FindReports

THIS IS THE ARCHIVE FOR SAHRIS 1.0


THIS SITE IS NOW AN ARCHIVE AND IS NOT SUITABLE FOR MAKING APPLICATIONS

Please be aware that no content and application creation or changes to information on this version of SAHRIS will be retained.

To make applications or utilise SAHRIS for the creation of information, please use the new site:

https://sahris.org.za

Changes to SAHRIS!

The South African Heritage Resources Information System (SAHRIS) has undergone a generational upgrade and restructure. These changes to the site include, but are not limited to:

  • A new & modernised look and layout
  • Improved site usage flows with respect to applications and content creation
  • Improved site performance and stability

Launch for the new version of SAHRIS occurred on Monday the 30th of October 2023.

The new site can be found here:

SAHRIS | SAHRIS

Advanced options
ReportRef ReportTitle ReportType ReportDate Authors AuthoringBody CommissioningCompany Post date
A REPORT ON THE ARCHAEOLOGICAL TEST EXCAVATIONS A REPORT ON THE ARCHAEOLOGICAL TEST EXCAVATIONS AT CHIEF DINGISWAYO’S HOMESTEAD SITE (OYENGWENI), MTETHWA TRIBAL AREA, NEAR KWAMBONAMBI, UTHUNGULU DISTRICT MUNICIPALITY, KZN APAC013/40 Archaeological Permit Report 03/06/2013 Anton Pelser A Pelser Archaeological Consulting KwaZulu-Natal Amafa and Research Institute 04/08/2013 - 21:58
HIA Bela Bela Solar Park - Expansion Heritage Impact Assessment for the Proposed Extended Bela-Bela Solar Park east of Bela-Bela, Limpopo Province HIA Phase 1 21/04/2015 Marko Hutten Department of Environmental Affairs Jacaranda Energy (Pty) Ltd 19/06/2015 - 11:34
mining right application for the mining of Gypsum, Dolomite and Limestone on Portion 1 of the Farm Bitter Put 113 mining right application Prieska ref: 10104MR HIA Letter of Exemption Department of Mineral Resources - Northern Cape Department of Mineral Resources - Northern Cape 26/07/2016 - 11:05
Sishen Mine - Proposed Overflow dam at Aldag PCD and Lylyveld South PCD HIA HIA_EXM_Proposed Pollution Control Dams_Final Reviewed Report Archaeological Specialist Reports 08/12/2017 Polke Birkholtz PGS Heritage (Pty) Ltd 24/01/2018 - 13:10
Phase 1 AIA - GGHNP Dinosaur IC Phase 1 Archaeological Impact Assessment for the proposed development of a Dinosaur Interpretation Centre within Golden Gate Highlands National Park, FS Province. AIA Phase 1 13/03/2015 Lloyd Rossouw National Museum Bloemfontein National Museum Bloemfontein 22/07/2015 - 11:10
HIA Kapama S24G Cultural Heritage Impact Assessment: Phase 1 Investigation for the Development of Lodges, Roads and other Tourist Infrastructure in Kapama Private Game Reserve, Maruleng Local Municipality, Mopani District Municipality, Limpopo Province HIA Phase 1 15/04/2019 Francois Coetzee Francois Coetzee NuLeaf Planning & Environmental 17/05/2019 - 09:47
Seuwe Bridge HIA Phase 1 Cultural Heritage Impact Assessment: THE PROPOSED CONSTRUCTION OF A ROAD BRIDGE, REFERRED TO AS SEUWE BRIDGE, IN THE GREATER TUBATSE LOCAL MUNICIPALITY, LIMPOPO PROVINCE HIA Phase 1 10/05/2022 Johnny van Schalkwyk J A van Schalkwyk 04/10/2022 - 13:38
