FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR GREENSIDE COLLIERY’S THANDEKA SHAFT AND OVERHEAD POWER LINE PROJECT A PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR GREENSIDE COLLIERY’S THANDEKA SHAFT AND OVERHEAD POWER LINE PROJECT NEAR EMAHLALENI (WITBANK) ON THE EASTERN HIGHVELD IN THE MPUMALANGA PROVINCE HIA Phase 1 01/01/2015 18/08/2015 - 09:18
Heritage Impact Assessment Siyabuswa Township Development CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED TOWNSHIP ESTABLISHMENT ON A PORTION OF THE FARM VALSCHFONTEIN 33JS, SIYABUSWA REGION JS MOROKA LOCAL MUNICIPALITY, MPUMALANGA PROVINCE Heritage Impact Assessment Specialist Reports 24/11/2016 Johnny Van Schalkwyk J van Schalkwyk 28/02/2017 - 16:26
Buffalo Camp Heritage Impact Assessment Heritage Impact Assessment for proposed clearing of 70 ha diamondiferous material from the Buffalo Camp on the north eastern side of Kimberley, Northern Cape HIA Phase 1 15/05/2015 David Morris McGregor Museum SRK Consulting (Pty) Ltd - Western Cape 13/10/2015 - 14:13
AIA_The_Rest_ptn_95_Celliers_JP_Jul04 Report on Archaeological Survey on Portion 95 of the Farm the Rest, Nelspruit Extension 30, 454 JT AIA Phase 1 26/07/2004 Jean-Pierre Celliers Kudzala Antiquity 16/06/2012 - 14:50
Phase 1 HIA East Manganise East Manganese: Phase 1 Heritage Impact Assessment on the farm East 270 (Portion 1 & Re) within the John Taolo Gaetsewe District Municipality, Northern Cape HIA Phase 1 14/06/2018 Siegwalt Udo Kusel, Udo Kusel African Heritage Consultants CC Strata Africa Resources 14/06/2018 - 15:24
Phase 1 Heritage Impact Assessment of the farm Eureka 200 PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL DESKTOP ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINING PERMIT ON THE FARM EUREKA 200 IN THE DISTRICT OF KIMBERLEY HIA Phase 1 05/09/2019 Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd Wadala Mining and Consulting Pty Ltd 05/09/2019 - 15:44
HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT, PRETORIA, GAUTENG PROVINCE HERITAGE SCOPING ASSESSMENT FOR THE PROPOSED LC DE VILLIERS CULVERT UPGRADE PROJECT ON THE REMAINDER OF PORTION 0 OF THE FARM KOEDOESPOORT 456 JR, PRETORIA, TSHWANE MUNICIPAL AREA, GAUTENG PROVINCE HIA Letter of Exemption 15/09/2016 Neels Kruger Exigo Sustainability Exigo Sustainability 09/11/2016 - 15:49
Progress Report_Nkomati Powerlines PROGRESS REPORT ON WORK UNDERTAKEN THUS FAR IN TERMS OF THE NKOMATI POWER LINES ARCHAEOLOGICAL MITIGATION Archaeological Permit Report 03/11/2011 PGS Heritage and Grave Relocation Consultants 29/04/2013 - 12:23
A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE A REPORT ON A SECOND ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED NEW RAILWAY BRIDGE AT THE BLACK ROCK MINING OPERATIONS, CLOSE TO HOTAZEL, NORTHERN CAPE PROVINCE Archaeological Specialist Reports 05/11/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants EScience Associates (Pty) Ltd 02/12/2019 - 13:45
