Displaying 801 - 850 of 17998
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
2020/2021 report | Rising Star permit report 2020 - 2021 | Palaeontological Permit Report | 09/10/2021 | Lee R. Berger | 09/10/2021 - 10:43 | ||
Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection | Heritage & Palaeontology Comparative Assessment for the Proposed Amendment processes for the 100MW Loeriesfontein 3 PV Facility 132kV Grid Connection, Hantam Local Municipality, Northern Cape Province | Heritage Impact Assessment Specialist Reports | 05/12/2022 | Jenna Lavin | CTS Heritage | Nala Environmental (Pty) Ltd | 24/01/2023 - 15:22 |
Nessie Knight Impact Assessment | Nessie Knight Impact Assessment | Heritage Impact Assessment Specialist Reports | 30/07/2013 | Deborah Whelan | Archaic Consulting | Eastern Cape Provincial Government | 01/08/2013 - 17:40 |
Phase 1 Heritage Impact Assessment | Phase 1 Heritage Impact Assessment with regards to a 24G application for an existing toll blending plant located in Anderbolt, Boksburg, Gauteng Province. | HIA Phase 1 | 19/05/2020 | Lloyd Rossouw | Paleo Field Services | Eko Environmental | 18/06/2020 - 14:03 |
Platsjambok West BESS HIA | PROPOSED CONSTRUCTION AND OPERATION OF THE BATTERY ENERGY STORAGE SYSTEM (BESS) AND ASSOCIATED INFRASTRUCTURE FOR THE AUTHORISED PLATSJAMBOK WEST SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITY, LOCATED NEAR THE TOWN OF PRIESKA, IN THE SIYATHEMBA LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT IN THE NORTHERN CAPE PROVINCE OF SOUTH AFRICA. | Heritage Impact Assessment Specialist Reports | 04/11/2020 | Wouter Fourie | PGS Heritage (Pty) Ltd | SiVEST SA (Pty) Ltd | 26/05/2021 - 16:36 |
Umsobomvu WEF PIA | PIA Phase 1 | John Almond | Natura Viva CC | Coastal & Environmental Services - East London | 16/03/2023 - 11:11 | ||
Western Aquaduct Heritage Management Plan | HERITAGE RESOURCE MANAGEMENT PLAN CONSTRUCTION PHASE 2: The Western Aqueduct Project KwaZulu-Natal | Heritage Statement | 02/02/2012 | Elize Becker | Knight Piesold Consultants | eThekwini Metropolitan Municipality | 10/10/2013 - 16:49 |
PIA - Water Scheme - Ward 5 and 7 Matatiele | Phase 1 Palaeontological Impact Assessment, assessing the potential palaeontological impact of the proposed Matatiele Ward 5 and 7, Water Supply Scheme, Alfred Nzo District Municipality in the Eastern Cape | PIA Phase 1 | 31/10/2014 | Gideon Groenewald | Dr. Gideon Groenewald | PGS Heritage and Grave Relocation Consultants | 10/11/2014 - 10:47 |
Heritage Impact Assessment for the clearing of indigenous vegetation for citrus and crop lands on the farm River 141 MS within Musina Local Municipality, Vhembe District, Limpopo Province | Heritage Impact Assessment for the clearing of indigenous vegetation for citrus and crop lands on the farm River 141 MS within Musina Local Municipality, Vhembe District, Limpopo Province | HIA Phase 1 | 12/03/2021 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Tua Conserva Environmental | 22/07/2021 - 17:34 |
HDBR Heritage Report | HERITAGE IMPACT ASSESSMENT: FOR THE PROPOSED CONSTRUCTION OF THE 2 KM LONG HOLSDAM BARKLEY RIVER FARMERS 11KV POWERLINE | Heritage Impact Assessment Specialist Reports | 02/11/2022 | Jaco van der Walt | 1World Consultants (Pty) Ltd | 1World Consultants (Pty) Ltd | 03/11/2022 - 16:12 |
Sani Pass | Phase 1 Heritage Impact Assessment Report of the Proposed Relocation of the Sani Pass Port of Entry, KwaSani Local Municipality, | HIA Phase 1 | 21/10/2013 | Len van Schalkwyk | eThembeni Cultural Heritage | eThembeni Cultural Heritage | 13/02/2015 - 10:36 |
