Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 14601 - 14650 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
HIA Modikwa Platinum Mine Access Roads | Heritage Impact Assessment - Proposed Access Roads at the Modikwa Platinum Mine, near Steelpoort, Greater Tubatse Local Municipality, Greater Sekhukune District Municipality, Llimpopo Province. | HIA Phase 1 | 24/05/2022 | Wouter Fourie | PGS Heritage (Pty) Ltd | Golder Associates Africa (Pty) Ltd | 22/07/2022 - 15:25 |
Brakpan Old Location HIA report | 20/04/2015 - 14:11 | ||||||
Skeerhok | 01/03/2021 - 12:44 | ||||||
D6 Phase 4 Social History | Socio-Hestorical Study Parcel P / Stage 4 District Six | Intangible Heritage Report | 20/06/2022 | Tracey Randle | Delta Built Environment Consultants (Pty) Ltd | 14/09/2022 - 14:31 | |
Till Manecke | 23/01/2013 - 16:22 | ||||||
Heritage impact Assessment PV 2 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 | Heritage Impact Assessment Specialist Reports | 31/03/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 03/04/2017 - 17:36 |
Heritage Impact Assessment | HERITAGE IMPACT ASSESSMENT FOR COAL MINING RIGHT APPLICATION, INTEGRATED WATER USE LICENSE APPLICATION AND ENVIRONMENTAL AUTHORISATION, ON DIFFERENT PORTIONS OF THREE FARMS: MOOIHOEK 168 HT, KLIPSPRUIT 136 HT, KLIPSPRUIT 137 & KLIPSPRUIT 138 HT LOCATED IN THE MAGISTERIAL DISTRICT OF PIET RETIEF, MPUMALANGA | HIA Phase 1 | 10/11/2022 | 15/12/2022 - 08:03 | |||
Dermatology, Skin Care | Conservation Recommendation | 05/05/2013 | Iqhayiya Design Workshop | 05/04/2013 - 12:58 | |||
PIA for the Padloper Solar PV Facility 1, NC | PALAEONTOLOGICAL IMPACT ASSESSMENT: PROPOSED PADLOPER (PROJECTS 1, 2, 3 and 4) SOLAR PHOTOVOLTAIC (PV) FACILITIES AND THE ASSOCIATED 132 kV OVERHEAD POWER LINES AND ASSOCIATED INFRASTRUCTURE NEAR MURRAYSBURG, WESTERN CAPE AND NORTHERN CAPE PROVINCES | Palaeontological Specialist Reports | 14/06/2023 | Elize Butler | Banzai Environmental (Pty) Ltd | African Clean Energy Developments (Pty) Ltd | 27/09/2023 - 14:08 |
Maritime Heritage in concession areas 12(c), 14(c), 15(c), 16(c), 17(c), 18(c) and 20(c) | Desktop Study for De Beers Marine assessing the significance of Maritime Heritage in concession areas 12(c), 14(c), 15(c), 16(c), 17(c), 18(c) and 20(c) | AIA Desktop | Iziko Museums of South Africa: Archaeology | De Beers Marine (Pty) Ltd | 31/10/2016 - 15:50 | ||
PIA Portion of Erf 1075 Olyvenhoutsdrift Settlement Kenhardt N Cape | Palaeontological Impact Assessment for the proposed sand mining operation farm Olywenhoutsdrift, north east of Louisvale, !Kai Garib Municipality, Northern Cape Province | PIA Desktop | 25/02/2018 | Marion Bamford | University of the Witwatersrand - Wits School of Arts | University of the Witwatersrand - Wits School of Arts | 01/06/2018 - 17:50 |
Exemption of a Heritage Impact Assessment (HIA) | Letter of Recommendation for Exemption of a Heritage Impact Assessment (HIA) for the proposed refurbishment to be undertaken at the existing Bushkoppie Wastewater Treatment Works | HIA Letter of Exemption | 12/08/2019 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | 07/11/2019 - 10:03 | |
Palaeontological Impact Assessment: Desktop Study. Sturdee Energy PPC Dwaalboom Solar Project, Thabazimbi Local Municipality, Waterberg District Municipality, Limpopo Province | Palaeontological Impact Assessment: Desktop Study. Sturdee Energy PPC Dwaalboom Solar Project, Thabazimbi Local Municipality, Waterberg District Municipality, Limpopo Province | PIA Desktop | 05/03/2021 | Dr. Heidi Fourie | Dr Heidi Fourie | Coastal & Environmental Services - East London | 29/09/2021 - 14:40 |
