THIS IS THE ARCHIVE FOR SAHRIS 1.0
THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS
Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.
To make applications or utilise SAHRIS for the creation of information, please use the new site:
https://sahris.org.za
Changes to SAHRIS!
The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:
- A new & modernised look and layout
- Improved site usage flows with respect to applications and content creation
- Improved site performance and stability
Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.
The new site can be found here:
SAHRIS | SAHRIS
Displaying 15301 - 15350 of 18975
ReportRef | ReportTitle | ReportType | ReportDate | Authors | AuthoringBody | CommissioningCompany | Post date |
---|---|---|---|---|---|---|---|
A REPORT ON THE ARCHAEOLOGICAL TEST EXCAVATIONS | A REPORT ON THE ARCHAEOLOGICAL TEST EXCAVATIONS AT CHIEF DINGISWAYO’S HOMESTEAD SITE (OYENGWENI), MTETHWA TRIBAL AREA, NEAR KWAMBONAMBI, UTHUNGULU DISTRICT MUNICIPALITY, KZN APAC013/40 | Archaeological Permit Report | 03/06/2013 | Anton Pelser | A Pelser Archaeological Consulting | KwaZulu-Natal Amafa and Research Institute | 04/08/2013 - 21:58 |
HIA Bela Bela Solar Park - Expansion | Heritage Impact Assessment for the Proposed Extended Bela-Bela Solar Park east of Bela-Bela, Limpopo Province | HIA Phase 1 | 21/04/2015 | Marko Hutten | Department of Environmental Affairs | Jacaranda Energy (Pty) Ltd | 19/06/2015 - 11:34 |
mining right application for the mining of Gypsum, Dolomite and Limestone on Portion 1 of the Farm Bitter Put 113 | mining right application Prieska ref: 10104MR | HIA Letter of Exemption | Department of Mineral Resources - Northern Cape | Department of Mineral Resources - Northern Cape | 26/07/2016 - 11:05 | ||
Sishen Mine - Proposed Overflow dam at Aldag PCD and Lylyveld South PCD HIA | HIA_EXM_Proposed Pollution Control Dams_Final Reviewed Report | Archaeological Specialist Reports | 08/12/2017 | Polke Birkholtz | PGS Heritage (Pty) Ltd | 24/01/2018 - 13:10 | |
Phase 1 AIA - GGHNP Dinosaur IC | Phase 1 Archaeological Impact Assessment for the proposed development of a Dinosaur Interpretation Centre within Golden Gate Highlands National Park, FS Province. | AIA Phase 1 | 13/03/2015 | Lloyd Rossouw | National Museum Bloemfontein | National Museum Bloemfontein | 22/07/2015 - 11:10 |
HIA Kapama S24G | Cultural Heritage Impact Assessment: Phase 1 Investigation for the Development of Lodges, Roads and other Tourist Infrastructure in Kapama Private Game Reserve, Maruleng Local Municipality, Mopani District Municipality, Limpopo Province | HIA Phase 1 | 15/04/2019 | Francois Coetzee | Francois Coetzee | NuLeaf Planning & Environmental | 17/05/2019 - 09:47 |
Seuwe Bridge HIA | Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTRUCTION OF A ROAD BRIDGE, REFERRED TO AS SEUWE BRIDGE, IN THE GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE | HIA Phase 1 | 10/05/2022 | Johnny van Schalkwyk | J A van Schalkwyk | 04/10/2022 - 13:38 | |
HIA Exemption Request | LETTER FOR HIA EXEMPTION REQUEST: Q4 Fuel Rustenburg: Proposed expansion of facilities | HIA Letter of Exemption | 05/07/2019 | Prof. Anton van Vollenhoven | Archaetnos Culture & Cultural Resource Consultants | Setala Environmental | 18/08/2019 - 11:41 |
Ntambana reticulation | HIA FOR THE UPGRADE OF WATER SUPPLY INFRASTRUCTURE FOR NTAMBANANA SUPPLY AREA, KZN | HIA Phase 1 | 17/04/2022 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | EnviroPro | 16/11/2022 - 17:14 |
THT370579122 - TSHILISANANI INNOCENT MUZILA | THT370579122 - TSHILISANANI INNOCENT MUZILA -PIA Desktop Study | PIA Desktop | 02/02/2021 | 01/03/2021 - 23:37 | |||
Kenhardt Orlight Tx Letter | AIA: PROPOSED CONSTRUCTION OF A 66KV/132KV LINE LINKING THE PROPOSED KENHARDT PHOTO-VOLTAIC SOLAR POWER PLANT WITH THE ARIES SUBSTATION, NORTHERN CAPE | AIA Desktop | 14/07/2012 | Lita Webley, Dave Halkett | ACO Associates CC | Digby Wells Environmental | 19/07/2012 - 12:30 |