HIA OF ABAKHETHINKOSI CO-OPERATIVE LIMITED | PHASE ONE HERITAGE IMPACT ASSESSMENT OF THE ABAKHETHINKOSI PRIMARY AGRICULTURAL CO-OPERATIVE LIMITED MINING PROJECT SITUATED ON PORTION 2201 OF THE FARM UMLAZI LOCATION NO. 4676 NEAR UMBUMBULU, KZN | HIA Phase 1 | 29/05/2017 | Frans Prins | Active Heritage CC | IMPENDULO CONSULTING | 12/07/2017 - 20:01 |
AIA_Kuboes_Waste_Site_Kaplan_JM_Aug11 | The proposed Kuboes Waste site Northern Cape | AIA Phase 1 | 12/08/2011 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:47 | |
Tormin PALAEONTOLOGICAL IMPACT ASSESSMENT | PALAEONTOLOGICAL IMPACT ASSESSMENT FOR PROPOSED EXTENSION OF TORMINMINE,WEST COAST, SOUTH AFRICA HERITAGE SPECIALIST STUDY | Palaeontological Specialist Reports | 01/08/2018 | John Pether | 20/09/2018 - 09:23 | ||
Boven Solar PV2 HIA | HERITAGE IMPACT ASSESSMENT Environmental Impact Assessment for the Proposed Development of a 75 MW Solar Photovoltaic Facility (Boven Solar PV2) on Boven Rugzeer 169/remainder, northeast of Kenhardt, Northern Cape Province | HIA Phase 1 | 01/02/2016 | Jayson Orton | ASHA Consulting(Pty) Ltd | Council for Scientific and Industrial Research | 24/03/2016 - 11:43 |
AIA FOR THE NATIONAL ROUTE R510 UPGRADE NEAR THABAZIMBI, THABAZIMBI LOCAL MUNICIPALITY, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) FOR THE IMPROVEMENT OF NATIONAL ROUTE R510 SECTION 2 FROM KM 6.3 AT BIERSPRUIT BRIDGE TO KM 33.4 NEAR THABAZIMBI, THABAZIMBI LOCAL MUNICIPALITY, WATERBERG DISTRICT MUNICIPALITY, LIMPOPO PROVINCE | AIA Phase 1 | 05/09/2017 | Neels Kruger | Exigo Sustainability | EOH Coastal & Environmental Services (CES) - East London | 05/09/2017 - 15:56 |
SUN4642 - HIA | Heritage Impact Assessment - Environmental Impact Assessment for the Proposed Future Developments within the Sun City Resort Complex, North West Province | HIA Phase 1 | 12/12/2018 | Shannon Hardwick, Justin du Piesanie | Digby Wells Environmental | Sun International (Pty) Ltd | 12/12/2018 - 14:07 |
Heritage Screener: Cement Factory, Middelburg | Desktop Heritage Screening Assessment for the Proposed development of a cement factory, Middelburg, Eastern Cape | Heritage Scoping | 24/11/2021 | Jenna Lavin | CTS Heritage | inClover Environmental Consulting | 13/12/2021 - 14:20 |
Aberdeen Solar Archaeology | Proposed Aberdeen Photovoltaic Plant - Eastern Cape Province | AIA Phase 1 | 04/05/2012 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 16/07/2012 - 16:54 |
Balgray PIA | PALAEONTOLOGICAL PHASE 1 IMPACT ASSESSMENT FOR THE PROPOSED RE-COMMISSION OF THE OLD BALGRAY COLLIERY NEAR DUNDEE, KWAZULU NATAL | Palaeontological Permit Report | 31/10/2019 | Elize Butler | PGS Heritage (Pty) Ltd | 08/09/2020 - 09:13 | |
PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT | The Proposed Wildfontein Coal Mining Development on a Portion of the Remaining Extent of the Farm Wildfontein 420 JS, District Middelburg, Mpumalanga | AIA Phase 1 | 15/03/2022 | Tobias Coetzee | 15/03/2022 - 09:38 | ||
Richards Bay Entrance - Exemption letter | HIA Letter of Exemption | Gavin Anderson | KwaZulu-Natal Amafa and Research Institute | Umlando: Archaeological Surveys & Heritage Management | 06/12/2013 - 09:39 | ||
Residential and business development on the farm Witgatboom, Burgersfort | A Phase 1 AIA / HIA for the proposed residential and business development on the remainder of the farm Witgatboom 316KT, Burgersfort. Limpopo Province | AIA Phase 1 | 04/05/2015 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Afrika Enviro & Biology | 04/05/2015 - 13:43 |
Heritage Impact Assessment of the SANBI KZN Herbarium, Durban Botanic Gardens, 4 Problem Mkhize Road | Heritage Impact Assessment of the SANBI KZN Herbarium, Durban Botanic Gardens, 4 Problem Mkhize Road | Heritage Impact Assessment Specialist Reports | 01/07/2014 | Deborah Whelan | Archaic Consulting | Futureworks Sustainability Consulting (Pty) Ltd. | 07/06/2016 - 12:03 |
