Displaying 801 - 850 of 17089
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
JAW2291_Heritage_Statement_Dragline_Relocation | HERITAGE STATEMENT FOR ATCOM AND TWEEFONTEIN DRAGLINE RELOCATION PROJECT | Heritage Statement | 17/07/2013 | Natasha Higgitt | Digby Wells Environmental | Jones & Wagener Engineering and Environmental Consultants | 19/07/2013 - 13:37 |
CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT TEMBA GAUTENG PROVINCE | CULTURAL HERITAGE RESOURCES IMPACT ASSESSMENT FOR THE CONSTRUCTION OF A PROPOSED PEDESTRIAN PATHWAY AND CYCLE PATH AT TEMBA GAUTENG PROVINCE | Archaeological Specialist Reports | 22/05/2013 | Udo Kusel | African Heritage Consultants CC | SPOOR Environmental Services (PTY) Ltd. | 19/09/2013 - 17:23 |
HIA report - Eloffspark | PROPOSED HOUSING DEVELOPMENT ON ELOFFSPARK 772JR, BETWEEN CAPITAL PARK AND ELOFFSDAL, CITY OF TSHWANE DISTRICT MUNICIPALITY, GAUTENG PROVINCE. | HIA Phase 1 | 28/06/2018 | Johnny van Schalkwyk | Envirolution Consulting (Pty) Ltd | 20/06/2018 - 13:06 | |
Additions and Alterations to 98 & 100 Sarnia Road | Additions and Alterations to 98 & 100 Sarnia Road, Seaview, Ethekwini, Kwa Zulu Natal. | Built Environment and Cultural Landscapes | 17/07/2022 | Sumesh Govender | 17/07/2022 - 20:05 | ||
HIA Kameelpoortnek | Phase 1 Archaeological and Heritage Impact Assessment on the farm Kameelpoortnek 218 JR in Thembisile Hani Local Municipality, Mpumalanga Province. | Heritage Scoping | 03/02/2017 | Jean-Pierre Celliers | Kudzala Antiquity | Plan Associates Town and Regional Planners | 23/05/2017 - 14:26 |
Copperton Borrow Pits PIA | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED DEVELOPMENT OF TWO QUARRIES AND TWO BORROW PITS ON PORTION 1 OF FARM VOGELSTRUISBULT 104 NEAR COPPERTON, SIYATHEMBA MUNICIPALITY, NORTHERN CAPE | PIA Desktop | 20/01/2015 | John E Almond | Natura Viva CC | ASHA Consulting(Pty) Ltd | 06/02/2015 - 09:42 |
Heritage Impact Assessment Eskom Aloe 132kV | Proposed Eskom Aloe Substation and Loop in Loop Out Powerlines | Heritage Impact Assessment Specialist Reports | 19/06/2020 | Vhufa Hashu Heritage Consultancy CC | 02/10/2020 - 10:16 | ||
PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED 4800 SOW UNIT PIGGERY | PHASE 1 HERITAGE IMPACT ASSESSMENT (HIA) FOR THE PROPOSED 4800 SOW UNIT PIGGERY TO BE ESTABLISHED ON SEVERAL FARM PORTIONS IN THE IDA AREA, EASTERN CAPE PROVINCE | HIA Phase 1 | 01/05/2018 | Leonie Marais-Botes | 22/08/2018 - 11:26 | ||
Mnandi Filling Station - HIA | 10/05/2019 - 10:11 | ||||||
Draft Basic Assessment Reports and supporting Heritage Impact Assessment for 3 Eskom Gauteng powerline developments | Eskom proposes to construct three (3) 132kV powerlines throughout the Gauteng Region. These include the 132kV Diamond-Bynes powerline, 132kV Bigtree-Refilwe-Pelly powerline and the 132kV Pelly-Fairfield powerline. The heritage specialist conducted heritage impact assessments for all three abovementioned projects and generated one (1) report containing the respective information for all three developments. Three (3) Basic Assessment Processes are currently underway for the abovementioned development. As such, three (3) separate DBARs have been uploaded for review and comment. | Heritage Impact Assessment Specialist Reports | 27/02/2015 | Umeshree Naicker | GIBB Engineering & Science - Head Office | Eskom Holdings SOC Ltd | 14/04/2015 - 10:57 |
