THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14551 - 14600 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
Ptn 58 Vaalbank PIA | Palaeontological Impact Assessment: Phase 1 Field Study. The Development of a Light Industrial Area on Portion 58 of the Farm Vaalbank 289 JS, Middelburg. Steve Tshwete Local Municipality, Nkangala District Municipality within the Mpumalanga Province. | PIA Phase 1 | 11/03/2020 | Dr. Heidi Fourie | Dr Heidi Fourie | AdiEnvironmental cc | 21/07/2020 - 12:32 |
Heritage Impact Assessment - PR11296 | Phase 1 Heritage Impact Assessment for proposed prospecting drilling on Portion 2 of Rozynbosch No.41 and Remaining Extent & Portion 1 of Wortel No. 42, Namaqualand District, NC Province. | Heritage Impact Assessment Specialist Reports | 09/12/2015 | Lloyd Rossouw | Paleo Field Services | Black Mountain Mining (PTY) LTD | 10/12/2015 - 11:47 |
Mayogi PV Heritage Impact Assessment | PROPOSED MAYOGI SOLAR PHOTOVOLTAIC (PV) RENEWABLE ENERGY FACILITY NEAR KIRKWOOD, EASTERN CAPE | Heritage Impact Assessment Specialist Reports | 31/07/2023 | Jenna Lavin | CTS Heritage | SiVEST SA (Pty) Ltd | 11/09/2023 - 10:42 |
HIA PORTION 1 OF THE FARM AARDVARK 164 | HERITAGE IMPACT ASSESSMENT: PROPOSED BORROW PIT ON PORTION 1 OF THE FARM AARDVARK 164, NAMAKWA MAGISTERIAL DISTRICT, NORTHERN CAPE | HIA Phase 1 | 30/07/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | ASHA Consulting(Pty) Ltd | 04/08/2021 - 14:52 |
Heritage Report Ikomkhulu Solar Plant | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED IKOMKHULU’S SOLAR PLANT ESTABLISHMENT ON PORTION 5 OF THE FARM ZOELENS LAAGTE 158 NEAR WINDSORTON, WITHIN DIKGATLONG LOCAL MUNICIPALITY OF THE FRANCES BAARD DISTRICT, NORTHERN CAPE PROVINCE, SOUTH AFRICA. | AIA Phase 1 | 01/12/2022 | Eric Ndivhuho Mathoho | Millenium Heritage Group (Pty) Ltd | 30/01/2023 - 15:54 | |
HIA for Proposed Drilling at Scholtzfontein South | Heritage Impact Assessment for proposed drilling site at Scholtzfontein South, near Hopetown, Northern Cape | HIA Phase 1 | 01/08/2020 | David Morris | Archaeology department, McGreggor Museum | De Beers Consolidated Mines (Pty) Ltd | 23/09/2020 - 10:14 |
Rensburg Drift Housing Development | Desktop Heritage Impact Assessment | Heritage Study | 17/10/2023 | Gert Stefanus Watson | K2M Environmental | K2M Environmental | 25/10/2023 - 15:47 |
Heritage Statement -Interior Alterations Trafalgar School District Six | Draft for Comment-Heritage Statement: Interior Alterations at the Trafalgar School District Six ( Erf 116980, corner Stirling and De Villiers Streets) | Heritage Statement | 02/10/2017 | 02/10/2017 - 17:26 | |||
Dieprivier to Kareedouw Substations | Phase 1 Heritage Impact Assessment Report: 132kV Power Line and Substation Infrastructure, Dieprivier-Kareedouw, Kouga Local Municipality, Cacadu District Municipality, Eastern Cape Province, South Africa | AIA Desktop | 30/05/2012 | Len van Schalkwyk, Elizabeth Wahl | eThembeni Cultural Heritage | GIBB Engineering & Science - Port Elizabeth | 18/09/2013 - 09:49 |
Glenvista Residential Development HIA | 13/12/2017 - 14:35 | ||||||
