HIA-MsengeEmoyeniWatercourse An Archaeological Walk through Survey if the proposed turbine footprint and infrastructure for the Msenge Emoyeni Wind Energy Facility, Bedford District, Blue Crane Route Municipality, Eastern Cape Province Archaeological Specialist Reports 24/03/2014 Johan Binneman Eastern Cape Heritage Consultants Savannah Environmental (Pty) Ltd 20/05/2015 - 08:54
HIA Ezingqungeni Gravel Road Proposed construction of 6.8 km gravel road in Ezingqungeni Village on the Farm Qamu Location 17484 Msinga LM, Mzinyathi District DM, KwaZulu-Natal Heritage Impact Assessment Specialist Reports 31/03/2017 Len van Schalkwyk eThembeni Cultural Heritage Magalela & Associates (Pty) Ltd 12/04/2017 - 12:05
Palaeontological Impact Assessment Farm Nababeep 134 Palaeontological Impact Assessment for the proposed mining operation Farm Nababeep a134 near Springbok, Northern Cape Province PIA Desktop 20/03/2018 Marion Bamford Palaeosciences Centre, University of the Witwatersrand Palaeosciences Centre, University of the Witwatersrand 01/12/2018 - 15:05
PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY PALAEONTOLOGICAL IMPACT ASSESSMENT: DESKTOP STUDY PROPOSED GROOTPOORT PHOTOVOLTAIC SOLAR ENERGY FACILITY NEAR LUCKHOFF, FREE STATE PROVINCE PIA Desktop 01/06/2016 John E. Almond 13/06/2016 - 12:24
LED4349 HBAR Heritage Basic Assessment Report: Environmental Authorisation Process for the Establishment of Five Borrow Pits near Lephalale, Limpopo Province Heritage Impact Assessment Specialist Reports 24/04/2017 Justin du Piesanie Digby Wells Environmental Ledjadja Coal (Pty) Ltd 06/06/2017 - 08:29
AIA:PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH ARCHAEOLOGICAL IMPACT ASSESSMENT: PROPOSED DEVELOPMENT AT BOSCHENDAL WESTERN, EASTERN, CENTRAL AND PRECINCTS, STELLENBOSCH DISTRICT, WESTERN CAPE AIA Phase 1 01/06/2009 Timothy Hart, Lita Webley ACO Associates CC 04/09/2016 - 20:08
HIA FOR DEMOLITION OF NORTHRAND SUBSTATION A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DEMOLITION OF THE OLD NORTHRAND SUBSTATION AND RELATED STRUCTURES FOR THE DEVELOPMENT OF A NEW ESKOM SUBSTATION AT NORTHRAND, GAUTENG November 2012 HIA Phase 1 23/11/2012 Anton Pelser A Pelser Archaeological Consulting Eskom - NWOU 27/11/2012 - 14:09
HIA_Wind_Energy_Cookhouse_Webley_LE_Dec09 Heritage Impact Assessment of a proposed wind energy facility to be situated on portions of farms Arolsen 69, Farm Baviaans Krans 151, Baviaans Krans 151/2, Klip Fonteyn 150/2, Roberts Kraal 281, Zure Kop 74/1, Zure Kop 74/2, Van Wyks Kraal 73/2 and Van W HIA Phase 1 14/12/2009 Lita Webley, Dave Halkett, Timothy Hart ACO Associates CC 16/06/2012 - 14:52
Ptn 58 Vaalbank HIA A Report on a Heritage Impact Assessment for the Proposed Development of a Light Industrial Area on Portion 58 of the Farm Vaalbank 289 JS, Middelburg, Mpumalanga Province. HIA Phase 1 05/03/2020 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants AdiEnvironmental cc 21/07/2020 - 12:28
CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROVISION OF BULK SERVICES (WATER AND SEWAGE) - HAMMANSKRAAL WEST AREA A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED PROVISION OF BULK SERVICES (WATER AND SEWAGE) TO THE HAMMANSKRAAL WEST AREA, CITY OF TSHWANE, GAUTENG PROVINCE HIA Phase 1 12/01/2018 Prof. Anton van Vollenhoven Archaetnos CC TGM Environmental Services CC 19/02/2018 - 12:28
NHLANGAKAZI ROAD AND CAUSEWAY UPGRADe HERITAGE SURVEY OF THE NHLANGAKAZI ROAD AND CAUSEWAY UPGRADE, WARD 9, NDWEDWE LOCAL MUNICIPALITY, ILEMBE DISTRICT MUNICIPALITY, KWAZULU-NATAL AIA Phase 1 12/04/2014 Gavin Anderson, Steven Whitaker Umlando: Archaeological Surveys & Heritage Management Enviroedge 12/05/2014 - 08:43