Permit application for Site 9 | Permit application for site 9 at Booysendal Platinum mine on the farm Booysendal 43JT, Steelpoort, Mpumalanga Office | 23/02/2016 | Jaco van der Walt | 07/03/2016 - 13:59 | |||
Cancellation 2020 fieldwork | Statement: cancellation of the March-April 2020 fieldwork campaign at Bushman Rock Shelter and Heuningneskrans, Limpopo Province, due to the COVID-19 pandemic. | Archaeological Specialist Reports | 23/11/2020 | 23/11/2020 - 19:48 | |||
AIA[P1]-Erven 7540, 7541 & 7538, Kimberley, SPM, NC | Phase 1 Archaeological Impact Assessment - 'Offer to Purchase' Property, Portions of Erf 7540, Erf 7541 and Erf 7538, Corner Quinn and Naude Streets, Kimberley, Sol Plaatje Municipality, Northern Cape | 25/05/2016 | Karen Van Ryneveld | P&V Pillay Family Trust | 25/05/2016 - 11:47 | ||
PIA Blue Wind | Palaeontological Impact Assessment (Desktop Study) Proposed Wind Energy Facility on Three Project Areas on the Namaqualand Coast, Northern Cape, Including Project Blue Wind Energy Facility, North of Kleinsee | PIA Desktop | 22/09/2011 | John Pether | Geological and Palaeontological Consultant | Savannah Environmental (Pty) Ltd | 22/06/2012 - 11:31 |
PHASE 1 HIA REPORT FOR THE PROPOSED CAVALIER ABATTOIR EXPANSION PROJECT | PHASE 1 HIA REPORT FOR THE PROPOSED CAVALIER ABATTOIR EXPANSION PROJECT ON PORTION 83 OF THE FARM TWEEFONTEIN 288JR, NEAR CULLINAN, GAUTENG - APAC021/76 | HIA Phase 1 | 02/08/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Bokamoso Landscape Architects and Environmental Consultants CC | 10/11/2021 - 12:43 |
Marapong Boikarabelo Effluent Pipeline | Phase 1 Archaeological Impact Assessment: Proposed Marapong Boikarabelo Effluent Transfer (MBET) Project - Pipeline. | AIA Phase 1 | 23/04/2012 | Natasha Higgitt | Digby Wells Environmental | Digby Wells Environmental | 09/10/2012 - 11:07 |
Waterval Propect Heritage Impact Assessment Report | Heritage Impact Assessment for the proposed Waterval Retrofit E-Feed Project located in Rustenburg, North West Province. | Heritage Impact Assessment Specialist Reports | 30/09/2013 | Anton van Vollenhoven | Archaetnos CC | 21/11/2013 - 09:42 | |
2022JvS001EIA496 | THE PROSPECTING RIGHT OF DIAMONDS ALLUVIAL (DA) AND DIAMONDS GENERAL (D) AND DIAMONDS IN KIMBERLITE (DK) ON THE REMAINING EXTENT, REMAINING EXTENT OF PORTION 1 (FIJNDOORNS), PORTION 9 (PORTION OF PORTION 2) OF THE FARM MARAETCHESFONTEIN 54 AND REMAINING EXTENT OF PORTION 4 OF THE FARM RIETPUT 60, REGISTRATION DIVISION: HO, SCHWEIZER-RENEKE REGION, NORTH WEST PROVINCE | HIA Phase 1 | 21/01/2022 | Johnny van Schalkwyk | 27/01/2022 - 15:42 | ||
Comment from heritage practitioner | Comment from heritage practitioner based on SAHRA's interim comment dated 9 May 2019 | 10/05/2019 | Prof. Anton van Vollenhoven | 13/05/2019 - 10:21 | |||