Integrated Heritage Impact Assessment - Waterberg JV | Heritage Impact Assessment Specialist Reports | 28/02/2020 | Prof. Anton van Vollenhoven, Gert Pretorius, Marietjie Eksteen, Lizinda Dickson | Archaetnos Culture & Cultural Resource Consultants | Bateleur Environmental & Monitoring Services (Pty) Ltd | 28/02/2020 - 15:37 | |
Phase 1 Heritage Impact Assessment for Green Valley | Phase 1 Heritage Impact Assessment for Green Valley Part of Portion 477 and Portion 484 of the farm Driefontein 85 IR, Ekurhuleni Metropolitan Municipality | HIA Phase 1 | 17/09/2020 | Udo Kusel, Siegwalt Udo Kusel | African Heritage Consultants CC | LEAP -Landscape Architectural and Environmental Planning | 15/04/2021 - 17:34 |
Cultural HIA for Emergency Nondabula Water Reticulation Project | CULTURAL HERITAGE IMPACT ASSESSMENT OF THE PROPOSED EMERGENCY NONDABULA WATER RETICULATION PROJECT, WARD 9 OF THE NODWENGU TRADITIONAL COUNCIL, ILEMBE REGIONAL MUNICIPALITY. | Heritage Impact Assessment Specialist Reports | 15/06/2015 | Frans Prins | 19/08/2015 - 14:53 | ||
REPAIR OR REPLACEMENT OF BRIDGES AND CULVERT STRUCTURES ON TRUNK ROADS 3305, 3501, 5801, DIVISIONAL ROAD 2307 AND MAIN ROAD 584 | Palaeontological Impact Assessment: Phase 1: Field Study Repair or Replacement of Bridges and Culvert Structures on Trunk Roads 3305, 3501, 5801, Divisional Road D2307, and Main Road 584 | PIA Phase 1 | 10/05/2021 | Dr. Heidi Fourie | Western Cape - Department of Environmental Affairs and Development Planning | Chameleon Environmental | 12/06/2021 - 11:33 |
BREEKKIERIE KENHARDT VAN WYKSVLEI | ARCHAEOLOGICAL & HERITAGE INVESTIGATION OF THE PROPOSED MTN CELL PHONE MAST AT BREEKKIERIE NEAR KENHARDT, NORTHERN CAPE | Heritage Impact Assessment Specialist Reports | 14/04/2011 | Cobus Dreyer | MTN (Pty) Ltd | MTN (Pty) Ltd | 18/10/2015 - 12:24 |
Mandlazini Road upgrade | HERITAGE SURVEY OF THE PROPOSED MANDLAZINI ROAD UPGRADE, RICHARDS BAY, KWAZULU-NATAL | HIA Phase 1 | 08/04/2017 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Exigent Engineering Consultants | 16/05/2017 - 09:35 |
PIA desktop report | Palaeontological Impact Assessment for the proposed Paradise-Fondwe 132kV powerline, Limpopo Province | PIA Desktop | 24/02/2023 | Prof Marion Bamford | Prof Marion Bamford | Setala Environmental | 26/02/2023 - 18:50 |
Heritage Impact Assessment for the Proposed Bokoni Klipfontein Project | Heritage Impact Assessment for the Proposed Bokoni Klipfontein Opencast Mine Project, Klipfontein 465 KS, Sekhukhune, Limpopo Province | HIA Phase 1 | 19/06/2013 | Shahzaadee Karodia Khan | Digby Wells Environmental | Bokoni Platinum Mine (Pty) Ltd | 20/06/2013 - 15:19 |
PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN GREYTOWN, KWAZULU NATAL PROVINCE. | APPLICATION FOR EXEMPTION ON THE PROPOSED CONSTRUCTION OF FURTHER EDUCATION TRAINING (FET) COLLEGE IN GREYTOWN, KWAZULU NATAL PROVINCE. | HIA Letter of Exemption | 13/02/2014 | Makhosazana Mngomezulu | 13/02/2014 - 09:00 | ||
HERITAGE IMPACT ASSESSMENT OF MPUMALANGA TOWN CENTRE PRECINCT PLANNING PROJECT, | HERITAGE IMPACT ASSESSMENT OF MPUMALANGA TOWN CENTRE PRECINCT PLANNING PROJECT, | Heritage Impact Assessment Specialist Reports | eThembeni Cultural Heritage | 26/07/2018 - 10:52 | |||
HIA: Middelvlei Solar | HERITAGE IMPACT ASSESSMENT In terms of Section 38(8) of the NHRA for the Proposed development of the Middelvlei Solar, 120MW Solar PV Project, Gauteng Province | HIA Phase 1 | 15/01/2023 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 25/04/2023 - 11:15 |