HIA for Proposed Drilling at Farm 277 Heritage Impact Assessment for proposed drilling site at Plaas 277, near Delportshope, Northern Cape HIA Phase 1 01/08/2020 David Morris Archaeology department, McGreggor Museum De Beers Consolidated Mines (Pty) Ltd 23/09/2020 - 10:07
Olympia Park Swimming Pool, Springs HERITAGE IMPACT ASSESSMENT OF THE PROPOSED UPGRADE OF THE SWIMMING POOL PRECINCT, OLYMPIA PARK SPORTS GROUNDS, (STAND 1226 GEDULD EXTENSION 4), SPRINGS. Compiled for Ekurhuleni Metropolitan Municipality. Heritage Impact Assessment Specialist Reports 01/02/2018 William Martinson, Johann Bruwer Osmond Lange Architects + Planners, Heritage Resources Management KWP Create 08/03/2019 - 15:11
Boitekong rescue excavation and skeletal analysis report Report on rescue excavations and physical anthropological analyses of two archaeological graves inadvertently uncovered in Boitekong, North-West. CAS 21/06/2015 and CAS 276/06/2015 Burial Grounds and Graves Specialist Reports 19/08/2015 Anja Meyer University of Pretoria - Forensic Anthropology Research Centre 04/09/2015 - 06:39
2 Seam (Pty) Ltd PHASE 1 HIA REPORT FOR THE PROPOSED VLAKLAAGTE BLOCK 6 OPEN PIT AREA LOCATED ON THE FARM LOURENS 472IS NEAR KRIEL IN THE PROVINCE OF MPUMALANGA Heritage Impact Assessment Specialist Reports 01/03/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 2 Seam (Pty) Ltd 03/06/2019 - 10:59
Sakata Warehouse Archaeological Impact Assessment for the Sakata Warehouse, Gauteng AIA Phase 1 20/02/2013 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management Sakata Seed Southern Africa Pty Ltd 01/03/2013 - 10:05
HIA for Eskom Platreef project PROPOSED ESKOM PLATREEF POWER LINE AND SUBSTATION PROJECT WITHIN MOGALAKWENA LOCAL MUNICIPALITY, WATERBERG DISTRICT IN LIMPOPO PROVINCE: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSESSMENT REPORT HIA Phase 1 30/07/2012 McEdward Murimbika Nzumbululo Heritage Solutions Nzumbululo Heritage Solutions 21/05/2013 - 10:58
HIA for Henville x 29 Heritage Impact Assessment for the Proposed Establishment of a Residential Township, to be called Henville Extension 29, on Remaining Extent of Portion 40, Farm Rietfontein 63 I.R. in the Ekurhuleni Metropolitan Municipality, Gauteng Province. HIA Phase 1 Stephan Gaigher 16/04/2018 - 11:41
ASR - Sekoko Archaeological Scoping Report for the Proposed Sekoko Waterberg Collier, Lephalale, Limpopo Province Archaeological Specialist Reports 17/12/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/07/2014 - 14:25
HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) PHASE 1 HIA FOR THE PROPOSED INSTALLATION OF 19.5 MW GAS TURBINES AND A BATTERY ENERGY STORAGE SYSTEM (BESS) ON THE REMAINING EXTENT OF THE FARM VETLAAGTE 4 WITHIN EMTHANJENI LOCAL MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 15/10/2020 Trust Mlilo Integrated Specialist Services (Pty) Ltd Sativa Travel and Environmental Consultants 17/11/2020 - 00:10
LoE Randfontein Exemption from Phase 1 Palaeontological Impact Assessment: Randfontein Community Library on Erven 135 and 123, Randfontein Local Municipality, Gauteng Province PIA Desktop 26/02/2017 Lloyd Rossouw Paleo Field Services METHALE ENVIRONMENTAL CONSULTING 14/06/2018 - 15:59
Updated Fossil Site Management plan for Bolts Farm Klinkerts Management, Monitoring and Evaluation of the Cradle of Humankind Fossil Sites Conservation Management Plan 01/01/2009 28/10/2014 - 15:53
AIA-KotuloTsatsiCSP1 Archaeological Impact Assessment for the Proposed SolarReserve KotuloTsati CSP1 Facility, located close to Kenhardt in the Northern Cape Archaeological Specialist Reports 11/08/2015 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 04/11/2015 - 08:17
Phase 1 Heritage Impact Assessment of the farm Eureka 200 PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL DESKTOP ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINING PERMIT ON THE FARM EUREKA 200 IN THE DISTRICT OF KIMBERLEY HIA Phase 1 05/09/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd Wadala Mining and Consulting Pty Ltd 05/09/2019 - 15:44