Klipdam Scoping Report | Draft | 20/02/2014 - 07:30 | |||||
Phase 1 HIA Desktop Study Menar Capital | PHASE 1 HIA HERITAGE DESKTOP STUDY MENAR CAPITAL PROSPECTING RIGHT NORTHERN CAPE PROPOSED PROSPECTING RIGHT APPLICATION FOR IRON ORE AND MANGANESE ON VARIOUS PORTIONS OF THE FARMS GNOOLOOMA 416, MELTON 420, DIEPWATER 361, LA ROCHELLE 359 AND PLUMSTEAD 418, LOCATED 41 KM NORTH-WEST OF KATHU WITHIN THE TSANTSABANE AND JOE MOROLONG LOCAL MUNICIPALITIES, NORTHERN CAPE PROVINCE. CaseID: 16605 (NC 30/5/1/1/2/12769 PR) | HIA Phase 1 | 10/08/2021 | Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Menar Capital (Pty) Lrd | 10/08/2021 - 15:04 |
HIA SISHEN WESTERN DEWATERING INFRASTRUCTURE | HIA SISHEN WESTERN DEWATERING INFRASTRUCTURE PROJECT | HIA Phase 1 | 21/10/2018 | Polke Birkholtz | PGS Heritage (Pty) Ltd | EXM Advisory Services (Pty) Ltd | 14/11/2018 - 14:26 |
Mooifontein, Colesberg 2019 | Archaeological Investigation of an early Trek-Farmer settlement: The farm Mooifontein, Colesberg district, Northern Cape | Archaeological Permit Report | 31/07/2019 | Gerda Coetzee, Heidi Fivaz | National Museum Bloemfontein - Archaeology and Anthropology | 31/07/2019 - 13:06 | |
PIA Karino Interchange, Mbombela, Mpumalanga | PALAEONTOLOGICAL DESKTOP ASSESSMENT OF THE PROPOSED DEVELOPMENT OF THE KARINO INTERCHANGE, LOCATED EAST OF MBOMBELA, MBOMBELA LOCAL MUNICIPALITY, EHLANZENI DISTRICT MUNCIPALITY, MPUMALANGA PROVINCE | PIA Desktop | 14/10/2017 | Elize Butler | Banzai Environmental (Pty) Ltd | PGS Heritage (Pty) Ltd | 18/10/2017 - 13:27 |
HIA Mbilane Bridge, KZN | HERITAGE IMPACT ASSESSMENT OF THE PROPOSED MBILANE RIVER BRIDGE AT ULUNDI, NORTHERN KWAZULU-NATAL | Heritage Impact Assessment Specialist Reports | Frans Prins | Active Heritage CC | Green Door Environmental | 02/07/2015 - 08:18 | |
PHASE 1 HERITAGE IMPACT ASSESSMENT | A REPORT ON A PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE DEVELOPMENT OF THE GOEDEHOOP 300MW SOLAR PV FACILITY LOCATED ON SEVERAL PORTIONS OF FARMS IN THE HANOVER DISTRICT, EMTHANJENI LOCAL MUNICIPALITY, PIXLEY KA SEME DISTRICT MUNICIPALITY IN THE NORTHERN CAPE PROVINCE. | HIA Phase 1 | 19/02/2021 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | APELSER ARCHAEOLOGICAL CONSULTING | 22/02/2021 - 09:45 |
Jagersfontein Prospecting Right Phase 1 HIA | Phase 1 Heritage Impact Assessment Report - Desktop and field based Heritage Impact Assessment for the prospecting right application for the Remainder, Portion 1 and 16 of the farm Jagersfontein 14, Xhariep District, Free State. | HIA Phase 1 | 21/02/2019 | Stephan Gaigher | G&A Heritage Management Consultants | G&A Heritage Management Consultants | 26/02/2019 - 13:06 |
AIA[P2.1]-Neotel, Kathu, NC - Final report - Archaeological Monitoring, Area 1 | AIA[P2.1]-Neotel, Kathu, NC - Interim report - Archaeological Monitoring, Area 1 | 08/08/2016 | Karen Van Ryneveld | Enviroworks | 08/08/2016 - 07:43 | ||
Regularizing the zoning of Groot Constantia Estate | Regularizing the zoning of Groot Constantia Estate, Constantia | 01/03/2021 | Nellis Beyers | Revel Fox & Partners | Groot Constantia Trust | 01/04/2021 - 18:48 | |