Adendum to Sorata-Witsieshoek 132kV Line HIA | ADDENDUM TO HIA In terms of Section 38(8) of the NHRA for a Sorata-Witsieshoek 132kV Line | Heritage Impact Assessment Specialist Reports | 10/12/2018 | Jenna Lavin | CTS Heritage | 28/01/2019 - 15:37 | |
Archaeological Impact Assessment for Humansrus PV 2 Grid Connection | Archaeological Impact Assessment: Proposed Construction of Humansrus PV 2 Grid Connection (associated with the Humansrus PV Energy Facility, previously named RE Capital 14 Solar Development) on the Remainder of the Farm Humansrus 147 near Copperton, Northern Cape (Assessment conducted under Section 38 (8) of the National Heritage Resources Act No 25 of 1999) | AIA Phase 1 | 30/11/2014 | Lita Webley | ACO Associates CC | Humansrus Solar PV Energy Facility 2 (Pty) Ltd. | 03/02/2015 - 16:33 |
Wonderwerk Cave 2018 | Report on 2018 excavation at Wonderwerk Cave | Archaeological Permit Report | 01/04/2022 | Michael Chazan | Department of Anthropology, University of Toronto | 01/04/2022 - 19:24 | |
HIA Aggeneys PV1 | Heritage Impact Assessment: Proposed Aggeneys 1 – 100MW Solar PV Facility and Associated Infrastructure Near Aggeneys, Namakwaland Magisterial District, Northern Cape | Heritage Impact Assessment Specialist Reports | 31/03/2019 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 24/04/2019 - 09:30 |
Proposed Ariadne-Eros 400/132 kV Multi-Circuit Transmission Power Line | Heritage Impact Assessment Study for the Proposed Ariadne-Eros 400/132 kV Multi-Circuit Transmission Power Line from Ariadne Sub-Station to Eros Sub-Station and the Expansion and Upgrade of the Ariadne Sub-Station and the Eros Sub-Station, Kwazulu-Natal, Kwazulu-Natal, Republic of South Africa As Part of the Construction Environmental Management Programme. | Heritage Impact Assessment Specialist Reports | Nkosinathi Godfrey Tomose | BAAGI ENVIRONMENTAL CONSULTANCY | 07/04/2015 - 15:09 | ||
Palaeontological Heritage Assessment Khubu | Palaeontological Heritage Assessment: Combined Desktop & flied-Based Study Proposed Khubu Solar Plant on Portion 5 (Shadow Eve) (Portion of Portion 4|). Farm Champions Kloof 731 near Vryburg. Naledi Local Municipality. North-West Province | Palaeontological Specialist Reports | John Edward Almond | 04/03/2016 - 11:28 | |||
PALAEONTOLOGICAL DESKTOP STUDY | Construction of a 30m mast and container house on Farm Dwarsspruit 247 MT, at Murunwa Village, Makhado Local Municipality, Limpopo | PIA Desktop | 05/06/2022 | Jacobus Francios Durand | Tekplan Environmental | Gaigher & Associates | 06/06/2022 - 10:14 |
DRAFT BAR FOR THE PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORIZATION | DRAFT BASIC ASSESSMENT REPORT OF A PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORIZATION APPLICATION WITHOUT BULK SAMPLING FOR IRON ORE, MANGANESE ORE AND GOLD ORE, IN PORTION 2, 3 AND PART OF PORTION 01 OF THE FARM GOEDGEDACHT 27 IQ: SITUATED IN THE MAGISTERIAL DISTRICT OF VENTERSDORP IN THE NORTH WEST PROVINCE. | 30/03/2023 | Jennifer Mokakabye | Setjo Sesho Consultants | 30/03/2023 - 15:06 | ||