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES Proposed exploitation of fresh and weathered dolerite from four quarry sites near Sutherland, Namaqua District Municipality, Northern Cape PIA Phase 1 23/12/2015 John Almond Natura Viva CC Site Plan Consulting 11/01/2016 - 08:27
PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE, AND RAIL LINE BETWEEN HOTAZEL AND THE GLORIA MINE, NORTHERN CAPE PROVINCE. PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE, AND RAIL LINE BETWEEN HOTAZEL AND THE GLORIA MINE, NORTHERN CAPE PROVINCE. PIA Desktop 30/05/2019 Elize Butler Banzai Environmental (Pty) Ltd, PGS Heritage (Pty) Ltd EScience Associates (Pty) Ltd 02/12/2019 - 13:43
UHIA for Pier 1, Port of Durban Underwater Heritage Impact Assessment for the Development of a Container Terminal at Pier 1, Phase 2 HIA Phase 2 01/04/2013 Vanessa Maitland Jeffares & Green - Port Elizabeth Transnet National Ports Authority - Saldanha 25/07/2013 - 23:12
FOU2191 Oakleaf HIA Heritage Impact Assessment: Environmental Impact Assessment for the Proposed Open Pit Coal Mine and Associated Infrastructure, near Bronkhorstspruit, Gauteng Heritage Impact Assessment Specialist Reports 31/08/2015 Justin du Piesanie Digby Wells Environmental Oakleaf Investment Holdings Holdings 95 (Pty) Ltd 17/10/2017 - 08:08
SUNNYSIDE BLOEMFONTEIN FIRST PHASE ARCHAEOLOGICAL AND HERITAGE ASSESSMENT OF THE PROPOSED MIXED LAND USE DEVELOPMENT AT SUNNYSIDE 2620, BLOEMFONTEIN AIA Phase 1 10/09/2013 Cobus Dreyer NSVT Consultants NSVT Consultants 25/09/2013 - 13:53
Addendum to the HIA - Douglas Solar Grid Connection Addendum to the HIA - Douglas Solar Grid Connection Heritage Statement 19/01/2021 David Morris Landscape Dynamics Environmental Consultants 09/02/2021 - 11:56
Palaeontology Letter of Exemption Palaeontology Letter of Exemption - Dyasonsklip Solar Energy Facility 1 PIA Desktop 01/12/2014 John E Almond Natura Viva CC Cape Environmental Assessment Practitioners 06/02/2015 - 12:53
AIA for the proposed development of residential township on Fouriestrust 2525 ARCHAEOLOGICAL IMPACT ASSESSMENT STUDY REPORT FOR THE PROPOSED DEVELOPMENT OF A RESIDENTIAL TOWNSHIP ON REMAINDER OF THE FARM FOURIESTRUST 2525 DISTRICT IN THE MANGAUNG METROPOLITAN MUNICIPALITY OF FREE STATE PROVINCE. AIA Phase 1 10/10/2016 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Thikho Consulting and Projects 08/02/2017 - 17:24
Vryburg Solar 2 Heritage Report Cultural Heritage Impact Assessment for the Proposed Development of a 100 MW AC (115 MW DC) Solar Photovoltaic Facility (Vryburg Solar 2) and Associated 132kV Transmission Line near Vryburg, North West Province Heritage Impact Assessment Specialist Reports 03/08/2018 J.A. van Schalkwyk 16/08/2018 - 15:51
Thomasville dam SURVEY OF THE PROPOSED THOMASVILLE DAM, CURRYS POST, KWAZULU-NATAL HIA Phase 1 09/03/2016 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Independent Environmental Advisor 14/03/2016 - 15:30
Port Shepstone Gaol HIA Part 2014 12 07 Port Shepstone Gaol Heritage Impact Assessment Specialist Reports 05/12/2014 Robert J W Brusse Robert J W Brusse Robert J W Brusse 03/04/2017 - 11:18
Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal Phase I Cultural Heritage Impact Assessment of the Proposed Upgrading of Main Road P231 between the Nseleni Interchange (N2-29) and Richards Bay, KwaZulu-Natal Mamoluoane Seliane HENWOOD & NXUMALO CONSULTING ENGINEERS CC HENWOOD & NXUMALO CONSULTING ENGINEERS CC 28/05/2016 - 21:15
HIA Heritage Impact Assessment Heritage Impact Assessment Specialist Reports 18/07/2016 Motlhabane Mosiane North West Provincial Heritage Resources Authority Vhufa Hashu Heritage Consultants 28/10/2016 - 15:14