Heritage and Paleontological report_Gloria | Prospecting activities on the farm Gloria 266, near Hotazel in the Northern Cape Province Heritage Impact Assessment | Archaeological Specialist Reports | 14/05/2013 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | 26/08/2013 - 10:09 | |
Exxaro_Belfast_BGGC_report | Exxaro Relocation Project Burial Grounds and Graves Project | BGG Phase 1 | 11/11/2015 | Johan Nel | Digby Wells Environmental | Exxaro Resources | 15/04/2016 - 12:14 |
Vaalkrans | Report on the 2002-2005 excavations at Vaalkrans Shelter, De Hoop Nature Reserve, southern Cape | Archaeological Permit Report | 19/01/2006 | Christopher Henshilwood | African Heritage Research Institute | 01/04/2014 - 12:21 | |
Heritage Screener: Van Wyks Vlei Borrow Pit | Desktop Heritage Screening Assessment for the Proposed development of a sand mine borrow pit outside of Van Wyks Vlei, Northern Cape | Heritage Scoping | 11/10/2018 | Jenna Lavin, John Almond | CTS Heritage | Guillaume Nel Environmental Consultancy | 18/10/2018 - 08:29 |
Archaeological Impact Assessment | PHASE1: ARCHAEOLOGICAL IMPACT ASSESSMENT RELATING TO THE PROPOSED HENNOPS WEDDING AND CONFERENCE CENTRE ON PORTION 200 OF THE FARM HENNOPS RIVIER NO 489 JQ, HENNOPS RIVER, CITY OF TSHWANE, GAUTENG PROVINCE, SOUTH AFRICA. | AIA Phase 1 | 02/08/2019 | Eric Mathoho | Millennium Heritage Group (PTY) LTD | 02/12/2021 - 20:10 | |
PHASE 1 HIA REPORT FOR THE PROPOSED UPGRADE OF THE COMET SEWER LINE IN THE BOKSBURG AREA | PHASE 1 HIA REPORT FOR THE PROPOSED UPGRADE OF THE COMET SEWER LINE IN THE BOKSBURG AREA OF THE EKURHULENI METROPOLITAN MUNICIPALITY, GAUTENG - APAC020/48 | HIA Phase 1 | 01/07/2020 | Anton Pelser | APELSER ARCHAEOLOGICAL CONSULTING | Vulcano Engineering & Environmental Consulting | 23/07/2020 - 10:22 |
NID application | NID application HWC | 01/03/2022 | 05/03/2022 - 14:52 | ||||
Erf 1820 LoE | DESKTOP HERITAGE SURVEY OF THE PROPOSED REZONING AND SUBDIVISION OF ERF 1820 (MTHATHA) TO ACCOMMODATE A RESIDENTIAL/BUSINESS DEVELOPMENT IN MTHATHA, EASTERN CAPE | HIA Letter of Exemption | 22/09/2020 | Gavin Anderson, Alan Smith | Umlando: Archaeological Surveys & Heritage Management | Indwe Environmental Consulting | 23/09/2020 - 11:27 |
HIA Report for Proposed Filling Station | 05/08/2021 - 12:25 | ||||||
PALAEONTOLOGICAL ASSESSMENT | GATKOP CAVE ON FARM RANDSTEPHANE 415 KQ NEAR THABAZIMBI, LIMPOPO PROVINCE | PIA Phase 1 | 01/02/2012 | John E Almond | Shangoni Management Services | 01/04/2014 - 12:31 | |
Heritage Scoping Report LONZA Water Products and Wood Preservation Facility | Heritage Scoping Report LONZA Water Products and Wood Preservation Facility Cato Ridge, eThekweni Municipality, KwaZulu-Natal | Heritage Scoping | 27/06/2017 | Len van Schalkwyk | eThembeni Cultural Heritage | Kantey & Templer Consulting Engineers | 05/10/2017 - 04:22 |
SANRAL Matatiele Road Upgrade PIA 2016 | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED ROAD UPGRADE DEVELOPMENT MATATIELE TO STRYDFONTEIN, MATATIELE LOCAL MUNICIPALITY, ALFRED NZO DISTRICT MUNICIPALTY, EASTERN CAPE PROVINCE | PIA Desktop | 28/05/2016 | Gideon Groenewald | PGS Heritage and Grave Relocation Consultants | EOH Coastal and Environmental Services | 05/06/2023 - 09:06 |
Klipsruit Water Pipe Bridge HIA | Klipsruit Water Pipe Bridge Basic Heritage Report | Heritage Impact Assessment Specialist Reports | 30/08/2013 | 31/10/2013 - 11:07 | |||
