FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HIA for UG1 opencast project Heritage Impact Assessment for the proposed Waterval UG1 opencast project, Rustenburg, North West Province Heritage Impact Assessment Specialist Reports 04/10/2021 Jaco van der Walt Beyond Heritage Alta van Dyk Environmental Consultants cc 10/03/2023 - 13:33
Gibson Bay Powerline Heritage / Archaeological Impact Assessment Heritage / Archaeological Impact Assessment Proposed Gibson Bay Wind Farm Grid Connection, Kou-Kamma and Kouga Local Municipalities, Humansdorp District, Eastern Cape Province AIA Phase 1 13/09/2013 Peter Nilssen Cape Environmental Assessment Practitioners 12/11/2013 - 12:04
PRE-COLONIAL ARCHAEOLOGY LOURENSFORD REPORT ON PRE-COLONIAL ARCHAEOLOGICAL SITES (OLDER THAN AD 1652) ON LOURENSFORD, SOMERSET WEST Heritage Study 11/01/2015 Janette Deacon 22/01/2015 - 15:53
HIA for Landside Infrastructure Development Heritage Impact Assessment for the Proposed Landside Infrastructure Development at Berth 203 to 205 HIA Phase 1 16/02/2016 Vanessa Maitland African Centre for Heritage Activities Nemai Consulting 07/06/2016 - 10:08
PIA-Panorama Farm Centre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape PIA-Panorama Farm Centre Pivot Irrigation Development, near Cradock, Inxuba Yethemba Local Municipality, Eastern Cape PIA Desktop Elize Butler isi-Xwiba Consulting cc 27/11/2017 - 09:21
HIA Hoekplaas Heritage Impact Assessment for Multiple Proposed Solar Energy Facilities on Farm Hoekplaas 146, Copperton, Northern Cape. Heritage Impact Assessment Specialist Reports 09/07/2013 Jayson Orton ACO Associates CC Aurecon - Cape Town 24/03/2015 - 10:51
Cultural heritage impact assessment for THE IMPROVEMENT OF NATIONAL ROUTE N11, SECTION 9 BETWEEN HENDRINA POWER STATION (KM18.5) AND N4 INTERCHANGE (KM 41.97), MPUMALANGA PROVINCE Cultural heritage impact assessment for THE IMPROVEMENT OF NATIONAL ROUTE N11, SECTION 9 BETWEEN HENDRINA POWER STATION (KM18.5) AND N4 INTERCHANGE (KM 41.97), MPUMALANGA PROVINCE HIA Phase 1 07/07/2016 Johnny Van Schalkwyk Chameleon Environmental 30/08/2016 - 10:17
PIA NW Gateway Palaeontological Desktop Study PIA Desktop 26/09/2018 19/03/2019 - 15:25
Heritage Impact Assessment Report, Farm Orange Fall Phase 1 Heritage Impact Assessment Report, Farm Orange Fall no 16 Agricultural Development, Augrabies, Northern Cape Province, March 2019 HIA Phase 1 01/03/2019 11/06/2019 - 10:44
Heritage Screening Assessment: Oya OHL Desktop Heritage Screening Assessment: Proposed development of an overhead powerline for the approved Oya PV Facility, Western and Northern Cape Heritage Scoping 30/10/2020 Jenna Lavin CTS Heritage G7 Energies (Pty) Ltd 02/11/2020 - 08:09
Heritage Screener: Orkney PV OHL DESKTOP HERITAGE SCREENING ASSESSMENT FOR THE PROPOSED ORKNEY SOLAR PV OVERHEAD POWER LINE AND SWITCHING STATION, NORTH WEST PROVINCE HIA Letter of Exemption 09/05/2022 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 17/05/2022 - 13:06
Report on Research Excavation of the Stables Building at Solms Delta Farm, Groot Drakenstein, Western Cape Report on Research Excavation of the Stables Building at Solms Delta Farm, Groot Drakenstein, Western Cape Archaeological Specialist Reports 26/03/2012 30/08/2012 - 10:24
PHASE 1 HIA - K147 ROAD CONSTRUCTION APAC02086 PHASE 1 HIA - K147 ROAD CONSTRUCTION APAC02086 HIA Phase 1 01/10/2020 Anton Pelser APELSER ARCHAEOLOGICAL CONSULTING 20/01/2021 - 13:42