Meppel/Joubertsvlei A REPORT ON A HERITAGE IMPACT ASSESSMENT FOR A PROPOSED OPENCAST COAL MINE ON THE FARMS JOUBERTSVLEI 260 IT AND MEPPEL 264 IT, CLOSE TO ERMELO, MPUMALANGA PROVINCE AIA Phase 1 01/06/2012 Anton van Vollenhoven Archaetnos CC 28/06/2012 - 15:41
Bloemsmond 5 Palaeontology Desktop Assessment RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED BLOEMSMOND 3, BLOEMSMOND 4 AND BLOEMSMOND 5 SOLAR PV FACILITIES ON PORTIONS 5 AND 14 OF THE FARM BLOEMSMOND 455 NEAR UPINGTON AND THEIR CONNECTION TO THE NATIONAL GRID VIA THE UPINGTON MAIN TRANSMISSION SUBSTATION, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PIA Desktop 05/09/2019 John Almond Natura Viva CC Cape Environmental Assessment Practitioners 03/02/2020 - 16:53
HIA Mumbe Road Upgrade Phase 1 Heritage Impact Assessment Report Mumbe Road Upgrade Project, near Pomeroy, KwaZulu Natal Province HIA Phase 1 11/02/2014 Stephan Gaigher G & A Heritage GBS Environmental Consulting 21/02/2014 - 10:55
Putfontein 52 - 54 HIA report Putfont 20/04/2015 - 09:45
PHASE 1 HIA REPORT FOR PROPOSED DEVELOPMENT ON ROOIKOPPIES 297JQ PHASE 1 HIA REPORT FOR PROPOSED DEVELOPMENT OF AFFORDABLE HOUSING & RELATED ACTIVITIES ON VARIOUS PORTIONS OF THE FARM ROOIKOPPIES 297JQ IN MARIKANA, NORTHWEST PROVINCE - APAC019/88 HIA Phase 1 02/09/2019 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING Seaton Thomson & Associates 19/06/2020 - 08:52
Heritage Screener: Cleary Park IPTS Heritage Screening Report for the Cleary Park IPTS, Nelson Mandela Metropolitan Municipality Heritage Scoping 08/11/2018 Jenna Lavin CTS Heritage Aurecon South Africa (Pty) Ltd 08/11/2018 - 13:07
HIA Northern Lights ARCHAEOLOGICAL SCOPING REPORT for Eco Elementum (Pty) Ltd on various farm portions near Welkom, Free State Province Heritage Scoping 25/04/2017 Tobias Coetzee 15/05/2017 - 10:34
HERITAGE IMPACT ASSESSMENT: PROPOSED 300 MW PHOTOVOLTAIC FACILITY AND POWER LINE ON OLYVEN KOLK 187/3, 187/6 & 187/7, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE HERITAGE IMPACT ASSESSMENT: PROPOSED 300 MW PHOTOVOLTAIC FACILITY AND POWER LINE ON OLYVEN KOLK 187/3, 187/6 & 187/7, KENHARDT MAGISTERIAL DISTRICT, NORTHERN CAPE Required under Section 38(8) of the National Heritage Resources Act (No. 25 of 1999). SAHRA Case No.: 11247 Dr Jayson Orton ASHA Consulting (Pty) Ltd 40 Brassie Street, Lakeside, 7945 Tel: (021) 789 0327 | 083 272 3225 Email: jayson@asha-consulting.co.za 1st draft: 28 September 2018 HIA Phase 1 28/09/2018 Jayson Orton ASHA Consulting(Pty) Ltd Solar Energy Land (Pty) Ltd 19/02/2019 - 16:17
National Council of Provinces Building, Parliament Repair, Restoration & Upgrade of the NCOP Building, Erf 95165, Parliament Street, Cape Town HIA Phase 1 14/10/2014 Clive Theunissen Holm Jordaan Group (Pty) Ltd Department of Public Works 17/08/2016 - 16:25
New Kleinfontein Return Water Dam A Report on a Cultural Heritage Impact Assessment for the proposed Return Water Dam at the New Kleinfontein Gold Mine close to Springs, Gauteng Province AIA Phase 1 01/08/2012 Anton van Vollenhoven Archaetnos CC Prime Resources (Pty) Ltd 22/10/2012 - 11:55
HIA: FARM 951 ZONDERWATERKRAAL HERITAGE IMPACT ASSESSMENT PROPOSED CULTIVATION OF ROOIBOS TEA ON FARM 951 ZONDERWATERKRAAL, NEAR NIEUWOUDTVILLE, HANTAM MUNICIPALITY, NORTHERN CAPE HIA Phase 1 29/09/2016 Jonathan Kaplan FOOTPRINT Environmental Services 29/09/2016 - 13:54
Heritage Report for Merapi PV Solar Facility 361, 362, 363 & 364 Heritage Impact Assessment Study for the Proposed PV Energy Facilities, near Excelsior, Free State HIA Phase 1 Nkosinathi Godfrey Tomose 08/02/2013 - 12:17
Almond Bank Heritage Impact Assessment Heritage Impact Assessment of Almond Bank Extension, Pietermaritzburg, KwaZulu-Natal HIA Phase 1 29/01/2009 eThembeni Cultural Heritage Afzelia Environmental Consultants cc 18/01/2018 - 14:14