HIA Exemption Request LETTER FOR HIA EXEMPTION REQUEST: Q4 Fuel Rustenburg: Proposed expansion of facilities HIA Letter of Exemption 05/07/2019 Prof. Anton van Vollenhoven Archaetnos Culture & Cultural Resource Consultants Setala Environmental 18/08/2019 - 11:41
Ntambana reticulation HIA FOR THE UPGRADE OF WATER SUPPLY INFRASTRUCTURE FOR NTAMBANANA SUPPLY AREA, KZN HIA Phase 1 17/04/2022 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management EnviroPro 16/11/2022 - 17:14
THT370579122 - TSHILISANANI INNOCENT MUZILA THT370579122 - TSHILISANANI INNOCENT MUZILA -PIA Desktop Study PIA Desktop 02/02/2021 01/03/2021 - 23:37
Kenhardt Orlight Tx Letter AIA: PROPOSED CONSTRUCTION OF A 66KV/132KV LINE LINKING THE PROPOSED KENHARDT PHOTO-VOLTAIC SOLAR POWER PLANT WITH THE ARIES SUBSTATION, NORTHERN CAPE AIA Desktop 14/07/2012 Lita Webley, Dave Halkett ACO Associates CC Digby Wells Environmental 19/07/2012 - 12:30
Weenen_Reservoirs_and_Canals Weenen_Reservoirs_and_Canals HIA Phase 1 14/10/2013 Frans Prins Active Heritage CC E&D Consulting Services cc 14/10/2013 - 13:23
Heritage impact Assessment PV 2 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED SOLARRESERVE KOTULO TSATSI PHOTOVOLTAIC POWER PLANT 2 Heritage Impact Assessment Specialist Reports 31/03/2017 Jaco van der Walt Heritage Contracts and Archaeological Consulting Savannah Environmental (Pty) Ltd 03/04/2017 - 17:36
Paleo - Stella Recommended Exemption from Further Palaeontological Studies: Proposed Stella-Helpmekaar 5MW Solar Energy Facility, Farm Helpmekaar 248 in, Dr Ruth Segomotsi Mompati District Municipality, North West Province Palaeontological Specialist Reports 30/11/2013 John E Almond Natura Viva CC Savannah Environmental (Pty) Ltd 09/12/2013 - 11:28
LAN3111_NID Notification of Intent to Develop for the Lanxess Chrome Mine: Section 102 Amendment Heritage Impact Assessment Specialist Reports 02/03/2015 Natasha Higgitt Digby Wells Environmental Lanxess Chrome Mine (Pty) Ltd 22/09/2015 - 15:36
UCL Packing HIA OF THE PROPOSED UCL AVO PACKAGING PLANT ON PORTION 22 (OF 18) OF ERF 162 UITMUNTEND, UMTSHWATHI LOCAL MUNICIPALITY, UMGUNGUNDLOVU DISTRICT MUNICIPALITY, KZN HIA Letter of Exemption 28/09/2021 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management Wallace and Green 26/10/2021 - 17:06
Ndanyana HIA Phase 1 Heritage Impact Assessment Report for Ndanyana Road Upgrade Project, near Pomeroy, Kwa Zulu Natal Province HIA Phase 1 21/09/2015 Stephan Gaigher G & A Heritage Msinga Local Municipality 25/11/2015 - 11:06
TRUP Baseline Heritage Study DRAFT FOR DISCUSSION TWO RIVERS URBAN PARK CAPE TOWN BASELINE HERITAGE STUDY Including erven Oude Molen Erf 26439 RE Alexandra Erf 24290 RE Valkenburg Erf 26439 RE, erven 118877,160695 The Observatory erf 26423-0-1 River Club erf 151832 Ndabeni Erf 103659-0-2 RE HIA Phase 1 01/11/2016 Melanie Attwell Melanie Attwell & Associates Western Cape Government: Department of Transport and Public Works 01/11/2016 - 12:00
Mabane Rd upgrade LETTER OF EXEMPTION FOR THE PROPOSED DAMBUZA ROAD UPGRADE 31/05/2018 Gavin Anderson Umlando: Archaeological Surveys & Heritage Management JG AFRIKA 02/06/2018 - 15:23