Newcastle Coal Project Palaeontological Impact Assessment Palaeontological Impact Assessment for the Newcastle Coal Mine Project, KwaZulu Natal Province Site Visit Report (Phase 2) PIA Phase 1 10/12/2022 Marion Bamford Prof Marion Bamford Cabanga Environmental 09/05/2023 - 12:20
HIA for the proposed drug rehabilitation center in Rustenburg. A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED DRUG REHABILITATION CENTRE ON PORTION 47 OF THE FARM WAGENPADSPRUIT 354 JQ, CLOSE TO RUSTENBURG, NORTH-WEST PROVINCE HIA Phase 1 21/12/2016 Prof. Anton van Vollenhoven 09/01/2017 - 10:55
ONVERWACHT PROSPECTING HERITAGE STATEMENT HERITAGE STATEMENT FOR THE ONVERWACHT PROSPECTING EMP, ONVERWACHT 97IS, 2629AC EVANDER, KINROSS, MPUMALANGA PROVINCE Heritage Statement 10/02/2014 Natasha Higgitt Digby Wells Environmental 10/02/2014 - 11:13
HIA exemption letter for the "Dry port fascility" establishment HIA exemption letter for conducting Phase 1 HIA for the proposed township establishment for a “Dry port facility”, located on portions 19-22, 26 and the remainder of portion 6 of the farm Lebombo 186-JU, Mpumalanga province. HIA Letter of Exemption 06/12/2022 Jennifer Mokakabye Setjo Sesho Consultants 12/06/2023 - 08:38
HIA for the Proposed Construction of the Additional Meredale Reservoir (210 Ml) (Eikenhof System), Johannesburg Cultural Heritage Assessment for the Proposed Construction of the Additional Meredale Reservoir (210 Ml) (Eikenhof System), City of Johannesburg District Municipality HIA Phase 1 14/05/2015 Francois P Coetzee Asande Projects Rand Water 06/03/2017 - 21:44
Phase 1 Eskom Pienaarsriver CNC HIA Study A Phase 1 Heritage Impact Assessment Study for Eskom's Proposed CNC in Pienaarsrivier in the Limpopo Province HIA Phase 1 20/09/2013 Julius CC Pistorius Texture Environmental Consultants 30/03/2014 - 17:52
AIA Scoping - Boulders WEF (Feb'18) Archaeological Scoping Study of the Proposed Boulders Wind Farm, Vredenburg Peninsula, Western Cape Archaeological Specialist Reports 29/11/2017 Dave Halkett, Lita Webley ACO Associates CC Savannah Environmental (Pty) Ltd 28/02/2018 - 13:52
Upgrading of P263 and Bridge Construction in Matiwane Upgrading of P263 and Bridge Construction in Matiwane, Ladysmith Local Municipality, KwaZulu Natal HIA Phase 1 26/10/2015 Mamoluoane Seliane 26/10/2015 - 18:45
Phase I Field Study Landau Dragline Relocation Landau Dragline: Proposed dragline road from Kromdraai Section to Navigation Section of the Landau Mine Nkangala District Municipality, eMalahleni Local Municipality, Mpumalanga Province PIA Phase 1 06/04/2016 Heidi Fourie Aurecon - Head Office 17/10/2016 - 15:15
Two Rivers Urban Park Baseline Heritage Study TWO RIVERS URBAN PARK CAPE TOWN BASELINE HERITAGE STUDY Including erven Oude Molen Erf 26439 RE Alexandra Erf 24290 RE Valkenburg Erf 26439 RE, erven 118877,160695 The Observatory erf 26423-0-1 River Club erf 151832 Ndabeni Erf 103659-0-2 RE HIA Phase 1 28/10/2016 Melanie Attwell & Associates Melanie Attwell & Associates Western Cape Government: Department of Transport and Public Works 24/11/2016 - 13:12
Phinda power HERITAGE SURVEY OF THE PROPOSED 3140MW COMBINED CYCLE POWER PLANT (CCPP) POWER PROJECT AT ERF 1854 ALTON, .RICHARDS BAY, KWAZULU-NATAL HIA Phase 1 13/09/2019 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Exigent Engineering Consultants 17/09/2019 - 08:26