Heritage Screening Assessment: Richards Bay Powerline | Heritage Screening Assessment for the Proposed development of a power line to connect a 400MW gas-to-power plant in the Richards Bay area to the electricity grid, Richards Bay | Heritage Scoping | 06/11/2020 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 17/11/2020 - 09:59 |
Mamatwan DTS | DESKTOP HERITAGE SURVEY OF THE PROPOSED MAMATWAN MANGANESE MINE SLIMES DAM | Heritage Scoping | 08/04/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 18/05/2016 - 14:24 |
Heritage Impact Scoping Assessment for the proposed Delareyville-Kopela Power line development, North West Province. | Heritage Impact Scoping Assessment for the proposed Delareyville-Kopela Power line development, North West Province. | HIA Phase 1 | 03/01/2010 | Johnny Van Schalkwyk | 16/06/2012 - 08:54 | ||
HIA Loeriesfontein Orlight PV | Heritage Impact Assessment: Proposed Loeriesfontein Photo-voltaic Solar Power Plant on Portion 5 of the Farm Klein Rooiberg 227, Northern Cape Province | HIA Phase 1 | 01/05/2012 | Lita Webley, Dave Halkett, John Pether | ACO Associates CC, Geological and Palaeontological Consultant | Digby Wells Environmental | 19/06/2012 - 16:33 |
Palaeontological Impact Assessment for the Lyra Energy (Pty) | Palaeontological Impact Assessment for the Lyra Energy (Pty) (Lyra 1 Solar Park) Renewable Energy Generation Project on Farm Welgelegen, 469-LQ with Overhead Powerline to the Eskom Matimba Substation and/or to the Eskom Waterberg Distribution Substation, within The Lephalale Local Municipality, Waterberg District Municipality, Limpopo Province | PIA Phase 2 | 18/03/2023 | Marion Bamford | Prof Marion Bamford | 19/05/2023 - 11:51 | |
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:43 | |
PROPOSED ESKOM MBAHE-MHINGA 132KV POWERLINE | PROPOSED ESKOM MBAHE-MHINGA 132KV POWERLINE FROM MBAHE SUBSTATION TO MHINGA SUBSTATION WITHIN THULAMELA LOCAL MUNICIPALITY, IN LIMPOPO PROVINCE: ARCHAEOLOGICAL AND HERITAGE IMPACT ASSESSMENT REPORT. | AIA Phase 1 | 01/07/2012 | McEdward Murimbika, Trust Mlilo | Nzumbululo Heritage Solutions | Shumani SHE Specialists | 02/10/2012 - 10:59 |
Pelly-Warmbad HIA 27 May 13 | A Phase 1 Heritage Impact assessment Study for Eskom's Poposed 132kV Chikadee Power Line (Loop-Out) from the Warmbad-Pelly 132 kV Backbone to the Rust de Winter Substation | HIA Phase 1 | 31/05/2013 | 19/11/2013 - 10:40 | |||
Exemption from Phase 1 HIA | Exemption of a Phase 1 Archaeological Impact Assessment for Plot 146 Bloemspruit, Bloemfontein Free State Province | HIA Letter of Exemption | 27/10/2016 | Lloyd Rossouw | National Museum Bloemfontein | National Museum Bloemfontein | 23/03/2018 - 09:29 |
HIA - Loeriesfontein 2 | HIA Assessment for the Proposed Re-Alignment of the Authorised 132 kV Power Line for the Loeriesfontein 2 Wind Energy Facility, Calvinia Magisterial District, Northern Cape | HIA Phase 1 | 04/02/2014 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 17/02/2014 - 13:14 |
Umqeku river bridge HIA desktop | DESKTOP SURVEY OF THE UMQEKU LOW LEVEL BRIDGE: | HIA Letter of Exemption | 22/09/2016 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Jeffares & Green - Pietermaritzburg | 27/10/2016 - 15:08 |
