FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
Final report on the results of a cultural heritage walk-down for the final EMP for the Spitskop-Marang 400 kv Eskom power line between Rustenburg and Northam Final report on the results of a cultural heritage walk-down for the final EMP for the Spitskop-Marang 400 kv Eskom power line between Rustenburg and Northam AIA Phase 1 01/01/2008 Anton van Vollenhoven, Anton Pelser Archaetnos CC 16/06/2012 - 08:54
kwaggafontein hertiage study PROPOSED OPENCAST MINING ON THE FARM KWAGGAFONTEIN 8 IT, NEAR CAROLINA, ALBERT LUTHULI LOCAL MUNICIPALITY, GERT SIBANDE DISTRICT MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 28/11/2017 - 10:01
Phase 1 Archaeological Impact Assessment of Portions of Lilyvale 2313 and Bayswater 2865, Bloemfontein Phase 1 Archaeological Impact Assessment of Portions of Lilyvale 2313 and Bayswater 2865, Bloemfontein AIA Phase 1 Lloyd Rossouw 29/03/2019 - 15:46
DUB01 and DUB02 - Destruction Monitoring report Report on the monitoring of the destruction of site DUB001 and DUB 001 under Permit Nr. 17306 as issued by Amafa Archaeological Permit Report 14/03/2022 Wouter Fourie PGS Heritage (Pty) Ltd Dube Trade Port Corporation 17/03/2022 - 06:27
Cultural and Archaeological Heritage Assessment Specialist Study for Borrow Pits Associated with Road D4381 Kildare to Ronaldsey in Bohlabela District, Limpopo Province Cultural and Archaeological Heritage Assessment Specialist Study for Borrow Pits Associated with Road D4381 Kildare to Ronaldsey in Bohlabela District, Limpopo Province AIA Phase 1 02/01/2006 McEdward Murimbika Nzumbululo Heritage Solutions 16/06/2012 - 08:54
Emergency overflow pipeline Application for Heritage Exemption Letter for the upgrade of the Station 2 Flocculation and Sedimentation Capacity at the Zuikerbosch Pumping Station: Proposed emergency overflow pipeline. HIA Phase 1 26/07/2013 Makhosazana Mngomezulu 26/07/2013 - 10:25
Stellenbosch Municipal Heritage Survey - Phase 3 HERITAGE INVENTORY OF, AND MANAGEMENT PLAN FOR, THE TANGIBLE RESOURCES IN THE STELLENBOSCH MUNICIPALITY - PHASE 3 Heritage Study 08/05/2018 Liana Jansen, Fabio Todeschini Cape Winelands Professional Practices in Association Stellenbosch Municipality 25/06/2019 - 12:00
a 06/09/2020 04/11/2020 - 07:37
Mapungubwe Park Management Offices HIA & PIA Heritage and Palaeontological Impact Assessment for the Park Management Office Complex Development Heritage Impact Assessment Specialist Reports 21/01/2020 Stephan Gaigher, John Almond G & A Heritage South African National Parks 21/05/2022 - 17:50
HIA_Vyfhoek_428_ptn_164_(of_1119)_Ki﾿ᄑsel_U_Jun07 Cultural Heritage Resources Impact Assessment on Portion 164 (a Portion of Portion 1119) of the Farm Vyfhoek 428 IQ, North West Province HIA Phase 1 06/01/2007 Udo Kusel African Heritage Consultants CC 16/06/2012 - 14:52
HERITAGE IMPACT ASSESSMENT FOR MULTIPLE PROPOSED SOLAR ENERGY FACILITIES HERITAGE IMPACT ASSESSMENT FOR MULTIPLE PROPOSED SOLAR ENERGY FACILITIES HIA Phase 1 09/07/2013 Jayson Orton, Lita Webley ACO Associates CC ACO Associates CC 30/09/2013 - 07:12
Heritage Impact Assessment for the access road to filling station on the Farm Nietgedacht 535JQ Heritage Impact Assessment for the access road to filling station on the Farm Nietgedacht 535JQ 17/08/2020 Jaco van der Walt Heritage Contracts and Archaeological Consulting Eco Assessments 26/01/2021 - 10:17