Weenen_Reservoirs_and_Canals | Weenen_Reservoirs_and_Canals | HIA Phase 1 | 14/10/2013 | Frans Prins | Active Heritage CC | E&D Consulting Services cc | 14/10/2013 - 13:23 |
Heritage impact Assessment PV 2 | HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 | Heritage Impact Assessment Specialist Reports | 31/03/2017 | Jaco van der Walt | Heritage Contracts and Archaeological Consulting | Savannah Environmental (Pty) Ltd | 03/04/2017 - 17:36 |
Paleo - Stella | Recommended Exemption from Further Palaeontological Studies: Proposed Stella-Helpmekaar 5MW Solar Energy Facility, Farm Helpmekaar 248 in, Dr Ruth Segomotsi Mompati District Municipality, North West Province | Palaeontological Specialist Reports | 30/11/2013 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 09/12/2013 - 11:28 |
LAN3111_NID | Notification of Intent to Develop for the Lanxess Chrome Mine: Section 102 Amendment | Heritage Impact Assessment Specialist Reports | 02/03/2015 | Natasha Higgitt | Digby Wells Environmental | Lanxess Chrome Mine (Pty) Ltd | 22/09/2015 - 15:36 |
UCL Packing | HIA OF THE PROPOSED UCL AVO PACKAGING PLANT ON PORTION 22 (OF 18) OF ERF 162 UITMUNTEND, UMTSHWATHI LOCAL MUNICIPALITY, UMGUNGUNDLOVU DISTRICT MUNICIPALITY, KZN | HIA Letter of Exemption | 28/09/2021 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | Wallace and Green | 26/10/2021 - 17:06 |
Ndanyana HIA | Phase 1 Heritage Impact Assessment Report for Ndanyana Road Upgrade Project, near Pomeroy, Kwa Zulu Natal Province | HIA Phase 1 | 21/09/2015 | Stephan Gaigher | G & A Heritage | Msinga Local Municipality | 25/11/2015 - 11:06 |
TRUP Baseline Heritage Study | DRAFT FOR DISCUSSION TWO RIVERS URBAN PARK CAPE TOWN BASELINE HERITAGE STUDY Including erven Oude Molen Erf 26439 RE Alexandra Erf 24290 RE Valkenburg Erf 26439 RE, erven 118877,160695 The Observatory erf 26423-0-1 River Club erf 151832 Ndabeni Erf 103659-0-2 RE | HIA Phase 1 | 01/11/2016 | Melanie Attwell | Melanie Attwell & Associates | Western Cape Government: Department of Transport and Public Works | 01/11/2016 - 12:00 |
Mabane Rd upgrade | LETTER OF EXEMPTION FOR THE PROPOSED DAMBUZA ROAD UPGRADE | 31/05/2018 | Gavin Anderson | Umlando: Archaeological Surveys & Heritage Management | JG AFRIKA | 02/06/2018 - 15:23 | |
PIA: Proposed development of a cement factory, Middelburg, Eastern Cape | Palaeontological Impact Assessment for the proposed development of a cement factory, Middelburg, Eastern Cape Province | PIA Desktop | 05/12/2021 | Marion Bamford | Amathemba Environmental Management Consulting CC | 17/01/2022 - 15:16 | |
BAR for Bothaville NE Ext A | BASIC ASSESSMENT REPORT FOR THE AMENDMENT OF AN EXISTING PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORISATION FOR BOTHAVILLE NE EXT A, SITUATED IN THE FREE STATE PROVINCE | Heritage Impact Assessment Specialist Reports | 28/02/2019 | Kuni Mosweu | Shango Solutions | 07/11/2019 - 14:26 | |
Proposed University of Venda upgrade of a 1.6km access gravel road and a new bridge within Thulamela Local Municipality | PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED UNIVERSITY OF VENDA ACCESS ROAD AND A BRIDGE IN THULAMELA LOCAL MUNICIPALITY OF VHEMBE DISTRICT MUNICIPALITY IN THE LIMPOPO PROVINCE | AIA Phase 1 | Munyadziwa Magoma | Vhubvo Archaeo-Heritage Consultance Cc | 04/09/2023 - 07:25 | ||
Heritage Screener: Loperberg WEF | Desktop Heritage Screening Assessment: PROPOSED AMENDMENTS TO THE AUTHORISED RAINMAKER LOPERBERG WIND ENERGY FACILITIES NEAR MOLTENO IN THE EASTERN CAPE | HIA Letter of Exemption | 12/07/2021 | Jenna Lavin | CTS Heritage | Savannah Environmental (Pty) Ltd | 30/07/2021 - 10:56 |