Esizayo 132kV HIA HERITAGE IMPACT ASSESSMENT: PROPOSED ESIZAYO 132KV TRANSMISSION INTEGRATION PROJECT, ON FARMS STANDVASTIGHEID 210 REMAINDER AND AURORA 285, WESTERN AND NORTHERN CAPE HIA Phase 1 01/12/2021 John Gribble ACO Associates CC WSP Group Africa (Pty) Ltd 29/08/2022 - 09:13
Hoedspruit Heritage Assessment for National Route R40 and R527 Project 12/10/2023 - 10:52
KLIP-KRUISFONTEIN HERITAGE REPORT Basic heritage assessment report for the PROPOSED CONSTRUCTION OF A NEW WATER PIPELINE IN THE KLIP-KRUISFONTEIN REGION OF THE TSHWANE METROPOLITAN MUNICIPALITY Heritage Impact Assessment Specialist Reports 26/06/2013 05/07/2013 - 14:01
Palaeontological Cover Letter and Impact Assessment - Updated Palaeontological Specialist Reports 06/05/2021 John Almond 06/05/2021 - 15:00
28 CHESTNUT ROAD - HERITAGE STATEMENT HERITAGE STATUS IF EXISTING BUILDINGS AT 28 CHESTNUT ROAD, GLENWOOD, DURBAN, 4001 Heritage Statement 10/10/2022 Lindsay Napier 21/10/2022 - 09:01
P2AM-Kouga Wind Farm, Oyster Bay, EC Phase 2a Archaeological Monitoring (Final Report) - The Kouga Wind Farm (Red Cap Kouga Wind Farm, Central Cluster), Oyster Bay, Eastern Cape, South Africa AIA Phase 2 01/10/2014 Karen Van Ryneveld 01/10/2014 - 08:36
Phase 1 AIA De Klerkskraal ARCHAEOLOGICAL IMPACT ASSESSMENT FOR THE PROPOSED DE KLERKSKRAAL SAND QUARRY THEUNISSEN, FREE STATE PROVINCE AIA Desktop 01/02/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Greenmined Environmental 12/04/2017 - 15:55
Water pipeline project, Hammarsdale Phase 1 Heritage Impact Assessment: Proposed Water Pipeline, Hammarsdale, eThekwini Metropolitan Municipality, KwaZulu-Natal HIA Phase 1 24/05/2017 Jean Beater JLB Consulting Nemai Consulting 07/06/2017 - 17:55
AIA - Kamieskroon Bulk Water Supply ARCHAEOLOGICAL SPECIALIST STUDY In terms of Section 38(8) of the NHRA for a PROPOSED KAMIESKROON BULK WATER SUPPLY AIA Phase 1 16/08/2018 Jenna Lavin, Jonathan Kaplan Cedar Tower Services Enviroafrica CC 16/08/2018 - 15:42
Heritage Impact Assessment for the Upgrade of the existing access road for the authorised Sutherland WEF Heritage Impact Assessment for the Upgrade and Widening of the existing access road for the authorised Sutherland WEF Palaeontological Assessment for the Upgrade and Widening of the existing access road for the authorised Sutherland WEF Heritage Impact Assessment Specialist Reports 25/07/2021 Jayson Orton, John Almond ASHA Consulting(Pty) Ltd, Natura Viva CC 10/09/2021 - 09:41
CTS16_012 CEN Summerville Citrus and Storage Expansion Eastern Cape Heritage Screener: CEN Summerville Citrus and Storage Expansion Eastern Cape 15/02/2016 Mariagrazia Galimberti, Kyla Bluff, Nicholas Wiltshire CTS Heritage CEN Integrated Environmental Management Unit 25/02/2016 - 16:00
Heritage Impact Assessment Proposed Visserspan PV Solar Energy Farm on Visserspan 40 near Dealesville, Free State HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED VISSERSPAN SOLAR PV FACILITY ON THE FARM VISSERSPAN NO. 40 NEAR DEALESVILLE, TOKOLOGO LOCAL MUNICIPALITY, FREE STATE PROVINCE AIA Phase 1 18/01/2020 Jonathan Kaplan Agency for Cultural Resources Management Enviroafrica CC 18/03/2020 - 15:04