PIA Camden I WEF 132kV Grid Connection Palaeontological Impact Assessment for the proposed Grid Connection for the Camden I Wind Energy Facility (up to 210MW), west of Camden, Mpumalanga Province PIA Phase 2 26/05/2022 Marion Bamford Beyond Heritage WSP Group Africa (Pty) Ltd 11/05/2023 - 14:03
off take 5b PROPOSED CONSTRUCTION OF OFF TAKE 5B POTABLE WATER PIPELINE AS PART OF THE LOWER THUKELA BULK WATER SUPPLY AT HYDE PARK, ILEMBE DISTRICT MUNICIPALITY, KZN AIA Phase 1 09/12/2014 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Triplo4 Sustainable Solutions (Pty) Ltd 07/02/2015 - 11:04
PIA Kenleaf x 35 Palaeontology Impact Assessment for the Kenleaf x 35 township PIA Phase 1 14/06/2023 Dr. Heidi Fourie 15/06/2023 - 09:17
Letter of Exemption -Umzumbe Phase A HIA Letter of Exemption Umlando: Archaeological Surveys & Heritage Management Umlando: Archaeological Surveys & Heritage Management 15/03/2016 - 16:12
Vlakvarkfontein Coal Mine Palaeontological Impact Assessment for the Expansion of Open Cast Mining, a New Integrated Water Use License and the Establishment of a Coal Processing Facility by Ntshovelo Mining Resources (Pty) Ltd on Farm Vlakvarkfontein 213R, Victor Khanye Local Municipality, Mpumalanga Province PIA Desktop 01/02/2018 W Fourie PGS Heritage (Pty) Ltd Environmental Impact Management Services (Pty) Ltd 08/03/2018 - 13:35
Palaeontological Assessment Phase 1 Palaeontological Assessment of the proposed Kagiso solar power plant (SPP) facility on the Remaining Extent of the farm Kameel Aar 315, near Hotazel, Northern Cape Province. PIA Phase 1 01/03/2016 Lloyd Rossouw 30/05/2016 - 11:22
AIA for erf364 ARCHAEOLOGICAL IMPACT ASSESSMENT (AIA) OF DEMARACTED AREAS ON ERF364A FOR THE PROPOSED SHOPPING CENTRE DEVELOPMENT IN WRIGHT PARK, SPRINGS, GAUTENG PROVINCE AIA Phase 1 16/04/2018 23/04/2018 - 11:33
Rondevly Mining Right: Phase 1 Heritage Impact Assessment (HIA) Archaeological Specialist Reports 23/09/2019 Leonie Marais 24/09/2019 - 07:21
Amafa Application Amafa Application 19/07/2022 Wellesley Morris 19/07/2022 - 09:56
AIA Greefspan Power Station II 2645 Archaeological Impact Assessment Phase 1: Proposed development of PV Power Station at Greefspan, near Douglas, Northern Cape AIA Phase 1 18/06/2010 David Morris McGregor Museum Van Zyl Environmental Consultants 18/06/2012 - 08:55
Paleo - Tranalloys Desktop Palaeontological Heritage Impact Assessement Report on the site of the Proposed Transalloys (Pty) Ltd's Power Station to be Location within Portions 25, 26, 33, 34, 35, 36 and 37 of the Farm Elandsfontein 309 JS and Portions 20, 24 and 38 of the Farm Schoongezicht 308 JS, Mpumalanga Province PIA Desktop 01/11/2013 Barry Millsteed Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 25/11/2013 - 15:57
2020/JvS/051Wouter THE MINING RIGHT APPLICATION FOR DIAMONDS ON PORTION OF REMAINING EXTENT OF PORTION 9 (WOUTER) OF THE FARM LANYON VALE 376, NEAR NIEKERSHOOP, PIXLEY KA SEME DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE HIA Phase 1 01/07/2020 Johnny van Schalkwyk 18/03/2021 - 09:22
Amended HIA for the PROPOSED SOLAR PV PLANT FOR THE MOGALAKWENA MINE, SITUATED NEAR MOKOPANE, LIMPOPO PROVINCE PROPOSED SOLAR PV PLANT FOR THE MOGALAKWENA MINE, SITUATED NEAR MOKOPANE, LIMPOPO PROVINCE - AMENDED HERITAGE IMPACT ASSESSMENT HIA Phase 1 14/07/2022 Polke Birkholtz PGS Heritage (Pty) Ltd PGS Heritage (Pty) Ltd 09/09/2022 - 12:22
PIA PPM Chrome Project Pilanesburg Platinum Mine Chrome Project – Palaeontological Impact Assessment PIA Desktop 10/02/2011 Bruce Rubidge Evolutionary Studies Institute SLR Consulting (Africa) 14/09/2012 - 15:41
