MUNICPALITY, EASTERN CAPE PROVINCE AIA Phase 1 10/08/2023 Celeste Booth 10/08/2023 - 10:34
Consultation mining permit Heritage Statement 10/09/2023 10/08/2023 - 09:41
HERITAGE SCREENER HERITAGE ASSESSMENT - KOPJE ALLEEN PROSPECTING RIGHT APPLICATION BY ZONDEREINDE MINE Heritage Statement 31/07/2023 Jenna Lavin CTS Heritage JEMS Pty Ltd 10/08/2023 - 09:35
Heritage Impact Assessment Mahikeng PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED DEVELOPMENT OF STUDENT HOUSING ON ERF 1733 MMABATHO UNIT 6, MAHIKENG LOCAL MUNICIPALITY, NORTH WEST PROVINCE HIA Phase 1 05/01/2023 Leonie Marais-Botes Leonie Marais Botes Environmental Consultants International (ECI) 10/08/2023 - 09:05
Klein Zeekoe PIA PALAEONTOLOGICAL SPECIALIST STUDY: Proposed Industrial Development Zone (IDZ) on Portion 123 of the Farm No. 335 (Estate Klein Zeekoei River), Jeffreys Bay 01/05/2023 Dewald Wilken 09/08/2023 - 20:41
HIA - Blue Hills services Cultural Heritage Assessment of Blue Hills Development, Midrand 01/04/2005 Francois P Coetzee 09/08/2023 - 13:54
Report on the assessment of potential graves by means of Ground Penetrating Radar (GPR) and archaeological test excavation at the Dwarsrivier Mine, Limpopo Province Report on the assessment of potential graves by means of Ground Penetrating Radar (GPR) and archaeological test excavation at the Dwarsrivier Mine, Limpopo Province Archaeological Permit Report 27/08/2023 Jaco van der Walt Beyond Heritage Envirogistics (Pty) Ltd 09/08/2023 - 09:50
Wadley Road Motivation for Additions & Alterations 09/08/2023 09/08/2023 - 08:55
ABO Nyala Solar Energy Facility 3 Cultural Heritage Site Sensitivity Report ABO Nyala Solar Energy Facility 3 Cultural Heritage Site Sensitivity Report and Associated Infrastructure. Site Inspection Report 03/07/2023 Francois P Coetzee Praxos 373 (Pty) Ltd 08/08/2023 - 12:00
Revised Cultural Heritage Management Plan CULTURAL HERITAGE MANAGEMENT PLAN RELATED TO ARCHAEOLOGICAL & HISTORICAL SITES RECORDED DURING PHASE 1 HIA’S FOR THE DEVELOPMENT OF A 300MW SOLAR PHOTOVOLTAIC (PV) FACILITY AND ASSOCIATED INFRASTRUCTURE ON SEVERAL PORTIONS OF FARMS IN THE HANOVER DISTRICT, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE FOR SOVENTIX SA (rights sold to SolarAfrica Energy (Pty) Ltd, Project Hereafter referred to as Sun Central). Conservation Management Plan 31/07/2023 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 08/08/2023 - 11:56
Revised Cultural Heritage Management Plan CULTURAL HERITAGE MANAGEMENT PLAN RELATED TO ARCHAEOLOGICAL & HISTORICAL SITES RECORDED DURING PHASE 1 HIA’S FOR THE DEVELOPMENT OF A 300MW SOLAR PHOTOVOLTAIC (PV) FACILITY AND ASSOCIATED INFRASTRUCTURE ON SEVERAL PORTIONS OF FARMS IN THE HANOVER DISTRICT, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE FOR SOVENTIX SA (rights sold to SolarAfrica Energy (Pty) Ltd, Project Hereafter referred to as Sun Central). Conservation Management Plan 31/07/2023 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 08/08/2023 - 11:32
ABO Nyala 2 Cultural Heritage SSV Report Cultural Heritage SSV Report for the ABO Nyala Solar Energy Facility 2 and Associated Infrastructure. Site Inspection Report 03/07/2023 Francois P Coetzee Praxos 373 (Pty) Ltd 08/08/2023 - 11:17