2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project 2nd Addendum to the 1st phase H.I.A. of a proposed upgrading and extension of the proposed storm-water management project at Venetia Mine, Limpopo Province, South Africa For De Beers Consolidated Mines (Pty) Ltd. 31/10/2021 15/11/2021 - 15:04
Heritage Report - Boundary Solar Energy Facility Proposed Boundary Solar Energy Facility on the farm Karreeboom 1716, east of Kimberley, in the Tokologo Local Municipality, Free State: Scoping phase Heritage Input Heritage Scoping 06/09/2013 David Morris McGregor Museum Savannah Environmental (Pty) Ltd 10/09/2013 - 09:03
PHASE 1 HIA REPORT FARM 387 PORTION 18 GROBLERSHOOP NORTHERN CAPE Version 2 HOLIDAY RESORT DEVELOPMENT ON PORTION 18 OF FARM 387, GORDONIA RD, EASTERN BANK OF THE ORANGE RIVER, APPROXIMATELY 1.7 KM NORTH OF GROBLERSHOOP, Z.F. MGCAWU DISTRICT MUNICIPALTY, NORTHERN CAPE. HIA Phase 1 23/07/2019 Heidi Fivaz, Jan Engelbrecht, Elize Butler UBIQUE HERITAGE CONSULTANTS , Banzai Environmental (Pty) Ltd Enviroafrica CC 05/08/2020 - 14:16
PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING LOCATED ON THE REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596 PALAEONTOLOGICAL DESKTOP STUDY FOR THE PROPOSED PROSPECTING LOCATED ON THE REMAINING EXTENT AND PORTION 1 OF FARM KWATOK NO.596. PIA Phase 1 30/04/2021 Francois Durand Francois Durand Integrated Specialist Services (Pty) Ltd 29/06/2021 - 17:38
Heritage preconstruction walkthrough report PRE-CONSTRUCTION ARCHAEOLOGICAL SURVEY OF THE AUTHORISED 140MW SUTHERLAND WIND ENERGY FACILITY AND ASSOCIATED GRID CONNECTION INFRASTRUCTURE, NORTHERN & WESTERN CAPE PROVINCES Heritage Impact Assessment Specialist Reports 01/12/2022 Jayson Orton ASHA Consulting(Pty) Ltd ASHA Consulting(Pty) Ltd 08/12/2022 - 15:18
Two Rivers Platinum Pre-Mine HIA Phase 1 Two Rivers Platinum Pre-Mine HIA Phase 1 HIA Phase 1 01/12/2001 Anton van Vollenhoven Archaetnos CC GCS Water and Environmental Consultants - Head Office JHB 12/11/2013 - 12:11
Kookfontein 5451Q BASIC ASSESSMENT REPORT FOR AN ATMOSPHERIC EMISSION LICENCE APPLICATION, R&D FURNACE, DMS POWDERS, MEYERTON PORTION 4 OF KOOKFONTEIN 545IQ, GAUTENG AIA Phase 1 01/08/2013 Anton Pelser Shangoni Management Services 23/01/2015 - 13:04
Dantoprox Mining Permit Application HIA and phase 1 PIA HERITAGE SURVEY OF THE MINING PERMIT APPLICATION FOR PORTION ONE OF FARM THE CORNER 11328 ET, UMZUMBE, KZN Heritage Impact Assessment Specialist Reports 12/08/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Dantoprox 18/08/2021 - 12:18
Sishen Expansion Project 2023 Addendum Sishen Iron Ore Expansion Project Site Inspection Report 14/02/2023 Siegwalt Kusel 14/02/2023 - 15:02
PIA-BlackwoodPower Phase 1 Palaeontological Impact Assessment of the Blackwood OV Solar Facility on farm Pandamsfontein 1598, Boshof Disctrict, FS Province PIA Phase 1 Paleo Field Services Savannah Environmental (Pty) Ltd 24/03/2015 - 10:55