PIA-Panorama Farm Cenre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | PIA-Panorama Farm Cenre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape | PIA Desktop | 27/11/2017 | Elize Butler | 27/11/2017 - 09:52 | ||
Heritage - Witberg WEF Amendment_Feb'19 | Witberg WEF Amendment | Heritage Impact Assessment Specialist Reports | 26/02/2019 | Tim Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 19/03/2019 - 16:49 |
Sedibelo Phase I Heritage Impact Assessment (HIA) study | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR A COMBINED PLATINUM MINING OPERATION NEAR THE PILANESBERG IN THE NORTH-WEST PROVINCE: CHANGING THE LAYOUT OF MINE INFRASTRUCTURE FOR THE APPROVED OPEN CAST AND UNDERGROUND MINING OPERATION AT THE SEDIBELO PLATINUM MINE | HIA Phase 1 | 16/02/2012 | Julius CC Pistorius | Itereleng Bakgatla Mineral Resources (Pty) Ltd | SLR Consulting (Africa) | 11/11/2012 - 19:33 |
N12 PFS (South) | 20/06/2019 - 16:01 | ||||||
Heritage Screening Assessment: Oya OHL | Desktop Heritage Screening Assessment: Proposed development of an overhead powerline for the approved Oya PV Facility, Western and Northern Cape | Heritage Scoping | 30/10/2020 | Jenna Lavin | CTS Heritage | G7 Energies (Pty) Ltd | 02/11/2020 - 08:09 |
HIA: Great Karoo PV Facilities | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed Nku, Moriri and Kwana PV Facilities which form part of the Great Karoo Renewable Energy Facility development near Richmond in the Northern Cape | HIA Phase 1 | 10/05/2022 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/05/2022 - 12:48 |
Eskom Boynton_Revised_12_02_2013 | A PHASE I HERITAGE IMPACT ASSESSMENT STUDY FOR ESKOM’S PROPOSED NEW 132KV POWER LINE BETWEEN THE LEBOWA SUBSTATION AND THE PROPOSED NEW DWAALKOP SUBSTATION IN LEBOWAKGOMO AND CHUNIESPOORT IN THE LIMPOPO PROVINCE | AIA Phase 1 | 12/02/2013 | Julius CC Pistorius | Texture Environmental Consultants | 18/02/2013 - 12:43 | |
Eagles Pride Bronkhorstspruit HIA | Anton Pelser | 03/03/2014 - 16:00 | |||||
PHASE 1 HIA - K147 ROAD CONSTRUCTION APAC02086 | PHASE 1 HIA - K147 ROAD CONSTRUCTION APAC02086 | HIA Phase 1 | 01/10/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | 20/01/2021 - 13:42 | |
Thankerton - Debushing of natural land | PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT FOR PROPOSED DEBUSHING OF NATURAL LAND FOR AGRICULTURAL USE: PORTION 10 OF THANKERTON 175 JU, HECTORSPRUIT AREA MPUMALANGA PROVINCE | AIA Phase 1 | 01/01/2014 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | 25/04/2014 - 10:25 | |
Proposed dam: Rietfontein 594/1, Sarah Baartman District | PROPOSED ESTABLISHMENT OF A NEW DAM ON A PORTION OF THE FARM RIETFONTEIN 594/1, SARAH BAARTMAN DISTRICT AND NELSON MANDELA BAY MUNICIPALITY | Heritage Statement | 09/01/2017 | Stefan de Kock | Perception Heritage Planning | Cape Environmental Assessment Practitioners | 09/01/2017 - 14:48 |
9-2-233-0018-20060103-BPI | The Temporary Export of 12 Possible Bone Tools from the Plio-Pleistocene Site of Drimolen for Analysis as Part of a Study of the Bone Tools from Early Hominid Sites, | Export Permit Report | 03/01/2006 | Mike Raath, Lucinda Ruth Backwell, Francesco d’Errico | Evolutionary Studies Institute | 16/06/2012 - 14:38 | |
Cedarville HIA Exemption letter | Letter Of Exemption For The Cedarville Middle Income Housing Development | HIA Letter of Exemption | 20/06/2015 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | NS Environmental (Pty) Ltd | 27/08/2015 - 22:52 |