AIA - Bosjesmansberg West Archaeological Impact Assessment for the Proposed Bosjesmansberg PV West Solar Energy Facility, located close to Copperton in the Northern Cape AIA Phase 1 20/12/2013 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 21/02/2014 - 12:43
APM2880_HIA Rietfontein Prospecting EMP, Rietfontein 101IS, 2629AD, Kriel, Mpumalanga Province: Heritage Impact Assessment HIA Phase 1 20/04/2015 Natasha Higgitt, Johan Nel Digby Wells Environmental 20/04/2015 - 11:58
PIA for Construction of Culvert on L2013 in Bergville Paleontological Impact Assessment for the proposed Culvert on Road L2013, Bergville, Okhahlamba Local Municipality, KwaZulu Natal Province PIA Phase 1 20/03/2021 Marion Bamford Prof Marion Bamford Prof Marion Bamford 14/05/2021 - 20:24
HIA: Roos Solar PV HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Roos PV Facility and associated grid infrastructure near Belfast, Mpumalanga Province HIA Phase 1 21/07/2023 Jenna Lavin, Nicholas Wiltshire, Marion Bamford CTS Heritage SiVEST SA (Pty) Ltd 07/08/2023 - 17:28
SCOPING REPORT: WATER PIPELINE BETWEEN ROOIWINKEL AND NABABEEP, NORTHERN CAPE ARCHAEOLOGICAL SCOPING THE PROPOSED CONSTRUCTION OF A NEW WATER PIPELINE BETWEEN ROOIWINKEL AND NABABEEP, NORTHERN CAPE Heritage Scoping 24/10/2011 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 18/08/2016 - 10:32
HIA; Proposed Gouda Wind Energy Facility, Tulbagh HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED GOUDA WIND ENERGY FACILITY, TULBAGH MAGISTERIAL DISTRICT, WESTERN CAPE HIA Phase 1 15/11/2010 Jayson Orton ACO Associates CC Savannah Environmental (Pty) Ltd 27/06/2018 - 10:24
PIA Phase 1 Final Field Study and Walkdown Report Proposed upgrading of the 66 kV network to a 132 kV network in the Hotazel, Kuruman and Kathu area, Ga-Segonyana -, Joe Morolong - and Gamagara Local Municipalities, John Taolo Gaetsewe District Municipality, Northern Cape Province. Palaeontological Impact Assessment: Addendum CaseID 11967. PIA Phase 1 16/08/2018 Dr. Heidi Fourie Dr Heidi Fourie Zitholele Consulting 04/09/2018 - 09:50
Proposed Capacity Improvements to National Route 1, Section 16, Winburg Station to Ventersburg. PROPOSED CAPACITY IMPROVEMENTS TO NATIONAL ROUTE 1, SECTION 16, WINBURG STATION (km 89,8) and VENTERSBURG (KM 133,53). LEJWELEPUTSWA DISTRICT MUNICIPALITY, FREE STATE PROVINCE HIA Phase 1 19/10/2019 Len van Schalkwyk eThembeni Cultural Heritage ENVIROMATRIX (Pty) Ltd 15/01/2020 - 13:27
12672PR PIA PALAEONTOLOGICAL IMPACT ASSESSMENT DANSILE NXIKWE DIAMONDS CC PROSPECTING RIGHT APPLICATION WITH BULK SAMPLING ON A PORTION OF PLOT 516, PLOT 678 AND PLOT 668, PORT NOLLOTH RICHTERSVELD LOCAL MUNICIPALITY, NAMAKWA DISTRICT MUNICIPALITY NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE PIA Phase 1 29/03/2021 John Pether ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 23/09/2021 - 20:20
Poortjie (Dark City) Poortjie (Dark City) – upgrading of informal settlement and township establishment, Extent of the Farm Poortjie 338 IQ and Portion 143 of the Farm Rietfontein 336 IQ, City of Johannesburg Metropolitan Municipality, Gauteng Province PIA Desktop 30/08/2016 30/09/2016 - 13:28
HERITAGE IMPACT ASSESSMENT: MESKLIP 259 HERITAGE IMPACT ASSESSMENT: PROPOSED SAND MINE ON PORTION 14 OF MESKLIP 259, NAMAKWALAND MAGISTERIAL DISTRICT, NORTHERN CAPE AIA Phase 1 14/04/2020 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 08/05/2020 - 10:11
PIA for Witpan Everest 132kV powerline Palaeontological Impact Assessment for the proposed construction of the Witpan - Everest 2.8 km 132kV powerline, Welkom, Matjhabeng Local Municipality, Free State Province Palaeontological Specialist Reports 07/10/2022 Marion Bamford Margen Industrial Service cc 01/11/2022 - 16:29