Heritage Impact Assessment for Messina Diamonds (Pty) Ltd PHASE I HERITAGE IMPACT ASSESSMENT (INCLUDING PALAEONTOLOGICAL ASSESSMENT) REQUESTED IN TERMS OF SECTION 38 OF THE NATIONAL HERITAGE RESOURCES ACT NO 25/1999 FOR THE PROPOSED MINE PROSPECTING AND APPLICATION FOR MINING RIGHTS ON THE FARM 85, BARKLY WEST DISTRICT, NORTHERN CAPE PROVINCE HIA Phase 1 08/12/2018 Edward Matenga Edward Matenga Archaeological and Heritage Services Africa (Pty) Ltd 08/11/2018 - 12:56
Site visit Report - Tubatse Switching Station Investigation of possible heritage sites near Roossenekal, Limpopo Province Site Inspection Report 23/08/2017 Henk Steyn PGS Heritage (Pty) Ltd 30/10/2017 - 14:43
RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED 400 MW PHOTOVOLTAIC ELECTRICITY GENERATION FACILITY & ASSOCIATED 132 kV POWER LINE ON PORTIONS 7 AND 3 OF FARM 187 OLYVENKOLK, KENHARDT DISTRICT, NORTHERN CAPE John E. Almond PhD (Cantab.) Natura Viva cc, PO Box 12410 Mill Street, Cape Town 8010, RSA naturaviva@universe.co.za September 2018 PIA Desktop 01/09/2018 John E Almond Natura Viva CC Wine Estate Capital Management (Pty) Ltd 19/02/2019 - 16:08
127 LAMONT ROAD - APPLICATION FORM A - STRUCTURES APPLICATION FOR DEMOLITION OF EXISTING LAPA & TENNIS COURTS FOR NEW 100 BED STUDENT RESIDENCE BUILDING AT UNIVERSITY OF KWAZULU NATAL HOWARD COLLEGE CAMPUS - 127 LAMONT ROAD, DURBAN. 15/02/2022 Denzil Coetzee Msimang Coetzee Architects University of Kwazulu Natal 15/02/2022 - 11:58
Waterloo Power Line Impact Assessment Cultural heritage impact assessment for THE CONSTRUCTION OF A POWER LINE FROM THE PROPOSED SOLAR POWER PLANT ON A PORTION OF THE FARM WATERLOO 992, VRYBURG REGION, NORTH WEST PROVINCE AIA Phase 1 01/03/2016 Johnny Van Schalkwyk J van Schalkwyk DPS79 Solar Energy (Pty) Ltd. 22/07/2016 - 09:05
PIA Kokerboom Voelklip Palaeontological Impact Assessment of the Proposed Kokerboom PV Solar Power Facility Project, Northern Cape Province PIA Desktop 15/08/2012 Jennifer Botha National Museum Bloemfontein - Karoo Palaeontology Department Savannah Environmental (Pty) Ltd 03/09/2012 - 09:58
Draft Basic Assessment Report for Buhe (Pty) Ltd DRAFT BASIC ASSESSMENT REPORT AND ENVIRONMENTAL MANAGEMENT PROGRAMME REPORT FOR THE APPLICATION OF A MINING PERMIT SITUATED ON A PORTION OF PORTION 2 OF THE FARM PRAMKOP 182, IN THE MAGISTERIAL DISTRICT OF MOUNT CURRIE, EASTERN CAPE Conservation Management Plan 14/10/2020 14/10/2020 - 10:25
Nyarhi SPP PIA Paleontological Impact Assessment 20/04/2022 - 15:45
Sishen Expansion Project 2023 Addendum Sishen Expansion Project Site Inspection Report 14/02/2023 Siegwalt Kusel Shangoni Management Services 14/02/2023 - 16:49
NID and Heritage Statement for the London Road Petrol Station NOTIFICATION OF INTENT TO DEVELOP AND HERITAGE STATEMENT FOR THE LONDON ROAD PETROL STATION Heritage Statement 11/02/2014 Natasha Higgitt, Johan Nel Digby Wells Environmental ERM South Africa 11/02/2014 - 11:18