Palaeontological Impact Assessment for the proposed Township development on Portion 8 of Farm Rietspruit 152-IR, Midvaal, Gauteng Province | Palaeontological Impact Assessment for the proposed Township development on Portion 8 of Farm Rietspruit 152-IR, Midvaal, Gauteng Province | PIA Desktop | 29/08/2021 | Marion Bamford | Prof Marion Bamford | Isquare Environmental Planning and GIS | 28/01/2022 - 08:33 |
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:32 | ||
Kambaku Private School | Heritage impact Assessment for the Proposed Development of the Kambaku private School on the Farm Vlakplaats 137 KQ, approximately 15 km north of Thabazimbi, Limpompo Province | HIA Phase 1 | 01/02/2012 | Marko Hutten | Hutten Heritage Consultants | Tekplan Environmental | 04/02/2013 - 11:57 |
PIA: Wolf-Skillpad-Grassridge 132kV Transmission Line | Palaeontological Impact Assessment for the proposed Wolf-Skilpad-Grassridge 132 kV powerline, Kirkwood area, Eastern Cape Province | PIA Phase 2 | 29/03/2022 | Marion Bamford | University of the Witwatersrand | Zutari (Pty) Ltd | 08/04/2022 - 09:52 |
Memela | The proposed forestry projects by Memela, M.W. (25ha) in respect of the same activity occurring in several locations in Boucher 15069ET Portion 1 farm in Umzimkhulu and Ubuhlebezwe local Municipalities within Sisonke District of Kwazulu Natal Province | HIA Phase 1 | 08/08/2013 | Gavin Whitelaw, Frans Roodt | KwaZulu-Natal Amafa and Research Institute | Shasa Heritage Consultants CC | 11/04/2014 - 14:13 |
HIA Magatle Filling Station | HIA Magatle Filling Station, Limpopo Province | HIA Phase 1 | 21/10/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Lokisa Environmental Consulting CC | 28/10/2019 - 22:03 |
BMM Swartberg Decline HIA | Phase 1 Heritage Impact Assessment for the proposed construction of a 800m section of gravel road and associated infrastructure at the Black Mountain Decline on the Farm Zuurwater 62 , Khai-Ma Local Municipality, NC Province. | HIA Phase 1 | 18/01/2017 | Lloyd Rossouw | Black Mountain Mining (PTY) LTD | EndemicVision Environmental Services | 01/02/2017 - 13:55 |
Vulindlela Pipelines | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE AMENDED PROPOSED VULINDLELA BULK WATER SUPPLY SCHEME, UMGENI AND MSUNDUZI MUNICIPALITIES. | HIA Phase 1 | 01/09/2017 | Frans Prins | Kerry Seppings Environmental Management | Active Heritage CC | 09/01/2018 - 09:32 |
Phase 1 PIA Waaihoek WEF | PALAEONTOLOGICAL IMPACT ASSESSMENT REPORT Waaihoek Wind Energy Facility (WEF) Utrecht, Kwa-Zulu Natal Province | PIA Phase 1 | 18/03/2014 | Gideon Groenewald | Coastal & Environmental Services - East London | 27/06/2014 - 10:00 | |
Buffalo Camp Heritage Impact Assessment | Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape | HIA Phase 1 | 29/05/2015 | David Morris | McGregor Museum | SRK Consulting (Pty) Ltd - Western Cape | 07/08/2015 - 17:07 |