PIA: Proposed development of a cement factory, Middelburg, Eastern Cape Palaeontological Impact Assessment for the proposed development of a cement factory, Middelburg, Eastern Cape Province PIA Desktop 05/12/2021 Marion Bamford Amathemba Environmental Management Consulting CC 17/01/2022 - 15:16
BAR for Bothaville NE Ext A BASIC ASSESSMENT REPORT FOR THE AMENDMENT OF AN EXISTING PROSPECTING RIGHT AND ENVIRONMENTAL AUTHORISATION FOR BOTHAVILLE NE EXT A, SITUATED IN THE FREE STATE PROVINCE Heritage Impact Assessment Specialist Reports 28/02/2019 Kuni Mosweu Shango Solutions 07/11/2019 - 14:26
Proposed University of Venda upgrade of a 1.6km access gravel road and a new bridge within Thulamela Local Municipality PHASE I ARCHAEOLOGICAL AND CULTURAL HERITAGE IMPACT ASSESSMENT SPECIALIST REPORT FOR THE PROPOSED UNIVERSITY OF VENDA ACCESS ROAD AND A BRIDGE IN THULAMELA LOCAL MUNICIPALITY OF VHEMBE DISTRICT MUNICIPALITY IN THE LIMPOPO PROVINCE AIA Phase 1 Munyadziwa Magoma Vhubvo Archaeo-Heritage Consultance Cc 04/09/2023 - 07:25
Heritage Screener: Loperberg WEF Desktop Heritage Screening Assessment: PROPOSED AMENDMENTS TO THE AUTHORISED RAINMAKER LOPERBERG WIND ENERGY FACILITIES NEAR MOLTENO IN THE EASTERN CAPE HIA Letter of Exemption 12/07/2021 Jenna Lavin CTS Heritage Savannah Environmental (Pty) Ltd 30/07/2021 - 10:56
Heritage Report Heritage Impact Assessment Specialist Reports Jenna Lavin PGS Heritage (Pty) Ltd Savannah Environmental (Pty) Ltd 25/01/2023 - 11:12
HIA for mixed use development on farm 15961 Madadeni PHASE I DESKTOP STUDY CULTURAL HERITAGE IMPACT ASSESSMENT STUDY FOR THE PROPOSED DEVELOPMENT OF RESIDENTIAL, INSTITUTIONAL AND COMMERCIAL UNITS AT MADADENI AREA WITHIN NEWCASTLE LOCAL MUNICIPALITY OF AMAJUBA DISTRICT IN KWAZULU-NATAL PROVINCE. HIA Phase 1 02/03/2020 Vhubvo Archaeo-Heritage Consultants 02/03/2020 - 13:29
Heritage and Paleontological Assessment Appendix H - Heritage and Paleontological Assessment Heritage Impact Assessment Specialist Reports 16/04/2021 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 16/04/2021 - 12:31
Klipkraal 5 Heritage Report PROPOSED CONSTRUCTION OF THE KLIPKRAAL PHASE 5 WIND ENERGY FACILITY, NEAR FRASERBURG, NORTHERN CAPE PROVINCE, SOUTH AFRICA Heritage Scoping Report Heritage Scoping 13/09/2023 Wouter Fourie, Nikki Mann 23/10/2023 - 14:30
HIA Berlin Kaapsehoop Survey SPECIALIST REPORT FOR PHASE 1 ARCHAEOLOGICAL / HERITAGE IMPACT ASSESSMENT, SURVEY AND MANAGEMENT GUIDELINES FOR MAJUBA 1 ROCK ART SITE: BERLIN PLANTATION, KAAPSEHOOP, MPUMALANGA. AIA Phase 1 01/08/2012 Christine Van Wyk Rowe Adansonia Heritage Consultants Komatiland Forests 14/11/2012 - 14:35
PIA LOE Zoovoorby 458, Soverby BP 3 RECOMMENDED EXEMPTION FROM FURTHER PALAEONTOLOGICAL STUDIES: PROPOSED UPGRADE & REPAIR OF WATER SUPPLY INFRASTRUCTURE, EKSTEENSKUIL, SOVERBY & CURRIESCAMP NEAR KEIMOES, NORTHERN CAPE PIA Desktop 05/08/2013 John E Almond NSVT Consultants NSVT Consultants 05/09/2014 - 12:40
AIA for Farm Gloria PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT For The Proposed Expansion of the East Manganese Mine on a Portion Intersecting Portion 1 of the Farm East 207 and Portion 1 of the Farm Gloria 266, Hotazel, Northern Cape AIA Phase 1 01/05/2021 Tobias Coetzee Tobias Coetzee Sitatunga Resources 14/06/2021 - 09:40