ABO Ndau SEF 2 Heritage Site Sensitivity Verification Report Cultural Heritage Site Sensitivity Verification: Proposed ABO Ndau Solar Energy Facility 2 & associated infrastructure , near Polokwane, Polokwane Local Municipality, Capricorn District Municipality, Limpopo Province Site Inspection Report 03/07/2023 Francois P Coetzee Praxos 373 (Pty) Ltd 08/08/2023 - 10:59
11SharpPlace, Montclair, Durban 08/08/2023 - 10:17
ABO Ndau SEF 1 Heritage Site Sensitivity Report Cultural Heritage Site Sensitivity Verification: Proposed ABO Ndau Solar Energy Facility 1 & associated infrastructure, near Polokwane, Polokwane Local Municipality, Capricorn District Municipality, Limpopo Province Site Inspection Report 03/07/2023 Francois P Coetzee Praxos 373 (Pty) Ltd 08/08/2023 - 10:15
HIA: Roos Solar PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Roos PV Facility and associated grid infrastructure near Belfast, Mpumalanga Province HIA Phase 1 21/07/2023 Jenna Lavin, Nicholas Wiltshire, Marion Bamford CTS Heritage SiVEST SA (Pty) Ltd 07/08/2023 - 17:28
Cultural Heritage Site Sensitivity Report - Nyala 1 Cultural Heritage Site Sensitivity Report for ABO Nyala Solar Energy Facility 1. Site Inspection Report 03/07/2023 Francois P Coetzee Praxos 373 (Pty) Ltd 07/08/2023 - 14:55
NID for Erf 35 Greenbushes Warehouse development on Erf 35 Greenbushes in the Nelson Mandela Bay Municipality. Heritage Scoping 07/08/2023 07/08/2023 - 14:38
Paleontological Desktop Assessment PALAEONTOLOGICAL DESKTOP ASSESSMENT PROSPECTING RIGHT APPLICATION NEAR VENTERSDORP IN THE NORTH WEST PROVINCE PIA Desktop 31/07/2023 Elize Butler Banzai Environmental (Pty) Ltd Milnex 189 CC 07/08/2023 - 14:38
Phase 1 Heritage Asesssment Cultural Heritage Impact Assessment: Phase 1 Investigation for the Proposed Prospecting Right Application to Prospect for Diamonds (Alluvial), Diamonds (General), Diamonds (DIA) & Gold Ore, including Associated Infrastructure on the Remaining Extent of Portion 2 and Portion 9, Portion 7, Portion 8 and a Certain Portion of Portion 12 (Portion of Portion 9) of the Farm Rooipoort 202 IP and Portion 11 (Portion of Portion 1) and Portion 15 (Portion of Portion 11) of the Farm Wildfontein 201 IP, Ditsobotla Local Municipality and JB Marks local Municipality, Ngaka Modiri Molema District Municipality and Kenneth Kaunda District Municipality, North West Province HIA Phase 1 01/08/2023 Francois Coetzee Francois P Coetzee Milnex 189 CC 07/08/2023 - 14:35
Newcastle Justice Historical Report WCS: 045965: Newcastle Justice: Heritage Buildings: Historical Report 04/08/2023 07/08/2023 - 13:22
SE2 Grave impact report A Report on the impact on identified graves by construction of the water pipeline (SE2) between Spitskop Pump Station and Mototolo Mine, located near Steelpoort, Limpopo Province Site Inspection Report 06/07/2023 Jean-Pierre Celliers Kudzala Antiquity Alta van Dyk Environmental Consultants cc 07/08/2023 - 07:58
ARCHAEOLOGICAL DESKTOP STUDY for the Proposed Tweefontein Coal Mine Prospecting Right near Morgenzon, Mpumalanga Archaeological Desktop Study for the Proposed Tweefontein Coal Mine Prospecting Right near Morgenzon, Mpumalanga AIA Desktop 19/06/2023 Tobias Coetzee 04/08/2023 - 15:33
HERITAGE STATEMENT – THE DAMLAAGTE AND ILIKWA OVERHEAD POWERLINE, LOCATED IN THE FREE STATE PROVINCE HERITAGE STATEMENT – THE DAMLAAGTE AND ILIKWA OVERHEAD POWERLINE, LOCATED IN THE FREE STATE PROVINCE Heritage Statement 28/06/2023 Jaco van der Walt Beyond Heritage SLR Consulting (South Africa) (Pty) Ltd 04/08/2023 - 14:21