HIA for Taung Skull WHS Heritage Impact Assessment for improvements to visitor facilities, site infrastructure and heritage site conservation measures for the Taung Skull WHS. HIA Phase 2 28/07/2015 Francois Odendaal, Jonathan Kingwill EcoAfrica Environmental Consultants EcoAfrica Environmental Consultants 17/08/2015 - 15:32
North Grid Palaeontology PIA Phase 2 Prof Marion Bamford 18/07/2022 - 10:04
Amakhala Emoyeni Wind Energy Facility, walk through An archaeological walkthrough survey of the turbine footprint for the proposed Phase 1 Amakhala Emoyeni Wind Energy Facility, Cookhouse District, Blue Crane Route Municipality, Eastern Cape Province AIA Phase 1B 01/08/2013 Johan Binneman Eastern Cape Heritage Consultants 18/01/2013 - 09:44
SISHEN MINE LYLYVLED EXPANSION HIA PROPOSED EXTENSION OF MINING ACTIVITIES AND THE WIDENING O A HAUL ROAD IN THE FARM LYLYVELD 545, NEAR KATHU, NORTHERN CAPE PROVINCE Heritage Impact Assessment Specialist Reports 15/11/2019 Polke Birkholtz PGS Heritage (Pty) Ltd EXM Advisory Services (Pty) Ltd 19/12/2019 - 10:03
Bluewave piggery A LETTER OF EXEMPTION FOR BLUEWAVE PIGGERY EXTENSION HIA Letter of Exemption 13/03/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management 18Phando Environmental Consulting 15/03/2021 - 21:59
Royal Showgrounds HIA Phase 2 HERITAGE IMPACT ASSESSMENT Assessment of structures and proposed development at the Pietermaritzburg Royal Agricultural Showgrounds 1 Howick Road, Erf 10065, Pietermaritzburg HIA Phase 2 18/08/2021 Lindsay Napier Lindsay Napier Architect Lindsay Napier Architect 06/09/2022 - 10:41
REMAINING EXTENT OF FARM 119, BARKLY WEST DISTRICT PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT REPORT ON A ~3 HA AREA, NEAR THE ELDORET HOMESTEAD, ON THE REMAINING EXTENT OF FARM 119, SITUATED ~40 KM NORTH-EAST OF DANIËLSKUIL, BARKLY WEST MAGISTERIAL DISTRICT, NORTHERN CAPE PROVINCE. AIA Phase 1 14/03/2013 Peter Beaumont McGregor Museum De Beers Consolidated Mines - Kimberley Mines 04/04/2013 - 12:54
Giyani AIA PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT for the Proposed Kusile Invest 133 Giyani Gold Mine Project on the demarcated portions of Un-Surveyed State Land of Greater Giyani 891 LT, Giyani, Limpopo AIA Phase 1 20/04/2021 Tobias Coetzee Tobias Coetzee 12/05/2021 - 17:32
23 Havelock Units Alterations & Additions to 23 Havelock Road, Greenwood Park, Durban Non Impact Assessment Related Reports 03/08/2023 Puleng Jali 03/08/2023 - 05:44
Cultural Heritage Impact Assessment Grootfontein Mine Cultural Heritage Impact Assessment of the Proposed Coal Mining on the Farm Grootfontein 165 IR, District Nigel, Ekurhuleni Metropolitan Municipality, Gauteng AIA Phase 1 01/03/2017 Francois P Coetzee 26/04/2017 - 09:59
Proposed borrow pit (Karusa North) on the Farm Rheebokke Fontein 209 Remainder near Sutherland, Northern Cape Proposed borrow pit (Karusa North) on the Farm Rheebokke Fontein 209 Remainder near Sutherland, Northern Cape Assessment conducted under Section 38 (3) of the National Heritage Resource Act (No. 25 of 1999) HIA Phase 1 01/12/2015 Jonathan Kaplan Agency for Cultural Resources Management Site Plan Consulting 11/12/2015 - 10:53
HIA FOR THE PROPOSED MAUNDE STREET FILLING STATION DEVELOPMENT, GAUTENG PROVINCE HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED MAUNDE STREET FILLING STATION DEVELOPMENT, GAUTENG PROVINCE HIA Phase 1 18/03/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting LEAP - Lanscape Architect Environmental Planner 20/06/2017 - 10:25