Ecological and Wetland Assessment for Kimswa MR | Report on the ecological and wetland assessment for the proposed alluvial diamond mining operations on a portion of the Remainder of the Farm Pniel 218 including a portion of the Vaal River near the town of Delportshoop, Northern Cape Province. | 16/08/2019 | Darius van Rensburg | DPR Ecologists and Environmental Services | 16/07/2019 - 13:43 | ||
Desktop PIA Cedarville Middle Income Housing development | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE CONSTRUCTION OF THE CEDARVILLE MIDDLE INCOME HOUSING DEVELOPMENT IN THE MATATIELE LOCAL MUNICIPALITY, ALFRED NZO DISTRICT MUNICIPALITY, EASTERN CAPE PROVINCE. | PIA Desktop | 24/06/2015 | Gideon Groenewald | Dr. Gideon Groenewald | NS Environmental (Pty) Ltd | 26/06/2015 - 16:45 |
Palaeo Field Report Exemption Letter - Wag n Bietjie MTS | Palaeo Field Report Exemption Letter - Wag n Bietjie MTS | HIA Letter of Exemption | 31/07/2022 | Marion Bamford | Landscape Dynamics Environmental Consultants | 01/08/2022 - 08:35 | |
Report on the 2012 and 2013 archaeological excavations at Klipdrift Complex, southern Cape, South Africa and update on current research, Klipdrift site and materials | 14/10/2019 - 08:21 | ||||||
Human Remains Elandsfontein (Annasdal), Britstown, Northern Cape | Skeleton eroding from the bank of the Ongers River, Elandsfontein (Annasdal), south of Britstown, Northern Cape: first report. | BGG Phase 1 | 17/07/2015 | David Morris | McGregor Museum | 31/07/2015 - 12:30 | |
Graaff-Reinet Survey Vol 1 | A Survey of buildings in Graaff-Reinet | Heritage Study | 01/01/1989 | Jalma Rudner | National Monuments Council | 10/02/2021 - 11:06 | |
Heritage study for Impala Diepkuil | A HERITAGE ASSESSMENT STUDY FOR IMPALA PLATINUM LIMITED’S (IMPALA) PROPOSED PROSPECTING DRILL HOLES ON THE FARM DIEPKUIL 116JQ IN THE RUSTENBURG DISTRICT IN THE NORTH-WEST PROVINCE | HIA Phase 1 | 29/07/2016 | Julius Pistorius | 01/08/2016 - 15:59 | ||
Archaeological Impact Assessment - Draft EIA Buffels 2 | 31/08/2016 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 26/09/2016 - 13:23 | ||
Palaeontological Desktop Assessment Filling Station 312 Vaal-Harts Settlement B, Hartswater | ESTABLISHEMENT OF A FUEL STATION, TRUCK STOP AND CONVENIENCE SHOP ON HOLDING 312, IN HARTSWATER | PIA Desktop | 10/12/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | Turn 180 Environmental Consultants | 27/06/2023 - 15:44 |
Heritage Survey - McGregor | A Survey of Buildings in McGregor | Heritage Study | 01/01/1986 | National Monuments Council | McGregor Municipality | 25/03/2021 - 11:48 | |
Heritage Screener - KwaZuluNatal Nongoma Borrow Pit 27 | Heritage Screening Report for KwaZuluNatal Nongoma Borrow Pit 27 | AIA Desktop | 27/10/2015 | Mariagrazia Galimberti | Cedar Tower Services | Green Door Environmental | 22/03/2017 - 16:17 |