HIA - Final EIR | Heritage Impact Assessment, Proposed Hartebeest Wind Farm At Moorreesburg, Western Cape | Heritage Impact Assessment Specialist Reports | 30/11/2016 | Timothy Hart | ACO Associates CC | Savannah Environmental (Pty) Ltd | 07/03/2017 - 10:53 |
Use of existing P73 borrow pit HIA | Use of existing P73 borrow pit, Hlokozi, Ubuhlebezwe Local Municipality, KwaZulu-Natal | HIA Phase 1 | 11/09/2017 | Jean Beater | JLB Consulting | Kerry Seppings Environmental Management | 01/03/2018 - 09:17 |
1, 2, 3, 4 Sahaba Lane & 64, 68, 72 Ciappini Street | Existing Housing Condition and Assessment of Recommended Work on City | Site Inspection Report | 20/03/2018 | Dieter Bossow | 19/04/2018 - 10:49 | ||
KotuloTsatsi CSP2 - Palaeontological | Palaeontological Heritage Assessment: Combined Desktop and Field Based Study for the Proposed SolarReserve Kotulo Tsatsi Energy CSP and PV Solar Energy Facilities near Kenhardt, NC Province | Palaeontological Specialist Reports | 02/03/2015 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 27/10/2015 - 12:06 |
Sabie Hydro Power Project, Hazyview | Phase 1 Archaeological / Heritage Impact Assessment for the proposed Sabie Hydro Power (Pty Ltd) project on portion 17 of the farm Tevrede 178JT, Hazyview, Mpumalanga Province | AIA Phase 1 | 19/10/2016 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Rhengu Environmental Services | 19/10/2016 - 09:48 |
ladsymith Erf15990 | HERITAGE SURVEY OF THE PROPOSED ERF 15990 MIXED DEVELOPMENT PROJECT, LADYSMITH, KWAZULU-NATAL | HIA Phase 1 | 19/09/2019 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | KV Development Group | 17/09/2019 - 09:18 |
North Grid Heritage | AIA Phase 1 | Beyond Heritage | 18/07/2022 - 09:44 | ||||
HIA Orlight Aggeneys Aroams PV | HERITAGE IMPACT ASSESSMENT: PROPOSED AGGENEYS PHOTO-VOLTAIC SOLAR POWER PLANT ON PORTION 1 OF THE FARM AROAMS 57, NORTHERN CAPE PROVINCE | HIA Phase 1 | 01/04/2012 | Lita Webley, Dave Halkett | ACO Associates CC | Digby Wells Environmental | 11/06/2012 - 14:17 |
Phase1: Cultural And Archaeological Heritage Assessment Specialist Study Report for the Proposed Surfacing of Access Streets and Storm Water Rehabilitation at Lebowakgomo Township (Zone A) in Lepelle Nkumpi Local Municipality, Limpopo Province | Phase1: Cultural And Archaeological Heritage Assessment Specialist Study Report for the Proposed Surfacing of Access Streets and Storm Water Rehabilitation at Lebowakgomo Township (Zone A) in Lepelle Nkumpi Local Municipality, Limpopo Province | AIA Phase 1 | 03/01/2006 | McEdward Murimbika | Nzumbululo Heritage Solutions | 16/06/2012 - 14:33 | |
Aletta WEF: DEIAr Heritage Report | Aletta Wind Energy Facility (WEF) Heritage Impact Report | Heritage Impact Assessment Specialist Reports | 03/11/2016 | Wouter Fourie | Department of Environmental Affairs | PGS Heritage and Grave Relocation Consultants | 25/11/2016 - 13:31 |
HIA Study for Eskom Khanyazwe/Buffelspruit | Proposed Eskom Khanyazwe - Buffelspruit 132kV Powerline. | HIA Phase 1 | 27/02/2013 | Anton van Vollenhoven | Wandima Environmental Services cc | Archaetnos CC | 08/05/2013 - 09:52 |
SISHEN MINE LYLYVLED EXPANSION HIA | PROPOSED EXTENSION OF MINING ACTIVITIES AND THE WIDENING O A HAUL ROAD IN THE FARM LYLYVELD 545, NEAR KATHU, NORTHERN CAPE PROVINCE | Heritage Impact Assessment Specialist Reports | 15/11/2019 | Polke Birkholtz | PGS Heritage (Pty) Ltd | EXM Advisory Services (Pty) Ltd | 19/12/2019 - 10:03 |
Bluewave piggery | A LETTER OF EXEMPTION FOR BLUEWAVE PIGGERY EXTENSION | HIA Letter of Exemption | 13/03/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | 18Phando Environmental Consulting | 15/03/2021 - 21:59 |