Bloemsmond 1 BESS Heritage Statement Bloemsmond 1 BESS Heritage Statement Heritage Statement 01/09/2020 Jaco van der Walt Heritage Contracts and Archaeological Consulting Cape Environmental Assessment Practitioners 01/12/2020 - 12:22
Kemo Phase 2 Phase 2 Archaeological Investigation of the so called ‘Kemo Dump’ (National Site Number 2824DB039) on Remainder of Erf 5024, Erf 6376 and Erf 5058, Vooruitzigt-81, Kimberley Northern Cape. Archaeological Permit Report 17/04/2023 Abenicia Henderson SAHRA HOU McGregor Museum 17/04/2023 - 13:53
Abersethin Heritage report ARCHAEOLOGICAL IMPACT ASSESSMENT SPECIALIST STUDY REPORT FOR THE PROPOSED NEW ABERSETHIN SUBSTATION AND LOOP IN LOOP OUT LINES IN BOHLOKONG TOWNSHIP OF DIHLABENG LOCAL MUNICIPALITY WITHIN THABO MOFUTSANYANA DISTRICT MUNICIPALITY. FREE STATE PROVINCE. Archaeological Specialist Reports 17/03/2014 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultants Vhubvo Archaeo-Heritage Consultants 31/03/2014 - 13:25
Phase 1 Cultural Heritage Resources Impact Assessment Phase 1 Cultural Heritage Resources Impact Assessment for the expansion of the existing cemetery site on the Remainder of Portion 33 of the Farm Mabopane 702 JR Tshwane Gauteng Province HIA Phase 1 22/04/2015 Udo Kusel African Heritage Consultants CC Aurecon - Head Office 17/06/2015 - 11:32
SRMO heritage HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SALDANHA REGIONAL MARINE OUTFALL PROJECT, VREDENBURG MAGISTERIAL DISTRICT, WESTERN CAPE HIA Phase 1 08/09/2014 Jayson Orton ASHA Consulting(Pty) Ltd Council for Scientific and Industrial Research 15/07/2015 - 09:08
Phase 1 Cultural Heritage Impact Assessment: THE CONSTRUCTION OF A 132KV CHIKADEE POWER LINE ON THE FARM LEEUWFONTEIN 428JQ, SOUTHWEST OF BELFAST, EMAKHAZENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE HIA Phase 1 05/12/2018 Johnny Van Schalkwyk Envirolution Consulting (Pty) Ltd Eskom Distribution Division 18/01/2018 - 10:24
HIA; Expansion of Existing Burrow Pits - 40 km SE Swellendam Heritage Impact Assessment for a Expansion of Existing Borrow Pits Located Along MR00268 at km 40.0 and 46.65 Approximately 40 km South-East of Swellendam in Overberg District Municipality, Western Cape. HIA Phase 1 27/06/2012 Vidamemoria Heritage Consultants Vidamemoria Heritage Consultants Aurecon South Africa (Pty) Ltd 10/04/2018 - 12:51
Desktop Palaeontological Study for proposed Lephalale Railway Yard PIA Desktop 06/04/2019 Jacobus Francios Durand 15/05/2019 - 09:08
Integrated HIA: AMDA Klondike Foxtrot SEF, Vryburg PROPOSED DEVELOPMENT OF THE AMDA FOXTROT PV (SOLAR ENERGY FACILITY) ON REMAINING EXTENT OF THE FARM KLONDIKE NO 670, AND OVERHEAD POWER LINE GRID CONNECTION TO THE MOOKODI MTS SUB-STATION ACROSS THE REMAINDER OF ERF 506 AND REMAINDER OF THE FARM ROSENDAL 673, VRYBURG DISTRICT, NORTH WEST PROVINCE Heritage Impact Assessment Specialist Reports 15/09/2016 Stefan de Kock Perception Heritage Planning Perception Heritage Planning 16/09/2016 - 07:03

Pages

CSV
 
 

Search form