Lebaleng X6 Desktop PIA DESKTOP PALAEONTOLOGICAL IMPACT ASSESSMENT Lebaleng Extension 6 Township development in Maquassi Hills Local Municipality PIA Desktop 19/06/2018 Bruce Rubidge University of the Witwatersrand - Evolutionary Studies Institute Maxim Planning Solutions 25/06/2018 - 09:38
HIA Bloemhof Heritage Impact Assessment Bloemhof Mining Right Application HIA Phase 1 20/08/2018 Jaco van der Walt Heritage Contracts and Archaeological Consulting Greenmined Environmental 30/08/2018 - 12:26
HIA_RE PTN166 & PTN168 TWEEFONTEIN 915LS Heritage Scoping 20/09/2021 Liesl Stegmann Shasa Heritage Consultants CC AGES (PTY) Ltd - Limpopo 20/09/2021 - 07:59
AIA for Material Sources for Upgrading of R335 btw Motherwell and Addo ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED ESTABLISHMENT OF MATERIAL SOURCES FOR THE UPGRADING OF THE R335 BETWEEN MOTHERWELL AND ADDO EASTERN CAPE AIA Phase 1 01/11/2018 Jonathan Kaplan Agency for Cultural Resource Terratest (Pty) Ltd 17/04/2020 - 19:21
Test delete 23/11/2021 - 16:35
HIA report Buchom Filling Station – Blouberg. Phase 1 Heritage Impact Assessment Report. Proposed Buchom Filling Station, Blouberg Local Municipality, Capricorn District, Limpopo Province. Heritage Impact Assessment Specialist Reports 28/10/2022 Frans Roodt Envirosana Environmental Consultants 28/10/2022 - 14:56
Fourways Fourways AIA Phase 1 16/06/2012 Thomas Huffman University of the Witwatersrand - Archaeological Resources Management 16/06/2012 - 08:54
Nomafu Road Upgrade HIA Phase 1 - Heritage Impact Assessment Report - Nomafu Road Upgrade Project near Greytown, KwaZulu-Natal HIA Phase 1 02/01/2013 Stephan Gaigher G & A Heritage 19/06/2013 - 11:49
Heritage Impact Assessment 1st phase Heritage Impact Assessment (“HIA”) of a portion of Nooitgedacht 37 IS in the Ogies district, Mpumalanga for Glencore Operations Limited – Nooitgedacht Project (“Glencore”). HIA Phase 1 01/07/2019 09/07/2021 - 12:30
Heritage Assessment Report Phase I Heritage Assessment of Princess Mkabayi Mixed Use Development. Erf 6018, Vryheid. HIA Phase 1 10/10/2022 Sian Hall Ancient Places Pty. Heritage Consultancy Princess Mkabayi City (Pty) Ltd 14/12/2022 - 09:18
Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Road D3911, d3912 Upgrade (Gravel to a Lo Volume Seal) from Mulelane - Crossing to Mabins within the Bohlabela District Municipality of Limpopo Province Cultural and Archaeological Heritage Assessment Specialist Study for the Proposed Road D3911, d3912 Upgrade (Gravel to a Lo Volume Seal) from Mulelane - Crossing to Mabins within the Bohlabela District Municipality of Limpopo Province AIA Phase 1 02/01/2006 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 08:54
AIA Wimbrecht Hub Archaeological Impact Assessment For the proposed Wimbrecht Agricultural hub, close to Marble Hall, Limpopo Province AIA Phase 1 19/06/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Midturion Information Consultants 22/08/2013 - 12:33
Archaeological Scoping Report Archaeoilogical Scoping Report for the proposed RE Capital 11 Solar Development AIA Desktop 28/08/2014 Lita Webley ACO Associates CC Cape Environmental Assessment Practitioners 03/09/2014 - 13:37
Phase 1 Cultural Heritage Impact Assessment: THE DEVELOPMENT OF THE PROPOSED ACRUX SOLAR PV PROJECT ONE NEAR BLOEMFONTEIN, FREE STATE PROVINCE 26/09/2023 - 16:17

Pages

CSV
 
 

Search form