Naudesbank Colliery Phase 1 PIA PIA Phase 1 04/08/2023 - 13:52
Naudesbank Colliery Phase 1 HIA HIA Phase 1 04/08/2023 - 13:49
PIA - Opinion for the Proposed Millsell Waterkloof Opencast Mine Request for Exemption of any Palaeontological Impact Assessment for the proposed the Section 24G Application for the rectification of the commencement of activities for the Samancor Millsell and Waterkloof Sections opencast mining, North West Province PIA Desktop 15/04/2023 Ragna Redelstorff, PhD University of the Witwatersrand Elemental Sustainability 04/08/2023 - 13:24
HIA for the Proposed Opencast Mining at Millsell Waterkloof Phase 1 Archaeological Impact Assessment for the Proposed Samancor WCM Millsell & Waterkloof Opencast Mine Project, Rustenburg, North West Province HIA Phase 1 23/06/2023 Tobias Coetzee Agri Civils Geo-Tech & Heritage Elemental Sustainability 04/08/2023 - 13:19
ALAEONTOLOGICAL IMPACT ASSESSMENT PROPOSED BRONVILLE 132KV SUBSTATION AND 132KV OVERHEAD POWERLINE. WELKOM PALAEONTOLOGICAL IMPACT ASSESSMENT PROPOSED BRONVILLE 132/11/6.6KV SUBSTATION IN WELKOM, FREE STATE PROVINCE Palaeontological Specialist Reports 28/04/2023 Elize Butler Banzai Environmental (Pty) Ltd Royal Haskoning DHV 04/08/2023 - 09:58
Phase 1 Heritage Impact Assessment: Proposed Bronville Substation an 132kV Overhead Powerline, Welkom Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED BRONVILLE SUBSTATION AND 132KV OVERHEAD POWER LINE, WELKOM REGION, MATJHABENG LOCAL MUNICIPALITY, FREE STATE PROVINC HIA Phase 1 31/07/2023 Johnny van Schalkwyk Royal Haskoning DHV 04/08/2023 - 09:54
Ludeke Dam DESKTOP HERITAGE SURVEY FOR THE LUDEKE DAM PIPE INSTALLATION, MBIZANA, EASTERN CAPE Heritage Impact Assessment Specialist Reports 01/08/2023 Gavin Anderson, Alan Smith Umlando: Archaeological Surveys & Heritage Management Afzelia Environmental Consultants Pty Ltd 03/08/2023 - 07:41
23 Havelock Units Alterations & Additions to 23 Havelock Road, Greenwood Park, Durban Non Impact Assessment Related Reports 03/08/2023 Puleng Jali 03/08/2023 - 05:44
Baillie Park X 63 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED TOWNSHIP DEVELOPMENT ON PORTION 1108 OF THE FARM VYFHOEK 428 IQ, JB MARKS LOCAL MUNICIPALITY, POTCHEFSTROOM, NORTH WEST PROVINCE. HIA Phase 1 01/05/2023 Jaco van der Walt Beyond Heritage 02/08/2023 - 14:40
PHASE 1 HIA REPORT GREATER GIYANI TOWNSHIP DEVELOPMENT PHASE 1 HIA REPORT GREATER GIYANI TOWNSHIP DEVELOPMENT HIA Phase 1 30/06/2023 Anton Apelser APELSER ARCHAEOLOGICAL CONSULTING APELSER ARCHAEOLOGICAL CONSULTING 01/08/2023 - 15:46
Recommendation for exemption - Vilander Pans_ AIA RECOMMENDED EXEMPTION FROM FURTHER ARCHAEOLOGICAL STUDIES, PROSPECTING RIGHT APPLICATION ON REMAINDER OF FARM VILANDER NO. 318, PORTION 1 OF FARM VILANDER NO. 318, PORTION 112 OF FARM KALAHARI-WES NO. 251, & PORTION 159 OF FARM KALAHARI-WES NO. 251, DAWID KRUIPER LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Letter of Exemption 17/07/2023 Jonathan Kaplan Agency for Cultural Resources Management Site Plan Consulting 01/08/2023 - 09:23
BASIC PALAEONTOLOGICAL ASSESSMENT - LOE BASIC PALAEONTOLOGICAL ASSESSMENT Letter of Recommendation for Exemption from further Palaeontological Studies VILANDER PANS SALT PROSPECT Farm Vilander 1/318 & RE/318 and Farm Kalahari-Wes 112/251 & 158/251 Dawid Kruiper Municipality, Gordonia District, Northern Cape HIA Letter of Exemption 21/07/2023 John Pether Site Plan Consulting 01/08/2023 - 09:20