HIA and PIA A Report On A Cultural Heritage Impact Assessment For A Proposed Underground Mine On Different Portions Of The Farm Schurvekop 227 Is, Close To Bethal, Mpumalanga Province and Palaeontological Impact Assessment For The Proposed Underground Mining Of The Schurvekop Coal Resource Near Bethal, Mpumalanga Province 16/05/2017 - 10:36
Revised HIA_Wonderfontein Colliery A REVISED PHASE I HERITAGE IMPACT ASSESSMENT (HIA) STUDY FOR THE PROPOSED WONDERFONTEIN COLLIERY NEAR BELFAST IN THE MPUMALANGA PROVINCE OF SOUTH AFRICA HIA Phase 1 01/02/2013 Julius CC Pistorius Zyntha Consulting (Pty) Ltd 20/02/2013 - 12:55
Taung Skull heritage site- 03. new ablution block and guardhouse, Tumeng Taung Skull heritage site- 03. new ablution block and guardhouse, Tumeng Gilbert Balinda Mashabane Rose Associates Independent Development Trust 04/03/2014 - 09:06
Jagersfontein Landfill Site Phase 1 Heritage Impact Assessment of a proposed new landfill site near Jagersfontein, Kopanong Local Municipality, FS Province. HIA Phase 1 10/12/2014 Lloyd Rossouw 10/12/2014 - 12:24
SUN4270 - NID Notification of Intent to Develop: Sun International Environmental Authorisation Process for Developments on the Farms Doornhoek 910 JQ and Ledig 909 JQ Heritage Impact Assessment Specialist Reports 26/07/2018 Justin du Piesanie Digby Wells Environmental Sun International (Pty) Ltd 26/07/2018 - 11:54
Palaeotechnic Report for Gauteng SAHRA PALAEOTECHNICAL REPORT: PALAEONTOLOGICAL HERITAGE OF GAUTENG Palaeontological Specialist Reports 31/03/2014 Gideon Groenewald SAHRA Council 05/05/2014 - 15:25
HERITAGE BASELINE REPORT For the Elandsfontein PV Cluster (Themeda PV and Aristida PV) , Lichtenburg, North-West Province HERITAGE BASELINE REPORT For the Elandsfontein PV Cluster (Themeda PV and Aristida PV), Lichtenburg, North-West Province Heritage Scoping 22/03/2022 28/03/2022 - 13:24
Heritage Comment Letter 11.08.18 (SI PV4) Heritage Comment Letter for the Splitting of Approved Sol Invictus PV4, Out Taaibosmond 66/5, near Aggeneys into PV4 and PV6 Heritage Impact Assessment Specialist Reports 11/10/2018 Jayson Orton ASHA Consulting(Pty) Ltd Savannah Environmental (Pty) Ltd 18/10/2018 - 08:41
Paleontological Desktop Assessment PALAEONTOLOGICAL DESKTOP ASSESSMENT FOR THE PROPOSED PROSPECTING RIGHT COMBINED WITH A WASTE LICENCE APPLICATION TO PROSPECT FOR DIAMONDS ON PORTION 7 OF THE FARM ADEISESTAD 409, PORTION 1 OF THE FARM KALKPUNT 407, REMAINING EXTENT OF PORTION 21 AND PORTION 29 (PORTION OF PORTION 21) OF THE FARM UAP 418 & ON FARM 596 NEAR UPINGTON IN THE NORTHERN CAPE PIA Desktop 31/05/2022 Elize Butler Banzai Environmental (Pty) Ltd Milnex 189 CC 01/06/2022 - 15:04
Tournee 1 HIA Proposed development of the Tournée 1 Solar PV Park near Standerton, Mpumalanga HIA Phase 1 01/02/2023 Jenna Lavin CTS Heritage WSP Group Africa (Pty) Ltd 27/03/2023 - 16:24
AIA_Sandrift_Oxidation_Ponds_Kaplan_JM_Aug11 Archaeological Impact Assessment the proposed Sandrift Oxidation Ponds and Sewer Pipeline, Northern Cape. AIA Phase 1 01/08/2011 Jonathan Kaplan Agency for Cultural Resources Management 16/06/2012 - 14:49