Klien Pella agriculture HIA | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CULTIVATION OF NEW LANDS AT KLEIN PELLA, NAMAKWALAND MAGISTERIAL DISTRICT, WESTERN CAPE | Heritage Impact Assessment Specialist Reports | 20/06/2015 | Jayson Orton | 30/06/2016 - 13:59 | ||
Palaeontological desktop study | Palaeontological desktop study of a 10 ha expansion of the Khumani low grade mine at Sishen, Northern Cape Province | PIA Desktop | 28/06/2017 | Palaeo Field Services | 14/12/2017 - 16:07 | ||
Phase 1 Archaeological Assessment | Report on a Phase 1 Archaeological Assessment of proposed mining areas on the farm Sivonel 42 er Schmidtsdrit Northern cape | AIA Desktop | 01/03/2015 | David Morris | Eddie Fortune Diamonds (Pty) Ltd | 30/01/2019 - 14:20 | |
PHASE 1 EXPANSION AND UPGRADE OF PABALLELO JUPITER CEMETERY, UPINGTON | PHASE 1 HIA FOR THE PROPOSED UPGRADE AND EXPANSION OF THE PABALLELO JUPITER CEMETERY, UPINGTON, DAWID KRUIPER LOCAL MUNICIPALITY, ZF MGCAWU DISTRICT MUNICIPALITY, NORTHERN CAPE PROVINCE. | HIA Phase 1 | Sky-Lee Fairhurst, Jan Engelbrecht, Elize Butler, Heidi Fivaz | UBIQUE HERITAGE CONSULTANTS | Enviroafrica CC | 17/07/2023 - 14:38 | |
HIA Siviti Lodge Thornybush NR Mpumalanga | Phase 1 Archaeological and Heritage Impact Assessment on the farm Guernsey 81 KU in respect of the proposed construction of accommodation facilities at Siviti Lodge in the Thornybush Game Reserve, Mpumalanga Province. | HIA Phase 1 | 20/05/2022 | Jean-Pierre Celliers | Kudzala Antiquity | Eco8 Environmental Planners | 20/10/2022 - 12:37 |
Tugela Ferry Irrigation Scheme Upgrade HIA | Frans Prins | Active Heritage CC | 24/04/2019 - 11:26 | ||||
DWARSLOOP TOWNSHIP ESTABLISHMENT | PROPOSED TOSNHIP ESTABLISHMENT IN DWARSLOOP WITIHIN BUSHBUCK RIDGE LOCAL MUNICIPALITY IN MPUMALANGA | Heritage Impact Assessment Specialist Reports | 06/05/2022 | Leonie Marais-Botes | GKM Consulting PTY LTD | Bushbuckridge Local Municipality | 06/05/2022 - 13:10 |
Assessment on site 4L on the Waterval 443 KQ | Assessment and comments on the illegal destruction of site 4L on the Waterval 443 KQ, Thabazimbi, Limpopo Province | Heritage Study | Sidney Miller | African Heritage Consultants CC | African Heritage Consultants CC | 29/01/2015 - 10:51 | |
Scoteville Phase II HIA for Built Environment | Phase 2 heritage impact assessment (Built Environment) for the proposed Scottsville Petrol Filling Station on New England Road, Pietermaritzburg with a drive-thru establishment, two level offices and a line shops on site. | HIA Phase 2 | 17/11/2020 | Roy Muroyi | Tsimba Archaeological Footprints (Pty) Ltd | Hanslab (Pty) Ltd | 17/11/2020 - 16:22 |
PIA Wag 'n Bietjie electrical infrastructure | PIA Wag 'n Bietjie electrical infrastructure | PIA Desktop | 04/12/2021 | Marion Bamford | 10/07/2022 - 11:25 | ||
PIA-KotuloCSP | Palaeontological Heritage Assessment: Combined Desktop and Field-Based Study Proposed Transmission Line for the Kotulo Tsatsi Energy Facilities near Kenhardt, Northern Cape Province | Palaeontological Specialist Reports | 26/01/2015 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 26/03/2015 - 10:46 |
GL21009-RW-B19 Pipeline | GL21009-RW-B19 Pipeline - Lethabo Pump Station in the Free State Province to Vereeniging Pump Station in the Gauteng Province | AIA Phase 1 | 22/11/2011 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Rand Water | 07/08/2012 - 13:48 |
Heritage Impact Assessment - DBAR | Specialist input for the impact assessment phase of the environmental impact assessment for the Paulputs CSP Project and Road Realignment of the MN73 road Near Pofadder | 30/06/2016 | David Morris | McGregor Museum | Savannah Environmental (Pty) Ltd | 25/01/2017 - 12:43 |