Light industrial development on Portion 16, Farm Gledhow Mount No. 1983 Proposed light industrial development on Portion 16 of Farm Gledhow Mount No. 1983, KwaDukuza Local Municipality, KwaZulu-Natal Heritage Statement 24/03/2023 Jean Beater JLB Consulting Confluence Strategic Development (Pty) Ltd 01/08/2023 - 07:44
Iphiva HIA Report Heritage Impact Assessment for the Proposed Iphiva 400/132 kV Substation, KwaZulu-Natal HIA Phase 1 05/07/2023 31/07/2023 - 13:46
Roodepoort Clay Quarry Heritage Impact Assessment BECS - KwaMhlanga - Roodepoort Clay Quarry_Phase 1 AIA_v1 AIA Phase 1 28/07/2023 31/07/2023 - 10:35
HEROES ACRE MEMORIAL HERITAGE IMPACT ASSESSMENT FOR the proposed upgrading of the existing Heroes’ Acre Memorial Park HIA Phase 1 31/07/2023 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd EnviroPro 31/07/2023 - 09:27
GOQOKAZI HIA PHASE ONE (1) ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT APPLICATION FOR ENVIRONMENTAL AUTHORISATION THE PROPOSED GOQOKAZI COLLECTOR SEWER IN ETHEKWINI MUNICIPALITY, KWA- ZULU NATAL 31/07/2023 Roy Muroyi Tsimba Archaeological Footprints (Pty) Ltd EnviroPro 31/07/2023 - 08:50
HIA report Iveraan village water supply project Heritage Impact Assessment Report. Assessment of suspected graves. Iveraan Village Water Supply Project. Blouberg Local Municipality. Capricorn District Municipality. Limpopo Province. HIA Phase 1 18/07/2023 Frans Roodt Gudani Consulting 28/07/2023 - 14:25
BELA BELA HIA A Phase 1 HIA Report for the Proposed Bela-Bela Commercial Park Development on the Remainder of Portion 25 of the farm Het Bad 465KR in the Bela-Bela Local Municipality of the Limpopo Province HIA Phase 1 01/07/2023 Anton Apelser APELSER ARCHAELOGICAL CONSULTING APELSER ARCHAELOGICAL CONSULTING 28/07/2023 - 10:17
HIA MAKHADO COLLIERY PHASE 1: HERITAGE IMPACT ASSESMENT RELATING TO COAL CORE SAMPLE DRILLING AND RELATED MINING INFRUSTRUCTURE ON FARMS DARU 889MS, TANGA 648MS, LUKIN 643 MS, SALAITA 188MT MAKHADO COLLIERY MINE, VHEMBE DISTRICT MUNICIPALITY, LIMPOPO PROVINCE. HIA Phase 1 09/09/2023 Millennium Heritage Group (PTY) LTD 26/07/2023 - 12:39
Palaeontological Impact Assessment for the proposed Machadodorp Manganese Smelter, southwest of Emthonjeni, Mpumalanga Province Palaeontological Impact Assessment for the proposed Machadodorp Manganese Smelter, southwest of Emthonjeni, Mpumalanga Province PIA Desktop 15/07/2023 Marion Bamford Prof Marion Bamford Envirogistics (Pty) Ltd 26/07/2023 - 10:30
Heritage Impact Assessment for the proposed Manganese Sulphate (MnSO4) Plant at African Rainbow Minerals: Machadodorp Works (ARMMDW), Mpumalanga Heritage Impact Assessment for the proposed Manganese Sulphate (MnSO4) Plant at African Rainbow Minerals: Machadodorp Works (ARMMDW), Mpumalanga HIA Phase 1 11/07/2023 Jaco van der Walt Beyond Heritage Envirogistics (Pty) Ltd 26/07/2023 - 10:26
Heritage Impact Assessment for Repair and Restoration Work to the Ramparts of the Old Fort, Constitution Hill, Johannesburg Heritage Impact Assessment for Repair and Restoration Work to the Ramparts of the Old Fort, Constitution Hill, Johannesburg HIA Phase 3 30/06/2023 Brendan Hart, Yasmin Mayat Mayat Hart Constitution Hill 25/07/2023 - 16:36
Paleo Impact Report - Copper 25/07/2023 - 09:25
Heritage Impact Assessment - Copper 25/07/2023 - 09:24