AIA Buchuberg Archaeological Impact Assessment Report for the Proposed re-use of a hard rock quarry on the Farm Buchuberg 296 in the Hay Magisterial District 24km East of Groblershoop AIA Phase 1 12/12/2012 Jaco van der Walt Heritage Contracts and Archaeological Consulting Site Plan Consulting 28/01/2013 - 12:49
Eston HIA Heritage Impact Assessment of the Greater Eston Bulk Water Supply Project, KZN HIA Phase 1 21/05/2009 Len van Schalkwyk 15/04/2014 - 15:54
Elders Colliery Scoping report Heritage Scoping 13/12/2016 - 15:50
Palaeontological Impact Assessment: Phase 1 Field Study THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE Palaeontological Impact Assessment: Phase 1 Field Study THE PROPOSED A-THERMAL RETORT TECHNOLOGIES PLANT UPGRADE PROJECT, CITY OF TSHWANE, GAUTENG PROVINCE PIA Phase 1 24/02/2020 Dr. Heidi Fourie Dr Heidi Fourie Exigo Sustainability 12/07/2021 - 10:03
Debushing of land for agricultural purposes on the farm Naude's Rust, Lows Creek area A Phase 1 AIA & HIA for the proposed Naude's Rust debushing project on portions 17 & 21 of the farm Naude's Rust, Kaapmuiden, Mpumalanga Province AIA Phase 1 15/12/2022 Christine Van Wyk Rowe Adansonia Heritage Consultants Rhengu Environmental Services 15/12/2022 - 12:28
Specialist report on Stone Age heritage resources, Kolomela Specialist report on the Stone Age and other heritage resources at Kolomela, Postmasburg, Northern Cape Archaeological Monitoring 14/11/2011 Maria Van der Ryst University of South Africa - Anthropology and Archaeology African Heritage Consultants CC 09/04/2013 - 08:51
Amalia X5 HIA Phase 1 HIA Report for the proposed township development (Amalia Ext. 5) on a portion of the Remaining Extent of Portion 2 and a portion of the Remaining Extent of Portion 6 of the farm Nieuwjaarsfontein No. 73HO, Mamusa Local Municipality HIA Phase 1 03/02/2014 Anton Pelser A Pelser Archaeological Consulting Maxim Planning Solutions 03/07/2014 - 16:44
PIA Hendrina Full Palaeontological Impact Assessment on the Farm Boschmanspoort 159, Hendrina, Mpumalanga Province. PIA Phase 1 10/08/2015 Barry Millsteed BM Geological Services Raubex Construction (Pty) Ltd. 18/08/2015 - 13:14
HIA of the Proposed 37.5 ML Underground Linksfield Reservoir, Johannesburg Cultural Heritage Assessment of the Proposed 37.5 ML Underground Linksfield Reservoir, City of Johannesburg Metropolitan Municipality, Gauteng Province HIA Phase 1 15/11/2016 Francois P Coetzee Asande Projects City of Johannesburg Metropolitan Municipality 01/03/2017 - 21:26
Itemba Wind Energy Facility (WEF) Itemba Wind Energy Facility (WEF) Heritage Scoping Report Heritage Impact Assessment Specialist Reports 04/11/2016 Wouter Fourie PGS Grave Solutions Sivest - Gauteng 23/06/2017 - 17:04
SWEP Phase 2 Alternative report 1st phase H.I.A. of a proposed extension and upgrading at Sishen Mine, also known as phase two of the Sishen Western Expansion Project that is PIA Desktop 01/06/2021 Sidney Miller Sidney Miller 02/09/2021 - 14:10
Heritage Statement and Notification of Intent to Develop for the Platreef Platinum Project Heritage Statement for the Platreef Platinum Project on the farms Turfspruit 241 KR, Macalacaskop 243 KR and Rietfontein 2 KS in Mokopane, Limpopo Province Heritage Statement 18/06/2013 Justin du Piesanie Digby Wells Environmental Platreef Resources (Pty) Ltd 20/06/2013 - 15:52

Pages

CSV
 
 

Search form