PIA for GK PV, Northern Cape Province Palaeontological Impact Assessment for the proposed GK Solar PV project on the Remaining Extent of Farm Geel Kop 456, SW of Upington, Northern Cape Province (Project No: Geelkop 7) PIA Desktop 25/03/2020 Marion Bamford Prof Marion Bamford Cape Environmental Assessment Practitioners 23/07/2020 - 12:04
Palaeontological Impact Assessment Transnet Manganese Export Terminal Palaeontological Impact Assessment Transnet Manganese Export Terminal Palaeontological Specialist Reports John Almond CSIR 16/05/2023 - 15:25
Exxaro Matla Project A Report on the Heritage Impact Assessment related to the Exxaro Matla Project near Kriel in the Mpumalanga Province AIA Phase 1 01/01/2012 Anton van Vollenhoven Archaetnos CC Ground Water Consulting Services 12/06/2012 - 12:49
EXX6685 Site Inspection Report Belfast Coal Mine Grave Inspection Burial Grounds and Graves Specialist Reports 23/09/2020 Justin du Piesanie Digby Wells Environmental Exxaro Coal Mpumalanga (Pty) Ltd 23/09/2020 - 13:17
Preliminary Heritage Impact Assessment Erven 635, 637 and 9282, Durbanville Preliminary Heritage Impact Assessment Erven 635, 637 and 9282, Durbanville AIA Desktop 16/06/2012 Mary Patrick, Harriet Clift 16/06/2012 - 14:33
Wesselsrust Farm House Historical Significance: Built in 1906 for / by J J Uys who is believed to have been part of the famous Uys family who resided in the proximity. It is further believed that the occupier was related to Gen Lafras Uys who was in command of the Utrecht Commando during the Anglo Boer War and who probably resided on the adjacent farm known as Bruwersrus. Additional information will follow after consultation wirh the local Museum curator and a previous farm owner who resides in Vryheid. Architectural significance: Built with dressed sand stone and blue hard rock external walls. Urban Setting: GPS coordinates - 273826S and 302838E 10/05/2013 Russellstone Group represented by Russell du Preez 10/05/2013 - 21:57
Palaeo-Wolmaransstad75MWSEF Recommended Exemption from Further Palaeontological Studies for the Proposed Wolmaransstad Municipality Solar Energy Facility, Farm Wolmarannstad and Townslands 184 Palaeontological Specialist Reports 26/01/2015 John E Almond Natura Viva CC Savannah Environmental (Pty) Ltd 10/03/2015 - 14:03
HIA: Driefontein 179 Ptn 90 Cultural Heritage Impact Assessment: Phase 1 Investigation for an Environmental Impact Assessment for the Proposed Construction of an Entertainment Area, Chalets, Camps, Cultural Huts, Septic Tank and Restaurant on the farm Driefontein 179, Portion 90, Muldersdrift, Mogale City Local Municipality, West Rand District Municipality, Gauteng Province HIA Phase 1 01/09/2017 Francois Coetzee GKM Environmental Consultants 06/10/2017 - 12:31
Helena Solar Projects: Heritage Scoping Report THREE 75MW SOLAR PHOTOVOLTAIC (PV) ENERGY FACILITIES – HELENA PROJECTS: Heritage Scoping Report Heritage Scoping 05/03/2015 Wouter Fourie PGS Heritage and Grave Relocation Consultants Sivest - Gauteng 01/06/2015 - 12:50