Heritage Report | Heritage Impact Assessment Specialist Reports | Jenna Lavin | PGS Heritage (Pty) Ltd | Savannah Environmental (Pty) Ltd | 25/01/2023 - 11:12 | ||
HIA for mixed use development on farm 15961 Madadeni | PHASE I DESKTOP STUDY CULTURAL HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED DEVELOPMENT OF RESIDENTIAL, INSTITUTIONAL AND COMMERCIAL UNITS AT MADADENI AREA WITHIN NEWCASTLE LOCAL MUNICIPALITY OF AMAJUBA DISTRICT IN KWAZULU-NATAL PROVINCE. | HIA Phase 1 | 02/03/2020 | Vhubvo Archaeo-Heritage Consultants | 02/03/2020 - 13:29 | ||
Heritage and Paleontological Assessment | Appendix H - Heritage and Paleontological Assessment | Heritage Impact Assessment Specialist Reports | 16/04/2021 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 16/04/2021 - 12:31 |
Klipkraal 5 Heritage Report | PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Scoping Report | Heritage Scoping | 13/09/2023 | Wouter Fourie, Nikki Mann | 23/10/2023 - 14:30 | ||
HIA Berlin Kaapsehoop Survey | SPECIALIST REPORT FOR PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT, SURVEY AND MANAGEMENT GUIDELINES FOR MAJUBA 1 ROCK ART SITE: BERLIN PLANTATION, KAAPSEHOOP, MPUMALANGA. | AIA Phase 1 | 01/08/2012 | Christine Van Wyk Rowe | Adansonia Heritage Consultants | Komatiland Forests | 14/11/2012 - 14:35 |
PIA LOE Zoovoorby 458, Soverby BP 3 | RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED UPGRADE & REPAIR OF WATER SUPPLY INFRASTRUCTURE, EKSTEENSKUIL, SOVERBY & CURRIESCAMP NEAR KEIMOES, NORTHERN CAPE | PIA Desktop | 05/08/2013 | John E Almond | NSVT Consultants | NSVT Consultants | 05/09/2014 - 12:40 |
AIA for Farm Gloria | PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Expansion of the East Manganese Mine on a Portion Intersecting Portion 1 of the Farm East 207 and Portion 1 of the Farm Gloria 266, Hotazel, Northern Cape | AIA Phase 1 | 01/05/2021 | Tobias Coetzee | Tobias Coetzee | Sitatunga Resources | 14/06/2021 - 09:40 |
HIA and PIA | A Report On A Cultural Heritage Impact Assessment For A Proposed Underground Mine On Different Portions Of The Farm Schurvekop 227 Is, Close To Bethal, Mpumalanga Province and Palaeontological Impact Assessment For The Proposed Underground Mining Of The Schurvekop Coal Resource Near Bethal, Mpumalanga Province | 16/05/2017 - 10:36 | |||||
Revised HIA_Wonderfontein Colliery | A REVISED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED WONDERFONTEIN COLLIERY NEAR BELFAST IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA | HIA Phase 1 | 01/02/2013 | Julius CC Pistorius | Zyntha Consulting (Pty) Ltd | 20/02/2013 - 12:55 | |
Taung Skull heritage site- 03. new ablution block and guardhouse, Tumeng | Taung Skull heritage site- 03. new ablution block and guardhouse, Tumeng | Gilbert Balinda | Mashabane Rose Associates | Independent Development Trust | 04/03/2014 - 09:06 | ||
Jagersfontein Landfill Site | Phase 1 Heritage Impact Assessment of a proposed new landfill site near Jagersfontein, Kopanong Local Municipality, FS Province. | HIA Phase 1 | 10/12/2014 | Lloyd Rossouw | 10/12/2014 - 12:24 | ||
SUN4270 - NID | Notification of Intent to Develop: Sun International Environmental Authorisation Process for Developments on the Farms Doornhoek 910 JQ and Ledig 909 JQ | Heritage Impact Assessment Specialist Reports | 26/07/2018 | Justin du Piesanie | Digby Wells Environmental | Sun International (Pty) Ltd | 26/07/2018 - 11:54 |
Palaeotechnic Report for Gauteng | SAHRA PALAEOTECHNICAL REPORT: PALAEONTOLOGICAL HERITAGE OF GAUTENG | Palaeontological Specialist Reports | 31/03/2014 | Gideon Groenewald | SAHRA Council | 05/05/2014 - 15:25 | |
HERITAGE BASELINE REPORT For the Elandsfontein PV Cluster (Themeda PV and Aristida PV) , Lichtenburg, North-West Province | HERITAGE BASELINE REPORT For the Elandsfontein PV Cluster (Themeda PV and Aristida PV), Lichtenburg, North-West Province | Heritage Scoping | 22/03/2022 | 28/03/2022 - 13:24 | |||