Phase 1 AIA Farm Wolverton, Addo | Phase 1 Archaeological Impact Assessment for the proposed agricultural activities on Portion 1 of the Farm Wolverton No. 119, located in the Sundays River Valley Local Municipality of the Eastern Cape Province | AIA Phase 1 | 19/02/2020 | Johan Binneman, Kobus Reichert | Eastern Cape Heritage Consultants | Habitat Link Consulting (Pty) Ltd | 19/02/2020 - 17:13 |
Palaeontological Assessment for Palm Springs Recreational Facility Development | Palaeontological Desktop Assessment for the proposed development of a Multi-Purpose Recreational Facility in Palm Springs, for Emfuleni Local Municipality, Sedibeng District Municipality, Gauteng Province | PIA Desktop | 28/07/2015 | Gideon Groenewald | 07/10/2015 - 11:56 | ||
Eland Palaeontological Desktop Assessment | Eland Grid Infrastructure Palaeontological Desktop Assessment | PIA Desktop | 07/06/2021 | Jenna Lavin | CTS Heritage | 07/06/2021 - 11:41 | |
Heritage Statement: Paulputs North WEF Grid | PAULPUTS WIND ENERGY FACILITY SPLIT: HERITAGE CONSIDERATIONS | Heritage Statement | 20/08/2020 | Jayson Orton | ASHA Consulting(Pty) Ltd | 29/07/2021 - 21:40 | |
Project Fairway | A Phase 1 Cultural ad Heritage impact Assessment 9HIA) study for the proposed extension of mining operations (Project Fairway) at Everest Platinum mine on parts of several adjoining farms in the Steenkampsberge between Roosenekal and lydenburg in the Mpumalnga province of South Africa. | HIA Phase 1 | 01/10/2011 | Julius CC Pistorius | Metago Environmental Engineers (Pty) Ltd | 22/04/2013 - 15:05 | |
Phase 1 archaeological impact assessment: portion 76, 77 and 78 of the farm Craigie Burn 202 Pacaltsdorp, George | Phase 1 archaeological impact assessment: portion 76, 77 and 78 of the farm Craigie Burn 202 Pacaltsdorp, George | AIA Phase 1 | 09/01/2008 | Mary Patrick | Cape Archaeological Survey CC | 16/06/2012 - 14:33 | |
Ntambanana HIA | HIA FOR THE PROPOSED NTAMBANANA WATER SUPPLY SCHEME WITHIN THE CITY OF UMHLATHUZE LOCAL MUNICIPALITY, KWAZULU-NATAL | HIA Phase 1 | 30/06/2022 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | ACER (Africa) Environmental Management Consultants | 13/06/2022 - 08:17 |
Heritage Report - Kgabalatsane Solar Facility | Archaeological Scoping Reports for the Proposed Kgabalatsane Solar Facility (50 MW), Norther-West Province | Heritage Scoping | 26/04/2013 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 28/06/2013 - 11:32 |
AIA for the proposed Springs Fresh Produce Market | ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED SPRINGS FRESH PRODUCE MARKET, GAUTENG PROVINCE | AIA Phase 1 | 03/02/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | ABS Africa | 11/04/2018 - 19:00 |
HERITAGE STUDY: IMPACT LEVEL REPORT | PROJECT NAME: PROPOSED TETRA4 CLUSTER 1 GAS PRODUCTION PROJECT | HIA Phase 1 | 10/03/2017 | Polke Birkholtz | PGS Heritage and Grave Relocation Consultants | Environmental Impact Management Services (Pty) Ltd | 28/03/2017 - 14:12 |
Heritage Assessment of the solid waste disposal site Curries Camp | First phase archaeological and heritage assessment of the solid waste disposal site at Curries Camp near Upington, Northern Cape Take note: also phase 1 heritage assessment. | AIA Phase 1 | 27/08/2014 | Cobus Dreyer | 23/09/2014 - 11:19 |