Heritage Report for Carolus Poort Solar Energy Facility 729 | Archaeological Impact Assessment for the Proposed Establishment of the Carolus Poort Energy Facility on remainder of Farm Carolus Poort RE/207, near Noupoort, Umsombomvu Local Municipality, Northern Cape Province | HIA Phase 1 | 31/10/2012 | Celeste Booth, Sholeen Shanker | Albany Museum - Archaeology | 01/02/2013 - 12:24 | |
Heritage Impact Assessment for Farm Mamatwan, Portion 20, near Hotazel, Northern Cape | Heritage Impact Assessment in Terms of Section 38(8) of the National Heritage Resources Act (no 25/1999) for a Mine Prospecting Application on Portion 20 of the Farm Mamatwan 331 near Hotazel, in the Gamagara Local Municipality, Northern Cape | Heritage Impact Assessment Specialist Reports | 03/08/2023 | Edward Matenga | (AHSA) Archaeological and Heritage Services Africa (Pty) Ltd | Yone STEM Frontiers (Pty) Ltd | 20/08/2023 - 12:41 |
Heritage Report 1993 | Kleinkopje Colliery. Phase 1 Identification survey of Historical Sites. Note the report date is set to the earliest available, but it is however supposed to be 1993. | HIA Phase 1 | 01/01/2014 | Anton van Vollenhoven | A.C. van Vollenhoven | A.C. van Vollenhoven | 08/05/2017 - 12:42 |
RHO1867_HIA | HERITAGE IMPACT ASSESSMENT FOR RHODIUM REEF LIMITED PLATINUM OPERATION, 2430CC KENNEDYS VALE, DE GOEDEVERWATCHING 332 KT, LIMPOPO PROVINCE | HIA Phase 1 | 16/04/2013 | Johan Nel, Justin du Piesanie, Natasha Higgitt | Digby Wells Environmental | 16/04/2013 - 11:33 | |
GWALA FARM | PROPOSED GWALA FARM SEWERAGE INFRASTRUCTURE PROJECT, TONGAAT, KWAZULU-NATAL | HIA Phase 1 | 30/06/2017 | Jean Beater | JLB Consulting | ECA CONSULTING | 24/05/2018 - 09:38 |
Mbila Underground Phase 1 Heritage Impact Assessment | A REPORT ON A CULTURAL HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED G-BLOCK UNDERGROUND MINING (PHASE I) AT THE PROPOSED MBILA ANTHRACITE MINE, NONGOMA DISTRICT, KWAZULU-NATAL PROVINCE | HIA Phase 1 | 19/02/2014 | Anton van Vollenhoven | Archaetnos CC | Prime Resources (Pty) Ltd | 08/04/2014 - 10:59 |
PIA: Phase 1: Field Study and Walkdown Addendum Report | PIA: Phase 1: Field Study and Walkdown Addendum Report | PIA Phase 1 | 11/07/2018 | Dr. Heidi Fourie | Zitholele Consulting | 11/07/2018 - 09:39 | |
PIA Phase 1 | PALAEONTOLOGICAL ASSESSMENT: COMBINED DESKTOP & SITE VISIT REPORT PROPOSED MELETSE IRON ORE PROJECT ON REMAINING EXTENT OF THE FARMS DONKERPOORT 448KQ AND RANDSTEPHANE 455KQ NEAR THABAZIMBI, WATERBERG DISTRICT, LIMPOPO PROVINCE | PIA Phase 1 | 21/03/2014 | John E Almond | Natura Viva CC | 23/06/2014 - 14:30 | |
PROPOSED PAULA POULTRY ABATTOIR | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PAULA POULTRY ABATTOIR NEAR BRANDFORT, MASILONYANA MUNICIPALITY, FREE STATE | PIA Desktop | 25/10/2020 | Elize Butler | Banzai Environmental (Pty) Ltd | 09/10/2021 - 11:48 | |
Springhaas Line 7 Heritage Impact Assessment | Heritage Impact Assessment: Proposed Powerlines From Springhaas Solar Facility 9 To Collector Substation A Within The Proposed Springhaas Grid Connection Corridor Near Dealesville In The Free State Province | Heritage Impact Assessment Specialist Reports | 20/06/2022 | Jayson Orton | ASHA Consulting(Pty) Ltd | ABO Wind Renewable Energies (Pty) Ltd | 19/09/2022 - 15:27 |