Heritage Comment Letter 11.08.18 (SI PV4) | Heritage Comment Letter for the Splitting of Approved Sol Invictus PV4, Out Taaibosmond 66/5, near Aggeneys into PV4 and PV6 | Heritage Impact Assessment Specialist Reports | 11/10/2018 | Jayson Orton | ASHA Consulting(Pty) Ltd | Savannah Environmental (Pty) Ltd | 18/10/2018 - 08:41 |
Paleontological Desktop Assessment | PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR DIAMONDS ON PORTION 7 OF THE FARM ADEISESTAD 409, PORTION 1 OF THE FARM KALKPUNT 407, REMAINING EXTENT OF PORTION 21 AND PORTION 29 (PORTION OF PORTION 21) OF THE FARM UAP 418 & ON FARM 596 NEAR UPINGTON IN THE NORTHERN CAPE | PIA Desktop | 31/05/2022 | Elize Butler | Banzai Environmental (Pty) Ltd | Milnex 189 CC | 01/06/2022 - 15:04 |
Tournee 1 HIA | Proposed development of the Tournée 1 Solar PV Park near Standerton, Mpumalanga | HIA Phase 1 | 01/02/2023 | Jenna Lavin | CTS Heritage | WSP Group Africa (Pty) Ltd | 27/03/2023 - 16:24 |
AIA_Sandrift_Oxidation_Ponds_Kaplan_JM_Aug11 | Archaeological Impact Assessment the proposed Sandrift Oxidation Ponds and Sewer Pipeline, Northern Cape. | AIA Phase 1 | 01/08/2011 | Jonathan Kaplan | Agency for Cultural Resources Management | 16/06/2012 - 14:49 | |
PIA for GK PV, Northern Cape Province | Palaeontological Impact Assessment for the proposed GK Solar PV project on the Remaining Extent of Farm Geel Kop 456, SW of Upington, Northern Cape Province (Project No: Geelkop 7) | PIA Desktop | 25/03/2020 | Marion Bamford | Prof Marion Bamford | Cape Environmental Assessment Practitioners | 23/07/2020 - 12:04 |
Palaeontological Impact Assessment Transnet Manganese Export Terminal | Palaeontological Impact Assessment Transnet Manganese Export Terminal | Palaeontological Specialist Reports | John Almond | CSIR | 16/05/2023 - 15:25 | ||
Exxaro Matla Project | A Report on the Heritage Impact Assessment related to the Exxaro Matla Project near Kriel in the Mpumalanga Province | AIA Phase 1 | 01/01/2012 | Anton van Vollenhoven | Archaetnos CC | Ground Water Consulting Services | 12/06/2012 - 12:49 |
EXX6685 Site Inspection Report | Belfast Coal Mine Grave Inspection | Burial Grounds and Graves Specialist Reports | 23/09/2020 | Justin du Piesanie | Digby Wells Environmental | Exxaro Coal Mpumalanga (Pty) Ltd | 23/09/2020 - 13:17 |
Preliminary Heritage Impact Assessment Erven 635, 637 and 9282, Durbanville | Preliminary Heritage Impact Assessment Erven 635, 637 and 9282, Durbanville | AIA Desktop | 16/06/2012 | Mary Patrick, Harriet Clift | 16/06/2012 - 14:33 | ||
Wesselsrust Farm House | Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E | 10/05/2013 | Russellstone Group represented by Russell du Preez | 10/05/2013 - 21:57 | |||
Palaeo-Wolmaransstad75MWSEF | Recommended Exemption from Further Palaeontological Studies for the Proposed Wolmaransstad Municipality Solar Energy Facility, Farm Wolmarannstad and Townslands 184 | Palaeontological Specialist Reports | 26/01/2015 | John E Almond | Natura Viva CC | Savannah Environmental (Pty) Ltd | 10/03/2015 - 14:03 |
HIA: Driefontein 179 Ptn 90 | Cultural Heritage Impact Assessment: Phase 1 Investigation for an Environmental Impact Assessment for the Proposed Construction of an Entertainment Area, Chalets, Camps, Cultural Huts, Septic Tank and Restaurant on the farm Driefontein 179, Portion 90, Muldersdrift, Mogale City Local Municipality, West Rand District Municipality, Gauteng Province | HIA Phase 1 | 01/09/2017 | Francois Coetzee | GKM Environmental Consultants | 06/10/2017 - 12:31 | |
Helena Solar Projects: Heritage Scoping Report | THREE 75MW SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITIES – HELENA PROJECTS: Heritage Scoping Report | Heritage Scoping | 05/03/2015 | Wouter Fourie | PGS Heritage and Grave Relocation Consultants | Sivest - Gauteng | 01/06/2015 - 12:50 |